Pre-Tenancy: Complex / Temporary Demountable Structure – Design Stage Form 2 Completed form to be submitted to your Event Manager at The NEC, Birmingham, B40 1NT Exhibition/Event Name: Hall: Dates: From: To: Structural Element – To be completed by a structural engineer appointed by the Exhibition Organiser. Copies of all relevant plans, calculations and construction details must be attached. I, the undersigned, confirm that I have checked the structural element of the stand, as detailed Declaration: below/or as per the attached, and confirm that it complies with the criteria as laid down within the eGuide Stand Construction & Plan Regulations. Contraventions: (All areas of non compliance must be detailed in the comments box above and detailed within the exhibitor’s risk assessment) Signed: Name: Company: Date: Non - Structural Element – To be completed by the Organiser’s competent person. Copies of all relevant plans, calculations and construction details must be attached. Declaration: I, the undersigned, confirm that I have checked the non-structural element of the stand, as detailed below/or as per the attached, and confirm that it complies with the criteria as laid down within the eGuide Stand Construction & Plan Regulations. Additional Comments: (All areas of non compliance must be detailed in the comments box above and detailed within the exhibitor’s risk assessment) Signed: Name: Company: Date: Staking & Ground Penetration Note: Stand No Please note that permission must be obtained from the Venue 28 days prior to works commencing. A CAT scan of the intended area to be staked and provision of Risk Assessment + Method Statement must be provided to the Venue for permission to be granted. Hall No For NEC Use: Documents received on: Revision 2, May 2015 Name of stand Contractor