Tender No. D 35201/02/2008-DPD Office of The Registrar general, India Data Processing Division In response to this office Tender Notice No G. 35201/1/2009 dated 07-04-2010, a Pre-Bid Conference was held at 11:00 AM on 12th April 2010 at ORGI’s Conference Hall, Ground Floor, DDE Centre, Wing-1, West Block-1, R K Puram New Delhi 110066. Clarifications on various queries received from the participating vendors are as given in following table. Sl. No. 1 2 Vendor’s Query/Request Increase in the Tolerance limit of scanners when multi features are on, from 2% to 10-15% Can ORGI award the Contract to multiple vendors? 3 Consideration of Single Higher speed scanner per locations 4 Level of customization for which 3 Software personnel from vendor side will be deployed. Who will provide the eFlow training to them? 5 Can SI put different types of scanners on different locations? Responses/ Clarifications Amendments in Tender Considered but tolerance limit remains No change. same i.e. 2%. In normal circumstances, contract will be given to only one vendor. However, under special circumstances discretion lies with ORGI. ORGI is not limiting Bidders from quoting scanners with speed more than 65 PPM(A3 Size) with minimum 2 scanners at each location. Bidder must remember that scanning will be done Batch by Batch. Average size of Batch is 110 Forms. Each Batch also requires some manual intervention to feed and check the location code parameters during scanning. It may consume around 30-40 seconds for each Batch. 3 software professionals will be used for writing codes in C-Sharp and should have knowledge of SQL and dot Net frame work. They will be utilized for developing various MIS Reports as well as tuning of e-Flow application. Required training of e-Flow for five to ten days will be provided by the ORGI. Standard Codes are pre-defined. However, EFI and template creation as well as tuning will be a part of core team consisting of ORGI employees and 3 software professionals deployed by SI. No change in Tender. Yes but these must be from same Make subject to the fulfillment of specification mentioned in Annexure T3 of Tender. Images from different make of scanners may have significant No change. No change No Change No Change 6 7 8 9 10 11 12 13 14 15 16 17 18 19 variation, which would require more efforts and time to develop, customised and tune e-Flow ICR application. It may affect the Recognition Accuracy also. No Change in Tender Criteria for prime Prime bidder will have to meet the No Change bidder eligibility criteria. Foreign party in consortium is allowed but not as a Prime Bidder. Is the Previous Yes, Scanning/ ICR project experience No Change scanning experience is a part of eligibility criteria. would be included for eligibility criteria. Document required for As per certificate from OEM or No Change Life cycle of scanner technical brochure of scanner. Shifting of scanner Can be considered in the project No change from one location to interest but cost will be born by SI. other location Bid evaluation criteria No. Technical qualification is used only No Change technical/ commercial for qualifying for opening the 50:50 or 70:30 or commercial bid. All the vendor weight for more Technically qualified will be on equal experience footing for opening of Commercial Bid. What type of Complete infrastructure as specified No Change Environmental for 6 Temporary Scanning Set up by conditions will be Vendor. I.e. ACs, Electricity, Power provided by the Backups, fire fittings and furniture. ORGI/DCO in Nine Scanning Centres Please confirm the Images are required at 200 and 300 No Change Image resolution DPI in dual streaming mode without any reduction in the specified speed. ORGI may consider to 4-5 weeks only from the LOI, However No Change increase the Scanner delivery can be prioritize and done in Delivery time at least partial manner as per Annexure G7 of by four weeks Tender. Blue print of spares Required to meet unforeseen No Change circumstances ORGI should allow to Acceptable provided the validity No Change adjust the EMD period of EMD is extended upto three against the security months after the completion of the Project. ORGI should reduce Project being time bound, long term No change the Annual Turn over and high value, the financial viability of which would be the participating firms should be around 33% of Project sound enough, therefore no change Value desired. Security Deposit In view of the importance and No change should be 5% instead timeliness of the project, 10% is of proposed 10% reasonable amount for Security Deposit. Speed of Scanners and SL. No. 1,2 and 3 mentioned in scanner No change its throughput specification at Annexure T3 should be read together. Buy back option for Buy back price will be deducted from No Change 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Scanners Please specify the Project period for buy back option. Scanner’s Consumable cost Saving of image format Possibility of forms pasted/ stapled with photograph Can all scanning be done in Delhi Counting machines the offered price for calculating L1. 2 years or completion of phase 2 No Change whichever is earlier. As mentioned in Annexure T3 of No Change Tender. As specified in Tender. No Change No photograph will be there. No Change No. No change Depends on the vendor. The scanner No change purchased by ORGI will not be used for this counting. Vendor can deploy his own means of mechanical counting to be completed within one to two months of receipt of Forms. What should be the It can be of any project in India or No Change supporting document abroad. for scanner is used or being currently used? OS support by scanner Preferably all 4. However, Win 7.0 is No Change must. As specified in Tender. Performance test 25,000 forms scanning in each of 2/3 No Change procedure for testing shifts. the ruggedness of Scanner Can a party be a part No except Scanner OEM. It is not No change of Multiple necessary for scanners OEM to be the Consortiums or is it consortium member. necessary for Scanner OEM to be a member of Consortium? How many numbers of Prime bidder/ consortium members/ No change offices in India will channel partners should have offices qualify for Multiple at more than one location out of 15 locations. locations mentioned in the Tender. Experience of Form Experience of form processing i.e., No change processing include the ICR/ OCR /OMR has to be submitted. Scanning, ICR, OCR and OMR Attestation of Self-attestation is sufficient. No Change documents Please clarify the data For phase 1 SI has to do scanning and No Change capturing in two e-Flow management while, for phase 2 phases and who will data extraction/ correction along with do QC and Computer scanning and e-Flow management. Assisted Coding for ORGI/DCO officials will do CAC and QC. NIC and NCO Please clarify if the Then correction operators work will be No Change Forms are not filled in more, however it is rare. proper manner and its treatment Deviation from Tender Yes, A separate page along with T4 No Change 36 37 38 39 40 41 42 43 44 45 46 47 48 requirement Training period for scanning operation is within the scanning period? What the vendor will do if the client due to secrecy is not providing Specimen copy of form? Does the Annexure T1 relates to the Scanner and what is the meaning of Brand of store offered What equipments and scanning software has to bring for Technical evaluation by the Bidder Digital micro-filming should be submitted. Yes, training period will be within the No Change scanning period. A certificate in this regard from the No Change client along with Annexure C of Tender is required. Yes it is related to the Scanner and No Change Brand of store referred to the make and model of the scanners. Bidder has to bring only scanner and No Change scanning stations H/W and scanning Software. However PCs and ICR software (Imaging Software for recognition) will be provided by ORGI. Give options for both 16mm and 35 No Change mm as a separate line item under ‘Any other item sub head in Other items (not included for calculating the project cost) in Annexure C 2. What is the accuracy In last census more than 90% No change of ICR software used recognition and less than 2% false by ORGI during 2001 positive was achieved. Census. What will be the Two years comprehensive on site No change Comprehensive guarantee/warranty with all Guarantee / warranty consumables and after that normal and AMC period for cost for AMC for further at least 3 Scanners. years from scanner OEM. Scanner OEM will also ensure the availability of spare parts for 3 years after the expiry of guarantee/warrantee period. Does the ORGI ensure Normally Yes, ORGI will ensure No Change the Sufficient supply of sufficient supply of schedules. schedules at each scanning locations. Clarification Point No. The 15.2 & 15.1 should be read as No change 15.2 15.1, 15.3, 15.4 15.1; 15.3 as 15.2 and 15.4 as 15.3 Clause mentioned in It is a standard clause and may be No Change Annexure C–3 in downloaded from the website namely respect of DGS&D-229 http://www.dgsnd.gov.in Relationship between These are the standard clause. SI has No Change clause 30 on to agree with all the clauses Arbitration and point mentioned in Arbitration whereas 17 under Annexure T1 agreement to point 17 under Annexure T-1 is optional. Format for EMD, Different banks use their own format No Change Credit worthiness and for these items; therefore one uniform Security format/pattern can not be prescribed. Last Date of 28th April 2010 at 13:00 hours followed No change submission of Tender by Technical Bid opening at 15:00 hours on 28th April 2010. (Mohan Singh Thapa) Joint Director