City of Cockburn CITY OF COCKBURN TOWN PLANNING SCHEME NO. 3 AMENDMENT NO. 17 June 2004 TOWN PLANNING AND DEVELOPMENT ACT, 1928 (AS AMENDED) RESOLUTION TO AMEND TOWN PLANNING SCHEME CITY OF COCKBURN TOWN PLANNING SCHEME NO. 3 AMENDMENT NO. 17 RESOLVED that the Council, in pursuance of Section 7 of the Town Planning and Development Act, 1928 (as amended), amend the above Town Planning Scheme by: 1. Including the following in Schedule 12 – Development Contribution Plan of the Scheme: Ref No: Area: Provisions: DCA 7 Aubin Grove Landowners within DCA 7 with the exception of Part of Lot 199 Gaebler Road identified as Bush Forever Site No. 492 and the Water Corporation bore sites shall make a proportional contribution to the cost of common infrastructure. Lot 448 Lyon Road, Aubin Grove has been identified for a primary school, if this site is not developed for a primary school a proportional contribution to the cost of common infrastructure will be required. The proportional contribution is to be determined in accordance with the provisions of clause 6.3 and contained on the Development Contribution Plan. Contributions shall be made towards the following items: Participants and Contributions: 2. Full earthworks; Provision of drainage infrastructure; Boring under the Kwinana Freeway; Servicing infrastructure relocation where necessary; Landscaping of the linear swale adjacent to the high voltage power line; Costs to purchase the land for the linear swale adjacent to the high voltage power line on the west side of the Freeway between Gaebler Road and Baler Court; Costs to administer cost sharing arrangements – preliminary engineering design and costings, valuations, annual reviews and audits and administration costs. In accordance with the cost Contribution Schedule adopted by the local government for DCA 7. Amending the Scheme Map to include Development Contribution Area No. 7 accordingly. Dated this 15th day of June 2004 CHIEF EXECUTIVE OFFICER 2 FILE NO. 9234 REPORT 1. LOCAL AUTHORITY City of Cockburn 2. DESCRIPTION OF TOWN PLANNING SCHEME: Town Planning Scheme No 3 3. TYPE OF SCHEME: District Zoning Scheme 4. SERIAL NO. OF AMENDMENT: Amendment No. 17 5. PROPOSAL: 1. 2. Including Aubin Grove in Development Contribution Area No. 7 in Schedule 12 – Development Contribution Plan of the Scheme. Amending the Scheme Map to introduce ‘Development Contribution Area No. 7’ over the suburb of Aubin Grove except for Lot 203 Kwinana Freeway. SCHEME AMENDMENT REPORT 4 Background In October 2003 the City finalised the Southern Suburbs Structure Plan – Stage 2 – Banjup (see Attachment 1) which shows the broad land use framework including major road network, neighbourhood structure, commercial, education, community and significant open space areas. The Structure Plan has been adopted and endorsed by Council and the Western Australian Planning Commission as the overarching Structure Plan for the area. To assist the City to resolve technical issues associated with the provision of a stormwater drainage system to service the Southern Suburbs Structure Plan – Stage 2 – Banjup area, the City engaged David Wills and Associates to prepare the ‘Southern Suburbs District Structure Plan Area – Russell Road Arterial Drain Scheme’ (December 2002). This Drain Scheme forms the basis of this Scheme Amendment. To facilitate the urban development east of Beeliar Regional Park the Water Corporation agreed to construct the Southern Lakes Main Drainage Scheme. After considerable negotiation with various government departments the final agreed main drainage system was to consist of three major “buffer lakes” (used for nutrient stripping and compensating effects) and a gravity pipe system to convey stormwater discharge from the proposed future urban area adjacent to Thomsons Lake to the degraded Yangebup Lake to the north. From Yangebup Lake, stormwater in excess of specified operating and environmental criteria was to be then pumped into Cockburn Sound. Additional drainage pump stations to control the rise in the water levels in various lake systems adjacent to the urban areas are also required to be constructed to assist in meeting the environmental criteria set out in the Southern Lakes Main Drainage Strategy Environmental Management Plan which was approved by the Department of Environmental Protection in 1988. Report Amendment No. 17 to Town Planning Scheme No. 3 proposes to introduce ‘Development Contribution Area No. 7’ to Schedule 12 of Town Planning Scheme No. 3 to ensure a coordinated approach is taken to regional drainage in the Southern Suburbs Area with all developers contributing to the provision of the drainage infrastructure. The Wills Report forms the basis of this Scheme Amendment to address the technical issues associated with the provision of a stormwater drainage system to service the Southern Suburbs District Structure Plan area. The main points of the Wills Report are: Provision of four compensation basins – connection to the Water Corporation’s Russell Road Buffer Lake (Lake Copulup); a 800m partially piped and partially open linear swale adjacent to the high voltage power lines on the western side of the Kwinana Freeway between Russell and Gaebler Roads; a compensation 5 basin within Lot 199 Lyon Road; a compensation basin within Lot 412 Gaebler Road; Basins will be constructed to retain a 1 in 5 year storm event except for the linear swale which will retain a 1 in 100 year event. Events greater than 1 in 5 will flow over land and discharge into wetlands/nature reserves nearby; Connection of the basins and swale will be via open channels and some piped sections; Subsoil drainage is to be provided throughout the area; The Drain Scheme does not cover nutrient stripping requirements and there will be a need for Drainage and Nutrient Management Plans to be approved by the City’s Environmental Services Team at the subdivision stage. The normal requirements for nutrient stripping will be required throughout the area. (Attachment 2 shows the Arterial Drainage Infrastructure Plan for the area) The Department of Environment approved the Wills report on the 26 November 2003 stating that the Scheme is considered to be environmentally beneficial principally in terms of further maximising onsite infiltration, being consistent with both EPA’s objectives for the drainage management in the catchment and the current Department of Environment policy for urban drainage management. (Attachment 3 contains a copy of the approval from the Department) page 1 (Attachment 3 contains a copy of the approval from the Department) page 2 The Water and Rivers Commission also approved the Wills report on the 19 March 2003 subject to a number of minor modifications which have since been carried out. (Attachment 4 contains a copy of the approval from the Commission). Funding for the construction of the proposed integrated regional drainage infrastructure should be contributed to by all developers within the area. It is proposed that Development Contribution Area No. 7 require contributions for the construction of the compensation basin within Lot 199 Lyon Road and the open linear swale adjacent to the high voltage power lines on the western side of the Kwinana Freeway between the northern boundary of Lot 80 Barfield Road and Baler Court. The cost of the works has been estimated to be around $510,784.37, this does not include the purchase of the land for the open linear swale. Contributions will be required to be made towards the following items: Full earthworks; Provision of drainage infrastructure; Boring under the Kwinana Freeway; Servicing infrastructure relocation where necessary; Landscaping of the linear swale adjacent to the high voltage power line; Costs to purchase the land for the linear swale adjacent to the high voltage power line; Costs to administer cost sharing arrangements – preliminary engineering design and costings, valuations, annual reviews and audits and administration costs. 6 All other works associated with the integrated regional drainage infrastructure will be developed as part of subdivision approvals. Stocklands who are developing Lot 199 Gaebler Road will pre-fund the construction of the regional drainage infrastructure including the compensation basin on Lot 199 Gaebler Road, boring under the Kwinana Freeway, construction of the linear swale from the northern boundary of Lot 80 Barfield Road to Baler Court and landscaping of the of the swale. The City already has six (6) other Development Contribution Areas within its Town Planning Scheme which are used to collect contributions from developers within the designated area for similar purposes as proposed in this Amendment. All the provisions required to manage Development Contribution Areas already exist within the Scheme and Amendment No. 17 proposes to introduce ‘Development Contribution Area No. 7’ into Schedule 12 and amend the Scheme Map to identify the area. Western Australian Planning Commission Planning Bulletins No. 18 and 37 outline the requirements for the application of development contribution areas and what works can be included in the contributions. The above proposed works comply with both Planning Bulletins. Conclusion The introduction of ‘Development Contribution Area No. 7’ to Town Planning Scheme No. 3 will require contributions towards the proposed integrated regional drainage infrastructure be made by all developers. Without the drainage system, groundwater could rise uncontrolled and create significant problems in the future for the area. The works proposed within Schedule 12 comply with the requirements of Planning Bulletins No. 18 and 37 and given that the infrastructure will benefit all landowners within the Development Area No. 11 cell the Development Contribution Area is required. 7 SCHEME AMENDMENT 8 TOWN PLANNING AND DEVELOPMENT ACT, 1928 (AS AMENDED) CITY OF COCKBURN TOWN PLANNING SCHEME NO 3 AMENDMENT NO. 17 The City of Cockburn under and by virtue of the powers conferred upon it in that behalf by the Town Planning and Development Act, 1928 (as amended), hereby amends the above Town Planning Scheme by: 1. Including the following in Schedule 12 – Development Contribution Plan of the Scheme: Ref No: Area: Provisions: DCA 7 Aubin Grove Landowners within DCA 7 with the exception of Part of Lot 199 Gaebler Road identified as Bush Forever Site No. 492 and the Water Corporation bore sites shall make a proportional contribution to the cost of common infrastructure. Lot 448 Lyon Road, Aubin Grove has been identified for a primary school, if this site is not developed for a primary school a proportional contribution to the cost of common infrastructure will be required. The proportional contribution is to be determined in accordance with the provisions of clause 6.3 and contained on the Development Contribution Plan. Contributions shall be made towards the following items: Participants and Contributions: 2. Full earthworks; Provision of drainage infrastructure; Boring under the Kwinana Freeway; Servicing infrastructure relocation where necessary; Landscaping of the linear swale adjacent to the high voltage power line; Costs to purchase the land for the linear swale adjacent to the high voltage power line on the west side of the Freeway between Gaebler Road and Baler Court; Costs to administer cost sharing arrangements – preliminary engineering design and costings, valuations, annual reviews and audits and administration costs. In accordance with the cost Contribution Schedule adopted by the local government for DCA 7. Amending the Scheme Map to include Development Contribution Area No. 7 accordingly. 9 ADOPTION Adopted by resolution of the Council of the City of Cockburn at the ordinary meeting of the Council held on 15th day of July 2004. ______________________________ MAYOR ______________________________ CHIEF EXECUTIVE OFFICER 10 FINAL APPROVAL Adopted for final approval by resolution of the City of Cockburn at the Ordinary Meeting of Council held on the …………. day of ………. 200….., and the Seal of the Municipality was pursuant to that resolution hereunto affixed in the presence of: ________________ MAYOR (Seal) ________________________ CHIEF EXECUTIVE OFFICER Recommended/Submitted for Final approval ___________________________________ DELEGATED UNDER S.20 OF WAPC ACT 1985 DATE: _____________ Final Approval Granted ______________________ MINISTER FOR PLANNING AND INFRASTRUCTURE DATE: _____________ 11 ATTACHMENT ONE 12 ATTACHMENT TWO 13 ATTACHMENT THREE 14 ATTACHMENT FOUR 15