SCHEDULE OF QUANTITIES - Delhi Development Authority

advertisement
ABSTRACT OF COST
Name of Work :
D/o 174.29 Hact. of Main Land in Sector 18 & 19(b) at Dwarka Phase-II
Sub Head
Construction of Toe Walls in residential areas in Sector 19 (b).
:
Sl.
Description of item
No.
1. Earth work in excavation by mechanical means
(Hydraulic excavator)/ manual means in foundation
trenches or drain (not exceeding 1.50 mm width or 10
sqm on plan) including dressing of sides and ramming
of bottoms, lift upto 1.50M including getting out the
excavated soil and disposal of surplus excavated soil as
direction within a lead of 50 M.
(a) All kinds of soil.
2.
Qty
Unit
Rate (Rs.)
Cum
103.40
(Rupees One hundred three
and paise forty only)
Cum
2079.60
(Two thousand seventy
nine and paise sixty only)
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering. All work upto plinth level :
(a) 1:5:10 (1 cement : 5 fine sand : 10 graded stone
agg. 40 mm n.s.)
Amount(Rs.)
(b) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
agg. 20 mm n.s.)
Cum
3257.45
(Three thousand two
hundred fifty seven and
paise forty five only)
3.
Random rubble masonary with hard stone in foundation
and plinth including levellin gup with cement concrete
1:6:12 (1 cement : 6 coarse sand: 12 grade stone
aggregate 20mm nominal size) at plinth level with
cement mortar 1:6 ( 1 cement : 6 coarse sand).
Cum
1838.90
(Rupees One thousand
eight hundred thirty eight
and paise ninety only)
4.
Centering and shuttering including strutting, propping
etc. and removal of form for :
(i) Retaining walls, return walls, walls (any
thickness) i/c attached pilasters, buttresses, plinth
and string courses, fillets ec.
Sqm
180.40
(Rupees One hundred
eighty and paise forty only)
Sqm
62.50
(Rupees Sixty two and
paise fifty only)
Total :
Add 5% contingencies
G.Total :
5.
Pointing on stone work with cement mortar 1:3
(1 cement : 3 fine sand).
(i) Flush/Ruled poining.
J.E.
A.E. /WD-15
EE/ WD-15
ABSTRACT OF COST
Name of Work :
D/o 174.29 Hact. of Main Land in Sector 18 & 19(b) at Dwarka Phase-II
Sub Head
Raising of existing stone masonary toe-walls of green belt.
:
Sl.
Description of item
No.
1. Demolishing cement concrete manually / by mechanical
means includings disposal of material within 50M lead
as per direction of Engineer-in-charge.
(i) 1:3:6 or richer mix.
2.
Qty
Unit
Rate (Rs.)
Cum
368.45
(Rupees Three hundred
sixty eight and paise forty
five only)
Cum
3257.45
(Three thousand two
hundred fifty seven and
paise forty five only)
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering. All work upto plinth level :
(a) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
agg. 20 mm n.s.)
Amount(Rs.)
3.
Random rubble masonary with hard stone in foundation
and plinth including levellin gup with cement concrete
1:6:12 (1 cement : 6 coarse sand: 12 grade stone
aggregate 20mm nominal size) at plinth level with
cement mortar 1:6 ( 1 cement : 6 coarse sand).
4.
Centering and shuttering including strutting, propping
etc. and removal of form for :
(j) Retaining walls, return walls, walls (any
thickness) i/c attached pilasters, buttresses, plinth
and string courses, fillets ec.
5.
Cum
1838.90
(Rupees One thousand
eight hundred thirty eight
and paise ninety only)
Sqm
180.40
(Rupees One hundred
eighty and paise forty only)
Sqm
62.50
(Rupees Sixty two and
paise fifty only)
Total :
Add 5% contingencies
G.Total :
Pointing on stone work with cement mortar 1:3
(1 cement : 3 fine sand).
(b) Flush/Ruled poining.
J.E.
A.E. /WD-15
EE/ WD-15
DELHI DEVELOPMENT AUTHORITY
Office of the
Engineer/ Western Division-15, Dwarka : Delhi
Name of Work :
D/o 174.29 Hact. of main land in Sector 18 & 19(b), at
Dwarka Ph.II.
Sub Head
:
Construction of Toe Walls in residential areas in
Sector 19(b).
Major Head
:
Nazul A/c – II
Minor Head
:
Detailed Head : D/o Main Land.
REPORT
The detailed estimate amounting to Rs._________________________
(___________________________________________________________
only) including 5% contingencies has been framed by the Executive
Engineers/WD-5 to cover the probable cost of the above said work.
HISTORY
The stone masonary toe walls are to be constructed afresh in the residential
area of Sector 19(b) as these walls were never constructed in the past and
the toe wall of the residential pocket DDA is to take up very shortly the
construction of 1240 MS SFS Flats in the residential area.
necessity of toe wall is must.
Hence the
And accordingly the estimate has been
prepared.
Contd…….P/2
/2/
Design & Scope: Foundation trenches of 90 cms depth and 75 cms wide
are to be done. CC 1:5:10 of 15cms thickness is to be
laid under the stone masonary wall, pointing is to be
done on both sides of the wall above ground level and
CC coping in 5 cms thickness is to be provided on top of
walls.
Specification
:
CPWD Specifications Vol. I to VII with upto date
correction slips shall be followed.
Method
:
By call of tenders.
Land/Site
:
Available
Rate
:
As per DSR-2007
Time Allowed :
Two months.
T&P
:
To be arranged by the Contractor
W/C Estt.
:
To be met out of 5% contingencies
Estimated cost
:
DELHI DEVELOPMENT AUTHORITY
Office of the
Engineer/ Western Division-15, Dwarka : Delhi
Name of Work :
D/o 174.29 Hact. of main land in Sector 18 & 19(b), at
Dwarka Ph.II.
Sub Head
:
Raising of existing stone masonary toe-walls of
green belt.
Major Head
:
Nazul A/c – II
Minor Head
:
Detailed Head : D/o Main Land.
REPORT
The detailed estimate amounting to Rs._________________________
(___________________________________________________________
only) including 5% contingencies has been framed by the Executive
Engineers/WD-5 to cover the probable cost of the above said work.
HISTORY
As the area falling under green belt and LSC had been filled up with earth
by the DLF so the entire area has now been come up with at par of the
previously toe wall. Hence it is necessary to raise the existing toe walls to
ear-marked properly the area falling under green belts and LSC in sector
19(b)..
Design & Scope: Foundation trenches of 90 cms depth and 75 cms wide
are to be done. CC 1:5:10 of 15cms thickness is to be
laid under the stone masonary wall, with cement motor
1:6 is to be raised up above the existing walls after
demolishing the CC coping. Both sides of the walls are
to be rendered with pointing and top of wall to be
strengthened with CC coping 5 cm. thick.
/2/
Specification
:
CPWD Specifications Vol. I to VII with upto date
correction slips shall be followed.
Method
:
By call of tenders.
Land/Site
:
Available
Rate
:
As per DSR-2007
Time Allowed :
Two months.
T&P
:
To be arranged by the Contractor
W/C Estt.
:
To be met out of 5% contingencies
Estimated cost
:
DELHI DEVELOPMENT AUTHORITY
WESTERN DIVISION NO. 15, DDA, DELHI
No. F3(9)/AE(P)/WD-15/DDA/
Dated :
MEMORANDUM
The following estimate is hereby technically sanctioned for
Rs.2,54,855/- (Rupees Two lacs fifty four thousand eight hundred and fifty
five only including 5% contingencies.
Name of Work
:
Development of 174.29 Hect. Of Main Land in Sector 18
& 19(b) at Dwaraka Phase-II.
Sub Head
:
Cleaning/ Desilting of Peripheral SW Drain and placing
of drain covers along 30 M R/W roads in Sector 19(b) at
Dwarka Phase-II.
Estimate No.
:
/EE/WD-15/DDA/2009-10
Major Head
:
Development of main land
Minor Head
:
_________________________________________
Detailed Head
:
Nazul A/c-II
A/A & E/S
A/R & M/O No
:
_________________________________________
_________________________________________
_________________________________________
Executive Engineer/WD-15/DDA
Copy to :
1.
2.
Asstt. Engineer/_____/WD-15,DDA for information.
AAO/WD-15 for information
Executive Engineer/WD-15/DDA
ABSTRACT OF COST
Name of Work :
M/o Completed Schemes under Dwarka Zone Phase-II
Sub Head
Boring of Tube well at 440 HIG (M.S.) Houses in Sector 19(B) Dwarka Phase-II.
:
Sl.
Description of item
No.
1. Earth work in excavation by mechanical means
(Hydraulic excavator)/ manual means in foundation
trenches or drain (not exceeding 1.50 mm width or 10
sqm on plan) including dressing of sides and ramming
of bottoms, lift upto 1.50M including getting out the
excavated soil and disposal of surplus excavated soil as
direction within a lead of 50 M.
(a) All kinds of soil.
2.
Qty
Unit
Rate (Rs.)
Cum
103.40
(Rupees One hundred three
and paise forty only)
Cum
2079.60
(Two thousand seventy
nine and paise sixty only)
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering. All work upto plinth level :
(c) 1:5:10 (1 cement : 5 fine sand : 10 graded stone
agg. 40 mm n.s.)
Amount(Rs.)
(d) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
agg. 20 mm n.s.)
Cum
3257.45
(Three thousand two
hundred fifty seven and
paise forty five only)
3.
Random rubble masonary with hard stone in foundation
and plinth including levellin gup with cement concrete
1:6:12 (1 cement : 6 coarse sand: 12 grade stone
aggregate 20mm nominal size) at plinth level with
cement mortar 1:6 ( 1 cement : 6 coarse sand).
Cum
1838.90
(Rupees One thousand
eight hundred thirty eight
and paise ninety only)
4.
Centering and shuttering including strutting, propping
etc. and removal of form for :
(k) Retaining walls, return walls, walls (any
thickness) i/c attached pilasters, buttresses, plinth
and string courses, fillets ec.
Sqm
180.40
(Rupees One hundred
eighty and paise forty only)
Sqm
62.50
(Rupees Sixty two and
paise fifty only)
Total :
Add 5% contingencies
G.Total :
5.
Pointing on stone work with cement mortar 1:3
(1 cement : 3 fine sand).
(j) Flush/Ruled poining.
J.E.
A.E. /WD-15
EE/ WD-15
ABSTRACT OF COST
Name of Work :
D/o 174.29 Hact. of Main Land in Sector 18 & 19(b) at Dwarka Phase-II
Sub Head
Raising of existing stone masonary toe-walls of green belt.
:
Sl.
Description of item
No.
1. Demolishing cement concrete manually / by mechanical
means includings disposal of material within 50M lead
as per direction of Engineer-in-charge.
(i) 1:3:6 or richer mix.
2.
Qty
Unit
Rate (Rs.)
Cum
368.45
(Rupees Three hundred
sixty eight and paise forty
five only)
Cum
3257.45
(Three thousand two
hundred fifty seven and
paise forty five only)
Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering. All work upto plinth level :
(c) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
agg. 20 mm n.s.)
Amount(Rs.)
3.
Random rubble masonary with hard stone in foundation
and plinth including levellin gup with cement concrete
1:6:12 (1 cement : 6 coarse sand: 12 grade stone
aggregate 20mm nominal size) at plinth level with
cement mortar 1:6 ( 1 cement : 6 coarse sand).
4.
Centering and shuttering including strutting, propping
etc. and removal of form for :
(l) Retaining walls, return walls, walls (any
thickness) i/c attached pilasters, buttresses, plinth
and string courses, fillets ec.
5.
Cum
1838.90
(Rupees One thousand
eight hundred thirty eight
and paise ninety only)
Sqm
180.40
(Rupees One hundred
eighty and paise forty only)
Sqm
62.50
(Rupees Sixty two and
paise fifty only)
Total :
Add 5% contingencies
G.Total :
Pointing on stone work with cement mortar 1:3
(1 cement : 3 fine sand).
(d) Flush/Ruled poining.
J.E.
A.E. /WD-15
EE/ WD-15
DELHI DEVELOPMENT AUTHORITY
Office of the
Engineer/ Western Division-15,
Dwarka : Delhi
Name of Work :
M/o Completed scheme under Dwarka Zone Ph.II.
Sub Head
:
Boring of tube well at 440 HIG (M.S.) Houses in
Sector 19(B) Dwarka Phase-II.
Major Head
:
9 C Maintenance.
Minor Head
:
HISTORY
An estimate of above said work has been prepared by
E/WD-15 to cover
the probable cost for amounting to Rs.5,35,257/- (Rupees Five lacs thirty
five thousand two hundred and fifty seven only) i/c 5% contingencies .
A meeting was held with R.W.A. and CE (Dwarka) in which it was decided
that a tube well is to be installed at above said housing pocket to meet out
the day to day requirement of portable water during summer season which
conveyed telephonically by Chief Engineer Dwarka to this office. As such
this estimate has been prepared.
Design & Scope: 400 mm dia bore shall be drilled with Rotary rig machine
and 200 mm dia M.S. ERW pipes and slotted pipes.
Tube well shall be developed by Air Compressor
Machine.
Specification
:
CPWD Specifications Vol. I to VII with upto date
correction slips shall be followed.
Contd……………P/2
/2/
Method
:
By call of tenders.
Land/Site
:
Available
Rate
:
As per Market Rates.
Time Allowed :
15 Days
T&P
:
To be arranged by the Contractor
W/C Estt.
:
To be met out of 5% contingencies
Estimated Cost : Rs.5,09,769.00
A/A & E/S
:
Already accorded by the competent authority.
Engineer
WD-15 / D.D.A.
DELHI DEVELOPMENT AUTHORITY
Office of the
Engineer/ Western Division-15, Dwarka : Delhi
Name of Work :
D/o 174.29 Hact. of main land in Sector 18 & 19(b), at
Dwarka Ph.II.
Sub Head
:
Raising of existing stone masonary toe-walls of
green belt.
Major Head
:
Nazul A/c – II
Minor Head
:
Detailed Head : D/o Main Land.
REPORT
The detailed estimate amounting to Rs._________________________
(___________________________________________________________
only) including 5% contingencies has been framed by the Executive
Engineers/WD-5 to cover the probable cost of the above said work.
HISTORY
As the area falling under green belt and LSC had been filled up with earth
by the DLF so the entire area has now been come up with at par of the
previously toe wall. Hence it is necessary to raise the existing toe walls to
ear-marked properly the area falling under green belts and LSC in sector
19(b)..
Design & Scope: Foundation trenches of 90 cms depth and 75 cms wide
are to be done. CC 1:5:10 of 15cms thickness is to be
laid under the stone masonary wall, with cement motor
1:6 is to be raised up above the existing walls after
demolishing the CC coping. Both sides of the walls are
to be rendered with pointing and top of wall to be
strengthened with CC coping 5 cm. thick.
/2/
Specification
:
CPWD Specifications Vol. I to VII with upto date
correction slips shall be followed.
Method
:
By call of tenders.
Land/Site
:
Available
Rate
:
As per DSR-2007
Time Allowed :
Two months.
T&P
:
To be arranged by the Contractor
W/C Estt.
:
To be met out of 5% contingencies
Estimated cost
:
DELHI DEVELOPMENT AUTHORITY
WESTERN DIVISION NO. 15, DDA, DELHI
No. F3(9)/AE(P)/WD-15/DDA/
Dated :
MEMORANDUM
The following estimate is hereby technically sanctioned for
Rs.__________________ (Rupees _______________________________
including 5% contingencies & increase / decrease due to difference in rates
of stipulated material.
Name of Work
:
Sub Head
_________________________________________
_________________________________________
_________________________________________
:
_________________________________________
_________________________________________
_________________________________________
Estimate No.
:
/EE/WD-15/DDA
Major Head
:
_________________________________________
Minor Head
:
_________________________________________
A/A & E/S
A/R & M/O No
:
_________________________________________
_________________________________________
_________________________________________
Executive Engineer/WD-15/DDA
Copy to :
3.
4.
Asstt. Engineer/_____/WD-15,DDA for information.
AAO/WD-14 for information
Executive Engineer/WD-15/DDA