Exhibit C

advertisement
Index
Tab
Description
1.
(i) Emergency Call Processing and Response Procedures
● Questar Gas Company – Emergency Plan – Section IV: Handling and Evaluating
Emergency Calls
1a
2.
2a
2b
2c
2d
3.
3a
3b
3c
4.
4a
5.
5a
(ii) Emergency Evacuation Procedures
● Questar Standard Practice
○ 3-75-01 – Evaluating Gas Leak Reports
○ 5-00-08 – Underground Gas Leak Procedure
● Questar Technical Service Policies and Procedures
○ 02-00-01 – Emergency Call Procedures
● Training Bulletin
○ November 16, 2007 – Revised Procedure – Outside Leak Screening on Inside
Leak Calls
○ January 28, 2008 – Additional Requirements for Evacuations and “A” Leaks
○ March 6, 2008 – Clarification on Leak Screening during Inside Leak
Investigation Procedure
○ May 7, 2008 – suspected Gas Leaks Inside Buildings
● Questar Gas Emergency Plan
○ Section V: Controlling Emergency Situations
(iii) Scene Control Procedures
● Questar Standard Practice
○ 5-00-08 – Underground Gas Leak Procedure
● Training Bulletin
○ November 16, 2007 – Revised Procedure – Outside Leak Screening on Inside
Leak Calls
○ January 28, 2008 – Additional Requirements for Evacuations and
“A” Leaks
● Questar Gas Emergency Plan
○ Section V: Controlling Emergency Situations
(iv) Natural Gas Migration
● 2008 New Operations Employee Construction Orientation School
○ Emergency Plan Section V reviewed with employees and written test
○ Underground leak repair procedure (evacuation policy) – review of
Standard Practice 5-00-08 with discussion of gas migration during
review of check list
○ Blow down, purging, and repair of broken natural gas lines
○ Emergency Plan Quiz
(v) Training and Qualification Procedures
● 2008 New Operations Employee Construction Orientation School
○ Emergency Plan Section V reviewed with employees and written test
○ Underground leak repair procedure (evacuation policy) – review of Standard
Practice 5-00-08 with discussion of gas migration during review of check list
5b
5c
○ Blow down, purging, and repair of broken natural gas lines
○ Emergency Plan Quiz
● DOT Operator Qualification – Quality Assurance Review
○ Physical Properties
○ Abnormal Operating Conditions
○ Leak Detection
○ Emergency Response
● Physical Properties of Natural Gas PowerPoint Training Presentation
J:\Regulated Companies\QGC\D2007-036 Saratoga Springs\FINAL Sett StipScope of Work and Exhibits\Index for scope of work.doc
Download