NOTICE OF FINAL SCOPE FROM MILLWOOD FIRE DISTRICT PO BOX 140 MILLWOOD NY 10546 DATE November 12, 2007 RE New Millwood Firehouse TO INVOLVED AGENCIES NYS Dept of Environmental Conservation 625 Broadway Albany NY 12233-1750 Supervisor & Town Board Town of New Castle 200 S Greeley Avenue Chappaqua NY 10514 Planning Board Town of New Castle 200 S Greeley Avenue Chappaqua NY 10514 Zoning Board of Appeals Town of New Castle 200 S Greeley Avenue Chappaqua NY 10514 Environmental Review Board Town of New Castle 200 S Greeley Avenue Chappaqua NY 10514 Department of Public Works Town of New Castle 200 S Greeley Avenue Chappaqua NY 10514 Building Department Town of New Castle 200 S Greeley Avenue Chappaqua NY 10514 Parks Department Town of New Castle 200 S Greeley Avenue Chappaqua NY 10514 Department of Health County of Westchester 145 Huguenot Avenue New Rochelle NY 10801 NYCDEP 465 Columbus Avenue Valhalla NY 10595 NYS Dept of Transportation Route 9A at Dana Road Valhalla NY 10595 NYS Dept of Environmental Conservation 21 S Putt Corners Road New Paltz NY 12561 US Army Corps of Engineers Eastern Permits Section 26 Federal Plaza New York NY 10278 TO INTERESTED AGENCIES West End Neighborhood Taxpayers (WENT) C/o Mr Kurt Kleinman 48 Edgewood Road Ossining NY 10562 Millwood Task Force P O Box 465 Millwood NY 10546 Westchester County Planning Board 148 Martine Avenue White Plains NY 10605 Chappaqua Public Schools 66 Roaring Brook Road Chappaqua NY 10514 Chappaqua PTA PO Box 5 Chappaqua NY 10514 Millwood Lumber 87 Millwood Road Millwood NY 10546 Millwood Realty, Inc C/o Richard Gardella Bertine Hufnagel Headley 700 White Plains Road Scarsdale NY 10583 Gordon, Morjikian, Neuberger,etal C/o Joseph Buderwitz One North Broadway 12th Floor White Plains NY 10601 Environmental Notice Bulletin 625 Broadway Albany NY 12233-1750 Journal News/Patent Trader 185 Kisco Avenue Mt Kisco NY 10549 League of Women Voters c/o Sheila Crespi 5 Round Hill Road Chappaqua NY 10514 NOTICE IS HEREBY GIVEN that the Millwood Fire District has adopted the following final scope in accordance with the requirements of 6 NYCRR Part 617.8: (1) A Brief Description of the Proposed Action: The Millwood Fire District needs a piece of property in the Millwood hamlet and a firehouse that can accommodate modern equipment, firematic training and administrative function; and provide community access for activities such as voting and meetings. For this purpose, a preferred site and three alternate sites have been chosen: the preferred site is the Realis Property ("Site 4"). The three alternative sites are: Rotta ("Site 1"), Vesce ("Site 2"), and the existing location of Firehouse #1("Site 3"). (2) Potentially significant adverse impacts identified and particular aspects of the environmental setting that may be impacted: Development on Sites 2 and 3 requires partially filling a wetland and wetland buffer. Development on Site 4 requires filling and replacing a wetland. Development on Sites 3 and 4 requires cutting into a steep slope. Development on Sites 2,3 and 4 will be completely within the New York City Watershed, where increases in impervious surface and construction of septic systems without generous land area are strongly discouraged by the NYC Dept of Environmental Protection. All sites will include an on-site sewage disposal system, and will increase the area of impervious material, collect storm water runoff, treat first flush storm water contaminants, and possibly detain storm water. On Sites 2, 3 and 4, these could affect the quality, quantity, and flow of water resources in the New York City Watershed, as well as those in the wetlands onsite and nearby. Use of Site 3 requires rock removal very close to the Catskill Aqueduct. There will be a rearrangement of noise generators within the Hamlet, with the Firehouse moving and/or enlarging, and other uses such as the lumberyard and beauty parlor moving. For individual lots within the Hamlet there may be some slight increases or decreases in transient noise levels. (3) Extent and quality of information needed to adequately address each impact: Preliminary designs, soils maps, soil test pits, percolation tests, wetlands maps, topographic maps, hydrogeologic study, geotechnical analysis, local zoning, traffic study, environmental investigations, tree assessment and historic/archeological study. (4) Initial identification of mitigation measures: design in accordance with all Codes, local Design Guidelines and Best Management Practices. (5) Reasonable alternatives to be considered: Site 1 with two alternative designs; Site 2 with two alternative designs; Site 3 with four alternative designs, including three from West End Neighborhood Taxpayers; and Site 4 with the preferred design and an alternative design from West End Neighborhood Taxpayers. (6) An identification of the information/data that should be included in an appendix rather than the body of the draft EIS: Detailed List of Problems with the Existing Building and Site; Project Programs; full Traffic Report; Archeology/History Report; Soils Descriptions; Maps and Drawings; Runoff Curve Numbers for Urban Areas; Plans and Notes; Stormwater Pollution Prevention Plan; Engineering Report; Wetlands Report; Geotechnical Analysis; and Site Consideration Map. (7) Those prominent issues that were raised during scoping and determined to be not relevant or not environmentally significant or that have been adequately addressed in a prior environmental review: Statistical, facility and equipment comparisons to other Districts; financing and desire of taxpayers; lifetime cost analysis; future financial needs beyond the firehouse; District and Company organization and governance; and five-year operating costs of the Fire Company. Please see also: the following draft Table of Contents for the Draft Environmental Impact Statement. TABLE OF CONTENTS EXECUTIVE SUMMARY PROJECT DESCRIPTION Introduction Site Location and Description Involved Agencies and Required Approvals Interested Parties Public Need and Benefits ENVIRONMENTAL SETTING, POTENTIAL IMPACTS & MITIGATION Introduction DESIGN DEVELOPMENT SKETCHES DESIGN CHOSEN Land Use Soils, Topography & Geology EXISTING CONDITIONS GEOLOGY SOILS & TOPOGRAPHY POTENTIAL PROJECT IMPACTS MITIGATION MEASURES Water Resources EXISTING POTENTIAL PROJECT IMPACTS MITIGATION MEASURES Traffic INTRODUCTION METHODOLOGY OF STUDY TRAFFIC SUMMARY Utilities EXISTING CONDITIONS POTENTIAL PROJECT IMPACTS MITIGATION MEASURES Noise EXISTING CONDITIONS POTENTIAL PROJECT IMPACTS MITIGATION MEASURES Visual Resources EXISTING CONDITIONS POTENTIAL PROJECT IMPACTS MITIGATION MEASURES Historical and Archeological EXISTING CONDITIONS POTENTIAL PROJECT IMPACTS MITIGATION MEASURES ALTERNATIVES No Action Chronological History of the Firehouse Site Search Options Options A & B, Site 1 Land Use Soils Topography Geology Water Resources Traffic Utilities Noise Visual Resources Historical and Archeological Options C & D, Site 2 Land Use Soils Topography Geology Water Resources Traffic Utilities Noise Visual Resources Historical and Archeological Options E-J, Site 3 Land Use Soils Topography Geology Water Resources Traffic Utilities Noise Visual Resources Historical and Archeological Option L, Realis Site Land Use Soils Topography Geology Water Resources Traffic Utilities Noise Visual Resources Historical and Archeological ADVERSE ENVIRONMENTAL EFFECTS THAT CANNOT BE AVOIDED IRREVERSIBLE AND IRRETRIEVABLE COMMITMENTS OF RESOURCES GROWTH INDUCING IMPACTS EFFECTS ON THE USE AND CONSERVATION OF ENERGY RESOURCES EXISTING CONDITIONS POTENTIAL PROJECT IMPACTS MITIGATION MEASURES APPENDICES A. Detailed List of Problems with the Existing Building and Site B. Project Programs C. Traffic Report D. Archeology/History Report E. Soils Descriptions F. Stormwater Pollution Prevention Plan G. Engineering Report H. Wetlands Report I. Geotechnical Analysis MAPS & DRAWINGS EX-1 Existing Map of Hamlet STG-1 Soil Survey Map STG-2 USGS Topographic Map WR-1 National Wetlands Inventory Map WR-2 NYSDEC Freshwater Wetlands Inventory Map WR-3 Runoff Curve Numbers for Urban Areas SK-1 Option A Rotta SK-2 Option B Rotta SK-3 Option C Vesce SK-4 Option D Vesce SK-5 Option E Existing FH-1 Option F Existing FH-1A Option G Existing FH-2 Option H Existing SK-6 Option I Existing Option I Notes Option I Resultant Project SK-7 Option J Existing Option J Notes Option J Resultant Project SK-8 Realis plan SK-9 Option L [Realis/WENT plan] SC-1 Site Consideration Map EX-2 Millwood Fire District Boundaries