Arf CV / Page1 of 6 Curriculum Vitae Rev : February, 2006 Personal Data : Name Date of Birth Nationality Passport No. Marital Status Religion Qualification Home Address Contact Person : : : : : : : Achmad Rofii March 22, 1974 Indonesian AH 081075 Married (1 / 1) Moslem At least 9 years experience in QA/QC Inspector Construction Oil & Gas : Perumahan Taman Mediterania Blok KK4 No.22 Batam Center 29432 Batam Island – Indonesia : Home : (0778) 471716 Mobile : 0813 64759145 Email : arofi_74@yahoo.com Education and Qualification Background : - Offshore safety training Conducted by Safetindo Perkasa Balik Papan 20 September 2005. - Certified of Welding Inspector – Steel CWIP 3.1 Conducted by The Welding Institute / TWI (UK)-PTSI Batam 14th to 25th July 2003, Certificate No. : 11351. - Certified Welding Inspector 2002 Conducted by Association of Indonesian Technical Inspection Agencies & Migas Certification Certificate No. 021/WI/-II/X/2002 - Certified Radiographic Film Interpreter ASNT Level II Conducted by Ministry of Industry and Trade Agency for Industrial and trade Research and Development Certificate No. 0797.26.3.031 - Computer Course & certified for Windows (Word, Excel, Internet for email) - English Course Certificate for Intermediate & Conversation. - Senior High School Certified 1993 Arf CV / Page 2 of 6 Employer 1. Company Position Inclusive Dates Location : PT. Prima Langkah Pratama (PLP) Under Contract for : Total Indonesie (Total E&P) Pipeline Repair Maintenance : QA/QC Supervisor (Client Reps) : 12 February ’04 – Up to Present : Balik Papan ( Handil – Site) Project Title : A* Hot taping sapi field 42”x12” and 8”x8” export Pipeline Senipah to Badak For Unocal B* Fabrication and Installation of new 12” Pipe Line River Crossing Spool HH to M2N as per API 1104 at CPA area C* Up Heavel Buckle (UHB # 16), 1. Lowering and Post trenching of Pipeline 24” 2. Screwed Anchor of Pipeline 24” 3. Back Filling & Install Retaining wall 4. Mangrove Re-plantation 5. Re-Commissioning (Caliper Pigging) D* 20” Main Oil Pipeline Emergency Repair Campaign 3 1. Soil Excavation activity - Install Shelter, Excavation & Retaining wall 2. Removal & Cleaning of Existing Coating 3. Wet blasting using portable blasting equipment 4. Sleeve Installation and welding to existing pipeline 5. Strong back applying Epoxy GS154, GS561 and Top coat nic coat 600 6. Hydrostatic testing using production fluid 7. Backfilling & signboard installation E* F* G* H* RMC-B (Repair Riser Main Campaign) coating repair River Crossing & Riser Coating Inspection ROW (Right of Way) Civil Construction Land RCB (River Crossing Bank) Reinstatement Repair Scope of work Well base Operator 2. Monitoring Quality and Records Contractor Daily Activity Arf CV / Page 3 of 6 3. Monitoring of HIRA (Hazards Identification and Risk Assessment) for safety aspect 4. Ensure all fabrications according to existing specification, code and standards. 5. Ensure all activity are in safe condition and take care of HSE (Health Safety and Environment) 6. Daily Progress Reporting to CSR (Company Site Reps) 2. Company Position Inclusive Dates Location Project Title Scope of work : Oceaneering / OiS PLC - Batam Under Contract : J Ray McDermott Batam Offshore Division : QC Welding Inspector : 26 March ’03 – Up to 01 December ‘03 : Onshore – J Ray McDermott MBS Yard Batam : * Totalfinaelf– Peciko, * Conoco-Belanak Well Head, * PTTEP-WP13 Bongkot * JVPC Vietnam * Cuulong SuTuDen.for Modec * Chevron Offshore Thailand Ltd : 1. Monitor Onshore WQT- for installation Pipeline WQT-for structural installation Jacket/Deck 3. Prepare Pipeline & Structural Welder Certificate 4. Record Welding & Prepare Runsheet for PQR- for offshore 5. Welding Inspection & Prepare document for Totalfinaelf– Peciko Dog Leg Make-up Riser MWP A & B 6. Welding Inspection, Dimensional Control & documentation for Tie-in Spool Conoco Belanak Project 7. Welding Inspection, Dimensional Control & Prepare document for PTTEP Total Bongkot Spreader Bar 8. Welding Inspection & Documentation for for Tie-in Spool Chevron Offshore Thailand Ltd. 3. Company : PT. P R O F A B I N D O N E S I A Pressure Vessel Design & Fabrication, Process skids, Air Cooled Heat Exchangers, Column, Reactors, Pipe spooling, Separators, all Heavy Fabrication for onshore & offshore facilities. Position Inclusive Dates Responsibilities : QA / QC Inspector : February 08, 2000 To 25 March 2002 : - Ensure all Fabrication Job as per Client Spec And Code, AWS, ASME, API etc - Ensure all Fabrication Job as per WPS be used Arf CV / Page 4 of 6 - Checking material, visual, dimensional, hardness, and compare the material with the Document / Mill certificate Checking Dimensional, Lay-out, Fit-up Checking electrode was receiving with the document Checking Visual Welding Prepared MDR, Summary Sheet, Material Trace ability Checking preparation Hydrotest and witness hydrotest with Client / Third Party / AI Witness and record welder test Witness and record PQR for WPS Review film Radiography from NDT Company Monitor NDT Records Completed prior Hydrotest Prepared NCR if any Assist Third Party, client in inspection Job Check Calibration Certificate of Equipment Project Involved : - - 4. 2 (two) units of Access Platform Kvaerner Process Systems for Gulf Grissik DEG Regeneration Skid Kvaerner Process Systems for Premier Oil ANOA Structural Skid & Vessel Petrosea for Kakap Gas Compression Project Structural Skid ,Vessel & Piping GSB for Premier Oil Natuna Sea Limited 6 Units Metering Skid PT. Enercon For Caltex Duri Filter Separator for Peerless MFG Co. 10 Units Gas Compressor Skid GSI for Gelam Comp, Air Serdang & Beringin 1 Unit Amine Contractor Vessel IKL for Unocal 1 Unit Still Column Vessel IKL for Unocal Pipe Line Global Offshore Pty. Ltd 2 Units Metering Skid Jordan Kent Metering System for Kuwait & Shell Iran Manifold Header Petronas Carigali for MLNG-3 Pipe line project Separator Skid Halliburton for Mobil Arun Project Mid Water Arch Bouy & Gravity Base for Coflexip Stena Offshore Sea Water Fine Filter Saint Gobaint Norpro for Shell Brunei Dry Gas Filter for Peco 360 Ton Module IKL for Conoco Hangtuah Project "R" Stamp Vessel LP. Drum Duplex PT. McDermott for Phillips Petrolium LTD Platform IKL for Conoco Belanak Project Company : PT. TRANSALINDO EKA PERSADA Structural Steel, Piping and Pressure Vessels Manufacturing Plant Position Inclusive Dates Responsibilities : QA / QC Inspector : November 17, 1997 To February 07, 2000 : Arf CV / Page 5 of 6 - Checking material, visual, dimensional, hardness, and compare the material with the Document / Mill certificate Checking Dimensional, Lay-out, Fit-up Checking electrode was receiving with the document Visual of Welding Prepared MDR, Summary Sheet, Material Trace ability Checking preparation Hydrotest and witness hydrotest with Client / Third Party / AI Witness and record welder test Witness and record PQR for WPS Review film Radiography from NDT Company Monitor NDT Records Completed prior Hydrotest Prepared NCR if any Assist Third Party, client in inspection Job Ensure all Fabrication Job as per Client Spec And Code, AWS, ASME, API etc Project Involved : - 2 (two) units of Dehydration Package TNOR Project for Total Indonesie Plem Skid & Process Piping Package for Istana Karang Laut / Pertamina / Belawan Gas Metering Skid for Istana Karang Laut / Total Indonesie Structure Steel Platform Pipe Support for PT. Ballast Nedam South East Asia Peco Filter Package for Mc. Dermot / IKL 3 (three) unit of Peco Filter for Gas Service International (s) PTE.LTD / Mobil Oil Suction & Discharge Scrubber Skid & Associated Piping for Caltex Pacific Ind. Glycol Dehydration Package for GSI (Gas Service International (s) PTE.LTD Pipe Spool, Riser Clamp, Instrument Support & Cone for Conoco Indonesia Reciprocating Gas Compressor Package, Skid, Pressure Vessel & Bottle for GSI for Santa Fe Energy Resouces (Jabung) Diesel Oil Storage Tank for Yadana Onshore Facilities for Primier Oil Pressure Vessel & Filter for Gema Sembrown / Peerless / Total Indonesie Gas Compressor Package, Skid & Pressure Vessel for GSI for Caltex Pasific Ind. Filters Arcowell Cluser Project for Peerless Vertical Filter Coalescer for Adiguna / PeerlessSkid Gas Separator, Skid Test Separator, Skid Inlet Manifolold for IKL for BWP. 1 (one) unit of Regeneration Package Bongkot Dev. Project For Total Thailand Gas Boot And Tank Venting Flare for Santa Fe Energy Resources 13 (thirteen) units of Pressure Vessels & Bottlees for GSI for BHP-Schlumberger. 3 (one) unit of Hyperbaric Chamber for Advance Marine Engineering PTE. LTD 2 (two) units of Steam Separator for Istana Karang Laut 5 (five) units of Pressure Vessels for Gas Compressor Package for GSI / Nong Khae 12 (twelve) units of Compressor Package for GSI / Petrobrass BV. Central Gathering Station Duri – Gas Metering Skid for GSI / Caltex Pasific Ind. 9 (nine) units of Gas Compressor Package Bekasap Field Rental Unit for GSI / CPI 54 (fifty four) unit of compressor station (stainless & carbon steel) for GSI / Conoco Arf CV / Page 6 of 6 - 42 (forty two) Pressure Vessel for Gas Services International (S) Pte. Ltd 1 (one) units of Regeneration Package NSO “A” for Mobil Exploration Indonesia