Container Handling Facilities 20ft (TEU’s) 40ft (FEU’s) Yes Yes Container Facilities Daily off-take capacity 5.000 Holding Capacities 32.017 TEUs Yards 20 Container Freight Stations (CFS) Yes Number of CFS 5 CFS at GCB 45.064 Sq. m CFS Storage Yard (GCB) 240.271 Sq. m CFS at CCT 13.671 Sq. m CFS Storage Yard (CCT) 150.000 Sq. m CFS Storage Yard (NCT) 220.000 Sq. m CFS Storage Yard (NCY) 62.532 Sq. m Railway Container Siding 550 m Refrigerated Container Stations Yes Number of Reefer Stations (connection points) 900 Stand-by Generator 16 MW Water Reservoir 140.000 Gallons Fire Brigade 1 unit Container Handling Equipment (Operational) Appliance Quantity Capacity Ship to Shore Gantry Cranes (SSG) 4 50 Ton Rubber Tyred Gantry Cranes (RTG) 11 40 Ton Straddle Carrier 25 40 Ton Forklift Trucks (FLT) 12 25 - 42 Ton Forklift Trucks (Spreader) 25 16 Ton Forklift Trucks (Fork) 03 16 Ton Reach Stacker (RS) 26 7 - 45 Ton Container Mover (CM) 03 50 Ton Terminal tractors 45 50 Ton Trailer 57 40 Ton Details 1. AT CONVENTIONAL BERTHS (GCB): For Containers Physical Facilities: 1.1 Holding Capacity 9.657 TEUs 1.2 Yards (20 Nos.) 212.238 Sq.m 1.3 Container Freight Stations (CFS-11Nos.) 86.168 Sq.m 1.4 Container storage yard 223.389 Sq.m 2. CONTAINER TERMINAL (CCT) Physical Facilities: 2.1 Holding Capacity 6.408 TEUs 2.2 Total Holding Capacity (GCB+CCT+NCT) 16.065 TEUs 2.3 Quay Length 450 M 2.4 CFS 12.700 Sq.m 2.5 Container Storage Yard 150.000 Sq.m 2.6 Railway Container Siding 550 M 2.7 Reefer Points 210 (415 volts) Points 2.8 Vessels 3 Container vessels of accommodating Length 2.9 Standby Generator 2 no (2.5 M.W) & 2 nos. (820 KVA each) 2.10 Water Reservoir 140.000 Gallons 2.11 Fire Brigade 1 Unit Inland Container Depot (ICD): An inland container at Dhaka is in operation since 1987 with an annual handling capacity of 80.000 TEUs. At present one container train runs daily each way between Chittagong and Dhaka ICD. Bangladesh Railway is considering introducing another train to run daily from either side. Facilities: Container holding capacity 3927 TEUs Yard Area 1 36 866 Sq. m CFS 8000 Sq. m Forklift/Top lifters (Private suppliers) 2 x 36 Ton, 1 x 35 Ton, 1 x 28 Ton, 1 x 8 Ton 1 x 5 Ton, 4 x 3 Ton, 2 tractor trailers units Railway Wagons for Container Transportation 350 Railway Terminal (Length of two tracks) 1097 m 1.1.1.1. Containerised Cargo (THC) Containerised Cargo Handling Charges Rates Particulars of Charges Basis of Charges (TEU’s) (FEU’s) Wholly using CPA equipment: (a) FCL Container Per Container US$ 43,40 US$ 65,10 (b) LCL Container -do- US$ 130,00 US$ 195,00 (c) Empty Container -do- US$ 22,10 US$ 33,20 Extra Container Movement Rates Particulars of Charges Basis of Charges Not Exceeding 21 ft. length Exceeding 21 ft. length Extra Container Movement: (a) Loaded Container Per Container Per Movement US$ 42,60 US$ 63,90 (b) Empty Container Do US$ 21,70 US$ 32,50 Reefer Container Service Particulars of Charges Basis of Charge Rates Supply of Electricity and Connecting and Disconnecting reefers, Including monitoring. Per Container, per diem or part thereof US$ 9,00 Change of Status Particulars of Charges Basis of Charges Rates Change of Status Per Container per change US$ 10,00 River Dues (Containerised) Rates Particulars of Charges Basis of Charges Not Exceeding 21 ft. length Exceeding 21 ft. length (a) Import (b) Export L.C.L. container and Contents: Per container Do Tk. 408,00 Tk. 184,00 Tk. 816,00 Tk. 368,00 (a) Import Per 1000 kg. or part thereof Tk. 34,10 (b) Export Do Tk. 15,30 F.C.L. container and Contents: Accounts Officer (Bill Revenue) Empty Container Rates Particulars of Charges Basis of Charges Not Exceeding Exceeding 21 ft. length 21 ft. length (a) Import Per container do Tk. 102,00 Tk. 204,00 (b) Export -do- Tk. 102,00 Tk. 204,00 Lift on / Lift off Charges Rates Particulars of Charges Lift on / lift off charge, Loaded container Lift on / lift off charge, empty container 1.1.1.2. Basis of Charges Not Exceeding 21 ft. length Exceeding per container Tk. 1000,00 Tk. 1500,00 -do- Tk. 375,00 Tk. 562,50 21 ft. length Shore handling containerised cargo Stuffing/Unstuffing Particulars of Charges Basis of Charges Rates Stuffing Unstuffing Per 1000 kg. or part thereof of contents Tk. 300,00 -do- Tk. 300,00 Hoisting Charge (Containerised) Particulars of Charges Rates Hoisting Charge (Containerised) 100% of the Stuffing/Unstuffing charge