Rev 05/2012 CLEARSKY GLASS SKYLIGHT [08 62 00 Unit Skylights] [08 73 00 Metal Framed Skylights] NOTE: THIS IS A PERFORMANCE SPECIFICATION IN CSI FORMAT. IN ORDER TO INSURE THE BEST SPECIFICATION FOR YOUR APPLICATION, WE RECOMMEND THAT YOU CONSULT WITH YOUR LOCAL CPI REPRESENTATIVE FOR ASSISTANCE DELETE OPTIONAL/UNNECESSARY ITEMS IN PARENTHESIS. Note: “ ” in left margin denotes option(s). SPECIFICATION IN DISC FORMAT IS AVAILABLE UPON REQUEST. [Downloadable Word Doc. file is available on our web site: www.cpidaylighting.com] CPI DAYLIGHTING CLEARSKY GLASS SKYLIGHTS MASTER SPECIFICATION To be certain that you are using the most recent available CPI Specification, please visit our website at www.cpidaylighting.com and download the current version. CPI DAYLIGHTING, INC. IS ENGAGED IN CONTINUING RESEARCH TO IMPROVE ITS PRODUCTS. THEREFORE, THE RIGHT IS RESERVED TO MODIFY OR CHANGE MATERIAL IN THIS SPECIFICATION WITHOUT NOTICE. [08 62 00] [08 73 00] Rev 05/2012 CLEARSKY GLASS SKYLIGHT SYSTEM [08 62 00 Unit Skylights] [08 73 00 Metal Framed Skylights] PART 1 GENERAL 1.1 Scope This section includes those items required for the skylight work shown on the contract drawings and as specified herein. They are limited to the skylight materials and are as follows: Structural calculations (Optional) Fabricated skylight frames and related fasteners Fabricated flashings and closures Applied finish of aluminum extrusions and sheet Glass and Glazing Installation 1.2 Related Work A. B. C. D. E. F. G. H. I. 1.3 A. Section (_____): Concrete and/or Masonry Section (_____): Structural Steel Section (_____): Metal Fabrications Section (_____): Flashing and Sheet Metal Section (_____): Glazing Section (_____): Roofing Section (_____): Sealants Section (_____): Wood Blocking Section (_____): Final Cleaning System Requirements Design 1. All vertical skylight framing components shall incorporate a system of alternate serrations for attachment of the exterior glass clamping bars with ¼”- 20 stainless steel screws, and Snap-On clamping bar covers. 2. All horizontal and vertical skylight framing components shall incorporate an integral condensate control gutter system with weep holes at the sill condition for positive drainage to the exterior. 3. The skylight system(s) shall incorporate flush silicone sealant joints at the horizontal framing components. 4. The skylight system(s) shall incorporate silicone sealant remedial seals adjacent to the vertical framing component clamping bars and Snap-On covers. 5. (Optional: The skylight system(s) shall incorporate flush silicone sealant joints at both the horizontal and vertical framing components, with fully concealed mechanical fasteners and factory applied structural silicone sealant joints, creating a totally flush glazed system.) 2 [08 62 00] [08 73 00] Rev 05/2012 B. 1.4 A. B. Performance 1. The skylight framing components, including the glass, shall be designed in accordance with the following requirements: a. ____ PSF Live or Snow Load acting vertically b. ____ PSF Wind Load acting horizontally c. A Dead Load as applicable to the framing and glass d. The support structure and adjacent construction must support the transfer of all loads, including horizontal and vertical, exerted by the skylight system(s). 2. The deflection of the framing member in a direction normal to the plane of the glass, when subjected to a uniform load deflection test in accordance with ASTM E330 and per the above specified loads, shall not exceed L/175 or ¾”, whichever is less, for the unsupported span. 3. The deflection of a framing member in a direction parallel to the plane of the glass, when carrying its full dead load, shall not exceed an amount which will reduce the glass bite below 75% of the design dimension, shall have a 1/8” minimum clearance between itself and the edge of the glass and shall not impair the function of or damage any joint seals. 4. Air Infiltration: allowable air infiltration shall not exceed 0.06 CFM of the total glazed surface area when tested in accordance with ASTM E283 at a static pressure of 6.24 PSF. 5. Water Penetration: no uncontrolled water penetration shall occur when the system is tested in accordance with ASTM E331 at a static pressure of 12 PSF and for dynamic water resistance in accordance with AAMA 501 at a static pressure of 12 PSF. 6. Thermal Movement: The skylight system(s) shall perform without detrimental effect at a temperature range of 100 +/- degrees from the ambient temperature. 7. Where permitted by code, a 1/3 increase in allowable stress for wind or seismic load shall be acceptable, but not in combination with any reduction applied to combined loads. In no case shall allowable values exceed the yield stress. 8. Compression flanges of flexural members may be assumed to receive lateral bracing only from anchors to the building structure and horizontal glazing bars or interior trim which are in contact with 50% of the members’ total depth. 9. (Optional: (limited reaction design) the skylight framing components are to be designed to exert no horizontal reactions under vertical gravity type loads (dead, live or snow). Unbalanced live loads (wind, seismic, etc.) acting upon the skylight will produce horizontal reactions that cannot be controlled by the skylight(s) and, therefore, must be resisted by the support structure.) Quality Assurance The skylight system(s) shall be furnished by a firm with a minimum of ten (10) years’ experience in the design, engineering, fabrication and installation of aluminum framed skylights. The work of this section, specifically the design, engineering, fabrication, finishing, glass, jobsite preparation, installation and glazing of the skylight system(s) shall be the responsibility of the skylight manufacturer. The skylight manufacturer shall be regularly engaged in these phases of skylight construction and be able to demonstrate successful performance on comparably sized projects and of comparable design complexity for at least the previous ten (10) years. 3 [08 62 00] [08 73 00] Rev 05/2012 1.5 A. Manufacturer The skylight system(s) shown on the contract drawings and as specified herein is/are based on system(s) as furnished by CPI Daylighting, Inc., telephone (800) 759-6985, (847) 816-1060, fax (847) 816-0425, Website: www.cpidaylighting.com and as locally represented by __________________________________________. Phone ______________________ B. 1.6 A. B. C. D. Optional Manufacturers must: 1. Qualify to bid not less than ten (10) days prior to bid closing date. 2. Submit complete details for review by the Architect prior to bid. 3. Submit structural calculations based on the design loads of this specification, showing sizes of framing members and loads applied to the support structure, for review by the Architect prior to bid. 4. Submit notarized certification that they have performed successfully in the design, manufacture and installation phases of skylight projects comparable in nature for at least the previous ten (10) years. Warranty Submit manufacturer’s warranty certifying that, except where specifically noted, the skylight work has been furnished and installed in accordance with the Contract Documents. Certify that the skylight framing system(s) is/are free of defects in design, materials and construction for a period of five (5) years from the Date of Skylight Completion. The finish shall be warranted as provided by the finish applicator. The glass shall be warranted against defective materials, delamination, seal failure, and defects in manufacture as provided by the glass manufacturer’s standard warranties. Glass breakage is not warranted. END OF SECTION PART 2 PRODUCTS 2.1 Materials A. Framework: Principal Supporting Members: 1/8” minimum thickness, extruded aluminum, tubular, 6063-T5, 6063-T6 or 6005-T5 alloy and temper per ASTM B221. Sizes, shapes and profiles [as per CPI Daylighting, Inc.’s standard components] [as indicated on the Contract Documents]. 1. Snap-On Covers and Miscellaneous Non-Supporting Trim: 1/16” minimum thickness, extruded aluminum, 6063-T5 alloy and temper per ASTM B221. 2. Principal Formed Metal Members: 1/8” minimum thickness, 5052 alloy per ASTM B209. B. Flashings and Closures 1. 1. 5005-H34 alloy sheet aluminum in a minimum [0.040”] [______] thickness. 2. Sheet metal flashings and closures shall be shop formed to profile in 10ft. lengths. When lengths exceed 10ft., field trimming to length and field forming the ends is necessary to suit field conditions. Sheet metal overlaps are to be 6”, set in sealant and aluminum pop riveted as required. 4 [08 62 00] [08 73 00] Rev 05/2012 C. Finish (as selected by the Architect) 1. [AA M10 C22 A31 Class II clear anodized] [AA M10 C22 A41 Architectural Class I clear anodized (AAMA 607.1)] [AA M10 C22 A44 electrolytically deposited anodized (AAMA 608.1] [Acrylic, Baked Enamel (e.g. ACRABOND) coating in a standard white, bronze or black color] [Fluoropolymer (e.g. ACROFLUR resinous coating, 50% Kynar, in a standard/custom color (AAMA 603.8] [Fluoropolymer (e.g. FLUROPON, DURANAR) resinous coating, 70% Kynar, in a standard/custom color (AAMA 605.2)] [SPECIAL as specified by the Architect]. D. Glass (as selected/specified by the Architect) 1. Non-Insulating Glass (laminated): two (2) lites interleaved with polyvinyl butyral (PVB) interlayer. Exterior lite: ____” thick, [annealed] [heat-strengthened], [clear] [bronze] [gray] [blue] [green] [blue-green] [special]; [ 0.030”] [0.060”] clear PVB interlayer; Interior lite: ____” thick, [annealed] [heat-strengthened], clear. 2. Insulating Glass (with silicone secondary edge seal): Exterior lite: ¼” thick, [tempered] [heat-strengthened], [clear] [bronze] [gray] [blue] [green] [bluegreen] [special]; ½” air space; Interior lite: ____” thick, [annealed] [heat-strengthened] clear laminated [SPECIAL] (as specified by the Architect). E. Fasteners 1. Exterior Clamping Bars: ASTM A193 B8 300 series stainless steel. 2. Framework Connections: ASTM A193 B8 300 series stainless steel. 3. Anchoring Skylight(s) To Support Structure: ASTM A307 zinc plated steel. F. Setting Blocks 1. Extruded Type II silicone rubber designed to permit adhesion and comply with the following specifications: a. Hardness: ASTM D2240 Type A 80 (+/-5) durometer. b. Color: Black. G. Glazing Gaskets 1. Extruded EPDM rubber design to comply with the following specifications: a. Hardness: ASTM D2240 Type A 60 (+/-5) durometer. b. Tensile Strength: ASTM D412 1200psi c. Elongation: 250% minimum. d. Color: Black. 2. Compression Set: ASTM D395 Method B, 22 hours @ 212 degrees F. 30%, maximum. 3. Heat Aging Characteristics: a. 70 hours @ 212 degrees F. b. ASTM D573 Hardness Change: +10. c. ASTM D573 Tensile Change: -15%. d. ASTM D573 Elongation Change: -40%. 4. ASTM D1149 Ozone Resistance: No cracks. 5. No visual checks, cracks or breaks after completion of tests. 6. Sealants Structural Flush Glazed Joints: High performance silicone sealant applied in accordance with manufacturer’s recommendations. Non-Structural Flush Glazed Joints and Weather seal Joints: silicone sealants applied in accordance with manufacturer’s recommendations. 5 [08 62 00] [08 73 00] Rev 05/2012 7. 2.2 A. B. C. D. E. F. G. H. I. J. K. Structural silicone sealant performance requirements: a. Hardness: ASTM D2240 Type A, 30 durometer. b. Ultimate Tensile Strength: ASTM D412, 170 psi. c. Tensile at 150% Elongation: ASTM D412, 80 psi. d. Joint Movement Capability After 14 Day Cure: ASTM D1149, +/- 50%. Fabrication The principal skylight framing components shall be factory assembled in whole or in part, identified and shipped knocked down for final assembly at the jobsite. All required welding of sheet aluminum flashings and closures shall be by the heliarc process with all welds ground smooth. Construct the skylight(s) using extruded aluminum members. Construct the skylight(s) using a continuous extruded aluminum sill adapter with expansion joints as required. Locate weep holes in the sill adapter, at each rafter connection, to positively drain condensation to the exterior of the skylight(s). Design all glass supporting members for slide-in type spline glazing gaskets. Design glass clamping bar fasteners to resist uplift loadings. The spacing of the fasteners shall be determined by the structural calculations, when applicable. H. Use Snap-on clamping bar covers to conceal the glass clamping bars and the glass clamping bar fasteners. Shop locate, drill and bolt the aluminum clips to the framing members. Set the glass with interior and exterior EPDM glazing gaskets. Use silicone setting blocks to support the glass and to provide edge clearances and glass bites in accordance with FGMA recommendations and as outlined below: 1. Set the blocks not less than 6” from the edge of the glass. 2. Glass Bite: Not less that ½” nor more than 5/8” on any side of the glass. 3. Maintain ¼” edge clearance between the glass and the adjacent metal frame. 4. Use EPDM rubber spacers to maintain the separation of the glass and the metal frame. END OF SECTION PART 3. INSTALLATION 3.1 Jobsite Inspection A. The skylight manufacturer’s installer shall examine the support structure and adjacent construction to determine that they are properly prepared, dimensionally correct and ready to receive the skylight work included herein. Any deviations from the approved skylight shop drawings shall be brought to the immediate attention of the General Contractor. No installation work shall begin until all such deviations have been satisfactorily corrected at the expense of the responsible party(s). 3.2 A. B. C. Preparation All skylight materials shall be inspected and all defective components shall be repaired or replaced. All contacts between aluminum and dissimilar materials shall be isolated via plastic shimwork, provided by the skylight manufacturer, to prevent electrolysis. The skylight manufacturer and the skylight manufacturer’s installer exclude all field measuring, demolition, removal, replacement, and/or rework of any existing material. 6 [08 62 00] [08 73 00] Rev 05/2012 3.3 A. B. C. D. E. F. G. 3.4 A. B. C. Installation All skylight materials shall be installed in accordance with the skylight manufacturer’s installation instructions packet, by experienced installers, in a clean and workmanlike manner. Install the skylight materials under the direction of the skylight manufacturer’s designated installer. Erect the skylight materials plumb and true and in proper alignment and relation to the established lines and grades as shown on the approved shop drawings. Anchor the skylight materials to the support structure in strict accordance with the approved shop drawings. Use high performance silicone sealants per the skylight manufacturer’s instruction. Apply all sealing materials in strict compliance with the sealant manufacturer’s recommendations. Before application, remove dirt, dust, moisture and other foreign matter from contact surfaces. Mask adjoining surfaces to maintain a clean and neat appearance. Tool the sealant to fill the joint and provide a smooth finish. Any temporary covering and weatherproofing of the skylight opening(s), if so required by the General Contractor and removal of same during and after the completion of the installation is excluded by the skylight manufacturer and the skylight manufacturer’s installer. Any temporary coverings that may be required are not to obstruct or interfere with the skylight installation in any way. Cleaning and Protection Install the skylight framework and associated metal so as to avoid soiling or smudging of the finish. Clean the glass and framework at the time of the installation. Final cleaning, if so required, subsequent to the completion of the installation, shall be the responsibility of the General Contractor. The skylight manufacturer does not provide nor include any temporary protection to the skylight materials after the completion of the installation. Protection of the skylight from ongoing work by other trades shall be the responsibility of the General Contractor. The skylight manufacturer is responsible only for the damage caused by the personnel under his control and responsibility. END OF SECTION 7 [08 62 00] [08 73 00]