Basin Officials Committee / MDBA Work Program List of SDL adjustment and constraint measure proposals agreed by Basin Officials Committee for business case development Project title Proponent state(s) Project description (include location) Chowilla floodplain TLM proposal South Australia The Living Murray (TLM) project. Riverine recovery project South Australia South East Flows Restoration Project Belsar Yungera floodplain management project SDL resource unit code and area Type of measure (supply or constraint) SS11 South Supply Australian Murray measure Status Estimated cost ($ million) Proponents estimate of potential SDL adjustment Business case summary submitted for consideration 23 December 2014. Nil. Funding has been provided through the TLM program of agreed works. Currently unknown Potential wetland evaporative savings through a range SS11 South Supply of activities that restore wetlands along the SA Murray Australian Murray measure River. For example, re-introducing wetting and drying cycles with the aim of achieving improved wetland habitats and water quality. Business case submitted for consideration 23 December 2014. Nil Currently unknown South Australia The Project will use a combination of newly constructed drains and widened existing drains within the Upper South East drainage system to divert additional water that currently flows to the sea from the Blackford Drain in the Upper South East into the Coorong South Lagoon. The diverted water will provide significant environmental outcomes for en route wetlands of the Upper South East through the provision of additional water of suitable quality, as well as salinity improvements in the Coorong South Lagoon. Business case submitted for consideration 23 December 2014. Nil Currently unknown Victoria Installation of pumps and regulators to provide SS2 Victorian sustained floodplain inundation under low and average Murray flow conditions. SS11 South Supply Australian Murray Measure Supply measure Business case $55.63 million submitted 14 January 2015. Currently unknown Project title Proponent state(s) Project description (include location) SDL resource unit code and area Type of measure (supply or constraint) Status Estimated cost ($ million) Proponents estimate of potential SDL adjustment Burra Creek floodplain Victoria management proposal Construction of levees in Burra North and South and two regulators in Burra North to retain water on the floodplain and improve environmental outcomes. SS2 Victorian Murray Supply measure Business case $12.14 million submitted 14 January 2015. Currently unknown Gunbower Forest TLM Victoria proposal 'The Living Murray' (TLM) project. SS2 Victorian Murray Supply measure Business case documents referred for consideration 22 September 2014. Potentially greater than 20 GL/year Gunbower National Park floodplain management project Victoria Construction of 50m channel for water delivery from Torrumbarry weir to the forest to water floodplain in upper Gunbower National Park at regulated river levels. Includes and offtake regulator with vertical slot fishway and turtle ramp to control releases; a road crossing, drainage works at Baggot Creek and levee improvements to remove artificial flow barriers SS2 Victorian Murray Supply measure Business case $28.45 million submitted 14 January 2015. Potentially greater than 20 GL/year Guttrum and Benwell State Forests floodplain enhancement project Victoria Construction of works and minor channel works to improve duration of floodplain inundation. SS2 Victorian Murray Supply measure Business case $6.5 million submitted 14 January 2015. Currently unknown Hattah Lakes north floodplain management project Victoria Construction works designed to capitalise on existing 'The Living Murray' works, comprising additional physical infrastructure works at key locations on the floodplain designed to provide enhance inundation extent. SS2 Victorian Murray Supply measure Business case $8.81 million submitted 14 January 2015. Currently unknown Hattah Lakes TLM proposal Victoria The Living Murray (TLM) project, SS2 Victorian Murray Supply measure Business case documents referred for consideration 22 September 2014. Potentially greater than 20 GL/year Nil. Funding has been provided through the TLM program of agreed works. Nil. Funding has been provided through the TLM program of agreed works. Project title Proponent state(s) Project description (include location) SDL resource unit code and area Type of measure (supply or constraint) Status Estimated cost ($ million) Lindsay Island (Stage 1) Victoria TLM proposal The Living Murray (TLM) project, currently under construction SS2 Victorian Murray Supply measure Business case documents referred for consideration 22 September 2014. Lindsay Island (Stage 2) Victoria floodplain management project Construction of a regulator across Lindsay River at Berribee Homestead and associated works at 6 sites (small regulators, access crossings, levee banks) to inundate mid and upper reaches of Lindsay Island floodplain at regulated river level. SS2 Victorian Murray Supply measure Business case $72.83 million submitted 14 January 2015. Potentially greater than 20 GL/year Mulcra Island TLM proposal Victoria The Living Murray (TLM) project, currently under construction SS2 Victorian Murray Supply measure Business case documents referred for consideration 22 September 2014. Currently unknown Nyah floodplain management project Victoria Installation of pumps, levees, culverts and regulating structures to improve floodplain inundation. SS2 Victorian Murray Supply measure Business case $10.94 million submitted 14 January 2015. Currently unknown Vinifera floodplain management project Victoria Installation of a pump, levee, flood runner cut-off, culverts and regulating structures to improve floodplain inundation. SS2 Victorian Murray Supply measure Business case $9.12 million submitted 14 January 2015. Currently unknown Wallpolla Island floodplain management project Victoria Construction of integrated works including a regulator SS2 Victorian on Wallpolla Creek, weirs, levees, access crossings and Murray alteration of river heights to improve inundation of Wallpolla floodplain and provide an increase in flowing habitat. Supply measure Business case $59.52 million submitted 14 January 2015. Potentially greater than 20 GL/year Potential rule change option: Allow Hume releases to be reduced more quickly when flows have not been elevated for an extended period beforehand, with the water saved released at a different point in time or in a different flow pattern that would provide additional environmental benefits. Supply measure Approved (5 June 2015) to be developed into a business case. Currently unknown Flexible Rates of Fall in Victoria / New River Levels South Wales Downstream of Hume Dam SS2 Victorian Murray, and SS14 New South Wales Murray Nil. Funding has been provided through the TLM program of agreed works. Proponents estimate of potential SDL adjustment Nil. Funding has been provided through the TLM program of agreed works. Nil Currently unknown Project title Proponent state(s) Project description (include location) SDL resource unit code and area Type of measure (supply or constraint) Status Estimated cost ($ million) Proponents estimate of potential SDL adjustment Hume Dam airspace Victoria / New Potential rule change options: management and pre- South Wales 1. Pre-releases executed to better contribute to release rules meeting flow targets at Barmah-Millewa Forest. 2. Translucent operations that ‘pass through’ inflows from the dam when managing airspace target levels. This type of operations would provide more natural variability of flows below Hume Dam and help meet environmental flow targets at BarmahMillewa Forest. SS2 Victorian Murray, and SS14 New South Wales Murray Supply measure Business case submitted 1 April 2015. Nil Currently unknown Barmah-Millewa forest Victoria /New Potential rule change option: environmental water South Wales allocation Vary the rules associated with the water set aside by Victoria and NSW in an environmental account (BMFEWA) to water the Barmah-Millewa Forest proposed to allow the use of other environmental entitlements to target the environmental requirements specified in the Basin Plan. SS2 Victorian Murray, and SS14 New South Wales Murray Supply measure Business case submitted 1 April 2015 Nil Currently unknown Alternative supply systems for effluent creeks – Murrumbidgee River SS14 NSW Murray Supply SS15 measure Murrumbidgee (potentially all valleys) Approved (5 June 2015) to be developed into a business case. $65- $124.2 million Potentially more than 20 GL/year New South Wales These systems are not efficient carriers and efficiency works could improve delivery. Potential water savings arise from piping of licensed domestic and stock supply. Computer Aided River New South Management (CARM) Wales Murrumbidgee CARM is a series of operational tools to better process SS15 river data such as flows, extractions and releases and Murrumbidgee to forecast flows and weather related flow trends. Supply measure Feasibility study Nil – already funded Potentially (Phase 1) approved by Water for Rivers. more than 20 (11 December 2014) GL/year to be developed into a business case (Phase 2). Improved Flow New South Management Works at Wales the Murrumbidgee River Yanco Creek Offtake Increase weir pool capacity and operational control of Yanco regulator and weir pool to the benefit of the environment providing a potential SDL adjustment Supply measure Business case $50.5 million submitted 12 August 2015. SS15 Murrumbidgee Potentially more than 1015 GL/year Project title Proponent state(s) Project description (include location) SDL resource unit code and area Nimmie Caira New South Infrastructure Wales Modifications Proposal Reconfigure water delivery infrastructure to more SS15 effectively deliver environmental flows to the Nimmie- Murrumbidgee Caira floodplain and other parts of the Lowbidgee, and deliver flows through the floodplain back to the Murrumbidgee River. SDL offsets in the Lower Murray NSW New South Wales Snowy Hydro Licence amendments to call environmental water New South Wales Type of measure (supply or constraint) Estimated cost ($ million) Business case $9.25-9.75 million submitted 12 August 2015. Potentially 2050 GL/year An integrated package of works, (including Locks 8 and SS14 NSW Murray Supply 9 weir pool manipulation Carrs, Capitts and Bunberoo measure Creeks connectivity, Frenchmans Creek fish passage) to restore and enhance river habitat in the Lower Murray region of New South Wales. Business case $28.6 million submitted 12 August 2015. Potentially less than 5 GL/year Amendment to Snowy Hydro licence in 2011 allow the SS14 NSW Murray Supply water recovered by the Murray River Increased Flows measure to be held and called out. Previously the release of the water was at the discretion of Snowy Hydro and was generally at times suited to Snowy Hydro’s commercial outcomes. This water can now be called out to meet environmental outcomes. Feasibility study Nil (Phase 1) approved (17 March 2015) to be developed into a business case (Phase 2). Currently unknown TLM environmental New South works and measures - Wales Koondrook-Perricoota Forest Flood Enhancement proposal The Living Murray (TLM) project. SS14 New South Wales Murray Business case documents referred for consideration 8 December 2014. Currently unknown Water Management Works Millewa and Yanga National Parks A suite of works aimed at delivering a more appropriate watering regime to core wetland communities within these national parks. SS14 NSW Murray Supply SS15 measure Murrumbidgee New South Wales Supply measure Status Proponents estimate of potential SDL adjustment Supply measure Nil. Funding has been provided through the TLM program of agreed works. Feasibility study $22.87 million (Phase 1) approved (17 March 2015) to be developed into a business case (Phase 2). Potentially more than 20 GL/year Project title Goulburn key focus area Proponent state(s) Victoria Project description (include location) SDL resource unit code and area Type of measure (supply or constraint) Status Estimated cost ($ million) Proponents estimate of potential SDL adjustment Investigation of opportunities to address physical and policy constraints to the delivery of higher regulated flows (up to 40,000 ML/day at Shepparton). Investigations will include the potential effects of higher flows on third parties and mitigation options to address negative impacts (including easements and/or infrastructure) to allow the delivery of these flows (to support improved river and wetland health outcomes). n/a Constraint measure Business case (Phase 2) - agreed by Basin Ministers to progress to business case development on 17 October 2014. Estimated by MDBA Not applicable $30- $46 million (assuming levee upgrades) Gwydir key focus area New South Wales Exploring options to allow greater ability to deliver environmental water to wetlands on the Gingham watercourse, lower Gwydir River and Mallowa watercourse. n/a Constraint measure Business case (Phase Uncertain at this 2) - agreed by Basin stage of Ministers to progress development to business case development on 17 October 2014. Hume to Yarrawonga key focus area Victoria/ New South Wales Investigation of opportunities to address physical and policy constraints to the delivery of higher regulated flows (up to 40,000ML/day from Hume Dam). Investigations will include the potential effects of higher flows on third parties and mitigation options to address negative impacts (including easements and/or infrastructure) to allow the delivery of these flows (to support improved river and wetland health outcomes). n/a Constraint measure Business case (Phase Estimated by MDBA Not applicable 2) - agreed by Basin $10- $16 million Ministers to progress to business case development on 17 October 2014. Lower Darling key focus area New South Wales Investigation of opportunities to address physical and policy constraints to the delivery of higher regulated flows (up to 16,000 ML/day at Weir 32). Investigations will include the potential effects of higher flows on third parties and mitigation options to address negative impacts (including easements and/or infrastructure) to allow the delivery of these flows (to support improved river and wetland health outcomes). n/a Constraint measure Business case (Phase Estimated by MDBA Not applicable 2) - agreed by Basin $4- $6 million Ministers to progress to business case development on 17 October 2014. Not applicable Project title Murrumbidgee key focus area Proponent state(s) New South Wales Project description (include location) SDL resource unit code and area Type of measure (supply or constraint) Status Estimated cost ($ million) Proponents estimate of potential SDL adjustment Investigation of opportunities to address physical and policy constraints to the delivery of higher regulated flows (up to 48,500 ML/day at Wagga Wagga). Investigations will include the potential effects of higher flows on third parties and mitigation options to address negative impacts (including easements and/or infrastructure) to allow the delivery of these flows (to support improved river and wetland health outcomes). n/a Constraint measure Business case (Phase Estimated by MDBA Not applicable 2) - agreed by Basin $60- $73 million Ministers to progress to business case development on 17 October 2014. Investigation of opportunities to address physical and policy constraints to the delivery of higher regulated flows (up to 80,000 ML/day at the SA border). Investigations will include the potential effects of higher flows on third parties and mitigation options to address negative impacts (including easements and/or infrastructure) to allow the delivery of these flows (to support improved river and wetland health outcomes). n/a Constraint measure Business case (Phase Estimated by MDBA Not applicable 2) - agreed by Basin $5 million Ministers to progress to business case development on 17 October 2014. Yarrawonga to Wakool Victoria/New Investigation of opportunities to address physical and junction key focus area South Wales policy constraints to the delivery of higher flows of up to 65,000 ML/d downstream of Yarrawonga Weir. Investigations will include the potential effects of higher flows on third parties and mitigation options to address negative impacts (including easements and/or infrastructure) to allow the delivery of these flows (to support improved river and wetland health outcomes). n/a Constraint measure Business case (Phase Estimated by MDBA Not applicable 2) - agreed by Basin $105-$218 million Ministers to progress to business case development on 17 October 2014. South Australian South Murray key focus area Australia Notes: 1. An SDL resource unit is a water planning term that refers to a region of water resources, generally based on catchments boundaries. 2. This table is updated from time-to-time as projects pass into the business case development phase and beyond. 3. There are a number of NSW projects pending consideration for business case development.