Section 3 MINISTRY OF TRANSPORTATION APPENDIX 3.A: PROJECT NOTIFICATION AND MNR INFORMATION REQUEST – TEMPLATE LETTER AND TABLE Environmental Guide for Fish and Fish Habitat Version: June 2009 Ministry of Transportation Environmental Guide for Fish and Fish Habitat Section 3: Background Data Collection Appendix 3.A: Project Notification and MNR Information Request VERSION HISTORY VERSION # 1.0 Jun-09 DATE Jun-2009 DESCRIPTION OF MAJOR CHANGE New Appendix containing Project Notification and MNR Information Request Template Letter & Table Page 2 of 4 Ministry of Transportation Environmental Guide for Fish and Fish Habitat Section 3: Background Data Collection Appendix 3.A: Project Notification and MNR Information Request Date Address Re: Attention: [CONTACT NAME] In accordance with the MTO/DFO/MNR Protocol for Protecting Fish and Fish Habitat on Provincial Highway Undertakings (2006), this letter is to provide notification to the Ministry of Natural Resources that the Ministry of Transportation is undertaking works [INSERT PROJECT TITLE/ACTIVITY]. [INSERT PROJECT/ACTIVITY DETAILS; i.e. type of activity and a concise description of the proposed work in and around waterbodies]. Please see the attached for details regarding the [INSERT THE NAMES AND LOCATION OF WATERBODY (IES)] within the project limits. As per Step 3 of the MTO/DFO/MNR Fisheries Protocol, we request that MNR complete the attached table that includes information on fish community and habitat. We look forward to MNR’s response to our request within 20 working days, as specified in the Protocol. [Name] [Title] Jun-09 Page 3 of 4 [INSERT MTO PROJECT TITLE] Waterbody Name and location (GPS coordinates & Google Earth map) Watercourse classification (i.e. warmwater, coldwater) Habitat information/ locations (fish passage barriers, known spawning habitats etc.) Historical data on fish species present, including whether the subject waterbody(s) [SPECIFY LOCATION] are considered to support any vulnerable, threatened or endangered aquatic species MNR fisheries management objectives, if applicable MNR interpretation of fish and fish habitat sensitivity (scale of high, moderate, low or unknown as per DFO’s Risk Management Framework In-water timing windows for construction NOTE: Jun-09 The applicant shall complete the waterbody name and location (column 1) and attach a Google Earth map or MTO project map identifying each waterbody and submit to MNR. MNR is required as per Step 3 of the Fisheries Protocol to provide the applicant with the information outlined in the table above (columns 2-7) within 20 working days. Page 4 of 4