The quarry is located on the territory: v. Soviet Rusavskoyi rural district council Yampolsky Vinnytsia region. Distance from Vinnitsa - 130 km The deposit was developed in 1963, now Whole "Yampolsky the plant of building materials" (1976 - "Yampolsky Quarry building materials"). At the beginning of the 90 years in his career were available: three kamnedrobarky, belt feeder, conveyor belts 6, three "sieve", crushers, compressors, elektroekskavator ECG 4, 6, hidroekskavator. Since 1995, the work carried out there. Industrial base abandoned and flooded quarry with water to a depth of 30-40 meters. According to information provided to the SSPE "Geoinform Ukraine" reserves of granite approved TDF Ukraine (Minutes № 4484 from 06.08.1985 year) as a raw material for the production of rubble and gravel for construction. Stocks in the State balance of mineral reserves "Stone Building". Balance Rusavskoho granite deposits as of 01.01.2014 made up by category (thousand cubic meters): Provoberezhna area: A - 1130.0, 1167.0 B, C1 - 2441.0, A + + and C1 - 4738.0; Left Bank area: C1 - 2710.0; Specification area: Total area: 14.5 ha Nature of investment: Extraction of granite and processing it into rubble . Owner: Rusavska village council (other reserve land 14.5 ha outside the settlement ). Contact: Dubytskaya Maria +38 (04336) 2 79 42 2 79 45 Transport: Railway line - Vapnyarka station - 57 km. , Mogilev Podolsky - 60 km. Access roads - asphalt , gravel , road " Rusava - Ryadyanske ." Technical infrastructure : Electricity - near the area , the substation 250 kVA Water - the source of drinking water nearby areas Gas - no The total investment of 12 million USD., Including : - Own funds - 0.0 million. - Investors' assets -12 million. Form of investment: direct investmen