Section Cover Page Section 07 52 00 Modified Bituminous Membrane Roofing 2011-08-15 Refer to “LEED Notes and Credits” page for additional guidance for LEED projects. Delete LEED items if project: .1 is excluded by the Department’s policy on LEED, or .2 the Department has determined that the work of this Contract is not to attain a LEED rating. Use this Section to specify requirements for SBS modified bituminous membrane roofing. Refer to criteria noted on Cover Page, Section 07 50 10, Bituminous Membrane Roofing General Requirements, before using this Section. Use this Section in conjunction with Section 07 50 10 and with Section 07 62 00, Metal Flashings for Bituminous Membrane Roofing. Refer to Data Sheet, Section 07 50 10, for coordination with Sections specifying other bituminous roofing membrane types. This Master Specification Section contains: .1 .2 .3 This Cover Page LEED Notes and Credits Specification Section Text: 1. 1.1 1.2 1.3 General Related Work Specified in Other Sections Reference Documents Detail Drawings 2. 2.1 Products Primary Membrane and Membrane Flashing 3. 3.1 3.2 Execution Installation MBM Primary Membrane Schedule BMS Basic Master Specification Alberta Infrastructure Master Specification System Page 0 LEED Notes and Credits 2011-08-15 Section 07 52 00 Modified Bituminous Membrane Roofing LEED Notes: .1 Sustainable practices for consideration in roofing other than LEED are highlighted in Section 07 50 10. LEED Credits: .1 Contribution towards LEED credits in this section may apply. Refer to Section 07 50 10. BMS Basic Master Specification Alberta Infrastructure Master Specification System Page 0 Section 07 52 00 Modified Bituminous Membrane Roofing Page 1 Plan No: Project ID: 1. General 1.1 RELATED WORK SPECIFIED IN OTHER SECTIONS SPEC NOTE: Edit this article to include only standards referenced within the edited version of this Section, including LEED documentation and sustainable practices. .1 .2 .3 .4 .5 .6 1.2 [LEED Submittal Forms [LEED Requirements [Environmental Procedures Waste Management and Disposal Bituminous Membrane Roofing General Requirements: Metal Flashings for Bituminous Membrane Roofing: Section 01 32 16.] Section 01 35 18.] Section 01 35 20.] Section 01 74 19. Section 07 50 10. Section 07 62 00. REFERENCE DOCUMENTS SPEC NOTE: Edit this article to include only standards referenced within the edited version of this Section, including LEED documentation and sustainable practices. .1 Alberta Roofing Contractor’s Association (ARCA): .1 .2 .3 American Society for Testing and Materials (ASTM): .1 ASTM D41-05 Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing .2 ASTM D2178-04 Standard Specification for Asphalt Glass Felt Used in Roofing and Waterproofing .3 ASTM D6162-00a (2008) Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using a Combination of Polyester and Glass Fibre Reinforcements .4 ASTM D6163-00 (2008) Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Glass Fibre Reinforcements .5 ASTM D6164-05e1 Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Polyester Reinforcements Canada Green Building Council (CaGBC): .1 2011-08-15 BMS Version Roofing Applications Standard Manual LEED Canada 2009 Rating System LEED Canada for New Construction and Major Renovations. LEED Canada for Core and Shell Development. Website: www.cagbc.org] Section 07 52 00 Modified Bituminous Membrane Roofing Page 2 Plan No: Project ID: .4 1.3 Canadian General Standards Board (CGSB): .1 CGSB 37-GP-9Ma Primer, Asphalt, Unfilled, for Asphalt Roofing, Dampproofing and Waterproofing .2 CGSB 37-GP-56M Membrane, Modified, Bituminous, Prefabricated, and Reinforced for Roofing .3 CAN/CGSB 51.33M89 Vapour Barrier Sheet, Excluding Polyethylene, for Use in Building Construction DETAIL DRAWINGS SPEC NOTE: Include this article only if detail drawings are appended to this Section. .1 Following detail drawings form part of this Section: 07 52 00.01 [ ] [ [ ]. ]. 2. Products 2.1 PRIMARY MEMBRANE AND MEMBRANE FLASHING .1 Provide two-ply SBS modified bitumen membrane, including SBS modified bitumen flashings, to manufacturer's recommendations conforming with ARCA accepted specifications, and as specified in this Section. .2 For membrane component types and reinforcement, refer to Primary Membrane Schedule at end of this Section. .3 Cap Sheet Finish: granules in colour selected by Minister from manufacturer's standard range. .4 Membrane Flashing Finish: granules in colour selected by Minister from manufacturer's standard range. 3. Execution 3.1 INSTALLATION .1 Install membrane components in accordance with requirements of ARCA Five Year Certificate of Assurance. .2 Use installation method as indicated on Primary Membrane Schedule at end of this Section. 2011-08-15 BMS Version Plan No: Project ID: Section 07 52 00 Modified Bituminous Membrane Roofing Page 3 .3 Torch apply sheet materials for continuous fusion of sheets and adhesion to substrates. .4 Seal seams of nailed base sheets using cold or hot applied asphalt, or with torch heat application. .5 Limit cap sheet bleed-out at seams to 12 mm. Cover excessive bleed-out and replace missing mineral surfacing by embedding matching colour granules. .6 Torch-apply cap sheet and cap sheet flashing [to seaming layout indicated on [reviewed shop] drawings] and MBM Primary Membrane Schedule. .7 Primary membrane deficiencies shall include, but not be limited to, ridges, tenting, buckles, wrinkles and voids. 2011-08-15 BMS Version Section 07 52 00 Modified Bituminous Membrane Roofing Page 4 Plan No: Project ID: 3.2 MBM PRIMARY MEMBRANE SCHEDULE SPEC NOTE: Specify 250 g/m2 polyester reinforcement for cap sheets where membranes will be subjected to infrequent traffic for servicing of rooftop equipment. Component Substrate Installation Method Reinforcement, Minimum, g/m2 Wood fibreboard Mop 95 glass fibre Plywood, lumber and OSB Nail or mop 180 polyester Gypsum sheathing Mop 95 glass fibre Concrete Mop or torch* 95 glass fibre Nail 180 polyester Self-adhered 180 polyester Torch [180][250] polyester Torch 180 polyester Base sheets on slopes up to 2:12 Base sheets on slopes over 2:12 Plywood, OSB and lumber Base sheet flashing All substrates Cap sheets Base sheet Cap sheet flashing Base sheet flashing *Base sheet installation method over concrete shall be either of the two methods specified, at Contractor's option. END OF SECTION 2011-08-15 BMS Version