Waterford City Development Plan 2007-2013 Proposed Variation No. 3 1. THE VISION “Waterford will realise its potential as an internationally competitive City and the premier settlement within the South-East Region. The City will provide a range of employment and educational opportunities and a choice of residential, retail, leisure, tourist and cultural facilities, where the principles of quality of life, environmental enhancement, economic development and social equity will be key drivers of the City’s future”1 2. PREAMBLE This is proposed Variation Number 3 of the Waterford City Development Plan 20072013. This proposed variation is to facilitate the Core Strategy requirements introduced by the Planning and Development (Amendment) Act 2010 and as per the revised population projections as set out in the Regional Planning Guidelines for the South-East Region 2010-2022 (RPGs) and to ensure that the Development Plan is consistent as far as practicable with national and regional development objectives set out in the National Spatial Strategy (NSS) and the RPGs. Waterford City Development Plan 2007-2013 Core Strategy 3. CORE DEVELOPMENT AIM Waterford City aims to fulfill its role as the Gateway economic driver of the South East Region, by developing in a balanced, sustainable, transport friendly and attractive way with good quality of life and opportunities for all of its citizens. 4. INTRODUCTION The Planning and Development (Amendment) Act 2010 (P&D 2010) amends Section 10 of the Planning and Development Act 2000 (P&D 2000) by introducing the requirement for each Planning Authority to prepare a Core Strategy. It states that a “core strategy shall show that the development objectives in the development plan are consistent, as far as practicable, with national and regional development objectives set out in the National Spatial Strategy and regional planning guidelines”. The Strategy herein reviews the current City Development Plan 2007-2013 in terms of demonstrating its consistency, as far as practicable, with both the National Spatial Strategy (NSS) and Regional Planning Guidelines (RPGs). 1 As articulated in Waterford Planning, Land Use and Transportation Strategy 2004-2020 (PLUTS) 1 5. CITY IN CONTEXT The Waterford Planning, Land Use and Transportation Strategy 2004 -2020 (PLUTS), sought to prevent unsustainable development trends occurring in and around Waterford City and its environs by providing a strong planning framework for the future development of the area. The PLUTS Strategy provides the strategic planning framework for the current City Development Plan, which advances a spatial development framework that includes the “compact city” concept. Figure 1 National Spatial Strategy – South East Region The PLUTS Strategy is consistent with the policy direction and requirements of the National Spatial Strategy. It supports and fosters balanced spatial development at a national, regional, city and local level. A key element of the Strategy is the achievement of critical mass to allow the City to reinforce and develop its role as the economic driver of the South-East Region of Ireland. Consequently, achieving critical mass in the City is a key aim of the Core Strategy herein. 2 6. ACHIEVING CRITICAL MASS The City’s Gateway designation under the NDP and NSS places large growth expectations on the City, particularly with regard to acquiring critical mass in terms of economic and social development. Critical mass has been identified in the NSS as an essential prerequisite for the formation and designation of Gateways. It also implies an explicit recognition of the hierarchical structuring of settlement patterns and the pre- eminence of Cities as drivers in their sub regional economies. Accordingly achievement of critical mass is of paramount importance for the City in order for it to fulfill its role as a magnet for investment and perform as the main economic driver of the South East region economy. Considerable capital investment in infrastructure is required to make the City attractive to investment and deliver economic growth. In this regard a number of major projects have been delivered for Waterford recently, including the M9 Motorway, the N25 Waterford City By-Pass, the East Waterford Water Supply Scheme and completion of the city’s Waste Water Treatment Plant. The transport facilities of Waterford Port and Waterford Regional Airport have also been significantly enhanced. Further significant investments have been made in such as broadband infrastructure, educational and health infrastructure as well as substantial investment in the development of tourism product and social and community infrastructure. This improved infrastructure finally puts Waterford City in a position to perform its role as a Gateway city in a more robust fashion. The level of investment is such that achieving the population targets set out in PLUTS will not require significant further investment 7. PERFORMANCE AS A GATEWAY CITY The recently-undertaken review of the Regional Planning Guidelines recognized Waterford City’s poor performance as a Gateway. Across a number of indicators outlined in the Gateway Development Index, Waterford scored poorly, and regularly scored last, when compared with other gateways and cities. In particular, Waterford City’s performance in areas such as population, enterprise and employment, knowledge and innovation as well as transport and connectivity were well below national average. Some of this performance can be attributed to the late arrival of much of the critical infrastructure outlined above. Other reasons are the lack of a University in the City, traditions of employment, general social mix and educational attainment. However, a significant factor is also the lack of Critical Mass alluded to regularly in the NSS and the RPGs, some of which can certainly be attributed to unsustainable growth in some of the region’s non-gateway towns. The attainment of critical mass is vital to the City performing on an equal par with the other gateway cities, leading to more balanced regional development. Achieving population growth is another key contributor to achieving critical mass. Securing same implies additional housing, In the context of the NSS, critical mass also implies a recognition of the need for Gateways to accommodate a range of housing types capable of embracing the often diverse needs of its residents at different stages of their life cycles and incomes. Accordingly a variety of housing type and tenures should be available to meet the needs of an expanding population base. To avoid further leakage to adjacent towns the City must offer choice in both location and house type. 3 8. CONSISTENCY OF THE CURRENT DEVELOPMENT PLAN WITH THE REGIONAL PLANNING GUIDELINES AND WITH THE NATIONAL SPATIAL STRATEGY The Development Plan is largely based on the PLUTS strategy, which, in turn, is based on the key principle enshrined in the National Spatial Strategy and in the Regional Planning Guidelines, which is the development of Waterford City as a substantial and robust Gateway City, thereby contributing to the achievement of the key objective outlined in the NSS i.e. balanced regional development Across almost all objectives, the Development Plan is consistent with the objectives outlined in the NSS and in the RPGs. This is particularly true with regard to those objectives which refer to: Regional Development Employment and Economic Opportunity Infrastructure Communications and Energy Community and Social Heritage and Environment There are two specific areas where the Development Plan and the RPG objectives are not consistent: Population and Housing Flood Risk Management 8.1 POPULATION AND HOUSING The population projections outlined in the Development Plan assumed a relatively robust and on-going demand for housing. The projections, based on the PLUTS projections and on CSO assumptions envisaged an increase in the population of the City of 5,000 between 2007 and 2013 i.e. from 45,748 to 51,000..This predicted growth in population, combined with the existing unresolved social housing demand, resulted in a predicted demand for in excess of 3,700 units over the period to 2013. The economic down-turn has meant a downwardly revised set of projections for population growth and these figures are enshrined in the RPGs. Actual population in 2011 as per recently published preliminary Census figures is 46,747 This also means a significantly diminished demand for, and supply of, housing units. Settlement Waterford City Population increase 2010-2016 (Based on Minimum Pop Targets) 2,500 4 Total Number of Residential Units required over period 2010-2016 961 8.1.1 Population Performance Critical mass of population is a fundamental pre-requisite for a City to become attractive to new development. Population growth in the last inter census period for Waterford City has been unspectacular at 2.6% (2.4 % lower than the previous census period ’96- ’02) which is also significantly below the average growth levels for other relatively large urban centres within the region Population Change 2002-2006 Regional Local Authority Areas 2002 2006 Actual Waterford City 44594 45748 1154 South Tipp 79121 83221 4100 Waterford Co. 56,952 62213 5261 Kilkenny 80339 87,558 7219 Carlow 46014 50349 4335 Wexford 116,596 131749 15,153 Region Total 423616 460838 37222 % 2.6 5.2 9.2 9.0 9.4 13.0 8.8% 8.1.2. National and Regional Population Targets The Regional Planning Guidelines Review, Gateway and Hub Population Targets, issued by the DoEHLG in October 2009, originally sets out population targets for the State and each of the regions up to 2022. These targets have now been subsumed into the Regional Planning Guidelines. In accordance with the guidance in the document, the South Eastern Regional Authority (SERA) allocated the Regional population targets at County, Gateway and Principal Town level within the South East Region. The targets for the Waterford City are set out in Table hereunder with the 2013& 2019 figures constitute disaggregation of 2016-2022 target figures. Population Targets Waterford City 2006-2022 Year Population Increase 2006 45,748 2010 +2752 2013 (+1250) 2016 +1250 2019 (+2000) 2022 +2000 Total +9252 Source: Regional Planning Guidelines for the South East Region 2010-2022 5 Target 48,500 (49,750) 51,000 (53,000) 55,000 8.1.3. Housing The City Development Plan housing strategy main aim is to ensure that sufficient land is zoned for a variety of residential types, sizes and tenures. As the existing housing strategy does not reflect the revised population and housing projections of the RPG’s, it is appropriate to revisit the housing strategy and the associated housing land requirement in light of these new targets. While the appropriate vehicle for undertaking such a review would be under the statutory development plan review process, the Core Strategy herein provides an interim picture of the existing statutory development plan’s conformity with the RPG’s housing land requirements, pending the formal review of the housing strategy as part of the City Development Plan review commencing June 10th 2011. The impacts of the recession on the housing construction sector in Waterford City has been significant. Notwithstanding that in excess of 2000 residential units have been granted planning permission under the current City Development Plan period to date, circa 900 residential units have only been completed in the last four years. There are some unfinished housing estates in the City. However, the city recorded the second lowest level of unfinished estates in the Country with 57 units unfinished. 8.1.4. Housing Land The following is a table of house completions in the City over the last four years HOUSE COMPLETIONS 2007 440 2008 297 2009 146 2010 110 Historically, housing densities in Waterford City have been low compared with the other Gateway cities. This trend is dictated by architectural constraints which impede the development of high density City Centre housing, increased suburbanisation and a traditional aversion to apartment-style living. Residential permissions since 11th June 2007 Zoning & No. of No. of nature of Residential permitted Of which residential Planning residential Apartments development Permissions units Residential Zoning- Major residential permissions( >10 units) Mixed use lands- Major residential permissions (>10 units) Of which Dwellings Avg. Net Density where relevant 18 1088 180 908 23/ha 9 714 621 93 50.05/ha N.B. calculation excludes replacement dwellings and or change of house type planning permissions 6 Density levels, as evidenced from the table above have remained relatively low at 23 ha. The levels on Mixed Use land have been better at circa 50 units to the hectare. As part of the preparation of this Core Strategy the remaining uncommitted housing land in the City was quantified (GIS based analysis) at the end of March 2011. Uncommitted land is classified as housing land with no existing permissions thereon. Quantification of uncommitted housing land Waterford City 2007 & 2011 Location June 2007 Remaining in March 2011 Opportunity Sites (BrownField) 56.74 ha 44.95ha Mixed Use Zoning ( Greenfield) & General Business 66.57 ha 12.612 ha infill opportunity areas Residential Zoned Land 334.95 ha 202.83ha Low density residential zoned land( min 20/ha) 78.99 ha 78.99 ha 8.1.5 HOUSING LAND REQUIREMENT 2011-2013 Remaining Plan period Population increases imply increased housing requirements. The findings of a recent assessment of the remaining uncommitted housing land capacity with in the city are set out in Table 9 Table 9- Remaining zoned housing land capacity Waterford City as of March 2011 Location March 2011 Unit Capacity Pop. Equivalent (2.6 avg. hsed size) Opportunity Sites 44.95ha @38% of land area (BrownField) 50/ha (854units) 2220 Mixed Use Zoning ( 12.61ha @36% of land area Greenfield) & (227 units) 590 General Business infill opportunity areas ( avg 50/ha) Residential Zoned 202.83ha 7099 units 18457 Land ( @ min 35/ha) low density 78.99 ha 1580 units 4108 residential zoned land( avg. 20/ha) TOTAL 339.38 ha 9760 Units 25376 7 The housing yield for opportunity sites and mixed use zoned land of 38% and 36 % respectively are average yields which have had regard to the mixed use objectives for these areas, their respective site locations, proximity to public transport, topography and character of the area. Yields for opportunity sites in the City range between 10%and 70% depending on location etc. Yields for greenfield mixed use zonings range between 0% and 80% also depending on location, character of area etc. Given that the remaining housing land capacity is capable of accommodating a population equivalent of 25376 based on National Guidance on residential density, while a population increase of 9252 persons is projected for the City up to 2022 a review of the existing phasing implicit in the PLUTS is warranted. The RPG’s have projected ( see table 10 below) total zoned housing land requirement for Waterford City covering the period 2010-2016 at 72hectares, whereas there is currently 339.38 ha uncommitted housing land remaining in the City. Table 10 - Waterford City remaining zoned housing land capacity versus projected housing/zoning requirement as per RPG’s Remaining Total RPG projected RPG project total zoned housing land total zoned housing zoned housing land 2011 land requirement requirement 20112010 -2016 2013 Hectares 339.38ha 72ha 36ha Unit capacity 9760 961 units 480 units Population 25,376 2500 1250 equivalent The 72 hectare figure does not coincide with the current development plan period 2007 2013, and following a disaggregation of the RPG figures to the remaining lifespan years of the current City Development Plan 2011 -2013 a remaining housing land requirement of 36 hectares would apply. Based on a projected population growth of 1250 persons over this period, approximately 480 residential would be required to meet the demand of the envisaged population increase. 8 8.1.6 STRATEGIC RESPONSE While the Development Plan must take into account changed economic circumstances and the resultant changes in housing supply and demand, it must do so in a way which must also acknowledge the need for the City to achieve the critical mass which will allow it to perform as a Gateway City. It will do this by: Supporting the strengthening of existing neighbourhoods, and the development of new ones, as strategic development areas Supporting the development of housing lands on a phased and sequential basis The prioritized sequence of supported development will be: Lands which are appropriately zoned and which are fully serviced Lands which are appropriately zoned and have ready access to services Lands which are appropriately zoned but which are currently unserviced Priority will also be given to those lands which are contiguous to already-developed lands and to those lands which, as defined by Flood Risk Assessment, are least vulnerable to potential flooding and least demanding on the need for investment in flood-related infrastructure. A critical objective of this strategy will also be to stem population/ housing leakage from the City by providing housing choice to meet market demand. It is important to recognize that Waterford City now has significant spare capacity in its water infrastructure which can support population growth without any further investments in capital works and, therefore, growth will not impinge negatively on the Water Services Capital Programme. This is also true for other areas of investment. While the strategic approach will emphasise this phased and sequential approach, the mapping of these lands will be undertaken as part of the new Development Plan which process will begin in June of this year. In recommending this approach regard is had to the prudent and restrained approach adopted in the current and previous development plans which has resulted in Waterford City avoiding any significant number of unfinished estates or unoccupied housing units which will enable development to resume earlier in Waterford City than in other areas of the country. There continue to be a number of constraints which will impede development in Waterford City such as the historical, architectural and archaeological importance of the City Centre, the City’s proximity to an SAC, and the fact that the City is bisected by a wide River Estuary, which can be prone to flooding. Other constraints are the lack of University status for Waterford Institute of Technology and limited investment in new rail services and the need for further investment in Waterford Regional Airport. However, the City has also significantly improved infrastructure and services which can support a substantial increase in population. The main improvements are listed at Appendix 1. 8.2 FLOOD RISK MANAGEMENT Flooding events have become more pronounced in Ireland in recent years. Waterford City, given its location on tidal estuary of the River Suir, is susceptible to both river and tidal flooding and sometimes a combination of both when certain meteorological situations arise. 9 8.2.1 STRATEGIC RESPONSE Waterford City Council has been pro-active in meeting its flood risk management responsibilities. The Waterford City Flood Alleviation Scheme is well advanced. This OPW scheme was designed to cater for a 1:200 year flood for both Suir and John’s Rivers. Financed by the OPW, this scheme is divided into five phases. Construction began in 2009 and two phases have been completed. The final three phases will extend the flood defences along John’s River to the Tramore Road and are currently at design stage. The decision on the Part 10 for the remaining phases was received in April 2011 and subject to funding work will commence by Spring 2012. Also the OPW’s initial pilot study ‘River Suir Catchment and Flood Risk Assessment and Management Study’ (CFRAM) and its associated River Suir Catchment Flood Risk Management Plan (CRFMP) are nearing completion (due to be finalized in November 2011). Waterford City Council was a participating local authority in the study and preparation of the subsequent Plan. The CFRAM studies are developed to meet the EU Directive requirement on the assessment and management of flood risks which was adopted in October 2007 (the ‘Floods Directive’). This directive was transposed into Irish law in March 2010 (S.I. No. 122 of 2010). The ‘Floods Directive’, which is aimed at reducing and managing flood-related risks to human health and life, the environment, cultural heritage, economic activity and infrastructure, links closely to the implementation of the Water Framework Directive, which also requires EU Member States to develop a preliminary Flood Risk Assessment including flood risk maps for all river basins/catchments. Notwithstanding the River Suir CFRAM Study, in November 2009 Mr. John Gormley, T.D., Minister for the Environment, Heritage and Local Government published statutory planning guidelines entitled ‘The Planning System and Flood Risk Management Guidelines for Planning Authorities’ which is aimed at providing a more consistent, rigorous and systematic approach to the avoidance and minimisation of potential future flood risk and to fully incorporate flood risk assessment and management into the planning system. The guidelines require flood risk assessment to be undertaken. In accordance with these guidelines Waterford City Council is currently in the process of undertaking flood risk assessment of the City and the preparation of associated flood zone maps. Flood Risk Assessment will form part part of the review of the forthcoming City Development Plan which commenced on June 10th 2011. The outcome of this assessment will contribute to the prioritisation of lands for development. 10 9. REVIEW OF CURRENT CITY DEVELOPMENT 2007-2013 Nowithstanding the disparity in the figures between the remaining uncommitted housing zoned land in the current City Development Plan and the projected Housing Zoned land requirement of the RPG’s which is based on minimum population growth, given that the formal review period of the current Waterford City Development Plan commences June 10th 2011, it is appropriate to defer the review of housing land zoning and or any necessary revised phasing to the formal Development Plan Review period. 10. CORE STRATEGY POLICY It is the policy of the Council to: Ensure that all policies comply with RPG population targets Meet the housing needs of the Citizens of Waterford in an environmentally sustainable manner and support the neighbourhood strategy. Ensure that housing development takes place sequentially in accordance with the priorities laid out in Section 8.1.1 above Ensure all development takes place in tandem with the provision of adequate infrastructure and services; Maintain and where possible enhance the vibrancy and vitality of the City Centre. Continue to facilitate improved access to the City. Continue to apply appropriate development management measures when assessing new retail proposals. Protect designated areas and high amenity value areas in the City as important elements ensuring that any plan or project associated with the provision of new housing which has the potential to significantly affect a Natura 2000 site is appropriately assessed in accordance with Article 6 of the Habitats Directive in order to avoid adverse impacts on the integrity of the site.; Promote increased residential densities where appropriate having regard to Sustainable Residential Developments in Urban Areas (2009) but conscious of the need to meet market demand for housing choice. Apply appropriate development management measures to ensure that growth is appropriate and compatible with the Regional Planning Guidelines for the South East Region 2010. Continue to encourage and promote the development of a range of quality tourism facilities, attractions and accommodation within the City. Adopt a climate change strategy for Waterford City Ensure that sufficient land is zoned for the educational requirements of 1st , 2nd and 3rd level educational establishments. Implement the Ministerial Guidance ‘The Planning System and Flood Risk Management Guidelines for Planning Authorities’ by undertaking flood risk assessment of the City and fully incorporating flood risk assessment and management into the planning system. 11 11. CONCLUSION Waterford is an underdeveloped Gateway and the lack of growth in the urban population of Waterford City and environs is a matter for concern. It is important that the Core Strategy and the Development Plan policies adopted do not further impede population growth within the city. The stated intention is to continue City Council’s responsible approach to planning and provide for the sustainable growth of the city. It is the intention to deliver on the objectives of the Development Plan to provide for population growth through the promotion of sustainable neighbourhoods within a compact city. While recognising the RPG targets, we also stress, however, that, in the context of Gateway cities, the population targets are minimum targets and are intended to promote the consolidation and sustainable growth of the city Appendix One Significant Recent Improvements in Infrastructure The M9 motorway, the N25 Waterford City By-Pass and the Outer Ring Road The East Waterford Water Supply Scheme which increased the capacity by 65% and secures the City’s water supply into the future The completion of the Waste Water Treatment Plant providing significant capacity for future housing and industrial development The provision of a virtually limitless bandwidth as provided by the MAN Broadband infrastructure. The delivery of major building programmes at Waterford Institute of Technology and Waterford Regional Hospital The carrying out of significant urban renewal and conservation projects in the city centre House of Waterford Crystal Visitor Centre Viking Triangle Project The provision of significant recreational, cultural and community facilities, including new parks, the redevelopment of the Regional Sports Centre, refurbishment of the Theatre Royal and Garter Lane Arts Centre and the provision of neighbourhood based childcare facilities Provision of pumping and transfer wastewater networks between city and new WWTP and sewerage collection system for City and environs (Co. Kilkenny), Kilbarry and Killure at Belview New water supply system for south city and north-west city area Water conservation rehabilitation works. Improved public transport services and facilities as recommended by the Waterford City Public transport Feasibility Study 2010. 12