Air Conditioning Laboratory Project 99.10 Design Team Members: Sean Gallagher 260 Elkton Rd, Apt D-9 Newark, DE 19711 (302) 369-2820 Prathana Vannarath 211-8 Thorne Lane Newark, DE 19711 (302) 738-8765 seangall@udel.edu 91719@udel.edu Brian Davison 64 Willow Creek Lane Newark, DE 19711 (302) 239-1340 Pamela McDowell 135 E Cleveland Ave Newark, DE 19711 (302) 366-7473 davison@me.udel.edu pamela@udel.edu Sponsors: Dr. Tony Wexler 226 Spencer Lab Mechanical Engineering Department University of Delaware Newark, DE 19716 (302) 831-8743 wexler@me.udel.edu Dr. Suresh Advani 205 Spencer Lab Mechanical Engineering Department University of Delaware Newark, DE 19716 (302) 831-8975 advani@me.udel.edu Executive Summary: The University of Delaware, Department of Mechanical Engineering, is drastically changing the curriculum for the class of 2000 in order to keep up with ABET standards. As a result, a new joint Thermodynamics and Heat Transfer laboratory has been created. Our mission is to design a set of experiments for this joint lab class. These experiments are to be based on an air conditioning cycle. After interviewing our customers to identify their wants, we made use of the SSD process to weight them. System benchmarking was used to identify our major competitors, and again SSD helped us compare them to a window air conditioner. None of the alternatives had nearly as many as the window air conditioner. Functional benchmarking was used to investigate specific types of window air conditioners and sensors. This project consists of two integrated parts, the lab apparatus and the lab experiments. When analyzing our project, we first considered the lab apparatus. As mentioned above, we decided that a window air conditioner was the best apparatus. From here, we generated concepts about the actual written experiments. Through evaluating our metrics, we decided on a set of labs that will have between four and seven experiments, each examining a component of the air conditioning unit. The students will be asked to write a short report following each lab, and after every experiment has been completed, a technical paper will be written bringing together all the concepts learned. Sensors were then chosen based on the needs of each experiment, and on our metrics. After fabrication of the apparatus was completed and lab experiments were written, we began the testing phase. From the results of the testing, we made 2 modifications and repeated the testing. Upon comparing our results with our wants and metrics, we concluded that we had successfully completed the project. 3 Table of Contents: Executive Summary…………………………………………………..3 Table of Contents……………………………………………………..4 Introduction…………………………………………………………...5 Background……………………………………………………5 Customers…………………………………………………….6 Wants…………………………………………………………7 Constraints……………………………………………………8 Metrics & Target Values……………………………………..8 Concept Generation………………………………………………….12 System Benchmarking……………………………………….13 Functional Benchmarking……………………………………15 Lab Experiment Benchmarking……………………………...17 Concept Generation………………………………………….18 Concept Selection……………………………………………………24 Fabrication…………………………………………………………...26 Assembly…………………………………………………………….31 Testing/Re-Design…………………………………………………...34 Hardware…………………………………………………….34 Labs………………………………………………………….37 Suggested Modifications…………………………………………….39 Conclusion…………………………………………………………..41 Appendix A – file – Appendix A_Team10.xls………………………….43 B – file – Appendix B_Team10.xls………………………….43 C – file – Appendix C_Team10.xls……….…………………43 D…………………………………………...………………...44 E……………………………………………………………...45 F……………………………………………………………...47 G……………………………………..………………………69 H……………………………………………………………..77 J – file – Team10.vi………………….………………………80 K – file – Appendix K_Team10.xls…………………………81 4 Introduction: Background: The University of Delaware, Department of Mechanical Engineering, is drastically changing the curriculum for the class of 2000 in order to keep up with ABET standards. Part of this new curriculum includes a joint laboratory class; this lab is for Thermodynamics and Heat Transfer. The professors of these courses, Dr. Wexler and Dr. Advani, have proposed a project to the New Castle Design Associates to design a set of experiments for this joint lab. The problem is to design a set of thermodynamic and heat transfer experiments using a window air conditioner unit for the Undergraduate Laboratory. Experiments will be based on lessons designed by our senior design group. Our mission is to design a set of thermodynamic and heat transfer experiments for the University of Delaware, Mechanical Engineering Undergraduate Laboratory, using an apparatus that will be completed by April 1999 for no more than four thousand dollars. In evaluating our concepts, we compared them in terms of their correlation to the wants and constraints set forth by our customers. In order to determine how exactly the concepts correspond to the wants we used metrics and target values derived from benchmarking. 5 Customers: Our customer list encompasses our sponsors as well as experts in the fields of HVAC, education, and scholarly work. Our customers are as follows: 1. Dr. Wexler, Professor 1. Dr. Advani, Professor 2. Undergraduate students 3. Graduate student TA’s 4. Judy Greene, Educational Expert 5. Dr. Sun, Professor, Lab Expert 6. William Davison, HVAC Engineer 7. Manufacturers: Hampden, Armfield Ltd. 8. Other schools (Georgia Institute of Technology, Pennsylvania State University) The list can be seen on our SSD chart, which is attached in Appendix A. The list is ranked by order of importance, which is set by the team. We determined that Dr. Wexler and Dr. Advani were of the utmost importance as sponsors. The project is not only their idea, but they are jointly funding it. Undergraduate students are directly effected by each and every aspect of our project. The primary purpose of any laboratory experiment is to effectively teach ideas in a hands-on manner. The graduate students are also directly effected in that they will be actively in charge of the hands-on learning process. Judy Greene, an educational expert, helped us evaluate the level of effectiveness of our laboratory experiments. Dr. Sun is an expert in the field of laboratory experiments, perhaps one day he will use our experiments and our apparatus to teach his classes. 6 William Davison is an expert in determining which hardware will function effectively under our given conditions. Manufacturers and other schools help in benchmarking, and are of concern in the case that our apparatus be manufactured for more widespread use. Wants: Our list of wants encompasses the top eleven most important wants set forth by our customers. It is as follows: 1. Educational Effectiveness 1. Portable 2. Easy to use 3. Self Evident 4. Easy to Set-Up 5. Cost Effectiveness 6. Multiple Purposes 7. LabVIEW Compatible Data Acquisition 8. Forgiving of Incompetence 9. Quiet 10. Quick These wants appear in their order of importance according to our SpreadSheet Design Chart, in Appendix A. This ranking comes about from assigning values to the wants according to their location on the customer list, and then weighting those numbers by multiplying them by the inverse of customer rank. For example, if Mr. Davison’s first want is cost effectiveness, then cost effectiveness is assigned a value of .45 because it 7 appears in the first column and then it gets multiplied by 1/6 because he has a rank of 6th on our list of customers. Constraints: The constraints for this project include a number of issues. The most important is the size. It must be small enough to be portable because it may be moved often. Also, we are on a strict schedule which states that this project be finished by April 1999, and the format of our presentations and written reports are given, which is all dictated by New Castle Design Associates. Lastly, our budget is four thousand dollars (see Appendix C). Our mission is to be fulfilled in such a way as to include as many customer wants and constraints as possible. We are going to measure whether we have satisfied this by using metrics and set target values. Metrics & Target Values: Although our project integrates two parts, lab experiments and the hardware, some of the wants pertain to the experiments and some to the lab apparatus. Considering the aspect of our lab experiments, each needs to be a self-evident, easy to use, effective learning tool. The most important benefit is that the undergraduate students here at the University of Delaware will learn about heat transfer and thermodynamics and the realities of measured versus theoretical quantities. To measure how well we have achieved each want, we will use metrics and the target values associated with them. As described previously, our wants are prioritized by their relative importance. Each want has at least one metric associated with it, and some 8 have multiple metrics. As for priority among the metrics, we used the association of the want as a determining factor. For example, if the want is ranked number one the metric corresponding with it is also ranked number one. If a want has multiple metrics, then we considered each to have the same rank. For instance, if the number two want has three metrics, then all three metrics have a rank of two. To see an all–encompassing table of prioritized wants, metrics and target values, see Appendix B. Below we discuss each metric according to whether it pertains to the lab experiments or the hardware. Several of the wants correspond to the lab experiments; they are educational effectiveness, self evident, and quick. Educational effectiveness is going to be measured by the evaluation chart found in Appendix C, for now, but ultimately by survey during the testing. Whether it is self-evident is going to be determined by survey. The questions on the survey are the basis for Appendix C. At this point in time, Judy Greene has evaluated our lab experiments and commented on them. She used her expertise based on her professional experience to perform the evaluation. When the apparatus is complete, we will persuade some undergraduates to perform the experiments and fill out surveys, commenting on how clear the lessons and objectives are and if the procedure is in a logical order. These surveys will have rankings on them from one to five, with five being the best. We have a target value of 4 because we want it to be self evident to everyone, but we realize that nothing will please everyone. For now we have evaluated these things based on our own experience, as we consider ourselves as experts in the field of laboratories for undergraduate students. Lastly, we want the experiments to be quick. From our personal experiences, those of other undergraduates, those of present teaching assistants, and those of Dr. Advani and Dr. Wexler: if the lab is too long very little is 9 retained. We are going to measure this with time. We have a constraint of two hours, which is the scheduled amount of time for the laboratory. However, we are aiming for no longer than an hour because based on our experience and under the advisement of Judy Greene, students attention deteriorates rapidly at this point. The rest of the wants pertain to the hardware aspect of the project. The most important according to our SSD chart, as described above, is that it be portable. We are going to measure this by size. The apparatus should fit on a cart that has wheels and is able to pass through a regular doorway, so we have set our target values to be 36 inches in width and 60 inches in height. We are also going to measure this by weight; we have designated 100lbs to be the target value in order to ensure that any one could push the cart. The next want is easy to use. We are going to measure this by physically looking at the apparatus and determining whether the components are visible and how accessible they are. By accessible, we mean that the students should be able to touch all the parts, not take them apart. In other words, we want to not only see the components in the apparatus, but we want to be able to touch them. We could physically count all the visible parts and the number of touchable parts; however, each apparatus may have a different number of parts so these numbers may not be comparable. Instead, as we consider each apparatus, we will visually examine them and determine whether the components are in fact visible and touchable. Each will receive either a ‘yes’, if they are, or a ‘no’, if they are not, for each category, visible components and accessible components. Our target value is of course yes, because we want everyone to be able to use the apparatus. 10 We also want the apparatus to be easy to set up. Time is the key method to measure this; we have a target value of 15 minutes, as this is the amount of time between classes and the TA should not need more time than this to set up the lab. We are also going to measure this by the number of separate parts. The idea is to be able to get the entire apparatus onto one moveable cart, because this would greatly minimize the time it would require to set up therefore increasing the ease of setting up the apparatus. Either it fits onto one cart or it does not. Our target value for this is that it does. The next want regarding the hardware is cost effectiveness. The apparatus should have a low initial cost, a low operating cost, be long lasting, and the parts should be easily available from a store or catalogue. Our target value for a low initial cost is the $4000 budget that we were given. For low operating cost we are aiming for $22, this comes from estimating that the apparatus runs for 12 hours a day, 5 days a week, for four weeks at a rate of 9 cents per kilowatt /hour (This is the rate charges by the City of Newark). For long lasting, we are targeting 10 years because of changes in technology and EPA standards. Currently R-22, the refrigerant in the window air conditioner, is banned from use in car air conditioners and central ac units in homes because of the environmental effects. Right now it is still being used for window air conditioners because of cost considerations, but in a few years it may be illegal to use R-22. Another want is that the apparatus have multiple purposes. It must contain both thermodynamic and heat transfer principles. This is a yes or no question asked of every concept. Our target value is going to be yes because this is a lab for both heat transfer and thermodynamics so both topics should be included. 11 This system should also have a LabVIEW compatible data acquisition system so that the existing acquisition board can be used to read the data. This is either present or it is not. Our target value is present. We are investigating other software packages besides LabVIEW; however, LabVIEW is what the ME department currently uses and would be the most convenient. LabVIEW satisfies all metrics associated with the acquisition program required, as it is compatible with itself and it is free. The apparatus should also be forgiving of incompetence. What this means is that the apparatus should give relatively good data even if the operator makes a few mistakes. This will be measured by physically trying the limits of the apparatus when it is finally assembled, but for now we are taking this into consideration when purchasing parts. We are consulting our customers, such as Dr. Sun, Dr. Advani, Dr. Wexler (who has written a book on sensors and can be considered an expert in this area) and other manufactures of sensors, such as Omega and Optrand. When we are able to test the apparatus, we will compare the data collected, and we have set a target value of 10%. By this, we mean that as long as the error in the data is less than 10%, it is acceptable. Lastly, we want the apparatus to be quiet. This will be measured by a target value we have set at 60 decibels, which is a conversation level of noise. OSHA laws are not important here, the noise level limitation is for the convenience of the users. Concept Generation: Although the project consists of two integrated parts, the hardware and the lab experiments were benchmarked separately. The following sections, system and 12 functional benchmarking, pertain to the hardware, and the benchmarking for the lab experiments follows below that. System Benchmarking: System level benchmarking began with a search for existing thermodynamics and heat transfer labs. We started by looking at what is being offered and what has been offered previously here at the University of Delaware. We found that the MEEG 391, Engineering Science Lab, taught by Dr. Sun, was the closest match, but none of the apparatuses displayed the Heat Transfer and Thermodynamics principles we had in mind. Investigations into various other universities’ engineering departments revealed information of little use. The same result applies to research into HVAC programs in technical schools. Through inquiries to professors and searches on the Internet, manufacturers in this area were found to be Armfield Limited and Hampden Engineering Corporation. Dr. Prasad provided some literature on both the Armfield and Hampden labs. A further check into the companies’ respective Internet pages provided updated information on the old labs and listings of new laboratory offerings. Armfield Limited offers a large selection of engineering teaching research equipment. The laboratory equipment most applicable to this project can be found in Armfield’s Heat Transfer line of laboratory equipment. Of primary interest is the HT10X line of heat transfer teaching equipment. This line is comprised of single bench top Service Unit, and seven individual laboratory accessories, each illustrating a single heat transfer fundamental. Each of the individual laboratory setups can be purchased with a Data Logging Accessory package. Additionally, in Armfield’s Fluid Mechanics line, the 13 FM23 Plunger Pump Demonstration Unit can be used to partially simulate the compressor found within an air conditioning unit. The air conditioning unit compressor is typically a piston type compressor and the FM23 uses a positive displacement pump. However, this is not a true match. This can also be said for the rest of Armfield labs. Some of Armfield’s products display heat transfer and thermodynamic principles, but none of them do everything a window air conditioner can do. Hampden differs from Armfield by offering laboratory equipment related to specific industry equipment such as cooling towers, heat exchangers, heat pumps, and refrigeration cycles. Of interest is Hampden’s H-ACD-2 Basic refrigeration Cycle Trainer. According to Hampden’s product literature, this equipment “has been designed to demonstrate the principles of … R-134 a refrigeration system … including heating, cooling, humidification, de-humidification, recirculation, and mixing.” The inclusion of humidification, de-humidification, recirculation, and mixing is beyond the original scope of our project, as this equipment is more oriented to larger, building HVAC systems rather than the small, window unit style air conditioning unit we are interested in. This is also evident in the size of the H-ACD-2. The unit measures 88” x 70” and 31” deep. Total weight for the unit is 1170 lbs. The H-ACD-2 requires 208V, three phase power and a water supply. Hampden offers an option data logging package including 13 type-T thermocouples, a single air velocity meter, three pressure transducers, two differential pressure transducers, and two wattmeters. Hampden also manufactures a Refrigeration Cycle Trainer, H-RST-2, that covers the complete refrigeration cycle. This does not take the form of a recognizable piece of machinery. All of the equipment, such as the coils, are specially fabricated for this lab 14 apparatus and are not industry standard equipment. The unit is also similar in size and weight as the H-ACD-2. There remains a number of Hampden labs such as the H-RST3B Basic Refrigeration Cycle and Heat Pump Trainer, the H-6710-CDL Refrigeration Demonstrator, and the H-6830 Heat Pump Trainer that each satisfy a few of our requirements, but are inferior to the H-RST-2 and H-ACD-2 as a competitor. Overall, we did not learn very much from the system benchmarking. What we did learn was that the window air conditioner appears to be our best choice. Functional Benchmarking: For functional level benchmarking, we researched the major manufacturers of laboratory equipment and scientific sensors. Omega Engineering, Incorporated was found to supply an extensive line of sensors. Additionally, their catalogs and web site offered plenty of technical information about each sensor. The sensors in Omega’s product line that we were interested in included thermocouples, pressure transducers, a mass flow sensor, and a relative humidity sensor. This was beneficial as a source to help determine specific types of sensors need for the purpose of this project. In terms of thermocouples, we found that type K are the best choice for our needs, the type K range from –100 oC to 400 0C. As for the other sensors we are investigating, all of them have outputs of volts, so they will not require modules to convert their signals. Pressure sensors come in a wide variety with fairly large ranges, so we will not have any problems choosing one that will be compatible with the air conditioner. The air conditioner, while off has a pressure of approximately 150psi, and while operating at full capacity, a low pressure of about 75psi and a high of about 250psi. Considering this, we 15 are investigating pressure sensors that have a range of 0 to 500psi. Relative humidity sensors are fairly standard. They all measure 0% to 100% relative humidity. These sensors also determine the temperature of the air, but the velocity will have to be determined with a separate sensor. The mass flow sensors are very delicate. It is difficult to find ones that are compatible with refrigerant. Therefore, the engineering department of Omega is guiding us. We trust their advisement because if it doesn’t work, they’ll replace it. Another company, Optrand, produces fiber-optic pressure transducers. This provides an alternative method of pressure measurements for the lab as well as allowing a thorough study of a compressor. Optrand’s AutoPSI-TC Dynamic Pressure Sensor would allow continuous measurements of the pressure inside the compressor. This is a new discovery and its feasibility for this particular lab will be further evaluated. Window air conditioner manufacturers were also researched. A large number of air conditioners in the range of products we are interested in were found in Carrier’s room Air Conditioners series, Airtemp’s Room Air Conditioner series, and Port-a-Cool’s product line to name just a few. The University of Delaware’s HVAC department donated an older air conditioning system. Unfortunately, this system uses R-22 for a refrigerant. We desire a newer system with an environmentally safe refrigerant. It does not do any good for the students to study a system using an obsolete refrigerant. Our customer, Dr. Wexler, agrees with the importance of using an environmentally safe refrigerant for the lab. This air conditioner did, however, provide an excellent opportunity to study the air conditioning system hardware in order to get a better picture of what the eventual lab setup will require. 16 The LabVIEW software and data acquisition board and computer are already available in the department. Therefore, the selection and purchasing of the data acquisition card and the software does not need to be considered. The number of channels and type of inputs that the board can handle has been determined to aid in the selection of the individual sensors. Finally, the actual mounting of the sensors needs to be determined. The fittings required in mating the sensors to the air conditioning unit refrigerant lines and coils is dependent on the sensor and its location on the air conditioner. Various tee fittings can be purchased with the required thread to match any threaded sensor and thermowells can be used for temperature measurements. The tee fittings can be soldered to the refrigerant lines, but the sensors should be removable for replacement or maintenance. The wiring and wire connectors required will also be determined later by sensor type and location. Lab Experiments Benchmarking: Benchmarking of thermodynamics and heat transfer labs from other schools turned out to be not that beneficial. Of all the schools we researched, none of them use a window air conditioner as a lab apparatus. The most helpful site was that of Michigan State. We got ideas for lab experiment styles and how to prove specific principles from labs with similar heat transfer and thermodynamic principles. The educational benchmarking we did was primarily through Judy Greene, an educational expert. As a way of measuring the teaching effectiveness of our labs, she recommended we evaluate the lab apparatus and lab reports. She provided us with pamphlets on teaching techniques and writing clear lesson plans. The pamphlets she 17 provided were “Evaluate Your Instructional Effectiveness”, ”Develop a Unit of Instruction”, and “Establish Student Performance Criteria”; we used these to help write the lab manual. She said we would have to evaluate the manual and apparatus for teaching effectiveness with actual students, and the best way to do this would be to conduct a survey and make modifications. We also researched a couple of web sites and books concerning educational effectiveness, however they were not nearly as beneficial as Judy Greene. Concept Generation: As previously stated, our project consists of two parts that must be integrated. One aspect is to design the experiments, and the other is to investigate the hardware needed to execute the experiments. The lab experiments section can also be examined in three different ways. The first being the number of experiments performed during the semester, the second being the basis of the experiments, either by component or by heat transfer/thermodynamic principle, and the third being the way in which the students write their lab reports. The three wants mentioned above for lab experiment concepts are educational effectiveness, self evident, and quick. The key method used to evaluate these concepts is through metrics for educational effectiveness. For number of experiments preformed during the semester, there are three possible concepts. The first is to do one experiment repeatedly, the only change being that different sensors will be used each time. For instance, we may only be able to evaluate conservation of energy in our apparatus. Conservation would be measured 18 repeatedly, every week, using a different type of sensor each week. This rated very poorly with undergraduates, graduate students, and professors. It rated poorly in terms of educational effectiveness because it would be monotonous since the objectives will be the same every time. Talking with Dr. Greene revealed that as a result, this monotony will cause the students to lose interest. It rated poorly in terms of the number of concepts covered because only a small number of objectives can be achieved, so this set of lab experiments will only cover the principles present. Although, seeing the different answers from different sensors can be an effective learning tool, it is not in our case because the main point demonstrated is experimental error, and these students, being in their third year and having performed numerous labs before, already know what experimental error is. The second possibility for number of experiments performed during the semester is to do four to seven laboratory experiments. Each experiment would differ in that they would present different fundamentals. This set of experiments would generate more interest because the experiments would vary from lab to lab. The last possibility is to do 13 experiments. This comes down to one lab per week. Within the apparatus there are a limited number of fundamentals. In order to stretch the fundamentals over 13 labs, the experiments would be short. From our own personal experience, we thought that this would not keep the students interest because the labs would seem pointless. When considering the basis of experiments, as mentioned above, we considered two options. One is to divide the experiments by fundamentals. Here each lab would deal with a different thermodynamic or heat transfer principle. For example, if the topic is 19 convection, the students would analyze the apparatus everywhere convection is taking place. The overview of how this set of experiments would flow is as follows: I Conservation of Energy II Convection III Conduction IV Psychometric Chart V Thermodynamic Diagrams (T-s & P-v) VI Cross Flow Heat Exchanger VII Overall Efficiency This concept contains the fundamentals covered in the classes. With each topic, there would be numerous components and data to analyze. The other way to divide the experiments is by component within the apparatus. Each lab would deal with a specific part, analyzing every thermodynamic and heat transfer aspects. For example, if the part is a throttle, the students would measure temperature and pressure and show that enthalpy remains constant throughout. Also, the fluid is going through a phase change as it passes through the throttle, so another objective would be to find the quality of the fluid. Another objective would be to determine whether the engineering assumption of approximating the fluid as saturated is appropriate. The overview of how this set of experiments would flow is as follows: I II Heat Exchanger - Heat Transfer - Efficiency Compressor 20 III IV Conservation of Energy Throttle - Constant Enthalpy - Quality Overall Efficiency - Coefficient of Performance This category contains the fundamentals covered in the class. The student is able to see what is going on with each component in every aspect. In the third examination of the lab experiments, we looked at the way in which the students write their lab reports. Two options were examined. One is to write standard lab reports after each experiment. By standard we mean they would have all the section including an objective, a procedure, a list of equipment, a theory, a background, results, data analysis, and a conclusion. These reports are typically 5-8 pages. The students would be writing a thorough report on the experiment. The other option is to write short weekly lab reports; then, in the end, write a technical paper on how the apparatus works. The short weekly lab reports would consist of a short background, results, data analysis, and a conclusion. The technical paper would tie all the labs together and the student would have to support all their conclusions with data that they collected from the labs. One constraint that goes along with this concept is time. The students would need time to write the technical paper after all the labs had been completed and all the short lab reports were written. Our target value is to allow the students four weeks to write the technical paper. The technical paper allows the student 21 to physically understand what is happening inside the apparatus, which gives a complete real world connection. The hardware section can be examined in two ways: apparatus and sensors. Through conversations with our sponsors, Dr. Wexler and Dr. Advani, as well as a thorough evaluation of our metrics, (see Appendix C) the window air conditioner was selected as the lab apparatus. Most importantly, a window air conditioner is a real world machine that students have seen. This is a point of major concern to our sponsors. The cost of creating a special built apparatus will be well over the cost of purchasing a commercially available air conditioning unit. Finally, the time constraint imposed on us by the senior design process prevent the thorough design of a specialized apparatus in conjunction with the thorough development of the educational values and laboratory procedures. Therefore, the option of creating our own lab apparatus is not feasible. The air conditioner chosen should use the newer, environmentally friendly refrigerant. The older refrigerants are obsolete, so there is no reason to have the students studying an already obsolete system. Purchasing and instrumenting a window air conditioner is also superior to purchasing a commercially available lab apparatus from our competitors. Again, through discussion with our sponsors and a thorough evaluation of the wants that appear on the evaluation chart, found in Appendix C, the window air conditioner is found to be superior to any commercially available lab apparatus. The sensor package requirements are partially determined by the lab experiments. The number of sensors required is determined by the data required to complete the labs. Eliminating overlapping or redundant sensors can optimize the cost of the sensor 22 package. The specific sensor concepts related to each individual lab concept can be summarized as follows; instrumented with redundancy, fully instrumented, and economically instrumented. In the case of the fully instrumented with redundancy, there are redundant sensors for the measurements required, allowing the comparison for different types of sensors. This concept requires the largest and most expensive sensor package. The second case, fully instrumented without redundancy, allows the complete measurement of all points in the air conditioning unit required to complete the labs without the redundancy in the previous case. This does not require a sensor package as large as in the previous case; therefore, it is not as expensive. The trade off is the redundancy factor, which is not a want; therefore, it is not nearly as important according to our wants as cost effectiveness. The last option is to economically instrument the air conditioner. In this case, we would cut the number of sensors to a bare minimum, including just enough to demonstrate a few heat transfer and thermodynamic principles. This would limit the capability of the air conditioner to perform all the requirements necessary to satisfy the want of educational effectiveness. The number of principles will not score well enough on our survey to meet the target value of four. This sensor package is the smallest and least expensive of all the cases, but it trades educational effectiveness for cost effectiveness. Concept Selection: In order to propose a complete solution, we need to choose a sensor package, the number of experiments to be preformed during the semester, the basis of the experiments, and the way that the students will write their lab reports. We have already justified using 23 a window air conditioner for the lab apparatus. To completely analyze all of our choices as they compare to our wants, we have created a table that correlate all of our wants with our metrics for each possibility. The metrics are answered with a ‘yes’ or ‘no’, either the metric is met or it is not. This table can be found in Appendix C, the evaluation chart. Once the table is filled out, the percentage of ‘yes’s’ is multiplied by that particular want’s Rate of Importance, determined by the SSD process, Appendix A. Each competing option with the highest number in the end is our best choice. When this is complete, we will have a complete solution. Upon detailed and careful observation of our metrics on the evaluation chart, we will compare the three cases possible for the number of experiments preformed during the semester. Educational effectiveness is the key want as mentioned above. The second case, four to seven experiments, keeps the students interest better than the other two concepts because it has variety and is complex enough to hold their attention. The first case, one experiment, is too monotonous. It lacks a number of fundamentals and doesn’t keep the students interest. The last case, 13 experiments, is too simple. It doesn’t keep the students interests either because the labs will be too short for the objective to seem clear, as the students would have to come several times to collect the necessary data to perform the analysis. Case two, four to seven experiments, contains more fundamentals than case one, and integrates the fundamentals better than case three. It is apparent using our metrics as they apply to our choices that four to seven labs is the best option for educational effectiveness. Comparing the two ways to base the experiments, by component or by principle, using educational effectiveness, we see that the basis of component has more real world 24 connections because they are analyzing components. These are things that the students can understand and relate to. The basis of heat transfer/thermodynamic principle analyzes the apparatus by topic; however this does not make real world connections to the students because they are not grasping how each individual component works. The students are only studying fundamentals, and not how they relate to the real world. Knowing that a real world connection is a metric for educational effectiveness, this comparison leads us to the conclusion that basing the experiments on components is the better choice. Evaluating the choices for the way the students could write their lab reports, leads us to choose the short lab reports followed by a technical paper. By examining Appendix C, it is apparent that this option scored twice as well as the option to write standard weekly reports. The technical paper brings all the fundamentals from the experiments together, forces the students to prove the heat transfer and thermodynamic principles through theory and experimental data, and goes that extra distance to make the real world connection. Regarding the sensors, the fully instrumented without redundancy was selected. While the fully instrumented with redundancy is more detailed, the additional cost of the sensors prevents its use. The economically instrumented package was not selected due to its hindering effect on the educational effectiveness of our labs. We have estimated the numbers of sensors needed to run our best lab experiments based on components. The specifics are outlined in our Drawing Package, Appendix G. The properties of the sensor are detailed in the fabrication section, as they depend on the specific operation conditions of the chosen window air conditioner. 25 From the above analysis, it is obvious that our current complete solution is to use a window air conditioner as the apparatus. Approximately four experiments will be written, each in reference to a specific component within the air conditioner. The lab reports will be short and followed by a technical paper, which will summarize the complete function of a window air conditioner, using experimental data to support all statements and analyses. Fabrication: Top Cover: The original air conditioner cover needed to be removed to make the internal components visible during lab. The removal of this cover also exposed the main electrical wiring for the control panel and the easily damaged styrofoam ducts. Finally, the original top cover provided the structural restraint for the cooling coil and fan. A new cover needed to be fabricated that would protect the foam and wiring, retain the original structural integrity, and keep the major components visible and accessible. A new top cover was designed and galvanized steel selected for its durability and ease of fabrication. (See Figure 1, Appendix G) Fabrication of the top cover began with the initial laying out of the pattern onto a sheet of galvanized steel. Next, 0.125” diameter holes were drilled at all internal corners. These holes provided a point to cut to as well as allowed clean bends to the corners. The pattern was then sheared from the sheet with a jump shear and finished with aviation snips. All bends were made on a brake. The cover is installed with self- 26 tapping sheet metal screws, therefore no mounting holes are provided. The cover was left unfinished, bare galvanized steel. Safety Guards: Three Safety Guards are required for the apparatus. (See Figures 2, 6, & 5, in Appendix G) The air conditioner uses two fans, which were exposed by the removal of the original cover. A guard must be placed over the opening between these fans to prevent injury due to the exposed fan blades. Additionally, the fragile coil fins were exposed with the removal of the original cover. These fins need to be protected from damage. The fins are also sharp and therefore cannot be left exposed. A galvanized steel frame with galvanized steel screen was selected for ease of fabrication and availability. The screen is ¼” mesh to provide sufficient protection and maintain visibility of the protected components. The first step in fabricating the guards was the laying out of the frame onto the sheet steel. The steel guards were cut on a shear and bent on a brake. The screen was cut with aviation snips. The frame was installed on the screen using 1/8” pop rivets. The guards were finished with black wrinkle-finish paint. The guards are installed with self-tapping sheet metal screws, therefore no mounting holes are provided. Heavier gage steel is recommended for future guards. The heavier steel would allow for cleaner bends and a stronger guard. 27 Thermocouple and Pressure Transducer Connector Panels: One of the wants for the lab apparatus was portability. To increase the ease in which the apparatus can be connected to the computer and to clean up the wiring, panels were created to mount connectors for all of the thermocouples and pressure transducers. Two panels were designed, one for thermocouples and one for the pressure transducers. Each panel is similar in design, varying only through the dimensions of the connector holes. Two separate panels were selected rather than a single panel to accommodate future changes or upgrades in either the thermocouples or pressure transducers. (See Figure 4 in Appendix 4) The panels were cut from .080” aluminum sheet on a band saw. 0.125” holes were drilled at all internal corners before cutting. The connector mounting holes were fabricated by drilling holes for each corner then cutting and filing the rectangular hole. For future production, the purchase and use of a square or rectangular punch would dramatically decrease the time required for fabrication as well as result in a much cleaner and accurate panel. All holes were drilled on a drill press after laying out the hole locations with a prick punch and center punch. The additional accuracy of the milling machine was deemed unnecessary for these panels and the drill press was chosen for speed. After all holes were made, the panels were bent on a brake. The guards are installed with self-tapping sheet metal screws, therefore no mounting holes are provided. RH Sensor Hangers: To minimize the expense of the sensor package, one RH sensor will be used to measure three points of interest. This will require a quick and convenient method of 28 mounting the RH sensor in each of these locations. ¾” PVC clips were used for the RH mounts. The clips are mounted to the air conditioner with angle brackets. The front and middle brackets are mounted with self-tapping sheet metal screws while the rear is mounted to a plastic shroud with double sided automotive trim tape. The clips are installed on the bracket using two 6-32 machine screws. Therefore, the only holes to be drilled are for the machine screws. The angle brackets were fabricated from .080” aluminum sheet. The brackets were cut on a shear, the holes drilled on a drill press, and the bend made in a vice. (See Figure 7, in Appendix G) Pressure sensors: The pressure sensors mount with a 1/8”NPT male connections. Bullet piercing valves were used to tap the pressure transducers to the refrigerant lines for two important reasons. First, using the piercing valves eliminates the need to cut the lines and sweat in fittings. Secondly, in the event of a pressure transducer failure or the need to change transducers, the valve can be shut off and the transducer removed without the need for evacuating the system of refrigerant. The valves use a ¼” male flare fitting. A 1/8”NPT to flare adapter was used in conjunction with a swivel nut flare fitting to mate the parts properly. The swivel nut flare adapter was used to allow rotation of the transducer with relation to the valve in order to guarantee proper alignment before tightening the seal. The No. 1 pressure transducer location required a clearance cut in the air conditioner chassis. This cut can be made properly with a die grinder. (See Figure 3, Appendix G) 29 Wiring of the transducers was done after installation. The transducers share a power source with the relative humidity sensor. All of the transducers’ power and ground leads are tied into a single two-pin connector on the pressure transducer connector panel. A power lead was made with a mating two-pin connector. The outputs of each of the pressure transducers are connected to two-pin connectors, even though the output only uses a single wire. Some pressure transducers and transmitters use a two-wire output. Using a two-pin connector allows the future modification to a different style of pressure transducer without changing the connector arrangement. Mass flow sensors: The mass flow sensor is supplied with two compression fittings. The sensor is heavy enough to require support other than a simple hanging from the copper lines. The bottom of the sensor has two tapped holes for 4-40 machine screws. The top cover was removed and the machine screws threaded in from the bottom. University of Delaware HVAC spliced additional copper tubing into the lines to route the refrigerant through the mass flow sensor. Thermocouples: The thermocouples are supplied with 36” leads. The leads were cut 10” from the thermocouple, creating a thermocouple with 10” leads to be mounted on the air conditioner and a 26” long lead to run from the air conditioner to the data acquisition board. A female miniature thermocouple connector was installed on the thermocouple leads while a male miniature thermocouple connector was installed on the data 30 acquisition leads. These connectors are installed by unscrewing the connector halves, carefully stripping the insulation off the leads, installing the leads at the connector’s screw terminals using the soft nylon washers, and reassembling the connector halves. Additionally, the panel mount brackets were installed on the female connectors. RH sensor: The relative humidity sensor requires an external power source. The sensor uses a four pin connector. The female end of the connector is wired to the sensor, the male end is supplied with the sensor. The power source and output leads need to be soldered to the male connector. The connector is disassembled by removing the two screws holding the tail piece on and the single screw holding the halves together. The wires are soldered to the sockets in the connector and the halves reassembled. Assembly Before assembly can be started, a few items need to be removed from the air conditioner. The outer casing of the air conditioner needs to be removed first. This requires the removal of the mounting screws as well as the air conditioner control knobs and face-plate. The knobs and controls face-plate need to be retained for reinstallation. Next, a damper control pull tab can be removed from the front duct. The air conditioner should now be sent to an HVAC shop to have the refrigerant recovered from the system. This needs to be done before the mass flow can be installed and doing this first has the added safety of eliminating the possibility of puncturing a 31 high pressure line during assembly. With these items removed and the refrigerant evacuated, the assembly process can begin. The first item to be installed is the top cover. The first step in installing the top cover is screwing the mass flow sensor to the cover. Next, the cover is fit over the front coil and control box. Once the cover is in complete alignment, self-tapping sheet metal screws are used to fasten the cover to the air conditioner. The connector panels can now be installed. These panels are fastened by driving self-tapping screws through the mounting flanges and into the air conditioner chassis. The power cable for the air conditioner passes through the air conditioner body near the location of the screws. This cable must be held out of the way of the screws to prevent damage. Once the screws are in place, the cable needs to be held away from the protruding screw points with a zip ties. The guards can be installed with self-tapping screws. The location of the screws needs to be examined to avoid piercing a tube in the coil. The relative humidity sensor clips and brackets can be mounted after the guards are in place. The bracket for the rear coil is adhered to the plastic coil shroud with double-sided automotive trim tape. The remaining two are fastened with self-tapping sheet metal screws. As stated in the fabrication procedure for the transducers, a clearance cut needs to be made on the air conditioner chassis before the pressure transducers can be installed. This cut is best made with a die grinder. Installation of the pressure transducers is simple. The valves can be installed on a variety of tubing diameters by using the shims included with the valves. First, the transducer, adapter fittings, and valve assemblies are 32 made. Teflon tape needs to be used to ensure a good seal on the pressure transducer’s pipe thread. The location of the valves is cleaned using a Scotch-Brite pad. The required shim is then placed in the valve and the valve attached to the tube using the three cap screws included with the valve. Any required adjustments to the rotational orientation of the transducers in order to make them fit can be done by loosening one of the flare fittings and rotating the assembly. The final step in installing the valve is to thread the needle into the valve body, piercing the tube, and then back it out a full turn, opening the valve. The nylon connectors are then fastened to the connector panel with 440 machine screws. The air conditioner is now ready to return to the HVAC shop to have additional copper tubing routed to the mass flow and to have the refrigerant recharged. The installation of the thermocouples must wait until after this process due to the relative fragility of the thermocouples. The thermocouples are supplied on adhesive backed pads. Installation of the thermocouples involves cleaning the area of the tubing to which the thermocouple will be installed with a Scotch-Brite pad and rinsing with acetone. Once the thermocouples are adhered to the air conditioner, the female connectors can be mounted to the thermocouple panel using the machine screws supplied with the panel mount brackets. The final details of the installation can now be completed. The control panel face-plate is attached with double-sided automotive trim tape. The face plate needs a small clearance notch in the bottom right to clear a wire. With the plate installed, the control knobs can be reattached by pressing them back onto the studs. This completes the hardware installation. (See Figure 8, in Appendix 8) 33 Testing/Re-Design Hardware (calibration): The hardware consists of four components: the AC unit, the sensors, the acquisition boards and the LabVIEW program. Part of the Testing of the air conditioning unit was necessary before testing of the other hardware could be accomplished. First we needed to determine that the unit was portable. Since the air conditioner easily fit on the cart that we had purchased, it was concluded that the constraint of ‘portable’ was satisfied. Secondly, it was necessary to determine how much noise was produced during operation of the air conditioner. Using a decimeter we determined that the air conditioner produced approximately 50dB during operation. This easily meets our target value of 60dB. Then we had University of Delaware HVAC evacuate the refrigerant so that the pressure sensors could be installed; after we did that, we had UD HVAC recharge unit with refrigerant. Again we had to make sure that the AC unit turned-on, and that the refrigerant was not leaking in order for us to test the rest of the hardware. Once we determined that the AC unit was functioning properly we were able to proceed with the testing of the other three components of the hardware. First a sample LabVIEW program was written. It is possible to test a program in LabVIEW by using its capability to read-in sample data. Usually it would be difficult to test the sensors and the acquisition board independently of each other. Fortunately the UD Mechanical Engineering department has a number of sensors that have already been determined to operate properly. With functional sensors we were able to determine the correlation 34 between LabVIEW channels and inputs on the acquisition board. In LabVIEW a different ‘channel’ must be used for each input to the program from the acquisition board. By specifying a ‘channel’ the user is telling LabVIEW where on the acquisition board to ‘look’ for a certain input. With the acquisition board and the LabVIEW program being operational we were able to turn our attention toward the sensors determining if they were operational and, if so, how to calibrate them. The pressure sensors were not an issue since the manufacturer calibrated them. They have a linear output of 1-5Volts with 1V being 0psi and 5V being 500psi. The thermocouples, however, presented a bit more of a roadblock. The only metric/restriction on thermocouples was that they be the economical and function over the entire temperature range of the air conditioner. Therefore, we originally had purchased ‘Type-T’ thermocouples since they best fit our temperature range and were quite inexpensive. In trying to test them we immediately noticed that, although we had ‘Type-T’ thermocouples, the university’s acquisition board is equipped with ‘Type-K’ modules. The problem being that, since different ‘Type’s of thermocouples are specified for different temperature ranges, the very same temperature is converted to different voltages depending on the ‘Type’ of thermocouple. Since the manufacturer was not aware of a correction factor between ‘Type-T’ and ‘Type-K’ products, a purchase was required. We determined that buying ‘Type-K’ thermocouples was a more cost and time effective option than re-quipping the acquisition board with ‘Type-T’ modules. If only life were so simple. We come to find out that the range on ‘Type-K’ modules is 0-5Volts and 0-500degrees Celsius. The problem here is that there are points 35 in the air conditioning cycle that the temperature of the refrigerant drops below 0degrees C. It is interesting to note that if in the LabVIEW program it is specified that the expected voltage is –1-4V instead of 0-5V then the module is ‘tricked’ into accepting different voltages than usual. And no error occurs since the module is still being asked to accept voltages within a 5Volt range. Now the temperature range on the ‘Type-K’ thermocouples is effectively –100-400degrees C, as opposed to 0-500degrees C. With this problem solved it became possible to calibrate the thermocouples. This is necessary since the correlation between temperature and voltage is not precisely linear. Calibration is done by placing the thermocouples in a medium of a known temperature; namely ice water at 0degrees C and boiling water at 100degrees C. The voltage is read at these two temperatures. With two points it is now possible to make a new linear correlation between voltage and temperature. This correlation is approximately 93% accurate and is thus acceptable given our target of 90%. However it is considerably more reliable than simply taking –1V to be - 100degrees C and 4V to be 400degrees C, and it is accurate certainly enough for the purposes of our labs. The mass flow sensor has it’s own read-out and thus does not need to be run through LabVIEW. And although it is calibrated for the mass flow of Nitrogen a correction factor for refrigerant was readily attainable. It was important, though, to have the mass-flow sensor placed in a location where no phase is homogenous, since phase change introduces error into the readings. Such a location is readily determined from an understanding of the air conditioning cycle. The relative humidity (rh) sensor has two outputs, temperature and relative humidity. The temperature was calibrated using ice water and boiling water, the same as 36 for the thermocouples. And stream was used as the calibration medium for the relative humidity. Actually, since this sensor uses temperature as one of its tools to calculate the rh, the steam was used to check the accuracy. And with a rh near 97% was obtained using steam, it was assumed that the relative humidity sensor was now properly calibrated. The velocity sensor is hand held with its own digital indicator and does not need to be run through LabVIEW. It also has a temperature reading. It can be placed at the inlet or exit of the condenser or evaporator and give a reading of the maximum velocity of the airflow if held perpendicular to the flow. The wattmeter is clamped to the end of the power cord and there is a digital readout, revealing the power drawn by the air conditioning unit. Labs: In order to test the labs we determined that it would be most effective to actually have undergraduate students come-in to perform and evaluate them. The reason that this is the most effective method is that our metrics for evaluating the labs are very subjective and extremely difficult to evaluate using typical engineering methods. So, by talking to experts in the educational field, out judgement to have student surveys was reinforced and we proceeded thusly. We had students from the ME undergraduate thermodynamics class come to our lab in groups of 4 to perform any one of 4 labs that we had written. While they performed the labs we, as instructors, made notes regarding the duration of the 37 experiment, how much time was spent waiting, and the nature of the questions that the students asked. After the students performed the lab we had them fill-out a survey. (See Appendix H) On this survey we asked them to evaluate our lab in several key areas, we asked: 1) Did you learn/see a number of fundamentals? 2) Were the lessons/objectives clear? 3) Did you feel ‘real world’ connections? 4) Did the lab keep your interest? 5) Was the lab hands-on/interactive? 6) Was the procedure logical? 7) Was the lab fun? With regard to these questions, the students rated the lab from 1 to 5 (1=poor, 5=excellent). We also asked them to write specifically which fundamentals they saw demonstrated in the lab; this was to ensure that the students truly understood the point of the lab. Most importantly, though, we asked the students to write down any suggestions for making the experiment better. After evaluating this first round of surveys we were rated with a high percentage of 4’s and 5’s and no 1’s or 2’s (for complete results see appendix E). We received a number of comments about what we had done well; but we also received a number of suggestions. The suggestions included: better labeling the sensors and components of the air conditioner; more clearly identifying the relation between the location of each sensor and where its output was reading in LabVIEW. Also, we took note of the fact that the 38 students seemed to learn the most about the air conditioner when they were discussing its functions among themselves. Using their suggestions and our own observations we determined that it would be beneficial to put all the experiments into a lab manual and include an introduction explaining some important aspects of the labs. We also included a complete description of all the hardware aspects of the lab (for a complete copy of our lab manual see appendix F). Upon completion of the lab manual we brought all the students into the lab for a second round of testing. Again we asked them to read the lab manual as well as run an experiment after which they were to fill out a survey. The second round survey was identical to the first round survey except that was asked for an additional evaluation: “If you participated in the previous round of experiments, please comment on whether or not you found the changes beneficial.” The second round of surveys yielded extremely positive results. The percentages of 4’s and 5’s rose significantly and all comments were positive. And every single person who participated in the first round of experiments found our changes to be beneficial (for complete results see appendix E). Suggested Modifications: We feel that, at this point, the lab manual that we have put together is truly an optimization given the input that we have received from lab experts, educational experts, and especially undergraduate students. However we also realize that we have never participated a lab course in which we didn’t have suggestions for improvement. Therefore we propose that, after each semester, the students should be asked for their 39 input and the lab manual should be modified accordingly. It will be known that he modifications have been beneficial as long as the same criticisms do not continue to be voiced. Also, we feel that it would be beneficial to have a larger pool of experiments to choose from. For instance, out of eleven total experiments, every semester four or five will be chosen. Not only will this provide an option for the professor to choose labs based on the specific needs of the class; but also it will help prevent the passing down of experiments from older engineers. We realize that it is not uncommon for students to obtain lab reports from older students and use them to aid in their own reports. By simply re-using old reports the student will lose the benefits of putting their own independent thought into the writing of the lab reports and especially the technical paper. As for hardware modifications we suggest that the mechanical engineering department purchase an entirely new apparatus. This includes: a new air conditioner, specifically a different brand; and new sensors, specifically different types of the same kind of sensor. By having an entirely new apparatus the students will be able to investigate how different air conditioners look and operate, as well as differences in accuracy’s between different types of sensors. Both of these are important real-life skills for an engineer. This should not be a monetary problem given the fact that we completed the entire design project for approximately half of our expected budget, although this could possibly turn out to be a problem in terms of actually finding someone to spend the time doing this. 40 Conclusion: In conclusion it can be seen that through our surveys we have satisfied our wants of ‘educational effectiveness’ and ‘self evident’. Since the components of the air conditioner are both visible and accessible the want of ‘easy to use’ is satisfied. Our experiments can be set-up in less than 15 minutes and all of the parts fit on our cart, thus we conclude that our experiment is ‘easy to set-up’. Our experiments successfully demonstrate the desired thermodynamic and heat-transfer concepts (as set-forth) by Dr. Advani and Dr. Wexler, therefore we have demonstrated ‘multiple purposes’. Our apparatus is LabVIEW compatible, and is thus ‘compatible with a data acquisition program’. The air conditioner operates under 60dB and can thusly be considered ‘quiet’. And finally the experiments were completed in 20min, well under the desired 2 hours, and are therefore ‘quick’. It needs to be made clear, if not already done so, that the wants of ‘educational effectiveness’ and ‘self evident’ truly drove our project. While ‘easy to use’ was the second most important want that, along with most of the other wants were both very easily measurable and easily obtainable using our metrics and target values. Consequently, nearly all of our time was spent meeting the two aforementioned wants. Wants 1 Educational Effectiveness 3 Self Evident Metrics Target Values Obtained Values Survey Judy Green 4 approval 4.6 approval Survey 4 4.6 This table includes the metrics we feel drove our project. A table including the rest of wants can be found in Appendix K. 41 Through benchmarking and evaluation of our customers’ wants and constraints, we determined our metrics as well as target values for each metric. Benchmarking and input from our customer provided the necessary information for brainstorming concepts and determining the optimal solution. We tested our prototype, including a lab-manual and apparatus, and made modifications where necessary. The final product consists of a window air conditioning unit, fully instrumented and labeled without redundancy, a lab manual consisting of four component-based labs, and a recommendation for short lab reports with a technical paper. We completed our project within the given time constraint and well under budget. Our customers are thoroughly satisfied with the final product. We have successfully completed the project. 42 Appendix A: The SSD Chart. See file Appendix A_Team 10.xls Appendix B: Table: Wants – Metrics – Target Values (Prioritized) See file Appendix B_Team 10.xls Appendix C: The evaluation chart. See file Appendix C_Team 10.xls 43 Appendix D: The budget 44 Appendix E: Test Results 45 46 Appendix F: Lab Manual for Air Conditioning Experiments For Heat Transfer and Thermodynamics Joint Laboratory 47 Mission Statement: Our mission is to teach the students the Thermodynamic and Heat Transfer principles of a window air conditioner with as little guidance as possible. This lab manual consists of what we hope is the only necessary information needed for the student to independently investigate these principles. We envision the lab time spent as a brainstorming session for the student to discuss the air conditioner with minimal time spent collecting data. WARNING: Be careful when examining the air conditioner, as some of the parts get very hot! 48 Table of Contents Introduction………………………………………………..50 Schematic of Refrigeration Cycle…………………………51 Description of Parts………………………………………..52 Sensors……………………………….……………………53 LabVIEW Controller……………………………………...54 Lab Reports………………………………………………..56-66 Compressor……………………...…..56 Throttling Valve………………....…..59 Air Flow Across the Coil……….……62 The Ideal Air-Conditioning Cycle…...65 References…………………………………………………68 49 Introduction: The basic objective of an air conditioner (or window AC as it would be) is to remove heat from the air of a room that is being cooled. The heat is discharged to the environment outside the room. It should be noted that the same air conditioner could be used as a heat pump as well by simply turning it around. In this case the air conditioner would be absorbing heat from the outside environment and rejecting it into the room. The ideal vapor-compression refrigeration cycle is the most widely used for refrigerators, air conditioning systems, and heat pumps. It is composed of four processes. Starting form the compressor, refrigerant is isentropically compressed. Then, it is sent through the condenser, where pressure remains constant. From the condenser, warm air is rejected into the outside environment. From there, the refrigerant flows through the throttling valve, which is an expansion device. Next, the refrigerant is sent through the evaporator, where pressure is again constant (as in the condenser). Finally, the refrigerant reaches the compressor where the cycle begins all over again. It is important to recognize that the refrigerant does not simply flow through the devices mentioned above. The refrigerant is experiencing phase changes throughout the cycle. As the refrigerant enters the compressor, it is a saturated vapor. During the compression process, the temperature of the refrigerant increases to well above that of the surroundings. As it enters the condenser it is a super-heated vapor, and it leaves as a saturated liquid. This phase change results from the refrigerant losing heat while flowing through the condenser. It should be noted that the temperature of the refrigerant at this phase is still well above that of the environment. Upon entering the throttling valve, the refrigerant experiences a pressure-drop, which in turn results in a decrease in temperature. It is at this point that the temperature of the refrigerant finally falls below that of the surroundings. As it enters the evaporator the refrigerant is a low quality saturated mixture. The refrigerant uses the heat from the room to provide the necessary energy to complete the evaporation process. At this point it is again a saturated vapor and ready to re-enter the compressor and start the cycle over. 50 It is often helpful to use graphs to interpret the process, which is the airconditioning cycle. One such graph is the ‘T-s diagram’. The heat transfer for internally reversible processes is represented as the area under the process curve ‘4-1’ (as shown in figure 2). Another commonly used graph is the ‘P-h’ diagram. As can be seen from figure 3, three of the four processes appear as straight lines. The heat transfer in the condenser and the evaporator is proportional to the lengths of the corresponding process lines. 51 Description of Parts: Condenser/Evaporator: In the window air conditioner, the condenser and the evaporator are actually heat exchangers. All that can be seen of either one are the ‘U’ shaped coils attached to the sides on the front and the back of the unit. One set of coils gets hot and the other gets cold, so be careful when touching them. Throttling Valve: A throttling valve, in this case, reduces the pressure of the refrigerant. To achieve this, the refrigerant should flow from a smaller diameter tube to a larger diameter tube. If you still are unsure where the throttle is, ask the TA. Compressor: The compressor is the tall black cylinder that sits between the heat exchangers. It gets very hot when the air conditioner has been running after several minutes. Other: The little black cylinder behind the compressor is a collector that has no effect on the Thermodynamic/Heat Transfer processes of the unit, so it is ignored. Fans are needed to move the air over the coils of the heat exchangers. There are two of them. They are both attached to the same motor, which is located next to the collector, between the heat exchangers. A shield covers them for your safety. 52 Sensors: Numbering of the Sensors: The sensors are labeled with numbers. These numbers are made to correspond with the LabVIEW program. They have no significance to any other numbering scheme mentioned in this laboratory manual or any of the written lab instructions. Pressure Sensors: There are four pressure sensors placed throughout the air conditioner. Basically one between each device (between the condenser and the compressor, etc.) They are black with the OMEGA label on them. They measure the pressure in volts (1-5V, 1 being 0 psi and 5 being 500 psi). They are connected to the data acquisition board through the blue wires. Thermocouples: There are also four thermocouples, placed the same as the pressure sensors. They are attached to the outside wall of the tubing. They are connected to the data acquisition board through the copper wires. Their output (in volts) is converted by LabView, and is displayed in degrees Celsius. Relative Humidity Sensor: This sensor is long and cylindrical in shape, and silver in color. It mounts to the air conditioner in three places, the outside of the evaporator, the outside of the condenser, and in between the two. It has two functions, measuring the relative humidity of the air and the temperature of the air. It output is also in volts, and converted by LabView to % relative humidity and degrees Celsius, respectively. 53 Mass flow sensor: The box mounted on top of the casing is the mass flow sensor. It has a digital display of it’s own. The number shown must be multiplied by a conversion factor of 0.4956, for refrigerant-22. Velocity Sensor – A hand held device use to measure the velocity and temperature of the air exiting the condenser and the evaporator. This device is used by simply holding it in front of desired air flow. NOTE: The fan should be perpendicular to the direction of the flow to maximize accuracy. This device also had a digital indicator of it’s own. The output of the temperature is in degrees Celsius, and the velocity is in meters per second. Watt Meter: This clamps to the power cord of the air conditioner, which is connected to the outlet. A digital read-out shows how much power the air conditioner is using. LabVIEW Program: The LabVIEW program (see Appendix H) is interfaced with the data acquisition boards. The two acquisition boards are 1) a green box, and 2) a green board with blue boxes. The green box is connected to the pressure sensors and the mass flow sensor. The green board with the blue boxes is connected to it; it reads the thermocouple outputs and the relative humidity sensor outputs. Our LabVIEW program (see Appendix H) reads and converts the signals from each of the sensors to their respective units of measure, for example pressure is converted from volts to psi and temperature in Kelvin. LabVIEW has the capability to read up to sixteen channels. The green board with the blue boxes is read into the first eight channels (0-7), and the green box reads into the upper eight channels (8-15). The pressure sensors are labeled 1-4 and their respective channels are 8-11. The thermocouples are also labeled 1-4, and their respective channels are 0-3. The mass flow 54 is read through channel 12, and the relative humidity is read through channel 4. Be sure the check the channel numbers BEFORE collecting any data. 55 Compressor Objectives: To understand the thermodynamic principles involved in the function of a compressor. To use conservation of energy to find heat loss to the environment. Background: The purpose of a compressor is to increase the pressure of a fluid. Work is done on the fluid therefore the work term is negative when dealing with a compressor. Certain engineering assumptions are made when dealing with a compressor: In the case of a compressor there is intentional cooling, therefore the heat transfer term cannot normally be neglected 1. Q0 2. W 0 A compressor involves a rotating shaft crossing its boundaries, therefore the work term is important. 3. pe 0 The change in potential energy is normally quite small and thus neglected. ke 0 In a compressor the velocities involved are usually not high enough to effect the kinetic energy at all, especially compared to the change in enthalpy. 4. P2,T2 q P1,T1 (figure 1) 56 A compressor can be modeled as a steady flow system. Relevant Equations: Conservation of Energy: q – w = h + pe + ke (eq. 1) By making the assumptions presented previously, eq. 1 can be reduced to q – w = h (eq. 2) Power = (mass flow rate)*(work per unit mass w) (eq. 3) Power: Procedure: 1. Measure the temperature and pressure at the inlet (1) and exit (2) of the compressor. Note: The numbers (1) and (2) do not correspond to the sensor numbers only the figure 1 numbers. 2. Measure the mass flow rate of refrigerant (read from indicator on sensor). 3. Determine the power input to the compressor by reading the current and voltage off the motor to the fan. OPTIONAL: Read the power from the Power Clamp on the cord, which is connected to the electrical outlet. Analysis: 1. Do the measured values of temperature and pressure correspond to what you know is happening in the compressor? Explain in terms of thermodynamic principles. 2. Using the measured temperature and pressure values, determine the specific enthalpy h at the inlet and exit using the refrigerant tables in the back of your thermodynamics text. 3. Solve for the work done on the fluid using the power input (read from the fan motor) to the compressor and eq. 3. 57 4. Solve for the heat loss to the environment using the values from parts 1 and 2 of the analysis and eq. 2. 5. Calculate the power input to the compressor using eq. 3, assuming heat loss can be neglected. Could this be a reasonable engineering assumption? Explain. 6. OPTIONAL: Compare the power calculated from reading the voltage and current off the fan motor to the power reading from the Power Clamp. Explain differences. 58 Throttling Valve Objectives: To understand the thermodynamic principles involved in the function of a throttling valve. To determine whether approximating the fluid as saturated at the inlet of the valve is a good engineering approximation. To determine the relationship between the quality of the mixture at the exit and the temperature. Background: The purpose of a throttling valve is to cause a significant drop in the pressure of the fluid. A good example of this is any adjustable valve such as a sink faucet. Along with the drop in pressure comes a drop in temperature. In an air conditioner, it is this temperature drop that is the primary purpose of a throttling valve. As with any device, several engineering assumptions are made in order to simplify the analysis: 1. q0 The fluid is usually moving rather quickly and throttling valves are usually small. Thus it is assumed that there is neither sufficient time nor area for significant heat transfer to occur. 2. w0 A throttling valve involves no moving boundaries and therefore no work is done by or on the fluid. 3. 4. pe 0 The change in potential energy is normally quite small and thus neglected. ke 0 Even though the change in velocity can be quite large, the change in kinetic energy is considered insignificant. Throttling Valve fluid (figure 2) A throttling valve can be modeled as a steady flow system. 59 Relevant Equations: Conservation of Energy: q – w = h + pe + ke (eq. 1) By making the assumptions presented previously, eq. 1 can be reduced to h = 0 or h1 = h2 (eq. 2) It is more useful to expand eq. 2: u1 + P1v1 = u2 + P2v2 where P is the pressure u is the internal energy, and v is the specific volume. (eq. 3) Quality x = mvapor (eq. 4) mtotal where mvapor is the mass of the vapor, and mtotal is the total mass of the liquid and the vapor It can be derived that: x = (hav – hf)/hfg (eq. 5a) x(exit) = (h(e) – hf(e) )/hfg(e) (eq. 5b) where hf is the specific enthalpy of the liquid hfg is the difference between the specific enthalpy of the fluid and the gas, and hav is defined as hf + xhfg. the subscript e is for the exit pressure Procedure: 1. Measure the temperature and pressure at the inlet (1) and exit (2) of the throttling valve. NOTE: The numbers (1) and (2) do not correspond to the sensor numbers, but they do correspond to the numbers in figure 1. 2. Measure the mass flow rate of refrigerant (read from indicator on the sensor). 60 3. Repeat step 1 for at least 2 more settings on the air conditioner (e.g. low, med, high). Analysis: Questions 1 through 3 need only be evaluated at 1 air conditioner setting. 7. Using only the inlet pressure reading and assuming that the refrigerant is a saturated liquid as it flows through the throttling valve, find the specific enthalpy. 8. Assuming that the enthalpy across a throttling valve does not change, use the enthalpy from question 1 and the reading of the exit pressure, determine what state the mixture at the exit is. 9. If the refrigerant is a saturated mixture at the exit, find the quality using equation 5b. 10. Using the temperature and the pressure form the inlet reading, does the previous assumption that the inlet and of the throttling valve is a saturated refrigerant? Explain why or why not. 11. What is the temperature change for this process? A) Using the saturation temperatures from the given pressures. B) Using the data read off of the air conditioner. Is there a difference and if so, explain. 61 Air Flow Across the Coil Objective: To understand the heat transfer principles by determining the convection heat transfer rate involved with cross flow over the coils (tubes). Background: There is a coolant flowing inside the coils and as the air flows over the coils, heat is transferred between the flowing coolant in the coil and the air around it. The rate at which the heat is transferred is dependent upon the heat transfer coefficient. The coil rows are either arranged in an aligned or staggered bank. geometry of the coils V, T (Tinlet) ST SL Relevant Equations: Maximum Velocity of the fluid around the tube ST V ST D V is the measured velocity Vmax (eq. 1) Reynolds number for the air Re D ,max Vmax D (eq. 2) D is the diameter of the tube is for the inlet of the air Air-side Nusselt number NuD C2C Re mD ,max Pr Pr 0.36 Prs 1 4 (eq. 3) 62 C2, C, and m values come from tables 7.7 and 7.8 from the Heat Transfer book The other properties are evaluated at the average of the inlet and outlet temperature of the fluid and the subscript s is for the surface temperature. The average heat transfer coefficient k D the k value is from the inlet of the air h NuD (eq. 4) Knowing only the inlet temperature of the fluid in the coil DNh Ts To Ts Ti exp VN S c T T p N is the number of coils NT is the number of coils that are first hit by the air flow and cp are properties from the inlet of the air (eq. 5) Log mean temperature difference Tlm Ts Ti Ts To ln Ts Ti / Ts To (eq. 6) Ts is the temperature of the coil surface Heat transfer rate per unit length of the tube q' N hDTlm (eq. 7) Procedures: 1. Measure the diameter of the coil. 2. Count the number of coils that are first hit by the air and the total number of coils for each exchanger (for every U shape seen, there are two coils running through). 3. Find the coil surface temperature. 4. Find velocity of the air entering the coils. 5. Find the temperature of the air entering the flow over the coils. 6. With the humidity sensor, take relative humidity and temperature readings of the air near the cool side of the air conditioner. 7. Repeat step 6 at the other locations on the air conditioner. 63 Analysis: 1. Using the tables in the back of the Heat Transfer book find the relevant properties of the air using table A4. Air properties using temperatures of the inlet and the coil surface. 2. Using the given equations, find the convection heat transfer rate. 3. Looking at the temperature and the relative humidity data, is this a comfortable atmosphere? 64 The Ideal Air-Conditioning Cycle Objectives: To determine the coefficient of performance (COP) of a window air-conditioner using the assumptions of an ideal vapor-compression refrigeration cycle. To determine the rate of heat removal from the refrigerated space and heat rejected from the refrigerant to the environment. To determine the power into the compressor. Background: The ideal vapor-compression refrigeration cycle is the most commonly used/assumed cycle for air-conditioning. This cycle in made-up of four processes: 1-2 2-3 3-4 4-1 Isentropic compression in a compressor. Heat rejection in a condenser coil, P = constant. Expansion in the throttling valve. Heat absorption in an evaporator coil, P = constant. Condenser 2 3 Compressor Win Throttling Valve 1 4 Evaporator (Figure 1) For an ideal cycle the refrigerant enters the compressor as a saturated vapor and is compressed isentropically. The temperature increases during the compression. The refrigerant enters the condenser as a superheated vapor and leaves as a saturated liquid. 65 The pressure and temperature both drop as it passes through the throttling valve. The refrigerant then enters the evaporator as a low quality mixture and evaporates completely as it absorbs heat from the surroundings. All four parts can be modeled as steady-flow devices. The change in kinetic and potential energy are usually small compared to the work and potential energy terms. The conservation of energy equation reduces to: q – w = he - hi (eq. 1) The condenser and evaporator do not involve any work. The compressor can be approximated as adiabatic. The COP of an air conditioner can be expressed as: COPR qL h h4 1 wnet ,in h2 h1 (eq. 2) COPHP h h3 qH 2 wnet ,in h2 h1 (eq. 3) In the ideal case h1 = hg@P1 and h3 = hf@P3. Relevant Equations: Rate of Heat removal Q m h (eq. 4) Power input W m h (eq. 5) Procedure: 1. Measure the temperature and pressure each of the four states described in the background. 2. Measure the mass flow rate of refrigerant (read from the indicator on the sensor). 66 3. OPTIONAL: Read the voltage and current from the fan motor and the power given by the Power Clamp. Analysis: 12. Determine the specific enthalpy h at each of the four states using the refrigerant tables in the back of your thermodynamics text. 13. Using the answers from (1): (a) Use eq. 4 to determine the rate of heat removal from the refrigerated space. (b) Use eq. 5 to determine the power input to the compressor. (c) Use eq. 4 to determine the rate of heat rejection from the refrigerant to the environment. 14. Determine the coefficient of performance of the refrigerator and the heat pump using equations 2 and 3 respectively. 15. OPTIONAL: Compare the power calculated in 2b to the power obtained by reading voltage and current from the motor of the fan and to the power read from the Power Clamp. 67 References: Boles, Dr. Michael A., and Dr. Yunus A. Cengel, Thermodynamics, An Engineering Approach, McGraw-Hill Inc., New York, 1994. Dewitt, David P., and Frank P. Incropera, Introduction to Heat Transfer, Third Edition, John Wiley & Sons, New York, 1985, pp. 351-360, 757. 68 Appendix G: The drawing package Figure 1 69 Figure 2 70 Figure 3 71 Figure 4 72 Figure 5 73 Figure 6 Brian Davison’s Responsibility 74 Figure 7 Brian Davison’s Responsibility 75 Figure 8 Brian Davison’s Responsibility 76 Appendix H: The surveys Instructor Survey Name of Lab Preformed __________________________________________ Start time _______ End time __________ Number of students in the group _____________ What questions did the students ask? ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ How many of the above questions pertain to each of the following? Procedure ____________ Data Analysis ____________ Other _____________ How much of the time was spent waiting, “down time”? _____________________ 77 Student Survey (1st Round) Name: _________________________________ Name of Lab: ____________________________ Date: _____________ Please answer the following questions on the basis of your personal experience during the lab. Please choose a number rating between one and five, with one being the lowest and five being the highest. Did you learn/see a number of fundamentals? 1 2 3 4 5 Were the lessons/objectives clear? 1 2 3 4 5 Did you feel “real world” connections? 1 2 3 4 5 Did the lab keep your interest? 1 2 3 4 5 Was the lab hands-on/interactive? 1 2 3 4 5 Was the procedure logical? 1 2 3 4 5 Was the lab fun? 1 2 3 4 5 What fundamentals did you see demonstrated in this experiment: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Thank you for your time and patience, your participation is greatly appreciated. Please list any comments or suggestions you may have below; they would be extremely beneficial to us. Comments/Suggestions: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 78 Student Survey (2nd Round) Name: _________________________________ Name of Lab: ____________________________ Date: _____________ Please answer the following questions on the basis of your personal experience during the lab. Please choose a number rating between one and five, with one being the lowest and five being the highest. Did you learn/see a number of fundamentals? 1 2 3 4 5 Were the lessons/objectives clear? 1 2 3 4 5 Did you feel “real world” connections? 1 2 3 4 5 Did the lab keep your interest? 1 2 3 4 5 Was the lab hands-on/interactive? 1 2 3 4 5 Was the procedure logical? 1 2 3 4 5 Was the lab fun? 1 2 3 4 5 If you participated with Dr. Wexler’s class, please comment on whether or not you found the changes beneficial. ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Thank you for your time and patience, your participation is greatly appreciated. Please list any comments or suggestions you may have below; they would be extremely beneficial to us. Comments/Suggestions: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 79 Appendix J: LabVIEW Program See file Team10.vi 80 Appendix K: Table: Metrics: Target values versus Obtained Values See file Appendix K_Team 10.xls 81