Facility/Plant Name Environmental Management System Manual APPENDIX F TRAINING MATRIX The following training matrix tables are only examples. They must be modified to properly address national, regional or local conditions and requirements. Issue Date: EMS Manual Facility/Plant Name Environmental Management System Manual TRAINING NEEDS MATRIX ENVIRONMENTAL COURSES Course A/C Refrigeration Servicing (Stationary) HAZWOPER: First Responder Environmental Awareness Incident Command Training Fire Brigade Training RCRA Awareness Training EMS Lead Auditor Training EMS Awareness Training EMS Document Training (see also "Applicable Procedures by Department" EMS Implementation Training EMS Internal Auditor Training Issue Date: Employees Requiring Training A/C Maintenance Security (Bulk Materials, HAZWOPER 1st Responder Awareness, Integrated Emergency Response and Spill Contingency Plan, Prevention Plan, Waste Management, Energy Management, Asbestos Management) Security and Supervisors Emergency Response Team Waste Management Coordinator Environmental Coordinator, Lead Internal Auditor All employees & full time on-site contractors Employees and full time on-site contractors whose work requires knowledge of the document Cross Functional Team & EMR EMS Internal Auditors Page F-1 Source of Training Duration (Hours) Frequency Once, each new maintenance staff Annual Every other year Annual For all new team members Annual Initially Initially, New hires and as necessary Initially, New hires and when document changes occur Initially Initially and New Auditors EMS Manual Facility/Plant Name Environmental Management System Manual TRAINING NEEDS MATRIX PROCEDURES AND WORK INSTRUCTIONS BY AREA/DEPARTMENT EV-01 EV-02 EV-03 EV-04 EV-05 WI02-01 WI03-01 WI03-02 WI03-04 WI04-01 WP03-05 WP03-06 WP03-07 WP05-01 WP06-01 Issue Date: CSP Asbestos Management PCB Management Bulk Material Management Outside Equipment Storage Management Material Usage/ Tox # Assignment PCB-Containing Transformer Instructions Bulk Chemical Truck Deliveries Bulk Truck Deliveries of Petroleum Products Bulk Propane Delivery and Storage Scrap Metal Machining Coulants Road Salt Power House/ Cooling Tower Chemical Usage Review/Approve "Special" Biocide Additions to CSP Coulant Systems KECKES Boilers Page F-2 Shipping Production Maint./Facility Engineering Powerhouse Engineer Safety Paint Shop Area/Department Truck Shop Title Tool & Die Procedure/ Work Practice No. X X X X X X X X X X X X X X X X X X X X X X X X X X X X X EMS Manual