STRUCTURE OF CONSTRUCTION EXECUTIVE DOCUMENTATION 1. Act-scheme of marking axes. 2. Act of bases (also the projector participates and signs the act). 3. Temporary draining for the period of construction. 4. Registers of construction works (including special works, e.g. pile works, concreting, post-tensioning of reinforced concrete structures, also subcontractor’s work, registers of author’s supervision. 5. Protocols of the meetings. 6. General executive documentation of construction, including acts of completed works. pile works (reinforcement, concreting, etc.) with pile site measuring coordinated with the (main) designer; (permanent) drainage under the building, drainage wells; grillages (reinforcement, concreting, etc.); foundations ( - “ - ); basement walls ( - “ - ); building of the basement floor and the foundation under the basement floor; damp-proofing of foundations, basement walls and floors; damp-proofing of building parts under the roof garden, parking plots, etc., lagging and damp-proofing of under-ground and basement parts and inverted roofs; act on the densification of the basement walls pipe penetrating; mounting of carcass and inserted ceilings (with measuring of the carcass and compiling executive drawings, which are generally made in accordance with the designers, also a valuation by experts is ordered – this is required at least by the local government of Tallinn); in case of monolithic carcass performed works’ acts of single operations (reinforcement, concreting, installing structural iron frames, etc.), carcass measuring, compiling executive drawings in accordance with the designer, in Tallinn also expert opinion is needed); acts of reinforced concrete structures’ (re-)stressing; settlement, compensation and temperature joints making; permanent concrete constructions (poured parts of mountable structures, pools, slades, retaining walls, etc.); (fire protection) fixings in communication shafts through floors; densification of communication penetrations between fire protection sections; corrosion prevention of structure patches and other metal parts; roof sarking felt basis and roof sarking felt making (incl. steam seals), warming, ventilation, etc.); making roof penetrations; installation of lightning protection or other hidden earthing network under or inside the floor or roof construction; densification of joints of protective edge covering sheet metal, etc., of roof and façade parts; fire protective and/or antiseptic processing of wooden structures on the spot, (in case of factory-processing the deliverer can be asked for certificates of material; insulation of garret and garret ceilings; insulation of outer boundaries (also wells of artificial or natural stone), steam seals, etc.; checking ventilation and smoke canals in (brick) walls (especially necessary in buildings with gas); installation of boundaries, banisters, ladders, fixings of advertising posters, etc.; building of foundation constructions of flooring (reinforcement, damp-proofing, noise isolation of inserted ceilings, moisture content measuring if necessary and documentation – e.g. in case of concrete-based parquet, making contraction joints, etc); floors’ damp-proofing and its recurving (in damp rooms, sanitary accommodation, shower-rooms, conditioner-rooms);