MEDA TWINNING NEWS 1 1. Further clarification on 3.9.2 : The approval of the Twinning Contract under MEDA and TACIS The first and the final draft of the Twinning contract should be submitted to Headquarters. As regarding the final draft, Headquarters will check to what extent the twinning contract has incorporated all the Line DG’s comments on the first draft. 2. Clarification on 8.2 : The detailed “Twinning Light” Project Fiche The project fiche for a twinning light project should contain all 11 bullet points mentioned on p101 and should be completed by ANNEX C1 : Standard Summary Project Fiche. 3. Clarification on 8.4.2 : Minimum criteria for proposals from MS As indicated in the above mentioned title of 8.4.2, the three bullet points are minimum criteria that should be contained in proposals from MS, the proposal should be completed by ANNEX C2 : Model Twinning Proposal. 4. Clarification on the use of Annex III to the twinning manual : The evaluation grid When section C : When the MS Junior Partner is not applicable, the score of 5 points will be transferred from question 1.8 to question 1.6 of section B : Pool of Short Term Experts. Even if there is no Junior Partner, question 1.7 should be understood as follows: Is the Lead MS Partner responding to all requirements? Normally he should be able to bring all the expertise required, so the score should be of 5 points. Under section 3 : Methodology, question 3.4 : Are there clear proposed activities with a realistic timeframe ? This question should be understood as follows: To what extent the Member State(s) submitting a proposal complies with the duration of the project proposed in the project fiche. Under section 4 : Sustainability; question 4.3 : Are the expected results of the proposed action sustainable at a financial, institutional and policy level ? 1 This question should be understood as follows : Is the MS proposal falling into a long term scope ? Regarding the use of the evaluation grid for a twinning light project, the 10 points for question 1.1 will be transferred to 1.2 and the 5 points for question 1.3 will be transferred to Section B, question 1.6. 5. ANNEX C1 : Standard Summary Project Fiche Point 3.5 : To the profile of the RTA should be added the profile of the PL and key Medium and/or Short-Term experts. 6. Additional information concerning ANNEX C2 : Model Twinning Proposal Under budgetary remarks: For a classic twinning project, the MS proposal can mention (in addition to any other remarks), that the detailed budget breakdown will be prepared with the work plan after being selected. For a twinning light, the MS proposal can mention (in addition to any other remarks) that the detailed budget breakdown will be prepared after being selected. 7. Revision of Annex A7 of the twinning contract : “Special Financial Annex” (See document attached to the e-mail) In agreement with DG ELARG, Annex A7 has been slightly revised and adapted to twinning light projects. This revised Annex A7 has immediate effect. 8. French translation of the Twinning Manual and its annexes (See documents attached to the e-mail) 2