Town of Conklin Mitigation Action Plan Review Worksheet Review Comments (Funds Available, Grant Eligible, Sufficient resources available?) 1. Continue to aggressively pursue NFIP buyout program for repetitive loss properties. (HMGP Property Acquisitions) 2. Conduct restudy and remapping of the Flood Insurance Study for the Town to reflect current conditions. 3. Pursue participation in the Community Rating System (CRS) of the NFIP. 4. Implement and enforce Phase 2 Stormwater regulations and compliance. 5. Promote implementation measures such as floodproofing for existing critical facilities. 6. Identify and address obstructions to surface water flows (ie bridge capacity improvements, culverts channel constrictions, etc) through engineering studies. DMA 2000 Hazard Mitigation Plan Update – Broome County, New York 2012 Discontinued Completed Continuous In Progress / Not Yet Complete Description No Progress / Unknown Status Town of Conklin Mitigation Action Plan Review Worksheet Review Comments (Funds Available, Grant Eligible, Sufficient resources available?) 7. Participate in ongoing or new Watershed Studies and programs for major tributaries (Little Snake Creek and Snake Creek). 8. Utilize local Soil and Water Conservation Districts program for possible stream stabilization projects. 9. Develop model ordinance for sediment and erosion control, stormwater control, and stream buffer implementation. 10. Identify, evaluate, and implement effective flood mitigation activities for specific chronic flooding locations. 11. Encourage development of acquisition and management strategies to preserve open space for flood mitigation and water quality in the floodplain. 12. Conduct a mailing campaign to property/business owners in the 100-year and DMA 2000 Hazard Mitigation Plan Update – Broome County, New York 2012 Discontinued Completed Continuous In Progress / Not Yet Complete Description No Progress / Unknown Status Town of Conklin Mitigation Action Plan Review Worksheet Review Comments (Funds Available, Grant Eligible, Sufficient resources available?) 500-year floodplains. 13. Limit future development in the floodplain to the extent practicable. Ensure new development that does occur in floodplain is constructed to or exceeds NFIP requirements for elevation. Require mitigation to insure “zero increase” in base flood elevations. 14. Ensure that adequate shelter is available to community residents in the event of future floods. 15. Implement training and public outreach to residents, code officials and contractors on floodplain management and mitigation as well as flood response planning and training. 16. Develop and utilize an early warning and evacuations DMA 2000 Hazard Mitigation Plan Update – Broome County, New York 2012 Discontinued Completed Continuous In Progress / Not Yet Complete Description No Progress / Unknown Status Town of Conklin Mitigation Action Plan Review Worksheet Review Comments (Funds Available, Grant Eligible, Sufficient resources available?) system for reducing life and property by giving lead time to move personal property and evacuate if necessary. 17. Consider changes to zoning changes to promote future development to areas of town outside of the floodplain. 18. Evaluate the benefits and costs of obtaining flood insurance for public buildings at highest risk. 19. Perform an engineering study to mitigate Stenson & Fallbrook Road erosion and wash-out problems. 20. Develop a plan to alleviate the Schnurbush Park standing water issue. 21. Perform a drainage study to mitigate the Carol Court flooding issue. DMA 2000 Hazard Mitigation Plan Update – Broome County, New York 2012 Discontinued Completed Continuous In Progress / Not Yet Complete Description No Progress / Unknown Status