106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To Utgåva/Issue 1 (10) För kännedom/For information Requirements Specification machining-centre Drilling of holes in mainshaft at Scania Technical questions Commercial questions D:\106739725.doc Sida/Page 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To Utgåva/Issue Sida/Page 2 (10) För kännedom/For information Index 1 2 General ................................................................................................................ 3 Scope of delivery .................................................................................................. 3 2.1 Tooling system ................................................................................................. 3 2.2 Clamping fixtures .............................................................................................. 3 2.3 Cycle time ......................................................................................................... 3 2.4 Robot loading ................................................................................................... 4 2.5 Programming .................................................................................................... 4 2.6 Acceptance-test ................................................................................................ 4 2.7 Training............................................................................................................. 5 2.8 Machine layout ................................................................................................. 5 2.9 Equipment for machine accuracy test ............................................................... 5 2.10 Production support............................................................................................ 5 3 Process description .............................................................................................. 6 3.1 Pre-machining .................................................................................................. 6 3.2 Process an parameters to be machined ........................................................... 6 4 Additional operation on retarder shaft 1747589 ................................................... 6 5 Time schedule ...................................................................................................... 6 6 Product ................................................................................................................. 7 6.1 General ............................................................................................................. 7 6.2 Operation sheets .............................................................................................. 7 6.3 Material ............................................................................................................. 7 6.4 Weight of parts ................................................................................................. 7 7 Prerequisites for the operation ............................................................................. 7 7.1 General ............................................................................................................. 7 7.2 Emulsion ........................................................................................................... 8 7.3 Floor specification ............................................................................................. 8 7.4 Available space................................................................................................. 8 7.5 Lubrication and hydraulic oils ........................................................................... 8 8 Function description ............................................................................................. 8 8.1 General information of the utilization of the machine ........................................ 8 8.2 Technical availability ......................................................................................... 8 9 Control system ..................................................................................................... 9 9.1 Communications ............................................................................................... 9 10 Safety ................................................................................................................... 9 10.1 TFP ................................................................................................................... 9 10.2 Emergency stop ................................................................................................ 9 10.3 CE marking ....................................................................................................... 9 11 Miscellaneous ...................................................................................................... 9 11.1 Scania Production System ................................................................................ 9 11.2 Content of quotation ....................................................................................... 10 Appendices:............................................................................................................... 10 D:\106739725.doc 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To 1 Utgåva/Issue 3 (10) För kännedom/For information General Scania in Södertälje has one line for machining of the mainshaft to the gearboxes. This specification concerns a numerically controlled machining centre for drilling, milling and deburring of the radial lubrication holes in the mainshaft. 2 Scope of delivery The machine should be delivered as a turn key solution and will be installed in the line, loaded by the already existing robot. The actual operation is described in the enclosed operations sheets. Additional the shaft must be indexed before drilling and burrs must be removed from the holes 2.1 Tooling system The preferred tooling system is HSK 63. 1 set of tools must be quoted so all parts can be machined in the specification. The tool magazine in the machine must have room for minimum 15 tools. The supplier must quote a solution of tool-breakage control. The toolbreakage control system should not touch the tools. Solid carbide drills are used today and needs an emulsion pressure of minimum 40 bars and a spindle speed of min 10000 rpm. 2.2 Clamping fixtures The quotation shall include clamping fixtures for all specified parts. The parts is recommended to be clamped between centres (A and B in operation sheets) so the indexing can be made without difficulties. The holes will in the future be drilled in other angles than 0 and 180 degrees but always perpendicular to the centreline. The fixtures must be possible to change over between all parts with smaller changes. Priority shall be given to minimising the number of mounting devices in order to keep the change over times. 2.3 Cycle time The quotation shall include a cycle time calculation containing: -Machining-time -Indexing-time D:\106739725.doc Sida/Page 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To Utgåva/Issue Sida/Page 4 (10) För kännedom/For information -Clamping and unclamping -Loading and unloading -Chip to chip tool changing time The required cycle time, measured floor to floor, must be below 2 mintues and 30 seconds measured on the part 1776321. 2.4 Robot loading The mainshafts is transported to the operation on a conveyer system. A robot takes the part from the conveyer and loads the machine. The robot is using diameter 80.3 mm on part 1776321. The machine must be prepared for robot- loading and unloading and communicate via I/O interface. The signals to be exchanged are not defined but can be discussed. The fixture must be prepared for robot handling of parts to facilitate the loading and unloading. The robot is using the diameter Ø90 or Ø80 on either side of the flange side depending on part number. 2.5 Programming Machining programs must be written for all parts in table 1 in section 5.1. Price for first program and additional programs must be separated. The structure of the programs should be approved by Scania. 2.6 Acceptance-test The requirements for acceptance test at the supplier are shown in Scania’s “Technical directives for production equipment”, dated 2004-01-22, chapter K. The part 1776321 will be used to evaluate the capability and quality control of the process. The capability will be analysed before delivery from supplier and after installation at customer works before taking over. All measurements in the operation sheets will be evaluated. The dimensions can be measured in a CMM or an altimeter. D:\106739725.doc 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To Utgåva/Issue 5 (10) För kännedom/For information Additional the two holes drilled in the splines (diameter 6 mm) will be checked by visual inspection so that no damages is done on the tooth flank. The hole must be drilled between the two flanks. During the capability test, the floor-to-floor time will be compared with the cycle time calculations made by the supplier. 2.7 Training The price for suitable training for operators and maintenance’s personnel should be quoted separately. It should clearly be stated how many persons and days are included in the quotation. The training shall be located both at the supplier and at Scania (Södertälje). It must be specified in the quotation what language will be used for the training. 2.8 At the supplier all necessary training to run the machine including safety, must be included. Machine layout The machine must be encapsulated and sealed in a way that chips and cutting compound or emulsion do not leak onto the floor or into the air. It must be possible to connect the machine to a central oil mist deflector system. A survey layout of the machine must be sent in DXF or DWG format together with the quotation so that Scania can insert the machine in the layout. 2.9 Equipment for machine accuracy test Before machine acceptance is done a machine accuracy test will be done according to chapter K3 in TFP 2004. Necessary equipment must be quoted to carry out a test according to the ISO-standard for the actual machine. 2.10 Production support The supplier should quote one week of production support after start of production in order to secure the start up. The calculation should be based on one person on day shift. D:\106739725.doc Sida/Page 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To 3 Utgåva/Issue 6 (10) För kännedom/For information Process description 3.1 Pre-machining The shaft is pre-machined in 3 operations. The part is centred and cut to length, deep hole drilled, turned and milled before the actual operation. The status on the mainshaft is shown on the 1st page in operation sheet. 3.2 Process an parameters to be machined The actual dimensions to be machined are described in the enclosed operating sheets in appendix 1. The part is not oriented (indexed) before it is loaded into the machine by the robot. 1. The part must therefore be indexed to a fix rotation angle to avoid damaged splines when drilling the diameter 6 holes. 2. Drilling, chamfering and milling must be made according to the given dimensions in the 2nd and 3rd page in the operating sheets. 3. Finally the outgoing burrs from the transversal holes must be removed. The robot will unload the part onto the conveyer when the machining is finished. 4 Additional operation on retarder shaft 1747589 The part 1747589 is enclosed in this operation as a new part for this project. This will be machined in Södertälje in the future and a possible solution to mill the keyway must be developed. The dimensions to be machined is given by the drawing “milling operation” in appendix 11. The pre-machining is given by the drawing “retarder shaft turning” in appendix 12. All costs for this operation must be quoted separately. 5 Time schedule The supplier must specify the required delivery time from order to the following activities: Pre-inspection Pre-acceptance Installation and commissioning Final acceptance test D:\106739725.doc Sida/Page 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date Utgåva/Issue 1.0 Fördelning/To 7 (10) För kännedom/For information The supplier must specify the time needed for installation of the equipment at customer plant. 6 Product 6.1 General The actual parts for this operation have the following part numbers and drawing numbers. The dimensions for the specific operation can be fined in the enclosed operation sheets. Mainshaft Partnumber/ Operating sheet H-Axel H-Axel H-Axel H-Axel H-Axel H-Axel H-Axel Table 1 6.2 1382978 1387295 1387296 1776321 1776322 1476200 1778017 Gearbox GRS900 / GRS920 / GRS890 GR900 GR801 GRS945 / GRS906 GRS886 GR875 GR905 Weight Material (kg) 92216 92216 92216 92216 92216 92216 92216 15,1 16 11,82 18,87 14,43 15,5 20 Operation sheets The operation sheets describe the dimensions that should be made in the operation and tolerance to be used in the capability study. The radial holes are to be drilled and chamfered with the specified tolerances. 6.3 Material The specification for the material is 92216. The content of alloys is 20MNnCrS5. See table 1. 6.4 Weight of parts The weight of parts is specified in table 1 in section 5.1. 7 7.1 Prerequisites for the operation General The purpose for this investment is to improve the present capacity and quality. D:\106739725.doc Sida/Page 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To Utgåva/Issue 8 (10) För kännedom/For information The machine must be able operate wet with water based emulsion and must be sealed so that no leakage with emulsion occurs. Leakage is a safety issue while many operators are injured every year through slippery floors. The foundation must be self-supportive and need no anchoring to the floor. All machine feet and any foundation supports are to be included in the quotation. 7.2 Emulsion The machine must be able to be connected to the central emulsion system. The used emulsion is water-based with 6-8% Quaker 8662. The pressure in the central system is 1.9 bars. The emulsion specification is to be found in appendix 10. 7.3 Floor specification The supplier has to specify if the machine require a special foundation made for the machine. Demands of flatness and floor pressure must be specified. 7.4 Available space A layout with the available space is included in the quotation in appendix 2. 7.5 Lubrication and hydraulic oils In order to reduce the number of suppliers of oil and lubricants Scania has a list of preferred products in appendix 6, which the supplier should use if possible. The supplier is always responsible for the warranty also with the preferred Scania product. If the list does not include the suppliers preferred product it should be specified in the quotation. 8 8.1 Function description General information of the utilization of the machine The machine shall be prepared for fully automated production. The machine is to be integrated in a line were a conveyer system transports the parts between the machines. It must also be possible to operate the machine in manual mode with manual loading. 8.2 Technical availability The technical availability requirements are 97% at three shift production 5400 hours/year. D:\106739725.doc Sida/Page 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To 9 Utgåva/Issue 9 (10) För kännedom/For information Control system The preferable control system is Siemens 840 D. If a Siemens system is chosen the quotation must fulfil the technical requirements for the control system in appendix 3. A specification of the components must be done in appendix 4. 9.1 Communications A communication with the conveyer system through I/O must be possible. 10 Safety 10.1 TFP The equipment has to comply with Scania’s “Technical directives for production equipment”, dated 2004-01-22 in appendix 8 and the amendment to the TFP valid from 2005-12-01 in appendix 9. All deviations from Scania’s directives must be listed in appendix 5 and quoted with a price to fulfil the directives. 10.2 Emergency stop There must be a safety signal interface between the robot cell and the machine. The machine must be stopped according to the regulations in TFP B1.2.4. Detail will be discussed. 10.3 CE marking The machine must be CE marked by the supplier. See the TFP L 2.2. The interface between the robot and the conveyer system will be CE marked by Scania. 11 Miscellaneous 11.1 Scania Production System Equipment must be easy to maintain. From a general maintenance perspective but also from a perspective with a larger amount of operator maintenance. Visualize. The “signals” for the equipment must be readily accessible and very clearly designed and implemented. E.g.; the level in the fluid level indicators must be easy to observe without open any doors or such. Much design effort should be put into ensuring that the surfaces on, in, and around the machine are kept as “clean” as possible. There must be a minimum of floor-mounted peripheral equipment, accumulation D:\106739725.doc Sida/Page 106739725 Dokumentnamn/Document name Info klass/Info class 106739725 Kod/Code Godkänd/Approved by Lagringsdata/File Reg nr/Reg. No. Se sidfot Utfärdare (tjänsteställebeteckning, namn)/Issued by Telefon/Phone Datum/Date 1.0 Fördelning/To Utgåva/Issue Sida/Page 10 (10) För kännedom/For information surfaces, narrow or tight spaces, etc. Flushing air nozzles must be available by the operator doors. 11.2 Content of quotation In order to have the valuable information available in the quotation, Scania requires that appendix 7 is used. Appendices: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Operating sheets of parts for operation. Layout of mainshaft machining line. Specification of requirements for control systems. Specification of components list. Template (deviations from Scania TFP 2004 2004-01-22). Lubrications at Scania. List of basic data for machine. Scania Technical Regulation for Production Equipment dated 2004 22 nd January. Amendment to TFP valid from 2005 1st December. Emulsion specification Quaker 8662 Milling operation on retarder shaft drawing: “bd_1747589_sparfrasning” Pre-machined retarder shaft drawing: “bd_1747589_svarvning” D:\106739725.doc