Updated as at: Saturday, 8 April 2006 INIDUSTRY OF INDUSTRY AND PRIMARY RESOURCES TOURISM INVESTMENT PROJECTS RKN8/9 No. 1 1.1 Dept/Sect/ Name of Project Vote No. Tourism Development Department 804-016-001 Renovation of Bridges in Kampong Ayer (RKN8) 1.2 804-016-001 1.3 804-016-001 1.4 804-016-001 Waterfront Development (RKN8) 1.5 804-016-001 1.6 804-016-001 Hotel Classification System (RKN8-9) Accreditation Scheme for Restaurant and Catering (RKN8-9) 1.7 804-016-003 1.8 804-016-002 1.9 824-003 Open Air Archeological Park (RKN8) Brooketon Colliery Project (RKN8) Kampong Ayer Cultural and Tourism Centre (RKN 8-9) Travel and Tourism Satellite Account (RKN 8-9) Comprehensive Plan on Human Resource Development in the Tourism Industry (RKN 8-9) Project Profile The renovation of old bridges in Mukim Tamoi undertaken by Department of Tourism Development and District Office. The development of archeological sites near the Brunei Museum and Malay Technology Museum This project is the development of the former coal mine area, which was operated between 1906 and 1925, to become an Open Air Museum The waterfront development is proposed in Jalan Residency with renovation of the food stalls and adding more facilities eg. ticket counter for water taxis Hotel Classification System based on international standard Accreditation scheme based on cleanliness, food and service quality etc. The Cultural and Tourism Centre is located in Mukim Peramu and Mukim Saba A research and programmed done by World Travel and Tourism Council (WTTC) that qualifies and analyses the impact of travel and tourism on the economy and employment of Brunei Darussalam This project is to identify the training and educational needs in the tourism sector in Brunei Darussalam in order to produce a new generation of local Bruneian that has the caliber and the expertise in developing and strengthening the tourism industry in Brunei Darussalam Projects Under RKN 8 & 9 Page 1 of 15 Updated as at: Saturday, 8 April 2006 MINISTRY OF INDUSTRY AND PRIMARY RESOURCES No. 1 1.1 Dept/Sect/ Name of Project Vote No. Forestry Department 802-005 Development of Tropical Biodiversity Centre (RKN8) - Master Plan for Development of TBC RKN 9 Stage 1- Visitor Centre, Resource centre & Operations Depot. - Surveying work/land work - Utility - Building / Main structure - Pedestrian - Landscaping - Drainage - Camping site - Transportation / Equipment - Preliminaries etc - Consultant - Site staff Project Profile Main objective of this project is to assure the management And restoration of the biodiversity source, so that it can be used in the best way of organizing it by compressive way in form of biodiversity tropical rain forest management. This centre will be the centre of data storage regarding with the Country biodiversity such as the forest genetic, programs and record of research biodiversity in which is in process plus the foundation initiative product of non forest product. Projects Under RKN 8 & 9 Page 2 of 15 Updated as at: Saturday, 8 April 2006 1.2 802-006 Development of National Park in Ulu Temburong Phase II (RKN8) - Sign post & map - Information Centre - Store - Hostel - Kitchen - Chalet - Jetty - Suspension Bridge Objective of this project is to arise the “Taman Negara Ulu Temburung” and to promote though out its nature restoration, education, nature research and the eco-tourism Phase III (RKN 9) - Power supply - flying foxes - multifunction platform - helipad - water supply - telephone line - Construction service road 1.3 802-007 Development & Upgrading of Forest Recreational Parks Phase I (RKN8) - Visitor Information Centre - Construction of Postal hut - Walkways - Rest huts - Playground - Stalls - Surau - Toilets The objective of this project is to prepare outsider recreation opportunity that is enough and comfort ability for the visitor and not to forget the disability and to expand the eco-tourism in the country and indirectly it can contribute to the economy development of the tourism industry. Main objective of the project is to arise the facility and the infrastructure in the Forest Recreation Park. Phase II (RKN9) - Power supply, Water supply - Construction facilities & garden’s basic Projects Under RKN 8 & 9 Page 3 of 15 Updated as at: Saturday, 8 April 2006 - 2 2.1 3 3.1 3.2 4 4.1 4.2 infrastructure at reacreational park Construct new forest recreational park area (swamp forest) Promotion and Enterprise Development Section 905-011Local products promotion This project is to promote and to expose of the the local product from 001 (RKN9) various sector. Activiti during the showcase will cover through the expo aktiviti and d sales of the local product from the entrepener. Fisheries Department Marine Park Presevration Centre dan Turtle Management Syarikat Semaun Holdings Sdn Bhd Recreational Park and Intergrated commercial resort Mini Golf Course - 9 holes Marin Park plays an important role in certain protection and managing the marine eco-system which support the sustaining the fishing industry, but it also can contribute to the compatible of economy activity. The sea zone which is been marked as the Marin park are the productivity area with biodiversity of flora and fauna. Aside of the breeding and nursery for the fishes and other marine life. Objective of this project is to assure that the sea prossessions such as the turtle not to be extinct. Tje project objective is to coordinate the supervision, protect and recover the turtle in national stage which is done together with the government agency. This project will have its own insfractucture tu set up Main Restore and the turtle country management at the Meragang Beach, site that has been identified for the Fishing sector. This centre will prepare the facility to assist the turtle to land and hatch, the turtle centre information and the presentation for visitor, lab, general office and othe facilities that is relevant. Investment will be made in joint venture in establish the basic facilities recreation in comersial standard at Tunggulian site or wherever site that is suitable to be developed. The process ot the Recreational Park project will be complementary to the nearby with the Sg Liang Industry with will be developed with the flow of the oil and gas aktiviti. Shareholder of the company or the local tourism entrepeneur and the shifting management to selected local tourism entrepenuer. Investment will be made in join venture in developing the recreational park by preparing the 9-hole golf park facilities. The project will be Projects Under RKN 8 & 9 Page 4 of 15 Updated as at: Saturday, 8 April 2006 4.3 5 5.1 Commercial Recreational Sports Centre 5.2 Agriculture Department 801-004 Establishment of Rimba Garden Centre 801-004 Agri-Food Market and Local Handicraft Busienss Horticulture Centre Rimba, Gadong. 5.3 801-009 Negara Brunei Darussalam Traditional food promotion– Consultant service done with the formation of Join venture with both local and foreign investment. The process of the project will be done by the BOOT (build operate, own & transfer) scheme The Investment will be made by joint venture in preparing the sport commercial recreation centre such as Deep-sea Sport Fishing, Scuba Diving, Outdoor Camping and so on. The formation of the centre is still in the design process It aim to promote the local processing food, preparing facilites for showcase of the local product and to be made as for the tourism destination for both local and foreign entrepenuer. Still in process Projects Under RKN 8 & 9 Page 5 of 15 Updated as at: Saturday, 8 April 2006 MINISTRY OF COMMUNICATIONS No. 1 Dept/Sect Port Department 809-009001 Name of Project Service and Export Hub, Muara Port Cruise Ship Centre 1.2 809-009002 Serasa Car Ferry Terminal 1.3 809-009003 Serasa Passenger Ferry Terminal 1.4 818 1.1 1.4.1 2 2.1 Kemudahan Awam dan Alam Sekitar 010 Temburong Jetty, Boat and Passenger ship Building Land Transport Department Construction of Central Bus Station (Dearah Brunei Muara) Project Profile To provide cruise ship passengers with various facilities. To attract more Cruise ship coming to Brunei. To anchor Cruise Sip operators. To provide TIC for Cruise Ship Passengers, Naval Vessel Crews, Police Vessel crews and Coast Guard crews. Serasa Car Ferry Terminal serves car ferry service between Serasa, Brunei and Menumbok, Sabah. Car Ferry Service by 1 Sabah operator and 1 Brunei Operator. Completed by end of this year. To provide facilities for the passenger and ferry services. Currently, Serasa Passenger Ferry terminal is managed and operated by Marine Dept. A new Terminal has been designed Tender document has been evaluated by PWD. Had made research, meeting and presentation had been done in the year of 2005. In process of organising a ”Sentral Bus Station” to replace the present Bus Stop Station in BSB. JKR has already setup the facilities for bus shelters by stages wuitable with the allocation and the needs. Construction of Bus Terminal Muara Construction of Bus Terminal Pekan Tutong Construction of Bus Terminal Sungai Liang Construction of Bus Terminal Bangar Temburong Construction of dedicated bus lane. Coordinate with JKR Projects Under RKN 8 & 9 Page 6 of 15 Updated as at: Saturday, 8 April 2006 2.2 Franchise Taxi and taxi infrastructure Construction of Rest and Relax area for long distance traveler. Still under review of the texi meter usage for the year of 2006/7, in where the allocation amount has been approved. Will open tender for interested parties from private sector to be taxi entrepenuer. In review of ”Teksi frenchising” which will have operational sytem for those qualified land and transport angency. Requirement fro ASEAN Frame Work agreement. To be privatized. Projects Under RKN 8 & 9 Page 7 of 15 Updated as at: Saturday, 8 April 2006 MINISTRY OF CULTURE, YOUTH AND SPORTS No. 1 1.1 Dept/Sect/ Name of Project Vote No. Brunei Museums Deapartment 819-007 Entire excavation and preservation of Kota Batu Ancient area Fasa 1 (RKN 8) 1.2 819-054 1.3 2 2.1 3 3.1 Maritime Archeology Building(RKN 8) Entire excavation and preservation of Kota Batu Ancient area Fasa 2 (RKN 9) Historical Department Renovation of the old Lapau building to the original shape (RKN9) Cultural Section Country’s Cultural Hall (RKN9) Project Profile Walkway throughout the forest reserve which connect to the ancient site and structuring the information office and the coaches parking area. A museum to placed item that is relevant in history and the Brunei Maritime Technology. Walkway trail connected to the three path of the ancient and through the mangrove forest and swamp and some shelter construction is undergoing. Reconstruction and recovery of the old ‘Lapau’ building to its original, to be the exhibit centre for the historical constitution of the year 1959, and the historical value especially for tourism. A place to show the handicraft and the work of the local culture Projects Under RKN 8 & 9 Page 8 of 15 Updated as at: Saturday, 8 April 2006 MINISTRY OF DEVELOPMENT No. 1 Name of Project Project Profile 1.1 Planetarium Building and Science Centre (RKN 9) ’Planetium’ is a building to place the projecting item of the planets position and the other space tobject in the domed ceiling. It is one way to attract the tourist while enchance to adapt more knowledge about the science space to its populated. In all aspect of science discipline, Anatomy is science that is popular in the society. In Islam, the showcase at the planetarium is not just a knowledge exhibition but also an entertainment. The main target is the government agency, students and the civilians. 2 2.1 Environmental Department 818-018-001 Beautification of Bandar Seri Begawan area (Town Centre) (RKN 8) 2.2 Dept/Sect Survey Department 818-018-007 Beautification of Muara Beach Recreation Area Improvements (RKN 8) This project steam to few necesity that is conect to the eco-system and landscape decorating such as: Up grade and developing new few site. Complete site facilities item Walkway trail system, lanscaping and the suitable shape of townscape Aside of the renovation of along the river, main focusing is given to the few path from the the centre/important route in Bandar Seri Begawan to the river banks across the park connectors. It is as a beach recreation that consist a walkway trail, roller skating, bicycle, huts and few facilities for the public usage. Projects Under RKN 8 & 9 Page 9 of 15 Updated as at: Saturday, 8 April 2006 2.3 2.4 818-018-010 Development of Open space Area at Jalan Menteri Besar (RKN 8) Design to be the recreation that has the car park area, public toilet, jogging path, huts, viewing tower, multi field used, recreation park, research place for rubbish dumping. Planting of the shady trees that are suitable for the park and walkway trail to the hills, bridge and main route. 818-018-011 Meragang Beach Park Implementation (RKN 8) Designing a recreation park that is taken for is nature quality that is to assure the forest flora and fauna is well protected and can be enjoy by the park visitors. In this detail projected, the Meragang beach will provided few facilities such as the bird watching/lookout tower, the boardwalk path to the swamp forest Api-api and to the connecting way to the Brooketon Colliery. 918-021 Beautification of Serasa Spit Recreation Area Improvements (RKN 9) Projects Under RKN 8 & 9 Page 10 of 15 Updated as at: Saturday, 8 April 2006 MINISTRY OF FOREIGN AFFAIRS AND TRADE No. 1 Dept/Sect Name of Project Project Profile Activities to improve/increase the tourism industry such as activities that are held by the ambassadors and the high commisioners of Brunei Darussalamoverseas (for e.g Brunei Tourism exhibition and leftlets phamplets distribution. Commercial agreement that relevant with tourism such as ASEAN-China. Activities to promote tourism in Asean Countries at the ASEAN Promotional Centre in Tokyo, Japan. Held BIMP-EAGA project involving tourism industry handled by International Commercial Department. Projects Under RKN 8 & 9 Page 11 of 15 Updated as at: Saturday, 8 April 2006 MINISTRY OF HOME AFFAIRS No. 1 1.1 1.2 1.3 Dept/Sect Name of Project Immigration and National registration Department Custom checkpoint & Immigresen Puni, Temburong (RKN 8) Immigration Post, Custom, Police and Health included Limau Manis Housing (RKN 8) Immigration Post Wharft, Putat (RKN 8) Project Profile This restricted area will provide check up especially for transportation, buses terminal and heavy clases transportation cehack up with the concept of the Sungai Tujuh Immergiresion Post. This Project is still under going in the planner and the building structure in which the tender for land work will be out in jun 2006 with the cooperation from JKR. The terminal post will use the same concept and structre as in the Puni Immergerision Post Terminal. The post will provided passage checkup for those who want to travel to Temburung district using the river. Projects Under RKN 8 & 9 Page 12 of 15 Updated as at: Saturday, 8 April 2006 2 2.1 2.2 2.3 3 3.1 Belait District’s Department Multipurpose Hall and Government Mukim Guest House (RKN8) Construct People’s Galery Construct Kuala Balai Cultural Centre Brunei dan Muara District’s Department Upgrade Kampong Ayer Jetty Facilities (20 buah) (RKN 9) 3.2 Upgrade Connecting bridge of Kampong Ayer concrete floor to 5 kilometer (RKN 9) 3.3 9 Community Hall (RKN 9) 4 4.1 Tutong District’s Department Rebuilding Sungai Basong Recreational Park as Eco-Tourism for Daerah Tutong (RKN 9) 4.2 Rebuilding one Tutong Culture and Heritage Centre (RKN 9) The new Jetty would be bigger that can provide a small tuck shop selling junk food, soft drink and souvenier for the tourist. The new bridge connecting from the Kg Ayer to the concrete floor is to safe cost of rearing and to perputate the country treassure toward to promote the eco-tourism. The hall construction is to facilitate for arise of the beauty of the village and the activities of the society and to attract the tourism. To prepare multi-facilities for public usage and as to attract tourism and also for the locals. With the up-to-date of the infrastructure and the building’s logistic need including the culture houses, stage culture, information building aside of it with a garden environment to beauty the surrounding with the building of walk made for relaxing, modern restaurant in concept of Floating Restaurant and the argo-farming garden in which the planting of the fruits trees and the local herbs. This centre will built the old building of the former official Tutong District Officer, which is to kept historical and heritage Tribe and the Tutong society as a platform to show the Tutong culture. Other than the potential for attraction tourism, it also can be a population reference especially for future generation and for the conformability of the student and higher educational institute to make Projects Under RKN 8 & 9 Page 13 of 15 Updated as at: Saturday, 8 April 2006 research. 4.3 4.4 Rebuilding Culture and Wasai Bedanu Natural Centre (RKN 9) Upgrading project of Pantai Seri Kenangan area,Tutong (RKN 9) As an attraction for tourism including d locals itself in providing facilities and for the recreation. Projects Under RKN 8 & 9 Page 14 of 15 Updated as at: Saturday, 8 April 2006 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 Kuala Belait & Seria Municipal Department Seria new stalls (RKN 8) Kuala Belait New Market Fasa I (RKN 8) Kuala Belait Multipurpose Hall (RKN 8) Development Plan and beautification of Kuala Belait Town Centre (RKN 8) Beautification of Belait River bank and its area inclusive of Eating stall construction (RKN 8) Beautification of Kuala Belait Fasa public car parking area 2 (RKN 8) Public facilities at Taman Jubli Perak Jalan Maulana Kuala Belait (RKN 8) Still under process and will be done in April Will be offered in Mac 2006 The architect design is still in process and increasing allocation for application Preparation Terms of Reference (TOR) by town and country planning department. In preparation of Terms of Reference (TOR) Evaluation Offer in process Undergoing project Construction of new bus building and Taxi Terminal, Jalan Bunga Kemantin Seria Building of Retaining Wall starting from Survey Department’s previous store to Menara Cendera Kenangan Jalan Sungai Kuala Belait (RKN 9) Upgrading the facilities of transportation aids and to enhance beauty of the environment. 5.10 Upgrade car park area Jalan Bunga Kenangan Seria (RKN9) The General Construction is such as providing lamp, rearranging the car park area and the street print at the surrounding. 5.11 Upgrade car park area Jalan Bunga Kemantin Seria (RKN 9) The General Construction is such as providing lamp, rearranging the car park area and the street print at the surrounding. 5.12 Installation of pedestrian path (Asphalt Street Print) Seria area (RKN 9) Facilities and the confort to the walway usage and to enchance the nature beauty 5.9 Continuity the RKN8 project in effort for upgrade along the Sungai Kuala Belait. Projects Under RKN 8 & 9 Page 15 of 15