ENERGOSERVICE LTD 20 Gagarin Ave., Kharkiv, Ukraine Telephone No.: + 380 57 732-01-39, tel./fax No.: +380 572 58-98-70 e-mail: energoservice@vl.kharkov.ua Executive Director, Manager of Metal Engineering Diagnostics and Inspection Laboratory – Aleksandr Frenkel Energoservice LTD was organized in 1997. The Company is a specialty enterprise in the field of metal engineering diagnostics and inspection. Under Authorization No. 438.03.30-31.62.3 granted by the State Committee for Occupational Safety and Health Supervision, we perform nondestructive testing by the following methods: * Visual testing; * Ultrasonic testing; * Radiographic testing; * Magnetic particle testing; * Penetrant testing; * As well as measure the hardness Of the following metal objects: * Steam and water boilers; * Pressure vessels; * Steam and hot-water piping; * Process piping and process equipment; * Steam and water turbines; * Cranes (save for portal cranes); * Trunk lines; * Gas supply systems; * Structural and enclosing steelwork. Also, we perform the engineering diagnostics and engineering examination of the following equipment: * Steam and water boilers; * Pressure vessels; * Steam and hot-water piping; * Process piping and process equipment; * Steam turbines. Experience of Energoservice LTD in the testing of metal: N 1 1 Year 2 2000 Location 3 Garbadani TPP, Georgia Project 4 300 MW Unit 9 Description of Work 5 Metal inspection for the purpose of preparing tender materials for unit repair: -High pressure, intermediate pressure, low pressure rotors and cylinders; bearing pedestals; steam distribution system, turning gear; turbogenerator rotor by the following methods: visual testing, ultrasonic testing, magnetic particle testing, penetrant testing. Opinion 6 Favorable report of AES MTKVARI LLC, USA 2 2000 Garbadani TPP, Georgia 300 MW Unit 9 3 2001-2002 Zmiyiv TPP, Ukraine 300 MW Unit 8 4 2002-2003 Starobeshevsk TPP, Ukraine 200 MW Unit 4 5 2003 Khmelnytskyy NPP, Ukraine Unit 2 6 2003-2004 Zmiyiv TPP, Ukraine 300 MW Unit 8 7 2002-2005 Kremenchuk, Ukraine ZAO Ukrtatnafta 8 2005 Kharkiv, Ukraine Philip Morris Tobacco Factory Development and introduction of electric-spark hardening technology for turbine blading and metal inspection during unit major overhaul: Main steam piping; hot and cold reheating piping; bypass pipes and various manifolds (headers); feed piping; turbine oil piping – welded joints and bends by the following methods: visual testing, ultrasonic testing, magnetic particle testing, penetrant testing. Radiographic testing of construction welded joints of the boiler and turbine during unit rehabilitation. Favorable report of AES MTKVARI LLC, USA Radiographic testing of Favorable report of Starobeshevsk TPP management construction welded joints at the Boiler Unit supplied by Lurgi Lentjes AG -Germany. Energoservice LTD‘ specialists performed gamma-ray flaw detection work on welded joints and piping during the completion of unit construction. Radiographic testing of welded joints of the boiler pipes. Visual testing, ultrasonic testing, magnetic particle testing, dye penetrant examination, hardness measurement in the diagnostics of vessels and apparatuses Radiographic testing, ultrasonic testing, leak-tightness tests on piping and equipment of the facility. Favorable report of BABCOCK and Siemens, Germany Favorable report of TEM, PLC Favorable report of ALSTOM, France Favorable report of ZAO Ukrtatnafta Favorable report of subsidiary M.T.G. Ukraine. Engineering and Trading, Turkey We performed metal engineering diagnostics and inspection at other projects of Ukraine as well. Energoservice LTD invites both domestic and foreign customers for mutually beneficial cooperation. Our flexible pricing policy, high quality of work, and prompt resolution of tasks set have enabled us to find reliable partners.