This document provides guidance on the structure and content of an approved maintenance
organisation (AMO) exposition as required under CASR paragraph145.030 (1) (a). The content
relates directly to the requirements of CASR Part 145 and the Part 145 Manual of Standards
(MOS) as applicable to an AMO.
The document is a mixture of requirements and guidance under recommended headings for a
AMO’s exposition. It is recommended that AMOs retain the headings (expanded as necessary)
and the content of Part 1. All other detail can be amended to suit your organisation.
The content of the sample exposition has been arranged into parts, sections and subsections.
The aim is to collate all the processes and procedures related to a subject under the relevant
section in the exposition, irrespective of the location of the legislative requirements either in the
CASR Part 145 or in the Part 145 MOS.
The text provided under each section or subsection of the sample exposition provides guidance
on the nature of contents to be included. The sections and subsections should be further
expanded according to the complexity of the processes and procedures of the AMO. As
mentioned above, CASA recommends Part 1 be retained as per the sample exposition as it
provides the main administrative information about the organisation, including the
organisation’s structure, location, scope of approval, list of key personnel etc.
In some cases specimen text or procedures have been included (in italics) in the sample
exposition to expand the guidance and to illustrate the nature of the content required. The
organisation should carefully consider the provided content and make necessary changes
before including it in their exposition.
It is important for the users of this document to appreciate that no single sample exposition can
meet the needs of all types and sizes of organisations or reflect the different organisational
structures, policies and procedures. This document is for guidance only and the structure and
content of the AMO’s exposition should reflect their structures, policies and procedures. CASA
suggests the organisation correlates the content of the exposition with a compliance check
list/matrix to demonstrate to CASA that they have fully addressed all applicable requirements of
CASR Part 145 and Part 145 MOS.
Where the content of the exposition requires processes and procedures to be provided, these
may be included in other documents provided they are referred to in the exposition. However, in
that case, the other documents form part of the exposition and are subject to the same
requirements and controls as the exposition. Processes and procedures included or referred to
in the exposition should be of adequate depth and include enough details to demonstrate they
establish compliance with the applicable requirements of CASR Part 145 and the Part 145
MOS. An accurately completed compliance matrix may benefit the AMO as a component of
their QMS for checking and conducting audit compliance requirements.
Duties and responsibilities of individuals as mentioned in the exposition should relate to the
obligation of the organisation or the individual under CASR Part 145 and Part 145 MOS, and
are not meant to cover employment conditions, performance criteria or administrative functions.
Where content of the exposition requires identifying the individual responsible for an action or a
decision that is part of a process, it is intended that the individual will be identified by their
position title (such as ‘quality manager’) or if applicable, by means that describes their function
(such as ‘Safety Manager’ or ‘data entry clerk’).
AMO Sample Exposition
Page i
Where content of the exposition deals with records to be created or kept by the organisation,
the relevant procedures in the exposition should take into account the following:



legibility of the record;
retrieval of records; and
protection of the records from loss, damage or accidental alteration.
CASA recommends worksheets, checklists, forms, lists of items and personnel etc. required
under the exposition or associated with the processes or procedures required by the exposition
should be included as appendices at the end of the exposition. However, as mentioned above,
they may be included in other documents that contain the processes and procedures or in any
other document if it is convenient for the organisation to do so.
AMO Sample Exposition
Page ii
Insert Organisation Logo here
ANYBODY'S PART 145 APPROVED
MAINTENANCE ORGANISATION
EXPOSITION
This exposition has been developed to meet the Civil Aviation Safety Regulations 1998 (CASR)
Part 145 Approved Maintenance Organisation exposition requirements
AMO approval certificate reference number
xxxxx
Anybody’s Aerospace Limited
Address 1
Address 2
Address 3
Telephone: xx xxxxxxx
Facsimile: xx xxxxxxxx
Email: xxxx@xxxx.xxx.xx
Copy Number:
x of xx
Holder Name:
TABLE OF CONTENTS
LIST OF EFFECTIVE PAGES ................................................................................................... 4
AMENDMENT RECORD ........................................................................................................... 5
DISTRIBUTION LIST ................................................................................................................. 6
ABBREVIATIONS, ACRONYMS AND DEFINITIONS................................................................ 7
PART 1
GENERAL ............................................................................................................... 8
1.1
ACCOUNTABLE MANAGER’S STATEMENT .............................................................. 8
1.2
SAFETY AND QUALITY POLICY ................................................................................ 9
1.3
MANAGEMENT PERSONNEL .................................................................................. 10
1.3.1
ACCOUNTABLE MANAGER........................................................................ 10
1.3.2
RESPONSIBLE MANAGER ......................................................................... 10
1.3.3
QUALITY MANAGER ................................................................................... 10
1.3.4
SAFETY MANAGER .................................................................................... 10
1.3.5
OTHER RELEVANT PERSONNEL .............................................................. 10
1.4
MANAGEMENT ORGANISATIONAL CHART ............................................................ 11
1.5
CERTIFYING EMPLOYEES ...................................................................................... 12
1.5.1
BASE CERTIFYING EMPLOYEES .............................................................. 12
1.5.2
LINE MAINTENANCE .................................................................................. 12
1.5.3
AERONAUTICAL PRODUCT MAINTENANCE ............................................ 12
1.6
MANPOWER PLAN ................................................................................................... 12
1.7
FACILITIES................................................................................................................ 13
1.7.1
BASE MAINTENANCE ................................................................................. 13
1.7.2
LINE MAINTENANCE .................................................................................. 13
1.7.3
AERONAUTICAL PRODUCT MAINTENANCE ............................................ 13
1.7.4
LAYOUT OF PREMISES .............................................................................. 13
1.7.5
LOCATIONS OTHER THAN THOSE LISTED IN THE EXPOSITION ........... 13
1.8
SCOPE OF MAINTENANCE SERVICES TO BE PROVIDED .................................... 14
1.8.1
AIRCRAFT MAINTENANCE ........................................................................ 14
1.8.2
ENGINE MAINTENANCE ............................................................................. 14
1.8.3
AERONAUTICAL PRODUCT MAINTENANCE ............................................ 14
1.8.4
SPECIALIST MAINTENANCE ...................................................................... 14
1.8.5
FABRICATION IN THE COURSE OF MAINTENANCE ................................ 15
1.9
SIGNIFICANT CHANGES .......................................................................................... 15
1.10
CHANGES THAT ARE NOT SIGNIFICANT CHANGES ............................................ 15
1.11
EXPOSITION ............................................................................................................. 15
1.11.1 PROVIDING EMPLOYEES WITH EXPOSITION .......................................... 15
1.11.2 KEEPING THE EXPOSITION UP-TO-DATE AND COMPLIANT .................. 16
1.11.3 CHANGES TO AMO EXPOSITION .............................................................. 16
1.11.4 DIRECTION BY CASA TO CHANGE EXPOSITIONS .................................. 16
PART 2
MAINTENANCE PROCEDURES .......................................................................... 17
2.1
SUPPLIER EVALUATION AND SUBCONTRACT CONTROL PROCEDURE ............ 17
2.2
RECEIPT / INSPECTION / ACCEPTANCE OF AERONAUTICAL PRODUCTS......... 17
2.3
STORAGE, TAGGING AND RELEASE OF AERONAUTICAL PRODUCTS .............. 17
2.4
TOOLS AND EQUIPMENT ........................................................................................ 18
2.5
CALIBRATION OF TOOLS AND EQUIPMENT .......................................................... 18
AMO Sample Exposition
June 2015
Page 1
2.6
USE OF TOOLING AND EQUIPMENT BY EMPLOYEES .......................................... 18
2.7
CLEANLINESS STANDARDS OF MAINTENANCE FACILITIES ............................... 18
2.8
INSTRUCTIONS FOR CONTINUING AIRWORTHINESS (ICA) ................................ 19
2.9
REPAIR PROCEDURE .............................................................................................. 19
2.10
AIRWORTHINESS DIRECTIVES PROCEDURE ....................................................... 19
2.11
OPTIONAL MODIFICATION PROCEDURE .............................................................. 19
2.12
MAINTENANCE DOCUMENTATION IN USE AND ITS COMPLETION ..................... 20
2.13
TECHNICAL RECORDS CONTROL.......................................................................... 20
2.14
RECTIFICATION OF DEFECTS ARISING DURING BASE MAINTENANCE ............. 20
2.15
MAINTENANCE CERTIFICATION AND CERTIFICATE OF RELEASE TO SERVICE20
2.16
RECORDS FOR THE OPERATOR............................................................................ 21
2.17
REPORTING OF DEFECTS TO CASA/OPERATOR/MANUFACTURER .................. 21
2.18
RETURN OF DEFECTIVE AERONAUTICAL PRODUCTS TO STORE ..................... 21
2.19
DEFECTIVE AERONAUTICAL PRODUCTS TO OUTSIDE CONTRACTORS ........... 21
2.20
CONTROL OF COMPUTER MAINTENANCE RECORDS SYSTEM ......................... 21
2.21
MAN-HOURS PLANNING VERSUS SCHEDULED MAINTENANCE ......................... 22
2.22
CONTROL PROCEDURES FOR CRITICAL TASKS ................................................. 22
2.23
SPECIFIC MAINTENANCE PROCEDURES .............................................................. 22
2.24
PROCEDURES TO DETECT AND RECTIFY MAINTENANCE ERRORS ................. 22
2.25
SHIFT/TASK HANDOVER PROCEDURES ............................................................... 23
2.26
PROCEDURES FOR MAINTENANCE DATA ............................................................ 23
2.27
PRODUCTION PLANNING PROCEDURES .............................................................. 23
PART L2 ADDITIONAL LINE MAINTENANCE PROCEDURES .......................................... 24
L2.1
CONTROL OF AERONAUTICAL PRODUCTS, TOOLS, EQUIPMENT, ETC. ........... 24
L2.2
PROCEDURES RELATED TO SERVICING / FUELLING / DE-ICING ETC. .............. 24
L2.3
CONTROL OF DEFECTS AND REPETITIVE DEFECTS .......................................... 24
L2.4
PROCEDURE FOR COMPLETION OF OPERATOR TECHNICAL LOG ................... 25
L2.5
PROCEDURE FOR POOLED PARTS AND LOAN PARTS ....................................... 25
L2.6
RETURN OF DEFECTIVE PARTS REMOVED FROM AIRCRAFT............................ 25
L2.7
PROCEDURE FOR CONTROL OF CRITICAL TASKS .............................................. 25
PART 3
QUALITY AND SAFETY MANAGMENT ............................................................... 26
3.1
QUALITY MANAGEMENT SYSTEMS ....................................................................... 26
3.2
QUALITY AUDIT OF ORGANISATION PROCEDURES ............................................ 26
3.3
QUALITY AUDIT OF AIRCRAFT (AND / OR AERONAUTICAL PRODUCTS) ........... 26
3.4
QUALITY AUDIT REMEDIAL ACTION PROCEDURE ............................................... 27
3.5
CERTIFYING EMPLOYEES – QUALIFICATIONS AND TRAINING ........................... 27
3.6
CERTIFYING EMPLOYEE RECORDS ...................................................................... 27
3.7
QUALIFYING AUDIT EMPLOYEES ........................................................................... 27
AMO Sample Exposition
June 2015
Page 2
3.8
MANUFACTURER'S AND OTHER MAINTENANCE WORKING TEAMS .................. 28
3.9
HUMAN FACTORS TRAINING PROCEDURE .......................................................... 28
3.10
COMPETENCE ASSESSMENT OF EMPLOYEES .................................................... 28
3.11
SAFETY MANAGEMENT SYSTEM (SMS) ................................................................ 28
PART 4
OPERATIONS ....................................................................................................... 30
4.1
CONTRACTED OPERATORS ................................................................................... 30
4.2
OPERATOR PROCEDURES AND DOCUMENTATION ............................................ 30
4.3
OPERATOR RECORDS COMPLETION .................................................................... 30
PART 5
TRAINING AND ASSESSMENT ........................................................................... 31
5.1
FACILITIES................................................................................................................ 31
5.2
PERSONNEL ............................................................................................................. 31
5.3
TRAINING AND ASSESSMENT PROCEDURES ...................................................... 31
5.4
TRAINING SOURCING AND QUALITY CONTROL ................................................... 32
5.5
AUTHORISATION AND REPORTING ....................................................................... 32
5.6
RECORDS ................................................................................................................. 32
PART 6
APPENDICIES ...................................................................................................... 33
6.1
LIST OF DOCUMENTS ............................................................................................. 33
6.2
LIST OF SUBCONTRACTORS.................................................................................. 33
6.3
LIST OF LINE MAINTENANCE LOCATIONS ............................................................ 33
6.4
LIST OF CONTRACTED PART 145 ORGANISATIONS ............................................ 34
6.5
PROVISION OF MAINTENANCE SERVICES FOR AIRCRAFT UNDER THE CAR 1988
REQUIREMENTS ..................................................................................................... 34
COMPLIANCE MATRIX …………………………………….……………………………...…38
6.6
AMO Sample Exposition
June 2015
Page 3
LIST OF EFFECTIVE PAGES
This section should include the list of effective pages of the complete manual. The list may be
prepared in the following manner.
Page No.
Revision
AMO Sample Exposition
Date
Page No.
June 2015
Revision
Date
Page 4
AMENDMENT RECORD
This section should set out the amendment record of the exposition. The amendment record
may be in the following form.
Amendment
Date
No.
AMO Sample Exposition
Amendment Details
June 2015
Amended by
Date of
Inclusion
Page 5
DISTRIBUTION LIST
This section should include a distribution list to ensure proper distribution of the exposition and
to demonstrate to CASA that all employees involved in maintenance have access to the
relevant information. This does not mean that all employees have to be in receipt of a complete
exposition but that a reasonable number of copies are distributed within the organisation so that
employees may have quick and easy access to this exposition.
Alternately, if the manual is available electronically this section should set out how the
electronic version is available throughout the organisation and to individuals outside the
organisation.
Distribution list.
Copy No.
AMO Sample Exposition
Holder
June 2015
Page 6
ABBREVIATIONS, ACRONYMS AND DEFINITIONS
This section should set out the meaning of any abbreviations, acronyms and unique terms used
in the exposition. For example:
AD ..................... Airworthiness Directive
AOC .................. Air Operator's Certificate
ARC……………...Authorised Release Certificate
CASA ................ Civil Aviation Safety Authority
CAMO ............... Continuing Airworthiness Management Organisation
CoA ................... Certificate of Airworthiness
CASR……………Civil Aviation Safety Regulations
CRS ................... Certificate of Release to Service
MEL ................... Minimum Equipment List
AMO .................. Approved Maintenance Organisation
MOS .................. Manual of Standards
AMP .................. Aircraft Maintenance Programme
SB ..................... Service Bulletin
AMO Sample Exposition
June 2015
Page 7
PART 1 GENERAL
1.1
ACCOUNTABLE MANAGER’S STATEMENT
(CASR subregulation 145.010 (1), regulations 145.025, 085 / paragraph 145.A.30 (a)
and subparagraph 145.A.70 (a) 1 of the Part 145 MOS refers)
The Accountable Manager's exposition statement should include the intent of the
following paragraph. The following statement may be used without amendment. Any
changes to the statement should not alter the intent.
I, the Accountable Manager have the corporate authority to ensure that all maintenance
services required by the customer can be financed and provided to the standard required
and that all necessary resources are available to enable compliance with this exposition.
I will establish and promote policies for safety management and quality systems for this
AMO and its employees in accordance with this exposition.
This exposition defines the procedures upon which the CASR Part 145 approval of
[organisation name] as an AMO is based.
The exposition, along with the procedures contained in it, are approved by CASA and
must be complied with as applicable, in order to ensure that all the activities involving the
provision of maintenance services including maintenance of aircraft and aeronautical
products is provided to the standard required under the Legislation.
The procedures included or referred to in this exposition do not override the necessity of
complying with any new or amended regulations published by CASA from time to time
where these new or amended regulations are in conflict with these procedures.
The AMO approval will continue whilst CASA is satisfied that these procedures are being
followed. CASA reserves the right to suspend, vary or cancel the AMO approval of the
organisation, as applicable, if CASA has evidence that the procedures are not being
followed and the standards are not being upheld.
Signed: ………………………………………… Date: …………………………….
Name: …………………………………………..
AMO Sample Exposition
June 2015
Title:
Accountable Manager,
[Organisation name]
Page 8
1.2
SAFETY AND QUALITY POLICY
(Paragraph 145.A.65 (a) of the Part 145 MOS refers)
The Safety and Quality Policy should, as a minimum, include a statement committing
the organisation to:
 recognise safety as a prime consideration at all times;
 apply Human Factors principles;
 encourage personnel to report maintenance related errors/incidents to meet
Part 145 requirements;
 recognise that compliance with procedures, quality standards and regulations is
the duty of all personnel; and
 recognise the need for all personnel to cooperate with the Quality Auditors.
Safety Policy Statement Refer to paragraph 145.A.65 (a) of the Part 145 AMC.
Safety is the first priority in all our activities. We are committed to implementing,
developing and improving strategies, management systems and processes to ensure that
all our aviation activities uphold the highest level of safety performance and meet national
and international standards.
Our commitment is to:
1
2
3
4
5
6
7
8
9
10
11
12
13
Develop and embed a safety culture in all our aviation activities that recognises the
importance and value of effective aviation safety management and acknowledges at
all times that safety is paramount.
Clearly define for all employees their accountabilities and responsibilities for the
development and delivery of aviation safety strategy and performance.
Minimise the risks associated with aircraft operations to a point that is as low as
reasonably practicable/achievable.
Ensure that externally supplied systems and services that impact upon the safety of
our operations meet appropriate safety standards.
Actively develop and improve our safety processes to conform to world-class
standards.
Comply with and, wherever possible, exceed legislative and regulatory requirements
and standards.
Ensure that all employees are provided with adequate and appropriate aviation
safety information and training, are competent in safety matters and are only
allocated tasks commensurate with their skills.
Ensure that sufficient skilled and trained resources are available to implement safety
strategy and policy.
Establish and measure our safety performance against realistic objectives and/or
targets.
Achieve the highest levels of safety standards and performance in all our aviation
activities.
Continually improve our safety performance.
Conduct safety and management reviews and ensure that relevant action is taken.
Ensure that the application of effective aviation safety management systems is
integral to all our aviation activities, with the objective of achieving the highest levels
of safety standards and performance.
Note: Additional topics for inclusion in the Accountable Manager’s Corporate Safety
Commitment may be found in paragraph 145.A.65 (a) of the Part 145 AMC.
AMO Sample Exposition
June 2015
Page 9
1.3
MANAGEMENT PERSONNEL
(CASR paragraph 145.030 (1) (f) and paragraph 145.A.30 of the Part 145 MOS refers)
This section should list names of the individuals occupying the following positions and
demonstrate the assessment procedure to ensure appropriate qualifications.
1.3.1
Accountable Manager
(CASR subregulation 145.010(1), regulations 145.025, 080, paragraph
145.A.30 (a), and subparagraphs 145.A.70(a) 1, and of the Part 145 MOS
refers)
This section should identify the Accountable Manager, set out the duties and
responsibilities of the Accountable Manager in relation the AMO, specify
standards such as required qualifications and experience and demonstrate that
the Accountable Manager has corporate authority for ensuring that all
maintenance services can be financed and carried out to the required standard.
1.3.2
Responsible Manager
(CASR subregulation 145.010 (1), regulation 145.080, paragraph 145.A.30 (b)
and subparagraphs 145.A.70(a) (2), (3) and (5) of the Part 145 MOS refers)
This section should identify and set out the duties and responsibilities of each
responsible manager and specify standards such as required qualifications and
experience. The level of detail should be sufficient to show that all the
responsibilities and obligations of the AMO under CASR Part 42, CASR Part
145 and the Part 145 MOS are covered by the responsible managers.
If there is more than one responsible manager then their responsibilities and
obligations should be framed with reference to the appropriate regulation or
chapter of the MOS. The size of an AMO and the complexity of its scope of
approval and the capability of individuals nominated determine the number of
Responsible Managers required.
1.3.3
Quality Manager
(CASR subregulation 145.010 (1), regulation 145.080 and subparagraphs
145.A.30 (c) 1 and 65 (a) and (c) of the Part 145 MOS refers)
This section should identify and set out the duties and responsibilities of the
quality manager, specify standards such as required qualifications and
experience and should demonstrate that he/she reports directly to the
accountable manager for all quality related matters.
1.3.4
Safety Manager
(CASR subregulation 145.010 (1), regulation 145.080 and subparagraphs
145.A.30 (c) 2 and 65 (a) and (d) of the Part 145 MOS refers)
This section should identify and set out the duties and responsibilities of the
Safety Manager, specify standards such as required qualifications and
experience and should demonstrate that he/she reports directly to the
accountable manager for all safety related matters.
1.3.5
Other Relevant Personnel
(CASR regulation 145.080 refers)
This section can be continued with the terms of reference of additional
management personnel, who report to the upper level of management, as
necessary to fully describe the organisation. This should also specify standards
such as required qualifications and experience.
AMO Sample Exposition
June 2015
Page 10
1.4
MANAGEMENT ORGANISATIONAL CHART
(Subparagraph 145.A.70(a) 4 of the Part 145 MOS refers)
This section sets out the organisational chart depicting reporting lines and chains of
responsibility of managers. Independence of Quality and Safety Managers from the
maintenance organisation structure as required by section 145.A.30(c) of the Part 145
MOS should be shown.
The following charts show examples of acceptable organisational structures for Part 145 AMOs.
Example 1: Multiple Responsible
Managers report to the Accountable
Manager. Quality & Safety Managers
independent of the Responsible Managers.
Accountable Manager
Responsible Manager
Line Maintenance
Responsible Manager
Aeronautical Product
Maintenance
Responsible Manager
Base Maintenance
Quality Manager
Safety Manager
Accountable Manager
Example 2: Multiple Responsible
Managers report to the Accountable
Manager through a Responsible Manager.
Quality & Safety Managers independent of
the Responsible Managers.
Responsible
Manager
Responsible Manager
Line Maintenance
Responsible Manager
Base Maintenance
Example 3: Small AMO not
more than 10 individuals
involved in maintenance.
Quality & Safety audit function
independence is maintained by
contractual arrangement.
Responsible Manager
Aeronautical Product
Maintenance
Accountable Manager
Quality Manager
Safety Manager
Contracted
Quality and Safety
Independent Auditing
Contracted
Quality and Safety
Independent Auditing
Responsible Manager
Accountable Manager
Responsible Manager
AMO Sample Exposition
June 2015
Page 11
1.5
CERTIFYING EMPLOYEES
(CASR regulations 42.295, 315 / CASR regulation 145.080, subparagraphs 145.A.30
(e), (f), (k), 35, 37 and 70 (a) 6 of the Part 145 MOS refers)
This section should list the standards of personnel qualifications that the AMO
will recognise and require for each type of certifying employee to be authorised
by the organisation as described under section 145.A.30 of the Part 145 MOS.
This section should demonstrate how the organisation ensures the
qualifications of the employees performing maintenance certification and
issuing Certificates of Release to Service are appropriate for the task they
perform. Qualification standards for the employees listed below should be
consistent with the scope of maintenance of the AMO.
1.5.1
Base Certifying Employees
(Subparagraphs 145.A.30 (h) (i) of the Part 145 MOS refers)
Category C
Category B1
Category B2
Specialist Maintenance Certifying Employees subparagraph 145.A.30(f) of the
Part 145 MOS
1.5.2
Line Maintenance
(Paragraph 145.A.30 (g) of the Part 145 MOS refers)
Category B1
Category B2
Category A (Where applicable)
Specialist Maintenance Certifying Employees paragraph 145.A.30 (f) of the
Part 145 MOS.
1.5.3
Aeronautical Product Maintenance
(Paragraph 145.A.30 (j) of the Part 145 MOS refers)
Aeronautical Product Certificate of Release to Service.
Specialist Maintenance Certifying Employees paragraph 145.A.30 (f) of the
Part 145 MOS.
1.6
MANPOWER PLAN
(Paragraph 145.A.30 (d), section 145.A.47 and subparagraph 70 (a) 7 of the Part 145
MOS refers)
This section should demonstrate how the organisation ensures the AMO has sufficient
employees to plan, perform, supervise, inspect and certify for maintenance and audit the
AMO for compliance and safety in accordance with the Quality and Safety Management
Systems required by paragraphs 145.A.65 (c) and (d) of the Part 145 MOS for each
maintenance function and location. The AMOs policies relating to the number of
employees required under various types of maintenance and the levels of supervision
required between individual maintainers and Certification Authorisation holders should
be shown here consistent with the Production Planning system.
AMO Sample Exposition
June 2015
Page 12
1.7
FACILITIES
(CASR regulation 42.310, Paragraph 145.A.10, 25 and subparagraphs 70 (a)8, 10, 15
of the Part 145 MOS refers)
This section should describe, in some detail, each of the facilities at which the
organisation intends to carry out maintenance. All locations should be included;
however a different emphasis can be placed on locations of different importance. For
example, the main locations, which are listed in the approval document, will need a
detailed description. Other significant locations such as principal (overnight) line
stations should be clearly described while en-route stations at which minor line
maintenance tasks are performed may be briefly covered.
1.7.1
Base Maintenance
This section should demonstrate specific requirements for Base Maintenance
facilities in accordance with the Part 145 MOS. These include:





1.7.2
a hangar visit plan;
specialist workshops;
environmental provisions;
office accommodation; and
storage and supply of aeronautical products, tools and equipment.
Line Maintenance
(Paragraph 145.A.75 (c) of the Part 145 MOS refers)
This section should describe facilities utilised at each location, to provide
evidence that the facilities are appropriate for the maintenance services to be
provided at that location and are appropriate for the scope of Line Maintenance
as approved for the organisation.
1.7.3
Aeronautical Product Maintenance
This section should describe facilities in adequate detail to show that
 workshops are large enough to accommodate the product to be maintained;
 serviceable and unserviceable aeronautical products, equipment and tools
are segregated;
 facilities for the accommodation of tools and equipment comply with
manufacturers instructions; and
 provide for adequate security of storage facilities.
1.7.4
Layout of Premises
(Subparagraph 145.A.70 (a) 8 and 15 of the Part 145 MOS refers)
This section should show floor plans and diagrams of the facilities, including
proposed accommodation of aircraft and aeronautical products, workshops,
storage facilities and office accommodation.
1.7.5
Locations other than those listed in the Exposition
(Paragraph 145.A.75 (b) of the Part 145 MOS refers)
This section will contain procedures for assessment of existing facilities, tooling,
equipment, data and personnel at locations where the AMO is required to carry
out unscheduled and unforeseen maintenance.
AMO Sample Exposition
June 2015
Page 13
1.8
SCOPE OF MAINTENANCE SERVICES TO BE PROVIDED
(CASR paragraph 145.025 (3) (b), regulation 145.070, section 145.A.10, subparagraph
70 (a) 9, 10 and Appendix I of the Part 145 MOS refers)
An AMOs approved scope of maintenance will be defined by the Approval Certificate
and exposition approved by CASA. The Approval Certificate may list the main locations,
Classes, Ratings and their limitations for the Maintenance Services that the AMO is
approved to provide.
The Part 145 MOS requires the AMO to specify in its exposition the scope of
maintenance it has the capability to perform at each of its locations. This section of the
exposition may contain a capability management procedure, to manage maintenance
within the scope of its approval. For example the aeronautical products the organisation
may maintain under a particular C rating.
1.8.1
Aircraft Maintenance
Location
Class
Rating
Sydney
Aircraft
A1
Melbourne
1.8.2
Line
Yes
Yes
No
Yes
No
No
Yes
Yes
No
Yes
Class
Engine
Rating
B1
Limitation
CFM 56-7B (Overhaul)
Aeronautical Product Maintenance
Location
Sydney
Melbourne
1.8.4
A1
Base
Yes
No
Engine Maintenance
Location
Melbourne
1.8.3
Aircraft
Limitation
B737-200
A320200/CFM56
A320200/V2500
B737-200
A320200/CFM56
A320200/V2500
Class
Aeronautical
Products
Aeronautical
Products
Rating
C3
ATA Chapter
23 – 34
C3
23 – 34
Limitation
Raytheon
Sikorsky
Raytheon
Sikorsky
Rockwell Collins
Specialist Maintenance
(CASR subregulation 145.025 (3) (b) (ii) and Part 145 MOS Appendix I refers)
If the AMO carries out Specialist Maintenance as part of the provision of
maintenance it provides under an A, B or C rating, and does not hold a D rating
for the Specialist Maintenance, this section of the exposition will fully describe
the procedures, facilities, equipment and tooling, data used and employee
qualifications used for that Specialist Maintenance.
AMO Sample Exposition
June 2015
Page 14
If the AMO has a D rating for the Specialist Maintenance that it carries out, this
section of the exposition may be set out in tabular form as laid out above for
maintenance within the scope of the AMOs approval certificate at various
locations.
1.8.5
Fabrication in the Course of Maintenance
(Section 145.A.43 of the Part 145 MOS refers)
If an AMO has been approved to maintain aircraft or aeronautical products
under CASR Part 145, it may only fabricate a part for an aircraft or aeronautical
product covered by its certificate of approval, and only if it has the capability to
fabricate the particular part with respect to appropriate facilities, tools and
trained and competent employees. If the AMO fabricates parts in the course of
maintenance, this section of the exposition will specify procedures to be used to
ensure all requirements of section 145.A.43 of the Part 145 MOS are complied
with.
1.9
SIGNIFICANT CHANGES
(CASR subregulation 145.010(2), regulation 145.050 and subparagraphs 145.A.70 (a)
11 and 70 (b) of the Part 145 MOS refers)
Significant changes to the organisation require approval by CASA in
accordance with CASR regulation 145.055. Significant changes are defined in
CASR subregulation 145.010(2).
This section should set out the procedure that the AMO must follow for making
significant changes to the organisation. In particular, it should set out how the
changes are initiated and assessed, how applications are made, how the
organisation ensures that the change is fully incorporated and who within the
organisation is responsible for managing these changes. (SMS management of
change)
1.10
CHANGES THAT ARE NOT SIGNIFICANT CHANGES
(CASR 145.060 and subparagraphs 145.A.70 (a) 12 and 70 (b) of the Part 145 MOS
refers)
Changes to the organisation and exposition that are not significant changes
may be approved by the AMO in accordance with CASR 145.060 without prior
approval by CASA.
This section should set out the procedure that the CAMO must follow for
making changes to the organisation that are not significant changes. In
particular, it should set out how the changes are initiated and assessed, how
applications are made, how approvals are given, how the organisation ensures
that the change is fully incorporated, how the organisation notifies CASA and
who within the organisation is responsible. (SMS management of change)
1.11
EXPOSITION
(CASR subregulation 145.015(2)(c) refers)
1.11.1 Providing employees with exposition
(CASR 145.080 refers)
This section should set out how the organisation ensures employees have
access to the parts of the exposition that relate to their duties and
responsibilities, and who is responsible for this.
AMO Sample Exposition
June 2015
Page 15
1.11.2 Keeping the exposition up-to-date and compliant
(Paragraph 145.A.70(b) of the Part 145 MOS)
This section should identify how the organisation ensures that the exposition is
kept up to date and it complies with requirements of CASR 42, 145 and Part
145 MOS in relation to its content and who is responsible for this.
1.11.3 Changes to AMO Exposition
(CASR 145.050, 060 and subparagraphs 145.A.70(a) 12 and 70 (b) of the Part
145 MOS refers)
This section should set out the how any proposed change to the exposition is
initiated, who is responsible for assessing the proposed change to determine
whether the change needs to be approved by CASA, or whether it may be
approved in-house. The section should set out the procedures for making
applications for changes to CASA or if applicable, the procedures for in-house
approval by the AMO. It should also identify the individual who is responsible
for incorporating the change in the exposition once it is approved.
1.11.4 Direction by CASA to change expositions
(CASR 145.065 and 145.085 refers)
This section should set out the how the AMO incorporates changes to its
exposition to comply with a direction given by CASA. The individuals
responsible for this should be identified.
AMO Sample Exposition
June 2015
Page 16
PART 2 MAINTENANCE PROCEDURES
(CASR 42.310 / CASR 145.070 and paragraph 145.A.65 (b) of the Part 145 MOS refers)
This part should set out, in detail, how the AMO provides the maintenance services it is
approved and required to provide in order to ensure that it meets its obligation under
CASR Parts 42, 145 and Part 145 MOS.
It is acceptable to refer to other documents and manuals of the AMO in order to prevent the
exposition from becoming unmanageably large. However, if this is done, then the other
documents and manuals become subject to the same requirements and controls as the
exposition e.g. CASA approval and change management.
2.1
SUPPLIER EVALUATION AND SUBCONTRACT CONTROL PROCEDURE
(Subparagraphs 145.A.65 (c) 5, 70 (a) 16 and 75 (a) of the Part 145 MOS refers)
Suggested subject headings
 Company Policy — (sources of supplies such as for 42.445, 42.455)
 Records of utilisation
 List of Approved Suppliers
 Monitoring of Suppliers Quality systems
 Findings, corrective and preventative actions
 System for placing orders
 Pre Contract Audit procedures
 Control of Subcontractors
 Documentation to be used
2.2
RECEIPT / INSPECTION / ACCEPTANCE OF AERONAUTICAL PRODUCTS
(CASR Subpart 42.E and Section 145.A.42 of the Part 145 MOS refers)
Suggested subject headings
 Aeronautical product/Standard Part/Material acceptance procedures —
(sources, conformity, eligibility acceptability to company requirements, records)
 Incoming inspection — (required documentation, compliance with order,
condition, "Quarantine" procedure)
 Control of aeronautical products received from customers for Repair and/or
Overhaul etc.
 Segregation of Serviceable/Unserviceable parts CASR 42.460
 Procedures for dealing with Unsalvageable parts CASR 42.465
 Procedures for dealing with suspected unapproved parts CASR Subpart
42.E.4
2.3
STORAGE, TAGGING AND RELEASE OF AERONAUTICAL PRODUCTS
(CASR Subpart 42.E and Subparagraph 145.A.25 (d) and 50 (d) of the Part 145 MOS
refers)
Suggested subject headings
 Procedures for maintaining satisfactory storage conditions — (Aeronautical
Products and consumable materials)
 System for control of shelf life and eligibility for fitment of items in storage
 Tagging/Labelling system and segregation — (serviceable, unserviceable,
unsalvageable, suspected unapproved parts and quarantine.)
 Issue of aeronautical products to maintenance
AMO Sample Exposition
June 2015
Page 17
2.4
TOOLS AND EQUIPMENT
(CASR 42.310(1)(b) and paragraph 145.A.40 of the Part 145 MOS refers)
Suggested subject headings
 Procedure for receiving tools and equipment
 Method for tracking service life
 Method of labelling tooling serviceable or otherwise
 Method of storing the paperwork specific to each item including manufactures
instructions and calibration reports
 Process for acceptance — (identification, certification, control, calibration)
 Procedure for identification and approval of Instructions for Continuing
Airworthiness (ICA) Maintenance data for the use of alternative tools and
equipment subparagraph 145.A.45 (d) 3 of the Part 145 MOS
2.5
CALIBRATION OF TOOLS AND EQUIPMENT
(CASR regulation 42.310(1)(c) and Subparagraphs 145.A.40 (b) (c) and (d) refers)
Suggested subject headings
 Inspection, servicing and calibration programme/equipment register
 Establishment of inspection, servicing and calibration time periods and
frequencies
 Identification of servicing/calibration due dates
 List of Standards being used
 Calibration procedures for serviceability and accuracy
 Recording and storage of the calibrated item and the standard it was calibrated
against
 Procedure for quarantine and investigation of tools and aeronautical product or
aircraft affected by the discovery of out of tolerance tooling
2.6
USE OF TOOLING AND EQUIPMENT BY EMPLOYEES
(CASR regulations 42.310(1), 42.330 and subparagraph 145.A.40 (a) 1 of the Part 145
MOS refers)
Suggested subject headings
 Issue of tools — (record of user and location)
 Determining tool serviceability prior to issue
 Training and certification of employees in the use of tools and equipment
 Personal (own) instrument/tool control
 Loan tool control and audit
 Alternative tool identification, data approval and use as per subparagraph
145.A.45 (d) 3 of the Part 145 MOS
2.7
CLEANLINESS STANDARDS OF MAINTENANCE FACILITIES
(CASR subparagraph 42.310(1) (a) (ii) and subparagraph 145.A.25 (a) 3, 4 of the Part
145 MOS refers)
Suggested subject headings
 "Foreign Object" exclusion programme
 Cleaning programme — individual responsibilities — Timescales
 Waste material disposal
 Segregation of working spaces
 Dust suppression in the workspace
AMO Sample Exposition
June 2015
Page 18
2.8
INSTRUCTIONS FOR CONTINUING AIRWORTHINESS (ICA)
(CASR subparagraph 42.310(1) (a) (i) and Section 145.A.45 of Part 145 MOS refers)
Suggested subject headings
 Control of information — Technical library (information held, control, issue)
 Technical information amendment procedures — Manuals — Service
Information — Uncontrolled copies of manuals
 Company Technical Procedures / Instructions
 Awareness of Technical Publications, Instructions and Service Information
 Maintenance documentation — (preparation from approved sources —
amendment control)
 CASA acceptance of organisation's transfer of ICA
 Review and identification of amendment status of ICA
 Distribution of ICA — access by maintenance personnel
 The verification and validation of new procedures where practicable
 Incorporation of best practice and human factors principles
 Control of customer supplied ICA
2.9
REPAIR PROCEDURE
(CASR regulation 42.325, CASR Subpart 42.E.2 CASR Subpart 42.D.6 and
subparagraph 145.A.65 (b) of the Part 145 MOS refers)
Suggested subject headings
 Company policy — (internal/external — sources of repair approval)
 Company approvals — scope of work — limitations and conditions
 Control system for fabrication of parts in the course of maintenance,
processing and inspection with regard to subparagraph 145.A.43 (c) of the Part
145 MOS
2.10
AIRWORTHINESS DIRECTIVES PROCEDURE
(Section 145.A.55 of the Part 145 MOS refers)
Suggested subject headings
 Airworthiness Directive (AD) response procedure — (terminating action/
inspection)
 Records of AD compliance and certification
 Repetitive AD requirements — (inspection control)
2.11
OPTIONAL MODIFICATION PROCEDURE
(CASR regulation 42.325, Paragraphs 145.A.45 and 55 of the Part 145 MOS refers)
Suggested subject headings
 Continued Airworthiness Information — (assessment procedure and methods
of response)
 Modification control — (requirements and approval)
AMO Sample Exposition
June 2015
Page 19
2.12
MAINTENANCE DOCUMENTATION IN USE AND ITS COMPLETION
(CASR subparagraph 42.310(1) (a) (i) and paragraph 145.A.45 and 55 of Part 145 MOS
refers)
Suggested subject headings
 Worksheets for non-routine tasks
 Assembly of work packages for issue to maintenance activity
 Work sheet/card completion — Maintenance sign-off and the performance of
Maintenance Certification
 Assembly of completed work package for coordination and CRS issue
 Recording of test results and dimensions (AMC 145.A.50(d))
 Control and use of customer supplied work card/sheets
2.13
TECHNICAL RECORDS CONTROL
(CASR Division 42.D.7 and sections 145.A.45 and 55 of Part 145 MOS refers)
Suggested subject headings
 System for control, storage and retrieval (paper or computer based)
 Control of access to records — (paper and/or computer based records)
 Record-keeping systems — (essential records)
 Turbine engines — module records
 Disposal of records — transfer of aircraft
 Lost or destroyed records (reconstruction and CASA acceptance)
 Provision of maintenance records to operator
 Retention of records (periods — methods and security)
2.14
RECTIFICATION OF DEFECTS ARISING DURING BASE MAINTENANCE
(CASR regulation 42.355 and subparagraph 145.A.50 (c) of the Part 145 MOS refers)
Suggested subject headings
 Recording and sign-off of base maintenance defects
 Carrying forward defects to future maintenance Inputs — (control and
accountability)
 Analysis of defects and rectification — human factors — maintenance
programme implications — reliability
2.15
MAINTENANCE CERTIFICATION AND CERTIFICATE OF RELEASE TO SERVICE
(CASR regulation 42.330, CASR Subpart 42.H and paragraphs 145.A.45 (e) and
section 50 of the Part 145 MOS refers)
Suggested subject headings
 Company procedures — (CRS statement)
 Issue of CRS after Base Maintenance
 Issue of CRS after Line Maintenance
 Issue of a CRS with uncompleted work
 Issue of a certification authorisation for a single maintenance event
 Sign-off after maintenance task completion
 Issue of CASA Form 1
 Certification — identity — qualified employees
 Cross-reference to work packs
 Re-release of aeronautical products removed serviceable from aircraft
AMO Sample Exposition
June 2015
Page 20
2.16
RECORDS FOR THE OPERATOR
(CASR regulation 42.405 and paragraph 145.A.55 (b) and subparagraph 145.A.65 (c) 3
of Part 145 MOS refers)
Suggested subject headings
 Contractor record keeping — specific operators
 Arrangements for processing and retention of maintenance records
2.17
REPORTING OF DEFECTS TO CASA/OPERATOR/MANUFACTURER
(CASR Subdivision 42.D.6.2 and section 145.A.60 of Part 145 MOS refers)
Suggested subject headings
 Methods of Reporting to:
º
CASA
º
Manufacturer
º
Operator/CAMO
 Persons Responsible for Reporting
 Reports must contain pertinent and evaluation results (where known)
 Defects Reported by Subcontractors and lessees
 Permitted Reporting Periods and Retention of Data
 Reportable Defects Investigation procedure and follow-up system
 Reporting timescale
2.18
RETURN OF DEFECTIVE AERONAUTICAL PRODUCTS TO STORE
Suggested subject headings
 Labelling and identification — (required information)
 Handling and movement of aeronautical products
 Storage and segregation of defective aeronautical products
 Aeronautical products "on hold" (pending determination of serviceability status)
2.19
DEFECTIVE AERONAUTICAL PRODUCTS TO OUTSIDE CONTRACTORS
Suggested subject headings
 Dispatch of aeronautical products for repair/overhaul/calibration
 Control of dispatch, location and return
 Identification of required work
 Return of aeronautical products
2.20
CONTROL OF COMPUTER MAINTENANCE RECORDS SYSTEM
(Subparagraph 145.A.45 (e)2, 145.A.55 (c)1 and paragraph 145.A.65 (c) of Part 145
MOS refers)
Suggested subject headings
 Information retrieval
 Back-up systems and second site storage
 Security and safeguards to unauthorised access
AMO Sample Exposition
June 2015
Page 21
2.21
MAN-HOURS PLANNING VERSUS SCHEDULED MAINTENANCE
(Paragraph 145.A.30 (d) and section 145.A.47 of Part 145 MOS refers)
Suggested subject headings
 Company planning v time available procedure
 Complexity of work
 Organisation of shifts
 Account of human performance limitations
2.22
CONTROL PROCEDURES FOR CRITICAL TASKS
(CASR division 42.D.5 and subparagraph 145.A.65 (b) 8 of Part 145 MOS refers)
Suggested subject headings
 Independent verification — inspection procedures
 Critical task procedures and control
 Critical task list
2.23
SPECIFIC MAINTENANCE PROCEDURES
Suggested subject headings
 Engine running
 Aircraft pressure run
 Aircraft towing
 Aircraft taxiing
 Scrapping of unsalvageable parts
 Working away from main base/workshop
2.24
PROCEDURES TO DETECT AND RECTIFY MAINTENANCE ERRORS
(Paragraphs 145.A.60 and Subparagraph 145.A.65 (b) 8 of the Part 145 MOS refers)
Suggested subject headings
 Aims and objectives of error management system
 The encouragement of reporting
 A code of practice
 Description of process that reports occurrences
 Description of process that investigates occurrences
 Description of process that records occurrences
 The analysis of occurrence data
 Management actions in response to occurrence findings
 Feedback to employees
 Sharing information from investigations
AMO Sample Exposition
June 2015
Page 22
2.25
SHIFT/TASK HANDOVER PROCEDURES
(Subparagraph 145.A.47 (b) 3 of the Part 145 MOS refers)
Suggested subject headings:
 Aims and objectives of the shift handover

Training of personnel in shift/task handover processes

Recording of shift/task handover

Description of shift handover process
º
º
º
º
2.26
Facility status
Work status
Manning status
Outstanding issues
PROCEDURES FOR MAINTENANCE DATA
(Subparagraph 42.310(1)(a)(i) and section 145.A.45 of the Part 145 MOS refers)
Suggested subject headings:
 Definitions of maintenance data ambiguities
 Responsible person for coordination of reporting and remedial actions
 Method of internal reporting of maintenance data ambiguities
 Method of external reporting of maintenance data ambiguities to the
appropriate CAMO and authors of that data
 Procedures for alteration and generation of maintenance data paragraphs
145.A.45 (b) and (d) of the Part 145 MOS
 Feedback to employees and implementation corrections
2.27
PRODUCTION PLANNING PROCEDURES
(Section 145.A.47 of the Part 145 MOS refers)
Suggested subject headings:
 Establishment of a clear work order or contract
 Procedures for establishing all necessary resources are available before
commencement of work
 Procedures for organising maintenance personnel and providing all necessary
support during maintenance
 Consideration of human performance limitations
 Planning of tasks
AMO Sample Exposition
June 2015
Page 23
PART L2 ADDITIONAL LINE MAINTENANCE PROCEDURES
(Paragraph 145.A.65 (b) of the Part 145 MOS refers)
L2.1
CONTROL OF AERONAUTICAL PRODUCTS, TOOLS, EQUIPMENT, ETC.
Suggested subject heading
 Aeronautical product/Material acceptance — required, documentation,
condition, "Quarantine" procedure
 Aeronautical products removed serviceable from aircraft
 Procedures for maintaining satisfactory storage conditions — (perishables,
flammable fluids, engines, bulky assemblies, special storage requirements)
 System for control of shelf life and modification standard
 Tagging/labelling system (serviceable; serviceable removed from aircraft;
unserviceable; scrap; suspected unapproved parts; quarantine etc.)
 Issue of aeronautical products to the maintenance process
 Free-issue dispensing of standard parts (control, identification, segregation)
 Tools and Test Equipment, servicing and calibration program / equipment
register / tool control after maintenance with regards to CASR 42.330
 Identification of servicing/calibration due dates
L2.2
PROCEDURES RELATED TO SERVICING / FUELLING / DE-ICING ETC.
Suggested subject headings
 Maintenance documentation —(control and amendment)
 Airworthiness data — (control and amendment)
 Fuel supply quality monitoring:
º bulk storage
º aircraft re-fuelling
 Ground de-icing:
º Procedures
º Monitoring of sub-contractors
 Maintenance carried out in the open — (limitations)
L2.3
CONTROL OF DEFECTS AND REPETITIVE DEFECTS
Suggested subject headings
 Reportable defects — Engineering entries — Cabin
 Deferred defect classification system
 Rules for deferring (periods — review — permitted personnel — conformity
with MEL/CDL provisions)
 Certification of defect rectification —- Transfer of defects to worksheets / cards
 Awareness of deferred defects carried by aircraft — monitoring of repetitive
defects
 Communication with main base
AMO Sample Exposition
June 2015
Page 24
L2.4
PROCEDURE FOR COMPLETION OF OPERATOR TECHNICAL LOG
Suggested subject headings
 Explanation of Technical Log system — completion of Sector Record Page —
Distribution of copies
 Certification/Sign-off — Maintenance, Pre-flight/Transit, EDTO — Independent
Inspections
 Maintenance control systems — Special Inspections, Out-of-Phase
maintenance
 Retention of records
 Maintenance Statements
L2.5
PROCEDURE FOR POOLED PARTS AND LOAN PARTS
Suggested subject headings
 Verification of approved sources of parts — Modification Standard and AD
compliance
 Compliance with loan and contract requirements — Tracking and control
 Required documentation
 Processing removed loan parts for return to source — service record
 Cannibalisation system — control procedures, authority
L2.6
RETURN OF DEFECTIVE PARTS REMOVED FROM AIRCRAFT
Suggested subject headings
 Required documentation — service record
 Processing advice of removal and dispatch to Technical Records
 Dispatch to rectification
L2.7
PROCEDURE FOR CONTROL OF CRITICAL TASKS
Suggested subject headings
 Allocation of employees
 Assignment of secondary inspections
AMO Sample Exposition
June 2015
Page 25
PART 3 QUALITY AND SAFETY MANAGMENT
(Paragraph 145.A.65 (c) (d) and subparagraph 145.A.70 (a) 13 of the Part 145
MOS refers)
3.1
QUALITY MANAGEMENT SYSTEMS
(Paragraph 145.A.65 (c) of the Part 145 MOS refers)
Suggested subject heading
 Audit procedures for regulatory compliance and maintenance standards
 Systems for remedial corrective and preventative action and feedback
 Identification, legibility, storage, protection, archiving, retrieval and retention of
records
 Regular review of Quality Management System subparagraph 145.A.65 (c) 4
of the Part 145 MOS
3.2
QUALITY AUDIT OF ORGANISATION PROCEDURES
Suggested subject headings
 Company Audit Policy/Plan/Schedule subparagraph 145.A.65(c)1 of the Part
145 MOS
 Definition of the Quality System
 Independence access to Accountable Manager
 Composition and functions of quality management group paragraph 145.A.35
(i) of the Part 145 MOS
 Annual Review of Maintenance Procedures
 Audit programme — Adequate and satisfactory facilities
 Compliance with approved procedures
 Dates and timescales
 Audit of suppliers and Subcontractors
3.3
QUALITY AUDIT OF AIRCRAFT (AND / OR AERONAUTICAL PRODUCTS)
(Subparagraphs 145.A.65 (c) 1 and 145.A.65 (b) 8 of the Part 145 MOS refers)
Suggested subject headings
 Scope of Maintenance
 System description
 Audit programme
 Auditing of standards
 Product samples (aircraft and/or aeronautical products)
 Dates and timescales
 Corrective Action
 Auditing methods
 Sampling — "Trail" audits.
AMO Sample Exposition
June 2015
Page 26
3.4
QUALITY AUDIT REMEDIAL ACTION PROCEDURE
(Subparagraph 145.A.65 (c) 2 of the Part 145 MOS refers)
Suggested subject headings
 Quality audit finding and risk assessments
 Quality audit report feedback system
 Accountable Manager/senior management review meeting
 Corrective action and timescale:
º remedial action
º disciplinary action
º retention and storage of Audit reports
 Management responsibilities for corrective action and follow-up
3.5
CERTIFYING EMPLOYEES – QUALIFICATIONS AND TRAINING
(CASR 42.315 and section 145.A.35 of the Part 145 MOS refers)
Suggested subject headings
 Experience, training and competence requirements
 Examination, test or assess procedure
 Continuation training procedures
 Qualifying subcontractor's personnel (if applicable)
 Authorisations issue and renewal procedures paragraphs
145.A.35 (a) (b) (c) (f) of the Part 145 MOS:
º currency
º licence validity
º age requirements paragraph 145.A.35 (m) of the Part 145 MOS
 One off certification authorisation paragraph 145.A.30 (l) of the Part 145 MOS
3.6
CERTIFYING EMPLOYEE RECORDS
(Section 145.A.35 and subparagraph 145.A.70 (a) 6 of the Part 145 MOS refers)
Suggested subject headings
 List of certifying personnel
 Minimum information list of employee particulars
 Control of certifying employee records paragraphs 145.A.35 (j) (l) of the Part
145 MOS
 Access to employee records subparagraphs 145.A.35 (h) (j)3 (k) (l) of the Part
145 MOS
 Retention of records subparagraph 145.A.35 (j) 2 of the Part 145 MOS
 Format of authorisation document and authorisation codes
3.7
QUALIFYING AUDIT EMPLOYEES
Suggested subject headings
 Experience (duration and technical), training and competence requirements
 Assessment procedures:
º Examination
º Testing
 Continuation training:
º Programme
º Procedures
AMO Sample Exposition
June 2015
Page 27
3.8
MANUFACTURER'S AND OTHER MAINTENANCE WORKING TEAMS
Suggested subject headings
 Source of work
 Authorisation of personnel
 System for control of materials
 Working instructions and procedures
 Control of documentation:
º Drawings
º Modification
º repair instructions
 Environmental conditions
 Final certification by the AMO
 Certification:
º Repair
º Replacement
º Modification
º Overhaul
º Inspection
3.9
HUMAN FACTORS TRAINING PROCEDURE
(Paragraphs 145.A.35 (d), (e) and 65 (B) (1) (6) of the Part 145 MOS refers)
Suggested subject headings
 Aims and objectives
 Categories of employees to be trained
 Duration
 Requirements for trainers
 Training methods and syllabus
 Continuation training
3.10
COMPETENCE ASSESSMENT OF EMPLOYEES
(CASR 42.315 and Paragraph 145.A.30 (e) of the Part 145 MOS refers)
Suggested subject headings
 Employees assessment standard
 Assessment procedures:
º Training
º Qualifications
º Supervision
º assessors
 Management competence assessment
 Assessment records
 Drug and Alcohol Management Plan
3.11
SAFETY MANAGEMENT SYSTEM (SMS)
(Paragraph 145.A.65 (d) of the Part 145 MOS refers)
Suggested subject headings
 Management commitment to, and responsibility for, safety risk management
 Safety accountabilities of managers
AMO Sample Exposition
June 2015
Page 28







Key personnel
SMS implementation plan
Third party relationships and interactions
Emergency response plan
Hazard identification — Risk management
Monitoring, investigation, review and amendment of procedures
Safety Promotion in the workforce
 Internal recording and analysis of safety data
 Safety assurance - Management of change
(Managing organisational changes should be considered with — Part 1, items
1.9 and 1.10)
AMO Sample Exposition
June 2015
Page 29
PART 4 OPERATIONS
(CASR Subpart 42.G and Subparagraph 145.A.70 (a) 14 of the Part 145 MOS refers)
This Part links the Part 145 AMO to the Continuing Airworthiness Management
Organisations for whom maintenance services are provided and should complement the
operator's own Continuing Airworthiness Management procedures, ensuring complete
and accurate compliance to requirements for:
 recording of maintenance carried out;
 maintenance Certification, CRS and other records in the Continuing
Airworthiness Records for aircraft;
 provision of Maintenance Records to the Operator;
 communication with CAMO or person responsible for continuing airworthiness
where appropriate; and
 retention of copies of Maintenance Records and CRS.
4.1
CONTRACTED OPERATORS
(Subparagraphs 145.A.70 (a) 14 of the Part 145 MOS refers)
Suggested subject headings
 List of operators for whom maintenance is provided, with details of the types of
aircraft (engines/APU)
 Scope of work undertaken, e.g. Base maintenance, Line maintenance, Defect
rectification etc. with any limitations
4.2
OPERATOR PROCEDURES AND DOCUMENTATION
Suggested subject headings
 All tasks should be described, that are performed by the maintenance
organisation to support the operator:
º spares management procedures;
º engine management programme;
º reliability monitoring and data input to the Operator Reliability program;
º deferred and repetitive defect monitoring and reporting to the operator;
º aircraft external damage control — identification and control; and
º reporting of un-airworthy conditions
4.3
OPERATOR RECORDS COMPLETION
(Subparagraph 145.A.65 (c) 3 of the Part 145 MOS refers)
Suggested subject headings
 Completing Operator's log books
 Keeping the Operator's technical records
 Retention of copy of Operator records
AMO Sample Exposition
June 2015
Page 30
PART 5 TRAINING AND ASSESSMENT
(CASR paragraphs 145.015(2) (f) (g), 025 (3) (c), regulations 145.040, 075 and
section 145.A.37 of the Part 145 MOS refers)
This section should set out the procedures that the Part 145 AMO must follow for the
training and assessment of Certifying staff including:




removing exclusions;
utilising manufactures training for ratings;
type and Task training for Category ‘A’ licence holders; and
pilot and flight engineer training for maintenance permitted by the Part 42
MOS.
Note: AMO’s that deliver training for certifying employees should also refer to the
relevant sections of CASR Parts 66 and 147 related to the training and assessment to
be conducted.
5.1
FACILITIES
Suggested contents
 Training facilities
 Instructional equipment
 Maintenance training material
5.2
PERSONNEL
Suggested contents
 Quality managers role
 Personnel responsible for training management
 Instructors
 Assessors
 Records of instructors and assessors
5.3
TRAINING AND ASSESSMENT PROCEDURES
Suggested contents
 Course plans
 Course material
 Conduct of training
 Exclusion training
 Aircraft system training
 Aircraft type training
 Conduct of assessment
 Aircraft type assessment
 Security of assessment material
AMO Sample Exposition
June 2015
Page 31
5.4
TRAINING SOURCING AND QUALITY CONTROL
Suggested contents
 Sourcing manufactures training
 Procedures to ensure training meets the standards required by CASR Parts 66
and 147
 Aircraft type training
 Aircraft type assessment
 AMO Quality system interface with training
5.5
AUTHORISATION AND REPORTING
Suggested contents
 Authorisation issue procedures
 Reporting procedures to CASA
5.6
RECORDS
Suggested contents
 Student records
 Retention periods
AMO Sample Exposition
June 2015
Page 32
PART 6 APPENDICES
The lists shown may be kept as separate documents from the exposition as long as an
adequate cross-reference is included in the exposition.
6.1
LIST OF DOCUMENTS
Suggested contents
 Goods Inwards Inspection Record (GRN)
 Serviceable, Unserviceable labels
 Register (or Card) of Precision Equipment and Tools
 Test Equipment "Calibration Due" Tag
 Controlled Manual / Service Information Identification
 AD control card / record
 Continued Airworthiness information (SB etc.) assessment record
 Maintenance Task Card (Scheduled Maintenance)
 Maintenance Task Card (Additional Defects)
 Life-limited parts/Out-of-Phase Work or Inspection-record Card
 Base Maintenance CRS
 CASA Form 1 or approved In-House Release form
 Un-airworthy Conditions Report Form
 Quality Audit Report Form
 Quality Audit Remedial Action Report Form
 Employee Training Record
 Certifying Employees Authorisation Record
 Certifying Employees Personal Authority
 Training records and forms
Note: This is a list of company forms and is not intended to be exhaustive or to
represent the forms required for any particular organisation. The approved
organisation must include those forms with which it controls and records its
maintenance work and procedures.
6.2
LIST OF SUBCONTRACTORS
(Subparagraph 145.A.70 (a) 16 and paragraph 145.A.75 (a) of the Part 145 MOS refers)
(If approval for the control of subcontractors is held by the organisation - see Part 1,
items 1.8, 1.9, 1.10 and Parts 2.1 and 3.1)
6.3
LIST OF LINE MAINTENANCE LOCATIONS
(Paragraph 145.A.75 (c) and subparagraph 70 (a) 15 of the Part 145 MOS refers)
(If line maintenance locations are established by the organisation — see Part 1, items
1.7.2 and 1.8.1)
AMO Sample Exposition
June 2015
Page 33
6.4
LIST OF CONTRACTED PART 145 ORGANISATIONS
(Subparagraph 145.A.70 (a) 16 of the Part 145 MOS refers)
(NDT contractors etc)
6.5
PROVISION OF MAINTENANCE SERVICES FOR AIRCRAFT UNDER THE CAR 1988
REQUIREMENTS
(Part 20 Division 4 of the CAR 1988; CASR subpart 202.GE)
This part should set out the additional procedures that the Part 145 AMO must follow to
ensure compliance with relevant CAR 1988 requirements for the provision of those
maintenance services:
Suggested contents
 Accountable manager (applicable CAR 30 requirements to be included at Part
1.1 and 1.3.1)
 Final certification and Maintenance release authorisations
 System of certification of completion of maintenance
 Issue of a Maintenance release
 Flight Control system inspections and certification
 Occurrence and Major defect reporting
 Additional procedures
6.6
COMPLIANCE MATRIX
This section may include a compliance matrix (example provided below) for the
organisation to demonstrate how its exposition meets the requirements of
CASR Part 42, 145 and the Part 145 MOS.
Sample
Exposition
Exposition
Title
1.1
Accountable
Mgr. Statement
1.2
Safety and
Quality Policy
1.3
Management
Personnel
.030(1)(f)
A.30
Accountable
Manager
.010(1),
.025, .080
A.30(a)
A.70(a)1,
Responsible
Manager
Quality
Manager
Safety
Manager
Other relevant
persons
Management
Org. charts
.010(1),
.080
.010(1),
.080
.010(1),
.080
A.30(b)
A.70(a)2,3,5
A.30(c)1
A.65(a)(c)
A.30(c)2
A.65(a)(d)
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
Part 42
Part 145
MOS
Reference
.010(1),
.025, .085
A.30(a),
A.70(a)1
Base Cert
1.5.2
Line Cert
A.30(g)(f)
AMO Sample Exposition
Exposition
Reference
.080
1.5.1
Certifying
Employees
1.5
GM
Reference
A.65(a)
A.30(c)
A.70(a)4
A.30(e,f,k),
A.35, A.37,
A.70(a)6
A.30(h)(i)(f)
1.4
AMC
Reference
.295, .315
.080
June 2015
Page 34
Sample
Exposition
1.5.3
Exposition
Title
Manpower Plan
1.7
Facilities
1.7.3
1.7.4
1.7.5
1.8
Base Maint
Line Maint
Aeronautical
Product Maint
Layout
Other
Locations
1.8.1
AC Maint
1.8.2
ENG Maint
1.8.3
AP Maint
1.8.4
Specialist Maint
1.8.5
1.11.3
FITCOM
Significant
changes
Non-significant
Changes
Exposition
Providing
employees with
exposition
Keeping
exposition upto -date
Changes to
Exposition
1.11.4
Directions by
CASA
1.10
1.11
1.11.1
1.11.2
Maintenance
Procedures
2
2.3
2.4
2.5
Supplier
Subcontract
AP from
external
Store, Tag &
Release AP
Tools & Equip
Calibration
2.6
2.7
2.8
Use of Tools
Cleanliness
ICA
2.1
2.2
AMO Sample Exposition
MOS
Reference
AMC
Reference
GM
Reference
Exposition
Reference
A.30(j)
A.30(d),
A.47,
A.70(a)7
A.10, A.25,
A.70(a)8,10,
15
.310
A.75(c)
A.25(a)6
A.70(a)8,15
A.75(b)
.025(3)(b),
.070
.025(3)(b)
(i)
.025(3)(b)
(i)
.025(3)(b)
(i)
.025(3)(b)
(ii)
Scope
1.9.
Part 145
AP Cert
1.6
1.7.1
1.7.2
Part 42
.010(2)
.050
.060
A.10,
A70(a)9,10
A.10
Appendix I
Appendix I
Appendix I
Appendix 1
A.43
A.70(a)11,
70(b)
A.70(a)12,
70(b)
.015(2)( c)
.080
.050, .060
A.70(b)
A.70(a)12,
70(b)
.065, .085
.310
.070
42.E
A.65(b)
A.65(c)5
A.70(a)16
A.75(a)
A.42
A.25(d)
A.50(d)
A.40
A.40(b,c,d)
42.E
.310(1)(b)
.310(1)(c)
.310(1),
.330
.310(1)(a)
.310(1)(a)
A.40(a)1
A.25(a)3,4
A.45
June 2015
Page 35
Sample
Exposition
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
Exposition
Title
Repair
Procedure
AD
Optional
Modifications
Maintenance
Docs
Tech Records
Defect
Rectification
Release to
service
Operator
records
Reporting
Defects
Defective AP to
Store
Defective AP to
Contractor
2.23
Control
Computer
records
man-hours
planning V
maint
Critical tasks
Specific maint.
Procedures
2.24
2.25
2.26
2.27
Maint errors
Handovers
Maint data
Prod planning
2.20
2.21
2.22
L2
L2.1
L2.2
L2.3
L2.4
L2.5
L2.6
L2.7
3
3.1
3.2
3.3
Additional Line
Maintenance
AP, Tools and
Equip
Servicing/fuel/
De-ice
Defects
Tech Log
Pooled or Loan
AP
Defective AP
Critical tasks
Part 42
Part 145
.325,42.D.
6, 42.E.2
.195
.325
A.43 A.65(b)
A.55
A.45(g)
A.55(b)
.310, .410
42.D.7
A.45 A.55
A.45 A.55
.355
.405
A.50(c)
A.45(e),
A.50
A.55(b),
A.65(c)3
42.D.6.2
A.60
.330, 42.H
AMC
Reference
GM
Reference
Exposition
Reference
A.60
A.45(e)2,
A.55(c)1,
A.65(c )
A.30(d),
A.47
A.65(b)8
42.D.5
A.60,
A.65(b)8
A.47(b)3
A.45
A.47
.310(a)(i)
A.47
A.47
A.47
A.65
A.65
A.65
A.65
A.65(b)
.330
Quality and
Safety man
QMS
Audit Proc
Aircraft /AP
Audits
AMO Sample Exposition
MOS
Reference
A.65(c)(d),
A.70(a)13
A.65(c)
A.65(c)1
A.65(b)8,
A.65(c)1
June 2015
Page 36
Sample
Exposition
Exposition
Title
3.7
Remedial
Action
Qualifications
and Training
Employees
records
Audit
Employees
3.8
Working Teams
3.4
3.5
3.6
3.9
3.10
3.11
4.1
HF Training
Assessment
SMS
Operations
Contracted
Operators
4.2
4.3
Procedures/
Documentation
Records
4
5
5.1
5.2
5.3
5.4
5.5
5.6
6
6.1
Training and
Assessment
Facilities
Personnel
Procedures
Sources and
Quality
Authorisation
and Reporting
Records
Appendices
List of
Documents
6.4
List of
Subcontractors
Line Maint
Location
Contracted Part
145
6.5
CAR 1988
Maintenance
6.6
Compliance
Matrix
6.2
6.3
Part 42
Part 145
MOS
Reference
AMC
Reference
GM
Reference
Exposition
Reference
A.65(c)2
.315
.075
A.35 A.37
A.35,
A.70(a)6
A.35(d,e),
A.37
A.65(b)1,6
A.30(e)
A.65(d)
A.70(a)14
.315
42.G
A.65(d)
A.70(a)14,
A.65(c)3
.015(2)(f,g)
.025(3)c,
.040, .075
A.37
A.70(a)16,
A.75(a)
A.70(a)15,
A.75(c)
A.70(a)16,
A.75(a)
INTENTIONALLY LEFT BLANK
AMO Sample Exposition
June 2015
Page 37
Download