Sample

advertisement
Updated as at: Saturday, 8 April 2006
INIDUSTRY OF INDUSTRY AND PRIMARY RESOURCES
TOURISM INVESTMENT PROJECTS RKN8/9
No.
1
1.1
Dept/Sect/
Name of Project
Vote No.
Tourism Development Department
804-016-001
Renovation of Bridges in
Kampong Ayer (RKN8)
1.2
804-016-001
1.3
804-016-001
1.4
804-016-001
Waterfront Development
(RKN8)
1.5
804-016-001
1.6
804-016-001
Hotel Classification System
(RKN8-9)
Accreditation Scheme for
Restaurant and
Catering (RKN8-9)
1.7
804-016-003
1.8
804-016-002
1.9
824-003
Open Air Archeological
Park (RKN8)
Brooketon Colliery Project
(RKN8)
Kampong Ayer Cultural and
Tourism Centre (RKN 8-9)
Travel and Tourism
Satellite Account (RKN 8-9)
Comprehensive Plan on
Human Resource
Development in the
Tourism Industry (RKN 8-9)
Project Profile
The renovation of old bridges in Mukim Tamoi undertaken by
Department of Tourism Development and District Office.
The development of archeological sites near the Brunei Museum and
Malay Technology Museum
This project is the development of the former coal mine area, which
was operated between 1906 and 1925, to become an Open Air
Museum
The waterfront development is proposed in Jalan
Residency with renovation of the food stalls and adding more facilities
eg. ticket counter for water taxis
Hotel Classification System based on international standard
Accreditation scheme based on cleanliness, food and service quality
etc.
The Cultural and Tourism Centre is located in Mukim Peramu and
Mukim Saba
A research and programmed done by World Travel and Tourism
Council (WTTC) that qualifies and analyses the impact of travel and
tourism on the economy and employment of Brunei Darussalam
This project is to identify the training and educational needs in the
tourism sector in Brunei Darussalam in order to produce a new
generation of local Bruneian that has the caliber and the expertise in
developing and strengthening the tourism industry in Brunei
Darussalam
Projects Under RKN 8 & 9
Page 1 of 15
Updated as at: Saturday, 8 April 2006
MINISTRY OF INDUSTRY AND PRIMARY RESOURCES
No.
1
1.1
Dept/Sect/
Name of Project
Vote No.
Forestry Department
802-005
Development of Tropical
Biodiversity Centre (RKN8)
- Master Plan for
Development of TBC
RKN 9
Stage 1- Visitor Centre,
Resource centre &
Operations Depot.
- Surveying work/land
work
- Utility
- Building / Main
structure
- Pedestrian
- Landscaping
- Drainage
- Camping site
- Transportation /
Equipment
- Preliminaries etc
- Consultant
- Site staff
Project Profile
Main objective of this project is to assure the management And
restoration of the biodiversity source, so that it can be used in the best
way of organizing it by compressive way in form of biodiversity tropical
rain forest management.
This centre will be the centre of data storage regarding with the
Country biodiversity such as the forest genetic, programs and record of
research biodiversity in which is in process plus the foundation initiative
product of non forest product.
Projects Under RKN 8 & 9
Page 2 of 15
Updated as at: Saturday, 8 April 2006
1.2
802-006
Development of National Park
in Ulu Temburong Phase II
(RKN8)
- Sign post & map
- Information Centre
- Store
- Hostel
- Kitchen
- Chalet
- Jetty
- Suspension Bridge
Objective of this project is to arise the “Taman Negara Ulu Temburung”
and to promote though out its nature restoration, education, nature
research and the eco-tourism
Phase III (RKN 9)
- Power supply
- flying foxes
- multifunction platform
- helipad
- water supply
- telephone line
- Construction service road
1.3
802-007
Development & Upgrading
of Forest Recreational
Parks Phase I (RKN8)
- Visitor Information
Centre
- Construction of
Postal hut
- Walkways
- Rest huts
- Playground
- Stalls
- Surau
- Toilets
The objective of this project is to prepare outsider recreation
opportunity that is enough and comfort ability for the visitor and not to
forget the disability and to expand the eco-tourism in the country and
indirectly it can contribute to the economy development of the tourism
industry. Main objective of the project is to arise the facility and the
infrastructure in the Forest Recreation Park.
Phase II (RKN9)
- Power supply, Water
supply
- Construction facilities
& garden’s basic
Projects Under RKN 8 & 9
Page 3 of 15
Updated as at: Saturday, 8 April 2006
-
2
2.1
3
3.1
3.2
4
4.1
4.2
infrastructure at
reacreational park
Construct new forest
recreational park
area (swamp forest)
Promotion and Enterprise Development Section
905-011Local products promotion
This project is to promote and to expose of the the local product from
001
(RKN9)
various sector. Activiti during the showcase will cover through the expo
aktiviti and d sales of the local product from the entrepener.
Fisheries Department
Marine Park
Presevration Centre dan Turtle
Management
Syarikat Semaun Holdings Sdn Bhd
Recreational Park and
Intergrated commercial
resort
Mini Golf Course - 9 holes
Marin Park plays an important role in certain protection and managing
the marine eco-system which support the sustaining the fishing
industry, but it also can contribute to the compatible of economy
activity. The sea zone which is been marked as the Marin park are the
productivity area with biodiversity of flora and fauna. Aside of the
breeding and nursery for the fishes and other marine life.
Objective of this project is to assure that the sea prossessions such as
the turtle not to be extinct. Tje project objective is to coordinate the
supervision, protect and recover the turtle in national stage which is
done together with the government agency. This project will have its
own insfractucture tu set up Main Restore and the turtle country
management at the Meragang Beach, site that has been identified for
the Fishing sector. This centre will prepare the facility to assist the
turtle to land and hatch, the turtle centre information and the
presentation for visitor, lab, general office and othe facilities that is
relevant.
Investment will be made in joint venture in establish the basic facilities
recreation in comersial standard at Tunggulian site or wherever site
that is suitable to be developed. The process ot the Recreational Park
project will be complementary to the nearby with the Sg Liang Industry
with will be developed with the flow of the oil and gas aktiviti.
Shareholder of the company or the local tourism entrepeneur and the
shifting management to selected local tourism entrepenuer.
Investment will be made in join venture in developing the recreational
park by preparing the 9-hole golf park facilities. The project will be
Projects Under RKN 8 & 9
Page 4 of 15
Updated as at: Saturday, 8 April 2006
4.3
5
5.1
Commercial Recreational
Sports Centre
5.2
Agriculture Department
801-004
Establishment of Rimba
Garden Centre
801-004
Agri-Food Market and Local
Handicraft Busienss
Horticulture Centre Rimba,
Gadong.
5.3
801-009
Negara Brunei Darussalam
Traditional food promotion–
Consultant service
done with the formation of Join venture with both local and foreign
investment. The process of the project will be done by the BOOT (build
operate, own & transfer) scheme
The Investment will be made by joint venture in preparing the sport
commercial recreation centre such as Deep-sea Sport Fishing, Scuba
Diving, Outdoor Camping and so on.
The formation of the centre is still in the design process
It aim to promote the local processing food, preparing facilites for
showcase of the local product and to be made as for the tourism
destination for both local and foreign entrepenuer.
Still in process
Projects Under RKN 8 & 9
Page 5 of 15
Updated as at: Saturday, 8 April 2006
MINISTRY OF COMMUNICATIONS
No.
1
Dept/Sect
Port
Department
809-009001
Name of Project
Service and Export Hub,
Muara Port
Cruise Ship Centre
1.2
809-009002
Serasa Car Ferry Terminal
1.3
809-009003
Serasa Passenger Ferry
Terminal
1.4
818
1.1
1.4.1
2
2.1
Kemudahan Awam dan
Alam Sekitar
010
Temburong Jetty, Boat and
Passenger ship Building
Land Transport Department
Construction of Central Bus
Station (Dearah Brunei
Muara)
Project Profile
To provide cruise ship passengers with various facilities.
To attract more Cruise ship coming to Brunei.
To anchor Cruise Sip operators.
To provide TIC for Cruise Ship Passengers, Naval Vessel Crews, Police
Vessel crews and Coast Guard crews.
Serasa Car Ferry Terminal serves car ferry service between Serasa,
Brunei and Menumbok, Sabah.
Car Ferry Service by 1 Sabah operator and 1 Brunei Operator.
Completed by end of this year.
To provide facilities for the passenger and ferry services.
Currently, Serasa Passenger Ferry terminal is managed and operated
by Marine Dept.
A new Terminal has been designed Tender document has been
evaluated by PWD.
Had made research, meeting and presentation had been done in the year
of 2005. In process of organising a ”Sentral Bus Station” to replace the
present Bus Stop Station in BSB. JKR has already setup the facilities for
bus shelters by stages wuitable with the allocation and the needs.
Construction of Bus Terminal
Muara
Construction of Bus Terminal
Pekan Tutong
Construction of Bus Terminal
Sungai Liang
Construction of Bus Terminal
Bangar Temburong
Construction of dedicated bus
lane. Coordinate with JKR
Projects Under RKN 8 & 9
Page 6 of 15
Updated as at: Saturday, 8 April 2006
2.2
Franchise Taxi and taxi
infrastructure
Construction of Rest and
Relax area for long distance
traveler.
Still under review of the texi meter usage for the year of 2006/7, in where
the allocation amount has been approved. Will open tender for interested
parties from private sector to be taxi entrepenuer. In review of ”Teksi
frenchising” which will have operational sytem for those qualified land and
transport angency.
Requirement fro ASEAN Frame Work agreement. To be privatized.
Projects Under RKN 8 & 9
Page 7 of 15
Updated as at: Saturday, 8 April 2006
MINISTRY OF CULTURE, YOUTH AND SPORTS
No.
1
1.1
Dept/Sect/
Name of Project
Vote No.
Brunei Museums Deapartment
819-007
Entire excavation and
preservation of Kota Batu
Ancient area Fasa 1 (RKN 8)
1.2
819-054
1.3
2
2.1
3
3.1
Maritime Archeology
Building(RKN 8)
Entire excavation and
preservation of Kota Batu
Ancient area Fasa 2 (RKN 9)
Historical Department
Renovation of the old Lapau
building to the original shape
(RKN9)
Cultural Section
Country’s Cultural Hall
(RKN9)
Project Profile
Walkway throughout the forest reserve which connect to the ancient site
and structuring the information office and the coaches parking area.
A museum to placed item that is relevant in history and the Brunei Maritime
Technology.
Walkway trail connected to the three path of the ancient and through the
mangrove forest and swamp and some shelter construction is undergoing.
Reconstruction and recovery of the old ‘Lapau’ building to its original, to be
the exhibit centre for the historical constitution of the year 1959, and the
historical value especially for tourism.
A place to show the handicraft and the work of the local culture
Projects Under RKN 8 & 9
Page 8 of 15
Updated as at: Saturday, 8 April 2006
MINISTRY OF DEVELOPMENT
No.
1
Name of Project
Project Profile
1.1
Planetarium Building and
Science Centre (RKN 9)
’Planetium’ is a building to place the projecting item of the planets
position and the other space tobject in the domed ceiling. It is one way to
attract the tourist while enchance to adapt more knowledge about the
science space to its populated. In all aspect of science discipline,
Anatomy is science that is popular in the society. In Islam, the
showcase at the planetarium is not just a knowledge exhibition but also
an entertainment. The main target is the government agency, students
and the civilians.
2
2.1
Environmental Department
818-018-001
Beautification of Bandar
Seri Begawan area (Town
Centre) (RKN 8)
2.2
Dept/Sect
Survey
Department
818-018-007
Beautification of Muara
Beach Recreation Area
Improvements (RKN 8)
This project steam to few necesity that is conect to the eco-system and
landscape decorating such as:
 Up grade and developing new few site.
 Complete site facilities item
 Walkway trail system, lanscaping and the suitable shape of
townscape
 Aside of the renovation of along the river, main focusing is given
to the few path from the the centre/important route in Bandar
Seri Begawan to the river banks across the park connectors.
It is as a beach recreation that consist a walkway trail, roller skating,
bicycle, huts and few facilities for the public usage.
Projects Under RKN 8 & 9
Page 9 of 15
Updated as at: Saturday, 8 April 2006
2.3
2.4
818-018-010
Development
of
Open
space Area at Jalan
Menteri Besar (RKN 8)
Design to be the recreation that has the car park area, public toilet,
jogging path, huts, viewing tower, multi field used, recreation park,
research place for rubbish dumping. Planting of the shady trees that are
suitable for the park and walkway trail to the hills, bridge and main route.
818-018-011
Meragang
Beach
Park
Implementation (RKN 8)
Designing a recreation park that is taken for is nature quality that is to
assure the forest flora and fauna is well protected and can be enjoy by
the park visitors. In this detail projected, the Meragang beach will
provided few facilities such as the bird watching/lookout tower, the
boardwalk path to the swamp forest Api-api and to the connecting way to
the Brooketon Colliery.
918-021
Beautification of Serasa
Spit Recreation Area
Improvements (RKN 9)
Projects Under RKN 8 & 9
Page 10 of 15
Updated as at: Saturday, 8 April 2006
MINISTRY OF FOREIGN AFFAIRS AND TRADE
No.
1
Dept/Sect
Name of Project
Project Profile
Activities to improve/increase the tourism industry such as activities that
are held by the ambassadors and the high commisioners of Brunei
Darussalamoverseas (for e.g Brunei Tourism exhibition and leftlets
phamplets distribution. Commercial agreement that relevant with
tourism such as ASEAN-China.
Activities to promote tourism in Asean Countries at the ASEAN
Promotional Centre in Tokyo, Japan. Held BIMP-EAGA project involving
tourism industry handled by International Commercial Department.
Projects Under RKN 8 & 9
Page 11 of 15
Updated as at: Saturday, 8 April 2006
MINISTRY OF HOME AFFAIRS
No.
1
1.1
1.2
1.3
Dept/Sect
Name of Project
Immigration and National registration Department
Custom checkpoint & Immigresen
Puni, Temburong (RKN 8)
Immigration Post, Custom, Police
and Health included Limau Manis
Housing (RKN 8)
Immigration Post Wharft, Putat
(RKN 8)
Project Profile
This restricted area will provide check up
especially for transportation, buses terminal and
heavy clases transportation cehack up with the
concept of the Sungai Tujuh Immergiresion Post.
This Project is still under going in the planner and
the building structure in which the tender for land
work will be out in jun 2006 with the cooperation
from JKR.
The terminal post will use the same concept and
structre as in the Puni Immergerision Post
Terminal.
The post will provided passage checkup for those
who want to travel to Temburung district using the
river.
Projects Under RKN 8 & 9
Page 12 of 15
Updated as at: Saturday, 8 April 2006
2
2.1
2.2
2.3
3
3.1
Belait District’s Department
Multipurpose Hall and Government
Mukim Guest House (RKN8)
Construct People’s Galery
Construct Kuala Balai Cultural
Centre
Brunei dan Muara District’s Department
Upgrade Kampong Ayer Jetty
Facilities (20 buah) (RKN 9)
3.2
Upgrade Connecting bridge of
Kampong Ayer concrete floor to 5
kilometer (RKN 9)
3.3
9 Community Hall (RKN 9)
4
4.1
Tutong District’s Department
Rebuilding Sungai Basong
Recreational Park as Eco-Tourism
for Daerah Tutong (RKN 9)
4.2
Rebuilding one Tutong Culture and
Heritage Centre
(RKN 9)
The new Jetty would be bigger that can provide a
small tuck shop selling junk food, soft drink and
souvenier for the tourist.
The new bridge connecting from the Kg Ayer to the
concrete floor is to safe cost of rearing and to
perputate the country treassure toward to promote
the eco-tourism.
The hall construction is to facilitate for arise of the
beauty of the village and the activities of the
society and to attract the tourism.
To prepare multi-facilities for public usage and as
to attract tourism and also for the locals. With the
up-to-date of the infrastructure and the building’s
logistic need including the culture houses, stage
culture, information building aside of it with a
garden environment to beauty the surrounding with
the building of walk made for relaxing, modern
restaurant in concept of Floating Restaurant and
the argo-farming garden in which the planting of
the fruits trees and the local herbs.
This centre will built the old building of the former
official Tutong District Officer, which is to kept
historical and heritage Tribe and the Tutong
society as a platform to show the Tutong culture.
Other than the potential for attraction tourism, it
also can be a population reference especially for
future generation and for the conformability of the
student and higher educational institute to make
Projects Under RKN 8 & 9
Page 13 of 15
Updated as at: Saturday, 8 April 2006
research.
4.3
4.4
Rebuilding Culture and Wasai
Bedanu Natural Centre
(RKN 9)
Upgrading project of Pantai Seri
Kenangan area,Tutong (RKN 9)
As an attraction for tourism including d locals itself
in providing facilities and for the recreation.
Projects Under RKN 8 & 9
Page 14 of 15
Updated as at: Saturday, 8 April 2006
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
Kuala Belait & Seria Municipal Department
Seria new stalls (RKN 8)
Kuala Belait New Market Fasa I
(RKN 8)
Kuala Belait Multipurpose Hall (RKN
8)
Development Plan and beautification
of Kuala Belait Town Centre (RKN 8)
Beautification of Belait River bank
and its area inclusive of Eating stall
construction (RKN 8)
Beautification of Kuala Belait Fasa
public car parking area 2 (RKN 8)
Public facilities at Taman Jubli Perak
Jalan Maulana Kuala Belait (RKN 8)
Still under process and will be done in April
Will be offered in Mac 2006
The architect design is still in process and increasing
allocation for application
Preparation Terms of Reference (TOR) by town and
country planning department.
In preparation of Terms of Reference (TOR)
Evaluation Offer in process
Undergoing project
Construction of new bus building and
Taxi Terminal, Jalan Bunga Kemantin
Seria
Building of Retaining Wall starting
from Survey Department’s previous
store to Menara Cendera Kenangan
Jalan Sungai Kuala Belait (RKN 9)
Upgrading the facilities of transportation aids and to
enhance beauty of the environment.
5.10
Upgrade car park area Jalan Bunga
Kenangan Seria (RKN9)
The General Construction is such as providing lamp,
rearranging the car park area and the street print at
the surrounding.
5.11
Upgrade car park area Jalan Bunga
Kemantin Seria (RKN 9)
The General Construction is such as providing lamp,
rearranging the car park area and the street print at
the surrounding.
5.12
Installation of pedestrian path
(Asphalt Street Print) Seria area
(RKN 9)
Facilities and the confort to the walway usage and to
enchance the nature beauty
5.9
Continuity the RKN8 project in effort for upgrade
along the Sungai Kuala Belait.
Projects Under RKN 8 & 9
Page 15 of 15
Download