SUBMITTALS CHECKLIST FOR ADEQ APPROVAL OF WATER & SEWER & SANITARY FACILITIES FOR SUBDIVISIONS Project No.: Project Name: EOR: Project Manager: Refer to Submittal Books in Submittals area for ADEQ procedures and examples. Also check web site: www.azdeq.gov The 208 Consistency (if applicable) will be submitted with the Sanitary Facilities Application for Subdivisions – this submittal usually will take up to 6 months for ADEQ approval – email the completed 208 Consistency to Edwina Vogan Vogan.Edwina@azdeq.gov 1. ADEQ Application for Sanitary Facilities to be filled out and signed by Client. Most of the information is acquired from NOI, Final Plat, Engineer’s Design Report. (submittal coordinator generates) (Exhibit A) 2. Request an ADEQ Final Plat from Tom Christopher or Korey Hill signed & stamped by RLS & EOR (submittal coordinator requests this final plat from survey when you have all other documents in hand) 3. Engineer’s Design Report (from project manager) 4. 208 Consistency Review – only for septic and onsite WW disposal – Edwina Vogan (602) 771-4606. (submittal coordinator does this paperwork- OP-Doc#____) 5. County conceptual approval (form 113) (if Septic, use Appendix B) (submittal coordinator generates and obtains signature) (Exhibit B) 6. Approval to Construct for Water (Once project is approved we receive the Approvals to Construct (ATC’s), The water service provider generates this document) – Please see attached form from ADEQ (application) a. ADEQ’s Form 114 Application for Approval to Construct Drinking Water Facilities (Exhibit C) 7. Approval to Construct for Sewer (Once project is approved we receive the ATC’s, The water service provider generates this document) – Please see attached form from ADEQ (application) a. ADEQ form – Notice of Intent to Discharge for a Sewage Collection System – Type 4.01 General Aquifer Protection Permit (see attached application) Exhibit D b. ADEQ form – Instructions for submittal of a Notice of Intent to discharge for an on-site wastewater treatment facility – septic (See attached application) Exhibit E 8. Sewage Treatment Facility Capacity Assurance – original signed & dated. You type up form, using the Engineer’s Design Report. (Exhibit F) 9. Capacity Assurance for Sewage Collection System – original signed & dated. Engineer’s Design Report. (Exhibit G) 10. Geosoil Report if applicable for onsite WW disposal (from Project Manager) 11. APP – Completed for WW disposal greater than 24,000 gpd 12. ADEQ’s Water Service Agreement – original signed and dated (submittal coordinator generates and obtains signature) (Exhibit H) 13. ADEQ’s Garbage service & Garbage Disposal agreement – original signed and dated (submittal coordinator generates and obtains signature) (Exhibit I) You type up form, using the 14. Storm Water Protection Permit (SWPPP) if project is greater than 1 acre the NOI from the SWPPP report. (from Project Manager) 15. Make the appropriate copies, package and send to: Attn: Vivian Adams Attn: Tina Holliman AZ Department of Environmental Quality (ADEQ), AZ Department of Environmental Quality 1110 W. Washington, Phoenix, AZ 85007. Northern Regional Office 1801 W. Route 66, Suite 117, Flagstaff, AZ 86001 NOTE: The ADEQ Phoenix areas cover all areas except:: Bullhead City, Lake Havasu City and Topock/Golden Shores, use Flagstaff office for Bullhead City, Lake Havasu City and Topock/Golden Shores area.