Building Plan Checklist

advertisement
CENTRAL BUILDING PLAN UNIT
CHECKLIST FOR BUILDING PLAN ON POLLUTION CONTROL
(A guide to check BP on Pollution Control)
Proposal
:
________________________________________________________________
________________________________________________________________
BP No.
:
________________________________________________________________
*YES
*NOT
APPLICABLE
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
Indicate the trade effluent drainage or piping
system to collect and convey trade effluent
generated
┌───┐
└───┘
┌───┐
└───┘
Indicate the location of the trade effluent
treatment plant, if required, and endorse on
the plan that technical details of the trade
effluent treatment plant to be submitted
separately for approval.
┌───┐
└───┘
┌───┐
└───┘
Item
General
(1)
Clearance on the proposed use of the
industrial premises
(2)
If no, complete Form-IA to apply for clearance
on the use of the industrial premises and
attach it together with BP.
(3)
Indicate use of buildings, sheds, enclosures,
structures and equipment installed.
(4)
Indicate the contents of storage tanks,
materials stored in storage areas or
warehouse and goods/materials handled at
loading/unloading area.
Water Pollution Control
(5)
(6)
(7)
Indicate the location of trade effluent sampling
sump/system and the connection to the
internal sanitary drainage system.
┌───┐
└───┘
┌───┐
└───┘
(8)
Indicate the last inspection chamber and
endorse on the plan that details of the pH
monitoring and effluent control system to be
submitted separately for approval.
┌───┐
└───┘
┌───┐
└───┘
(9)
Indicate the open process areas which may
cause contamination to rain water and the
system to collect contaminated rain water for
treatment before discharge into the open
drain.
Item
*YES
*NOT
APPLICABLE
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
┌───┐
└───┘
Air Pollution Control
(10)
Indicate the types and locations of fuel burning
equipment and the location of the chimney(s)
for the dispersion of flue gases.
(11)
Endorse on the plan that the technical details
of the fuel burning equipment, the fuel to be
used, the chimney and source emission
monitoring equipment/testing facilities to be
submitted separately for approval.
(12)
(13)
Indicate the locations of air pollution control
equipment and the stacks for the dispersion of
exhaust gases.
Endorse on the plan that technical details of
the air pollution control equipment, stacks for
the dispersion of exhaust gases and source
emission
monitoring
equipment/testing
facilities to be submitted separately for
approval.
Chemical/Oil Storage Facilities
(14)
(15)
(16)
Check and confirm the capacity of the
secondary containment facility for storage
tanks in a tank farm area is greater than the
capacity of the largest tank.
Indicate the system for the treatment, if
required, and the discharge of rainwater
collected within the secondary containment
facility.
Endorse on the plan that a leak detection
system to be provided within the secondary
containment facility for the underground
storage tanks.
Toxic Industrial
Facilities
(17)
Waste
Treatment
and
Disposal
Indicate the location(s) of toxic industrial
waste treatment and disposal facilities and
endorse on the plan that technical details of
the facilities to be submitted separately for
approval.
Checklist-PC- 99