RR/2007/107/P - Rother District Council

advertisement
Rother District Council
PLANNING COMMITTEE
15 March 2007
Minutes of the Planning Committee meeting held at the Town Hall, Bexhill-on-Sea on
Thursday 15 March 2007 at 9.30am.
Present: Councillors C.N. Ramus (Chairman), R.E. Parren (Vice Chairman), Mrs
H.R. Bridger (in part), C.A. Clark (in part), P. Fairhurst, Mrs J.P. Gadd, G.E.S. Hearn,
J.A.J. Kemp, B. Kentfield, P.G. Lendon, C.R. Maynard (in part) and D.W.L.M.
Vereker.
Also present: Councillors G. Gubby (in part), Mrs J.M. Hughes (in part), S.H.
Souster, K. Standring (in part) and M.J. Wilson (in part).
Advisory Officers in attendance: Head of Planning, Development Control Manager,
Team Leader (East) Development Control, Team Leader (West) Development
Control, Senior Democratic Services Officer, 22 members of the public and two
members from the local press.
PL92.
MINUTES
The Chairman was authorised to sign the minutes of the meeting of the
Committee held on 15 February 2007 as a correct record of the
proceedings.
PL93.
APOLOGIES FOR ABSENCE
Apologies for absence were received from Chairman of Council, Councillor
Mrs W.M. Miers (ex-officio) and Councillor Mrs. D.C. Williams.
PL94.
ADDITIONAL AGENDA ITEMS / WITHDRAWN APPLICATIONS
The Development Control Manager advised the Committee of the planning
applications which had been withdrawn from the Agenda, by the applicants.
The Head of Planning confirmed that in future this information would be
notified as a formal Agenda Item, at the commencement of each meeting.
This improved communication would enable both Members of the
Committee and members of the public to know before the application was
called, whether or not it was due for consideration at the meeting. This
information would also be added to the Planning Committee Agenda on the
website, as and when applications were withdrawn, if any, following the
publication of the Agenda.
1
DECISIONS TAKEN UNDER DELEGATED POWERS
PL95.
ENFORCEMENT MATTERS
The following enforcement matter was reported:
(1) Icklesham – Regina, Tram Road, Rye Harbour
RESOLVED: That subject to being satisfied evidentially, the District
Secretary be authorised to issue the appropriate enforcement notice
and take any other steps necessary including legal action under
Sections 179 and 181 of the Town & Country Planning Act 1990.
Compliance period: Two months.
PL96.
TREE MATTERS
The following tree matters were reported:
(i)
10.4.2.269 – The District of Rother (Woodlands Caravan Park,
Westfield Lane, Westfield) Tree Preservation Order 2006
RESOLVED: That the District of Rother (Woodlands Caravan Park,
Westfield Lane, Westfield) Tree Preservation Order 2006 be
CONFIRMED subject to MODIFICATION changing the boundary in the
area referred to a W1b so that the Order now forms a 10 metre strip
along the southern boundary of the site, connecting a small woodland
area which is retained in the south east corner and the rest of the
protected wood to the west, in respect of several trees of whatever
species comprising mainly of broadleaved species (W1).
(ii) RR/2007/126/T – 113 Winchelsea Road, Rye – Crown Reduction by
25%. 40% reduction of one limb and crown lift by 7m of one holm
oak.
Members were concerned at the extent of the proposed works to this
tree which formed an important element of the gateway into Rye. It
was agreed that a site inspection be carried out prior to approving any
works and a more detailed report be submitted to the next meeting.
RESOLVED: That the decision be deferred pending a site inspection
and further detailed report.
PL97.
APPLICATIONS
Outline planning permissions are granted subject to approval by the Council
of reserved matters before any development is commenced, which are
layout, scale, appearance, access and landscaping. Unless otherwise
stated, every planning permission or outline planning permission is granted
subject to the development beginning within 3 years from the date of the
permission. In regard to outline permissions, reserved matters application
2
for approval must be made within three years from the date of the grant of
outline permission; and the development to which the permission relates
must begin no later than whichever is the later of the following dates: the
expiration of three years from the date of the grant of outline permission or,
the expiration of two years form the final approval of the reserved matters,
or in the case of approval on different dates, the final approval of the last
such matters to be approved.
In certain circumstances the Planning Committee will indicate that it is only
prepared to grant or refuse planning permission if, or unless, certain
amendments to a proposal are undertaken or subject to completion of
outstanding consultations. In these circumstances the Head of Planning
can be given delegated authority to issue the decision of the Planning
Committee once the requirements of the Committee have been
satisfactorily complied with. A delegated decision does not mean that
planning permission or refusal will automatically be issued. If there are
consultation objections, difficulties, or negotiations are not satisfactorily
concluded, then the application will have to be reported back to the
Planning Committee or reported via the internal-only electronic notified ‘D’
system by means of providing further information for elected Members.
This delegation also allows the Head of Planning to negotiate and amend
applications, conditions, reasons for refusal and notes commensurate with
the instructions of the Committee. Any applications which are considered
prior to the expiry of the consultation reply period are automatically
delegated for a decision.
RESOLVED: That the planning applications be determined as shown in
Appendix A attached hereto.
MATTERS FOR INFORMATION
PL98.
APPEALS
Members noted the report of the Director of Services detailing the appeals
which had been allowed, dismissed or lodged since the last meeting,
together with information on forthcoming inquiries and hearings.
RESOLVED: That the report be noted.
PL99.
DATE FOR SITE INSPECTIONS – Tuesday 17 April 2007 at 8.30am
departing from the Town Hall, Bexhill.
CHAIRMAN
The meeting closed at 3.00pm
pl070315.lja
3
APPENDIX A
RR/2007/107/P
BURWASH THE OAKS, VICARAGE ROAD
CHANGE OF USE OF LAND TO AND CONSTRUCTION OF A
RIDING ARENA COMPRISING OF A NETWORK OF LAND
DRAINS WITH A STONE BASE/ SILICA SAND AND RUBBER
SURFACE, SURROUNDED BY A POST AND THREE RAIL
FENCE.
Mrs Powell
Statutory 8 week date: 07 March 2007
DECISION: GRANT (FULL PLANNING) DELEGATED (SUBJECT TO
NEGOTIATION WITH THE ENVIRONMENT AGENCY REGARDING THE
CULVERT)
1.
No floodlightling or other external means of illumination of the riding arena
shall be provided, installed or operated at the site, except in accordance with
a detailed scheme which shall have first been submitted to and approved in
writing by the local planning authority.
Reason: To safeguard the visual amenities of the locality in accordance with
Policies GD1(iv) & (v) and CF5 of the Rother District Local Plan and Policies
S1(f) & (j) and EN2 of the East Sussex and Brighton & Hove Structure Plan
1991-2011.
2.
The riding arena for the exercising/training of horses hereby permitted shall
be used for private equestrian/recreational purposes only and not for any
commercial riding, livery use or other business use.
Reason: To preserve the visual and/or residential amenities of the locality in
accordance with Policies GD1(ii), (iv) & (v) and CF5 of the Rother District
Local Plan and Policies S1(f) & (j) and EN2 of the East Sussex and Brighton &
Hove Structure Plan 1991-2011.
3.
Manure must be stored at least 10 metres away from any watercourse and
sited in accordance with the ‘Code of Good Agricultural Practice for the
Protection of Waters’.
Reason: To prevent pollution of the water environment from any run-off in
accordance with Policies GD1(v) & (x) of the Rother District Local Plan and
Policies S1(g) and EN11 of the East Sussex and Brighton & Hove Structure
Plan 1991-2011.
4.
Prior to the commencement of the development hereby approved, full details
of the method/ measures of protection of the public sewer are to be submitted
to and approved in writing by the Local Planning Authority, in consultation with
Southern Water. The development shall be carried out in accordance with the
approved details and maintained in that condition thereafter.
Reason: To prevent damage to public utility infrastructure (mains sewer) and
pollution of the water environment in accordance with Policies GD1(v) & (x) of
the Rother District Local Plan and Policies S1(g) and EN11 of the East
Sussex and Brighton & Hove Structure Plan 1991-2011.
Notes:
1.
Under Section 85 of the Water Resources Act 1991 the Environment Agency
would take action against any contaminated water (effluent) discharge into a
controlled watercourse.
2.
The introduction of a culvert into a stream requires the separate prior consent
of the Environment Agency (EA) under Section 23 of the Land Drainage Act
1991 in addition to planning permission.
4
3.
4.
No new building, new trees or large bushes or other new permanent
obstructions should be located within 3 metres either side of the centreline of
the public sewer.
All existing infrastructure should be protected during the course of
construction works. Liaison with Southern Water is advised.
REASONS FOR GRANTING PERMISSION: The proposed riding arena is of an
appropriate design and position and will not adversely affect the character of the
area or the amenities of adjoining properties and therefore complies with Policies S1
and EN2 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and
Policies GD1 and CF5 the Rother District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2006/3499/P
MOUNTFIELD
DARWELL
RESERVOIR
AND
BEAUPORTWATER SUPPLY WORKS - LAND BETWEEN IN
MOUNTFIELD,
WHATLINGTON,
SEDLESCOMBE,
WESTFIELD AND BATTLE
CONSTRUCTION OF REPLACEMENT RAW WATER
PIPELINE
Southern Water Ltd
Statutory 16 week date: 12 April 2007
DECISION: GRANT (FULL PLANNING) DELEGATED (REGARDING SECTION
ADJACENT TO MARLEY LANE/PETLEY WOOD RE TREES)
1.
Standard approval/time implementation.
2.
Detailed aspects of the assessment and mitigation strategies for archaeology
shall be submitted for the consideration and approval of the Local Planning
Authority prior to development commencing. The development shall only be
carried out in accordance with the approved details.
Reason: To ensure that features of archaeological interest are properly
examined and recorded, in accordance with Policy GD1(viii) of the Rother
District Local Plan and Policies S1(j) and EN22 of the East Sussex and
Brighton & Hove Structure Plan 1991-2011.
3.
Detailed aspects of the mitigation strategies for landscaping shall be
submitted for the consideration and approval of the Local Planning Authority
prior to development commencing. The development shall only be carried out
in accordance with the approved details. If within a period of five years from
the date of the planting of any tree/hedgeline that tree or hedge plants, or any
replacement, is removed, uprooted or destroyed or dies, [or becomes, in the
opinion of the local planning authority, seriously damaged or defective,]
another tree/hedge plant of the same species and size as that originally
planted shall be planted at the same place, unless the local planning authority
gives its written consent to any variation.
Reason: To enable planting to re-establish and thereby ensure that the
proposed development does not prejudice the appearance of the landscape
quality of the High Weald AONB in accordance with the requirements of
Policy GD1(iv, v) of the Rother District Local Plan and Policy S1(j) and EN2 of
the East Sussex and Brighton & Hove Structure Plan 1991-2011.
4.
Details of the measures to minimise and manage waste generated by the
scheme shall be submitted for the consideration and approval of the Local
Planning Authority prior to the commencement of works on the excavation of
5
the pipeline. The development shall only be carried out in accordance with the
approved details.
Reason: In the interests of seeking a sustainable development which
minimises waste, in accordance with the Supplementary Planning Guidance
on ‘Construction and Demolition Waste’, of the East Sussex and Brighton &
Hove Structure Plan 1991-2011.
5.
No development approved by this permission shall be commenced until a
detailed method statement for temporary and permanent water crossings, with
detailed pollution prevention measures and any mitigation required, has been
submitted to and approved in writing by the Local Planning Authority in
association with the Environment Agency (EA). Thereafter the approved
scheme shall be carried out in accordance with the approved method
statement. The statement shall include details on the following:
a)
Additional river corridor and crossing point surveys;
b)
Use of no dig techniques at crossing points unless otherwise agreed in
writing;
c)
Location and method for wash-outs on the pipeline;
d)
Timescales for the works, which should be outside the trout spawning
season;
e)
Containment of any sediment run off and/or excavated river bed
material;
f)
Minimisation of sediment disturbance;
g)
Containment of increased silt/suspended solids as a result of
backfilling;
h)
Oil, plant and chemical storage;
i)
Containment of increased silt/suspended solids as a result of sheet
piling or dewatering activities;
j)
Method of construction and operation for the project in order to prevent
pollution of underlying groundwater.
Reason: To prevent pollution of the water environment and impacts upon
protected species in accordance with Policy GD1(x) of the Rother District
Local Plan and Policy S1(g) of the East Sussex and Brighton & Hove
Structure Plan 1991-2011 and Government guidance and requirements
contained within the Wildlife and Countryside Act and PPS9.
6.
Drainage details. CN8C.
Reason: To ensure the satisfactory drainage of the site and to prevent water
pollution in accordance with Policy GD1(x) of the Rother District Local Plan
and Policy S1(g) of the East Sussex and Brighton & Hove Structure Plan 1991
– 2011.
7.
If, during development, contamination not previously identified is found to be
present at the site then no further development (unless otherwise agreed in
writing with the local planning authority), shall be carried out until a method
statement detailing how the unsuspected contamination shall be dealt with
has been submitted to and approved in writing by the local planning authority
and the works shall be completed in accordance with the approved method
statement.
Reason: To prevent pollution of the water environment in accordance with
Policy GD1(x) of the Rother District Local Plan and Policy S1(g) of the East
Sussex and Brighton & Hove Structure Plan 1991-2011.
8. Details of any floodlighting or external illumination shall be submitted to and
approved in writing by the local planning authority before the development
commences. Development shall be carried out in accordance with the
approved details and no other lighting shall be installed.
6
Reason: To safeguard the visual, rural and residential amenities of the
locality, to reduce any impact upon wildlife and to control overspill and light
pollution in accordance with Policy GD1 (ii), (iv) and (vii) of the Rother District
Local Plan and Policy S1 (f) and (j) of the East Sussex and Brighton & Hove
Structure Plan 1991-2011.
Notes:
i.
N1B – AB.44081.01018E, AB.44081.01906B, 01911B and 01912B. Date
stamp 26 February 2007.
ii.
East Sussex County Council will require that the impact of construction traffic
on the County's highway network is minimised to levels acceptable to the
Highway Authority and that the costs of all necessary mitigation works are met
by the applicants.
iii.
East Sussex County Council will require that the reinstatement of all affected
highways and rights of way are undertaken by the applicant to a standard
acceptable to the County Council.
iv.
With regard to conditions 5 and 6 of this permission the applicant is referred to
the full details contained within the letters from the EA dated 5 and 23
February 2007.
v.
The applicant is reminded of the need to obtain prior consent from the EA
under Section 23 of the Land Drainage Act 1991 for the erection of any
access, culvert, dam or like obstruction to the flow of any ordinary
watercourse.
vi.
The applicant is reminded of the need to obtain Consent to Discharge under
the Water Courses Act 1991, Schedule 10 (as amended).
vii.
The applicant is reminded of the need to obtain an EPS mitigation licence
from Natural England for works affecting both Great Crested Newts and
Dormice.
REASONS FOR GRANTING PERMISSION: The proposed development is
considered to be justified and to be of an appropriate design and detailing and will
not adversely affect the long term character or appearance of the area or the
amenities of adjoining properties and therefore complies with Policy GD1 of the
Rother District Local Plan and Policies S1, EN2, EN12, EN17, EN22 and EN24 of
the East Sussex and Brighton & Hove Structure Plan 1991-2011.
View application/correspondence
___________________________________________________________________
RR/2007/25/P
BATTLE 56-58 HIGH STREET
REFURBISHMENT
FOR
DELICATESSEN:
AIR
CONDITIONING, SINK PROVISION, REMOVE RECENT
PARTITIONS, RE-LINE WALLS & CEILINGS AND WORKS
TO IMPROVE ACCESSIBILITY OF DOORWAYS.
T Crum
Statutory 8 week date: 12 March 2007
DECISION: GRANT (FULL PLANNING)
1.
Standard time period.
2.
CN6A – control use “a delicatessen or other retail shop falling within Class A1
and for no other food retail use including any other purpose in Classes A3-5 of
the Schedule ……”. Reason: To ensure an appropriate use of the site without
causing detriment to the residential amenities of neighbouring properties
having regard to Policy GD1 of the Rother District Local Plan.
7
3.
Before the use hereby permitted commences, a scheme for the sound
insulation and/or anti-vibration treatment of the air conditioning and condenser
units shall be submitted to and approved in writing by the local planning
authority and the works shall be completed prior to operation of the air
conditioning equipment. The sound insulation and anti-vibration treatments
shall thereafter be maintained in accordance with the approved details.
Reason: To protect the residential amenities of the locality in accordance with
Policy GD(ii) of the Rother District Local Plan and Policy EN15 of the East
Sussex and Brighton & Hove Structure Plan 1991 - 2011.
4.
No external extraction or ventilation flues other than those hereby approved,
shall be installed without the grant of planning permission by the local
planning authority. Reason: To protect the residential amenities of the locality
in accordance with Policy GD1(ii), (viii) of the Rother District Local Plan and
Policy EN15 and EN23 of the East Sussex and Brighton & Hove Structure
Plan 1991-2011.
5.
The air conditioning and condenser units hereby approved, shall not be
operated, before 7.00 a.m. or after 10.00 p.m. on weekdays or Saturdays, or
before 8 a.m. or after 4 p.m. on Sundays, Bank or Public Holidays. To protect
the residential amenities of the locality in accordance with Policy GD(ii) of the
Rother District Local Plan and Policy EN15 of the East Sussex and Brighton &
Hove Structure Plan 1991 - 2011.
Note: Your attention is drawn to the associated listed building consent RR/2007/31/L
and the attached conditions.
REASONS FOR GRANTING PERMISSION: The proposed change of use and
associated works represent an appropriate use and detail and will not adversely
affect the character of the area or the amenities of adjoining properties and therefore
complies with Policy GD1 of the East Sussex and Brighton & Hove Structure Plan
1991-2011 and Policy S1, EN15 and EN23 of the Rother District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/31/L
BATTLE 56-58 HIGH STREET
REFURBISHMENT FOR DELICATESSEN INCLUDING AIR
CONDITIONING, SINK PROVISION, REMOVAL OF RECENT
PARTITIONS, RE-LINE WALLS AND CEILINGS AND WORKS
TO IMPROVE ACCESSIBILITY OF DOORWAYS.
Fine Developments Ltd
Statutory 8 week date: 12 March 2007
DECISION: GRANT (LISTED BUILDING CONSENT)
1.
Standard LB time period.
2.
The works hereby approved shall be carried out in accordance with the details
submitted and as specified on the approved plan no. 021-1.002-C, date
stamped 13 January 2007 and contained within the letter date stamped 12
February 2007. Reason: To ensure the preservation of structure, features and
detailing that form part of the architectural and historic character of the Listed
Building in accordance with Policy GD1(viii) of the Rother District Local Plan
and Policies S1(m) & EN23 of the East Sussex and Brighton & Hove Structure
Plan 1991-2011.
Note: Your attention is drawn to the associated planning permission RR/2007/25/P
and the attached conditions.
8
REASONS FOR GRANTING CONSENT: The works to the listed building are
considered to be of an appropriate design, appearance and use of materials and will
not adversely affect the special architectural or historic character of the building or its
setting and therefore complies with Policy GD1(viii) of the Rother District Local Plan
and Policy EN23 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.
View application/correspondence
___________________________________________________________________
RR/2006/3341/P
BEXHILL 154 BARNHORN ROAD, COPPERBEECH
ERECTION OF TWO STOREY REAR EXTENSION TO
PROVIDE 19 ADDITIONAL BEDROOMS WITH EN-SUITE
AND LIVING ROOM
Meeraraj Ltd
Statutory 8 week date: 15 February 2007
DECISION: REFUSE (FULL PLANNING)
1.
The proposed two storey extension would by virtue of its height, bulk and
extent have an over dominant and intrusive impact on the residential
amenities of the adjoining property, 152 Barnhorn Road, and is contrary to
Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011
and Policy GD1(ii) of the Rother District Local Plan.
2.
The proposed development results in the creation of some bedroom
accommodation that fails to provide a satisfactory level of amenities for the
occupiers in terms of room size, natural light and outlook. The proposal is
therefore considered to be contrary to Policy GD1(i) of the Rother District
Local Plan.
View application/correspondence
___________________________________________________________________
RR/2006/3353/P
BEXHILL 30 SHIPLEY LANE
REVISED PROPOSALS FOR THE ERECTION OF A SINGLE
STOREY EXTENSION TO FORM GRANNY ANNEXE AND
REPLACEMENT
OF
EXISTING
CONSERVATORY
PREVIOUSLY APPROVED UNDER PLANNING PERMISSION
RR/2006/1581/P (RETROSPECTIVE APPLICATION).
Mr and Mrs G Monteith
Statutory 8 week date: 10 April 2007
DECISION: DEFERRED FOR THE SUBMISSION OF AMENDED PLANS
View application/correspondence
___________________________________________________________________
9
RR/2006/3375/P
BEXHILL ST JAMES PLACE, WRESTWOOD ROAD
ERECTION OF 28 DWELLINGS INCLUDING FORMATION OF
NEW VEHICULAR ACCESS PURSUANT TO OUTLINE
PLANNING PERMISSION RR/2003/2438/P
Allum Developers and Contractors Limited
Statutory 13 week date: 16 March 2007
DECISION: DEFERRED FOR AMENDED LAYOUT/REDUCTION IN NUMER OF
UNITS
View application/correspondence
___________________________________________________________________
RR/2006/3401/CM BEXHILL REPROTECH - FORMER SITE OF, FRESHFIELDS,
BEXHILL ROAD
CHANGE OF USE TO A WASTE AND RECYCLABLES
TRANSFER STATION, DEPOT AND ANCILLARY USES
Veolia E S South Downs Ltd
Last date for decision: 19 January 2007
DECISION: THAT THE COUNTY COUNCIL BE ADVISED THAT THE DISTRICT
COUNCIL STRONGLY OBJECTS TO THE PROPOSED USE ON THE BASIS THAT
ALL THE INFORMATION SO FAR RECEIVED GIVES INSUFFICIENT
ASSURANCES THAT THERE WILL BE NO ADVERSE EFFECT ON THE AREA
AND NO WORSENING OF THE SITUATION IN TERMS OF NOISE, AIR QUALITY
AND TRAFFIC GENERATION PARTICULARLY HAVING REGARD TO THE
AMENITIES OF LOCAL RESIDENTS AND THE PROXIMITY OF THE FACILITY TO
THE PROPOSED PEBSHAM COUNTRYSIDE PARK. NOTWITHSTANDING THE
ABOVE THE DISTRICT COUNCIL ALSO STRONGLY OBJECT TO SEVEN DAY
WORKING ON THE SITE FROM EARLY MORNING TO LATE EVENING. AND
REQUIRES CLARIFICATION OF WASTE VEHICLE MOVEMENTS GENERATED
FROM ADJOINING LOCAL AUTHORITIES.
(Councillors C.A. Clark, P. Fairhurst and J.A.J Kemp each declared a personal
interest in this matter in so far as they are Council appointed Members to the
Pebsham Countryside Park Management Board and in accordance with the
Members’ Code of Conduct remained in the room during consideration thereof.)
View application/correspondence
___________________________________________________________________
RR/2006/3404/P
BEXHILL ST MARY’S SCHOOL, WRESTWOOD ROAD
ERECTION OF TWO STOREY EXTENSION TO EXISTING
BLOCK INCLUDING PROVISION OF DISABLED FACILITIES
St Mary’s Wrestwood Children’s Trust
Statutory 8 week date: 07 February 2007
DECISION: GRANT (FULL PLANNING)
1.
Standard commencement condition.
2.
No development shall take place until samples of the materials to be used for
all external finishes of the building hereby permitted, including the photovoltaic
10
3.
4.
cells, have been submitted to and approved in writing by the Local Planning
Authority. Development shall be carried out in accordance with the approved
details.
Reason: In the interests of the visual amenity of the area in accordance with
Policy GD1(iv) of the Rother District Local Plan.
No development shall take place before full details of the foundations of the
new building and a Method Statement for construction in relation to
safeguarding the root systems of the adjoining trees and for protecting the
trees during the course of development has been submitted to and approved
in writing by the Local Planning Authority. Thereafter no works shall be
undertaken other than in complete accordance with the approved Method
Statement.
Reason: In order to safeguard the adjoining trees which contribute to the
character of the site and enhance the setting of the buildings in accordance
with Policy GD1(vi) of the Rother District Local Plan.
The car parking spaces shown on the drawing 135/06, approved as part of
this application, shall be provided prior to the occupation of the development
hereby permitted and thereafter shall not be used for any purpose other than
the parking of staff or other operational vehicles.
Reason: To ensure an adequate level of off-street parking to serve the
development in accordance with Policy S1(d) of the East Sussex and Brighton
& Hove Structure Plan 1991-2011 and Policy GD1 (iii) of the Rother District
Local Plan.
Note:
N1C Schedule of Drawings: 135/4B, 135/05 and 135/06
REASONS FOR GRANTING PERMISSION: The proposed building is of an
appropriate size and design within the context of this large school site. The additional
facilities are acceptable in the terms of Policy GD1 of the Rother District Local Plan.
(Councillor Mrs J.P. Gadd declared a personal and prejudicial interest in this matter
in so far as her husband is an elected Member of East Sussex County Council and
serves on the Board of Governors of St. Mary’s and in accordance with the
Members’ Code of Conduct left the room during consideration thereof.)
View application/correspondence
___________________________________________________________________
RR/2006/3435/P
BEXHILL
74 GRANGECOURT DRIVE
ERECTION OF DETACHED BUNGALOW
FORMATION OF NEW VEHICULAR ACCESS.
J Panice
INCLUDING
Statutory 8 week date: 06 April 2007
DECISION: GRANT (FULL PLANNING)
1.
Standard time permission.
2.
CN5A (Exclude G.D.O. specified structures)
3.
CN5E a) and b) (Restriction of alterations/additions)
4.
CN9I – dwelling is first occupied – (Walling/fencing – Non estate
development)
5.
CN13A (Landscaping scheme)
6.
CN13B (Implementation of landscaping scheme)
11
7.
8.
9.
10.
11.
CN8C (Foul and surface water details)
CN7B a) the roofing tiles and b) the facing bricks (External materials)
The new access shall be in the position shown on the submitted plan [drawing
number 2006,096,1] and laid out and constructed as specified on the Form
HT 407 attached hereto and all works undertaken shall be executed and
completed by the applicant to the satisfaction of the Local Planning Authority.
Reason: To ensure the safety of persons and vehicles entering and leaving
the access and proceeding along the highway and accord with Policy S1(d) of
the East Sussex and Brighton & Hove Structure Plan 1991-2011, and Policy
GD1(iii) of the Rother District Local Plan.
The access shall not be used until the parking area has been provided in
accordance with the approved plan and the area shall thereafter be retained
for that use and shall not be use other than for the parking of motor vehicles.
Reason: To ensure the safety of persons and vehicles entering and leaving
the access and proceeding along the highway and accord with Policy S1(d) of
the East Sussex and Brighton & Hove Structure Plan 1991-2011, and Policy
GD1(iii) of the Rother District Local Plan.
Before commencement of any ground works for the development hereby
approved, the finished ground floor level of the building in relation to existing
and proposed site levels, the adjacent highway and adjacent properties,
together with details of levels of the driveway, shall be submitted to and
approved in writing by the Local Planning Authority and the works shall be
carried out in accordance with the approved details.
Reason: To ensure satisfactory development of the site in accordance with
Policy GD1(ii) and (iv) of the Rother District Local Plan and Policy S1(f) of the
East Sussex and Brighton & Hove Structure Plan 1991-2011.
REASONS FOR GRANTING PERMISSION: The proposal is for a modest dwelling
similar in size to the indicative outline proposal approved under RR/2005/3047/3R.
The proposal takes advantage of a small infill site in an established area of mixed
character. The dwelling will have no adverse effect on the street scene and although
it will be visible from Nos. 28 and 32 its modest design with shallow pitched roof will
preserve their residential amenities. It therefore complies with Policy S1 of the East
Sussex and Brighton & Hove Structure Plan 1991-2011, and Policy GD1 of the
Rother District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/185/P
BEXHILL 41, 41A, 43, 45, 47 BARNHORN ROAD,
REDEVELOPMENT
TO
FORM
60
EXTRA
CARE
APARTMENTS FOR THE FRAIL ELDERLY PLUS
COMMUNAL FACILITIES AND STAFF FLAT INCLUDING
FIRST AND SECOND FLOOR BALCONIES WITH PROVISION
OF NEW VEHICULAR AND PEDESTRIAN ACCESSES,
ACCESS ROAD AND TWENTY THREE PARKING SPACES.
McCarthy & Stone
Statutory 13 week date: 17 April 2007
DECISION: REFUSE (FULL PLANNING)
1.
The application does not make provision for 40% affordable housing on site
and has not fully and financially demonstrated that affordable housing could
not be provided on the site or that it would make the development of the
12
2.
3.
4.
5.
6.
whole site uneconomic. The proposal is therefore contrary to Policies HG1
and DS1(ii) of the Rother District Local Plan 2006.
The proposed development would, if permitted, be out of character with the
locality by the creation of a continuous façade and a density and mass
unrelated to the established development in the locality. The proposal is
therefore considered to be contrary to Policy S1(b) and (f) of the East Sussex
and Brighton & Hove Structure Plan 1991-2011 and Policy GD1(iv) of the
Rother District Local Plan 2006.
The proposed development would, if permitted, be out of character with and
detrimental to the amenities of neighbouring residences by reason of
overlooking, the overbearing scale of the proposed building and disturbance
through vehicle movements to the occupier of 49 Barnhorn Road. The
proposal is therefore considered to be contrary to Policy GD1(ii) of the Rother
District Local Plan 2006
It has not been demonstrated that the proposal can be drained satisfactorily,
in terms of both surface water and foul drainage. The proposal is therefore
considered to be contrary to Policies GD1(ix) and GD2 of the Rother District
Local Plan and Policy S3 of the East Sussex and Brighton & Hove Structure
Plan 1991-2011.
It has not been demonstrated that the proposal has been developed with due
regard to the probable existence on the site of species protected by the
Wildlife and Countryside Act 1981, the Protection of Badgers Act 1992 and
the Countryside and Rights of Way Act 2000 as required by Policy GD1(vii) of
the Rother District Local Plan 2006.
It has not been demonstrated that the level of car parking proposed in the
scheme is adequate to serve the scale of development proposed and the
proposal would be contrary to Policies GD1(iii) and TR3(i) of the Rother
District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/227/P
BEXHILL 25 WITHYHAM ROAD
CONVERSION OF DOUBLE GARAGE TO BEDROOM AND
ERECTION OF SINGLE STOREY EXTENSION TO THE REAR
Iliace
Statutory 8 week date: 26 March 2007
DECISION: WITHDRAWN.
View application/correspondence
___________________________________________________________________
RR/2007/264/P
BEXHILL 47-51 COODEN SEA ROAD
DEMOLITION OF BUILDINGS AT 47-51 COODEN SEA
ROAD, CONSTRUCTION OF ONE RETAIL UNIT AND 10
RESIDENTIAL
FLATS
INCLUDING
GUARDRAIL
BALCONETTES TO FIRST AND SECOND FLOORS
INCLUDING SITE ACCESS, ALTERATION TO EXISTING
ACCESSES, PROVISION OF TWENTY TWO CAR PARKING
SPACES AND ASSOCIATED EXTERNAL WORKS.
H22 Bexhill Ltd
13
Statutory 13 week date: 01 May 2007
DECISION: DEFERRED FOR FURTHER INFORMATION FROM THE HIGHWAY
AUTHORITY, DESIGN AMENDMENTS AND CLARIFICATION OF WASTE
DISPOSAL FACILITIES ON SITE.
(Councillors Mrs J.P. Gadd and R.F. Dyason wished it to be recorded that they voted
against deferral and were in favour of the application being refused.)
View application/correspondence
___________________________________________________________________
RR/2007/278/P
BEXHILL ST GEORGES CHURCH – LAND AT, CANTELUPE
ROAD
ERECTION OF CENTRE OF WORSHIP AND COMMUNAL
ACTIVITIES
The United Reformed Church (Southern Province) Trust Ltd
Statutory 8 week date: 26 March 2007
DECISION: DEFERRED FOR A COMPREHENSIVE SCHEME TO RELATE TO
PLANNING APPLICATION RR/2007/287/P
View application/correspondence
___________________________________________________________________
RR/2007/287/P
BEXHILL ST GEORGES CHURCH, CANTELUPE ROAD
DEMOLITION OF EXISTING BUILDINGS AND ERECTION OF
A BLOCK OF 10 FLATS INCLUDING FORMATION OF NEW
VEHICULAR ACCESS
The United Reformed Church (Southern Province) Trust Ltd
Statutory 13 week date: 30 April 2007
DECISION: DEFERRED FOR A COMPREHENSIVE SCHEME TO RELATE TO
PLANNING APPLICATION RR/2007/278/P
View application/correspondence
___________________________________________________________________
RR/2007/345/P
BEXHILL 75 PEARTREE LANE
OUTLINE: DEMOLITION OF EXISTING HOUSE AND
ERECTION OF TWO PAIRS OF SEMI-DETACHED HOUSES
AND A DETACHED HOUSE SERVED BY A NEW VEHICULAR
ACCESS AND PARKING AREA FOR TEN VEHICLES WITH
CLOSURE OF EXISTING ACCESS.
Mr P Stavri.
Statutory 8 week date: 29 March 2007
DECISION: REFUSE (FULL PLANNING)
1.
The proposed development if granted would introduce to the residential
environment an unacceptable level of overlooking of neighbouring properties,
a poor relationship to plot size and layout in the area, overdevelopment
14
leading to site cramming, noise and disturbance from motor vehicles using the
communal parking area and potential security implications associated with the
communal parking area. The proposed development would conflict with
Policies S1(b)(s)(e) contained within the East Sussex and Brighton & Hove
Structure Plan 1991-2011 and Policies GD1(ii)(iv)(xi), HG4(i)(vii)(xi) and
TR3(xi) contained within the Rother District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/530/C
BEXHILL BEXHILL HIGH SCHOOL, GUNTERS LANE
NEW INDOOR SPORTS FACILITY TOGETHER WITH
FLOODLIT ALL WEATHER COURTS (RENEWAL OF
PLANNING APPLICATION RR/2062/CC).
East Sussex County Council
Last date for consultation: 16 March 2007
DECISION: OBJECTION (COUNTY COUNCIL) ON THE FOLLOWING GROUNDS:
(a)
loss of playing fields, especially when taking into account the future plans to
consolidate the High School onto the site, to allow the High School to offer a
full range of sport and recreation facilities to both its pupils and the local
community.
(b)
detrimental traffic impact of the proposed development, taken together with
the intention to consolidate the High School and presence of other
development in the area.
For information: The County Council is reminded of the existence of a Section 106
Agreement in respect of the area of playing fields fronting Gunters Lane. This area is
to be retained as playing fields, i.e. with no built development thereon.
(Councillor C.R. Maynard declared a personal and prejudicial interest in this matter
in so far as he is an elected Member of East Sussex County Council and ViceChairman of the ESCC Planning Committee and in accordance with the Members’
Code of Conduct left the room during consideration thereof.)
(Councillor B. Kentfield declared a personal and prejudicial interest in this matter in
so far as he is the Chairman of Governors at Bexhill High School and in accordance
with the Members’ Code of Conduct left the room during consideration thereof.)
(Councillor R.F. Dyason declared a personal interest in this matter in so far as he is
an elected Member of East Sussex County Council and in accordance with the
Members’ Code of Conduct remained in the room during consideration thereof.)
View application/correspondence
___________________________________________________________________
RR/2007/542/P
BEXHILL 19 STEVENS CLOSE – LAND ADJ
ERECTION OF TWO STOREY BUILDING COMPRISING TWO
1 BEDROOM FLATS INCLUDING ASSOCIATED WORKS
AND ALTERATIONS TO EXISTING CAR PARK TO FORM 10
PARKING SPACES.
Rother Homes Ltd
15
Statutory 8 week date: 16 April 2007
DECISION:
REFUSE
(FULL PLANNING) DELEGATED (EXPIRY OF
CONSULTATION PERIOD)
1.
The proposed dwellings by reason of their siting and height will have a poor
relationship and an unacceptable impact on the amenities of 19 Stevens
Close, resulting in an overbearing and over dominant building within a metre
of their side boundary. As such the proposal fails to meet the general aims of
Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011
and the specific criteria of Policy GD1(ii) of the Rother District Local Plan in
terms of safeguarding the amenity of exiting and future residents.
View application/correspondence
___________________________________________________________________
RR/2007/571/P
BEXHILL LITTLE COMMON RECREATION GROUND
ERECTION OF FENCING AND GATE TO PROVIDE A
STORAGE AREA FOR ROLL-ON CRICKET NET
Little Common Ramblers Cricket Club
Statutory 8 week date: 19 April 2007
DECISION:
GRANT
(FULL
CONSULTATION PERIOD)
PLANNING)
DELEGATED
(EXPIRY
OF
REASONS FOR GRANTING PERMISSION: The proposed fencing and gate are an
appropriate development for the recreation ground and will not adversely affect the
character of the area or the amenities of adjoining properties in the position indicated
and therefore comply with Policy GD1(ii) and (iv) of the Rother District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/47/P
BECKLEY AZTEC HOUSE, MAIN STREET
ERECTION OF A 4/5 BEDROOM DETACHED HOUSE
Mr T Clarke
Statutory 8 week date: 5 March 2007
DECISION: WITHDRAWN
View application/correspondence
___________________________________________________________________
RR/2007/122/P
NORTHIAM EGMONT FARM, COPPARDS LANE
ERECTION OF REPLACEMENT TIMBER OUTBUILDING
(RETROSPECTIVE APPLICATION)
Miss Richardson and Mr Taylor
Statutory 8 week date: 06 April 2007
DECISION: GRANT (FULL PLANNING)
1.
Standard time period.
2.
CN6C (Domestic Use Building)
16
REASONS FOR GRANTING PERMISSION: The building is of an appropriate size,
design and materials and will not adversely affect the character and appearance of
the landscape and High Weald Area of Outstanding Natural Beauty and therefore
complies with Policies S1(b), (k), EN2 and EN3 of the East Sussex and Brighton &
Hove Structure Plan 1991-2011 and Policy GD1(iv), (v) of the Rother District Local
Plan.
View application/correspondence
___________________________________________________________________
RR/2006/3056/P
PEASMARSH BERRYNARBOR, SCHOOL LANE
ERECTION OF REPLACEMENT DWELLING AND DETACHED
GARAGE.
Mr Mike Wells
Statutory 8 week date: 1 January 2007
DECISION: GRANT (FULL PLANNING)
1.
CN5A (Exclude G.D.O. specified structures)
2.
CN5D (Obscure glaze windows) (Insert ‘at first floor level on the north
elevation, and Velux window on the east elevation)
3.
CN5E a), b) and c) (Restriction of alterations/additions)
4.
CN7B a) the roofing tiles, b) the hanging tiles and c) the facing bricks
(External materials)
5.
CN8C (Foul and surface water details)
6.
CN13A (Landscaping scheme)
7.
CN13B (Implementation of landscaping scheme)
8.
The access shall not be used until parking areas have been provided in
accordance with the approved plan and the areas shall thereafter be retained
for that use and shall not be used other than for the parking of motor vehicles.
Reason: To ensure the safety of persons and vehicles entering and leaving
the access and proceeding along the highway and to accord with Policy S1 of
the East Sussex and Brighton & Hove Structure Plan 1991-2011.
9.
The ridge height of the dwelling hereby approved shall not exceed 6.8m in
height.
Reason: to safeguard the amenities of the neighbouring properties in
accordance with Policy GD1(ii) of the Rother District Local Plan and Policy
S(f) of the East Sussex and Brighton & Hove Structure Plan 1991-2011.
N1C Drawing ref. 06-792/104G proposed elevations 02/03/07
Drawing ref. 06-792/102F proposed site plan 02/03/07
Drawing ref. 06-792/103D proposed house plan 07/11/06
REASONS FOR GRANTING PERMISSION: The position of the replacement
dwelling lies within the development boundary for Peasmarsh as defined within the
Rother District Local Plan. Although set to the rear of dwellings fronting School Lane
and is a replacement of a bungalow with a chalet bungalow, the insertion of obscure
glazing into windows at first floor level on the north and east elevations will preserve
the privacy of neighbouring properties. Its amended siting (following the earlier
refusal) closer to the western boundary of the site and the relocation of the garage,
while having some greater impact than the existing smaller dwelling, maintain the
wider outlook of the residents of ‘Raymaur Lodge’ and ‘Eureka’. As such the
proposal meets the objectives of Policies S1, EN2 and EN3 of the East Sussex and
17
Brighton & Hove Structure Plan 1991-2011, and Policy GD1 of the Rother District
Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/326/P
PEASMARSH 60 – 64 THE MALTINGS
ERECTION OF TWO FLATS AND ONE TWO STOREY
DWELLING WITH PROVISION OF PARKING SPACES.
Rother Homes Ltd
Statutory 8 week date: 28 March 2007
DECISION: REFUSE (FULL PLANNING)
1.
The proposed dwellings by reason of their siting and height will have an
unacceptable impact on adjoining residents. The existing dwellings adjoining
to the south have small gardens, which would be dominated by the flank wall
on the proposed dwellings. As such the proposal fails to meet the general
aim of Policy S1 of the East Sussex and Brighton & Hove Structure Plan
1991-2011 and the specific criteria of Policy GD1(ii) of the Rother District
Local Plan in terms of safeguarding the amenity of existing and future
residents.
Note:
N1A Amended plan (ref. RH.06.121.PH/02A) date stamped 8 March 2007.
View application/correspondence
___________________________________________________________________
RR/2007/75/P
RYE FOREIGN RYE ROAD (A268) – LAND AT
ERECTION OF 15M REPLICA TELEGRAPH POLE MAST
AND ASSOCIATED EQUIPMENT CABINETS
T-Mobile UK Ltd
Statutory 8 week date: 05 March 2007
DECISION: GRANT (FULL PLANNING)
1.
Standard time period.
2.
The development hereby permitted on the site shall be removed from the land
on which it is situated within 6 months of the time when it is no longer required
for telecommunication purposes.
Reason: To enable the Local Planning Authority to regulate and control the
development of the land in accordance with Government Advice In Planning
Policy Guidance Note 8 and Policy EN30 of the East Sussex and Brighton &
Hove Structure Plan 1991-2011.
3.
The screen planting shown on the submitted plan shall be carried out at the
time of development or at such later date as may be agreed in writing by the
Local Planning Authority, and in any event within 6 months from the
completion of the development. Any plants removed, becoming severely
damaged or diseased, or which die within 5 years of planting shall be
replaced by plants of similar size and species to those originally required to be
planted.
Reason: To improve and maintain the characteristics of the locality and to
accord with Policies S1, EN2 and EN3 of the East Sussex and Brighton &
Hove Structure Plan 1991-2011 and Policy GD1(iv)(v) of the Rother District
Local Plan.
18
REASONS FOR GRANTING PERMISSION: The Local Planning Authority is
satisfied that the applicant has demonstrated justification for a higher level of
coverage in the area, that alternative sites have been investigated, and that the
proposal strikes an acceptable balance between the applicant’s technical
requirements and the impact upon the visual appearance of the landscape and the
High Weald Area of Outstanding Natural Beauty. The application is therefore
considered to accord with Government Advice contained in PPG: 8
Telecommunications and Policies S1(b)(j), EN2, EN3 and EN30 of the East Sussex
and Brighton & Hove Structure Plan 1991-2011 and Policy GD1(iv)(v) of the Rother
District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/274/P
CAMBER DRAFFIN LANE – LAND ADJ, (LAND ADJ JAIME)
ERECTION OF DWELLING INCLUDING FORMATION OF
NEW VEHICULAR ACCESS
P J Brazier & Co Ltd
Statutory 8 week date: 23 March 2007
DECISION: WITHDRAWN.
View application/correspondence
___________________________________________________________________
RR/2007/356/P
CAMBER MARINA CAFÉ, OLD LYDD ROAD
ERECTION OF SINGLE STOREY EXTENSIONS TO FORM
BURGER BAR AND SANDWICH BAR.
Mr J Hyatt
Statutory 8 week date: 30 March 2007
DECISION:
GRANT
(FULL PLANNING) DELEGATED
CONSULTATION PERIOD/AMENDED PLAN)
1.
Standard time period.
2.
CN7E (Matching render-extension)
(EXPIRY OF
REASONS FOR GRANTING PERMISSION: The proposed extensions are of an
appropriate design and will not adversely affect the character of the area of the
amenities of adjoining properties and therefore complies with Policy S1(f) of the East
Sussex and Brighton & Hove Structure Plan 1991-2011, and Policies GD1(ii) and (iv)
and HG8 of the Rother District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/118/P
ICKLESHAM THE AMUSEMENT ARCADE, PETT LEVEL
ROAD, WINCHELSEA
OUTLINE:
DEMOLITION OF EXISTING BUILDINGS.
ERECTION OF FOUR SEASIDE HOUSES INCLUDING
FORMATION OF A NEW AND ALTERATIONS TO AN
EXISTING VEHICULAR ACCESS
19
Stade Developments (Hastings) Ltd
Statutory 8 week date: 21 March 2007
DECISION:
(1)
GRANT (OUTLINE PLANNING) DELEGATED (NEGOTIATION ON DESIGN
DETAIL/HIGHWAY ISSUES/RESOLUTION OF FLOOD RISK ISSUES)
REASONS FOR GRANTING PERMISSION:
The site lies within the
Development Boundary of Winchelsea Beach and residential redevelopment
is accepted in principle. Provision of four houses can be accommodated
without detriment to neighbouring properties and the varied character of this
area without conflict with Policy S1 of the East Sussex and Brighton & Hove
Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan.
OR
In the event that flood issues cannot be resolved –
(2)
REFUSE (OUTLINE PLANNING)
1.
In respect of absence of satisfactory flood risk assessment and an
inability of the scheme to meet the tests of PPS25: Development and
Flood Risk
View application/correspondence
___________________________________________________________________
RR/2007/27/P
TICEHURST UPPER TOLHURST FARM, BIRCHETTS GREEN
LANE
CHANGE OF USE OF SHEEP PASTURE TO, AND
CONSTRUCTION OF, ACCESS TRACK ONTO BIRCHETTS
GREEN LANE
Mr D Henderson
Statutory 8 week date: 21 March 2007
DECISION: GRANT (FULL PLANNING)
1.
The new access shall be in the position shown on the submitted plan and
constructed as specified on the form HT401 attached thereto and all works
undertaken shall be executed and completed prior to the access being
brought into use.
Reason: To provide acceptable traffic conditions, including highway safety,
and to accord with Policy S1(d) of the East Sussex and Brighton & Hove
Structure Plan 1991-2011 and Policy GD1(iii) of the Rother District Local Plan.
2.
The access shall not be used until parking areas have been provided in
accordance with the approved plan and the areas shall thereafter be retained
for that use.
Reason: To provide acceptable traffic conditions, including highway safety,
and to accord with Policy S1(d) of the East Sussex and Brighton & Hove
Structure Plan 1991-2011 and Policy GD1(iii) of the Rother District Local Plan.
3.
Within one month of the new access being brought into use or at such a time
as shall have been agreed in writing with the Local Planning Authority, the
existing agricultural field access identified on the submitted plan shall be
stopped up and a hedge and/or a field fence reinstated in accordance with a
scheme that shall have been submitted to and approved by the Local Planning
Authority.
20
4.
5.
6.
Reason: To provide acceptable traffic conditions, including highway safety,
and to accord with Policy S1(d) of the East Sussex and Brighton & Hove
Structure Plan 1991-2011 and Policy GD1(iii) of the Rother District Local Plan.
Within one month of the new access being brought into use the existing
access to the south-west of the dwelling shall be closed-off to vehicular traffic
in accordance with details to be submitted to and approved by the Local
Planning Authority.
Reason: To retain a single point of access for vehicular traffic in the interests
of highway safety and in accordance with Policy S1(d) of the East Sussex and
Brighton & Hove Structure Plan 1991-2011 and Policy GD1(iii) of the Rother
District Local Plan.
Details of any works or alterations to the existing stone bridge that may be
required shall be submitted for the consideration and approval of the Local
Planning Authority before being carried out. The development shall only be
carried out in accordance with the approved details.
Reason: To ensure that any such details take into account the stability of the
bridge, the need to safeguard the watercourse, and also need to safeguard
the visual amenities of the rural area in accordance with Policy S1 of the East
Sussex and Brighton & Hove Structure Plan 1991-2011.
CN10A (Attached Highway conditions).
REASONS FOR GRANTING PERMISSION: The Planning Committee having
inspected the site is satisfied that the development would not have a harmful impact
on the character and appearance of the Area of Outstanding Natural Beauty and
would accord with Policy S1 (j) of the East Sussex and Brighton & Hove Structure
Plan 1991-2011 and Policy GD1 (v) of the Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/275/P
SEDLESCOMBE CHITTLEBIRCH YARD, GREAT SAUNDERS
FARM, BEECH FARM ROAD
TEMPORARY SITING OF MOBILE HOME.
Mr and Mrs Rowlands
Statutory 8 week date: 4 April 2007
DECISION: REFUSE (FULL PLANNING)
1.
It has not been demonstrated that there is any need for the siting of a
residential mobile home for the running of the enterprise which is located in
the countryside within the High Weald Area of Outstanding Natural Beauty
and the proposal is therefore contrary to Policies GD1(v), HG5 and HG10(iii)
of the Rother District Local Plan, Policies EN2 and EN3 of the East Sussex
and Brighton & Hove Structure Plan 1991-2011 and Government advice
contained in PPS7 (Annexe A Paragraph 12).
View application/correspondence
___________________________________________________________________
21
RR/2007/282/P
SEDLESCOMBE PESTALOZZI GARDEN, PESTALOZZI
INTERNATIONAL VILLAGE
CONSTRUCTION OF PESTALOZZI GARDEN INCLUDING A
STRAW BALE CLASSROOM INCLUDING ROOF LIGHTS,
STORAGE SHED, GREENHOUSE AND FORMATION OF
NEW VEHICULAR ACCESS AND PEDESTRIAN ACCESSES
Pestalozzi International Village Trust
Statutory 8 week date: 04 April 2007
DECISION:
GRANT
(FULL PLANNING) DELEGATED
(SATISFACTORY
RESOLUTION OF THE CONCERNS RAISED BY THE ENVIRONMENT AGENCY
AND CONFIRMATION THAT THE COUNTY ARCHAEOLOGIST DOES NOT WISH
TO OBJECT/DETAILS OF THE USAGE OF THE ACCESS TO COTTAGE LANE)
1.
Standard time period.
2.
No development shall take place until there has been submitted to and
approved by the Local Planning Authority, a scheme for new hedge planting
within the areas identified on the approved plan. The scheme shall include the
details of the species of plants, the size of plants, the spacing between plants,
and the pattern of planting (i.e. number of staggered rows).
Reason: To enhance the appearance of the development and to accord with
Policies S1(j) and EN2 of the East Sussex and Brighton & Hove Structure
Plan 1991-2011 and Policy GDG1(v) of the Rother District Local Plan.
3.
CN13B (Implementation of landscaping scheme).
4.
CN13C (Tree retention).
Reason: To maintain the characteristics of the locality in accordance with
Policies S1(j) and EN2 of the East Sussex and Brighton & Hove Structure
Plan 1991-2011 and Policy GD1(v)of the Rother District Local Plan.
REASONS FOR GRANTING PERMISSION: The site lies within the established
boundaries of the Pestalozzi Community and the development is required in
association with the existing residential use of the Trust. The new built development
would be confined to a small part of the site and new and existing tree/hedge
planting would provide screening to mitigate against the impact of the development
in the AONB landscape. The proposal is in accordance with Policies S1(j) and EN2
of the East Sussex and Brighton & Hove Structure Plan 1991-2011.
View application/correspondence
___________________________________________________________________
RR/2007/378/P
SEDLESCOMBE
PESTALOZZI
INTERNATIONAL
VILLAGE
OUTLINE:
ERECTION OF 6 DWELLINGS WITH
ALTERATION TO AN EXISTING ACCESS
Pestalozzi International Village Trust
Statutory 13 week date: 21 May 2007
DECISION: DEFERRED TO ALLOW A FULL REPORT TO BE PRESENTED TO
THE NEXT PLANNING MEETING
View application/correspondence
___________________________________________________________________
22
RR/2007/397/P
SEDLESCOMBE
PESTALOZZI
INTERNATIONAL
VILLAGE
PART
DEMOLITION
OF
EXISTING
AND
CONSTRUCTION OF REPLACEMENT BUILDINGS
INCLUDING IMPROVED CONFERENCE, DINING,
ADMINISTRATION
&
EDUCATION
FACILITIES,
ACCOMMODATION INCLUDING ROOF LIGHTS AND
ASSOCIATED WORKS INCLUDING PARKING AND
ALTERATION TO AN EXISTING ACCESS.
Pestalozzi International Village Trust
Statutory 13 week date: 04 May 2007
DECISION: DEFERRED TO ALLOW A FULL REPORT TO BE PRESENTED TO
THE NEXT PLANNING MEETING
View application/correspondence
___________________________________________________________________
RR/2007/471/P
GUESTLING UPPER LIDHAM HILL BARN, NORTH LANE
CHANGE OF USE AND CONVERSION OF BARNS INTO B1
USE. CONVERSION OF BARN TO FORM DWELLING TO BE
USED SOLELY BY WORKERS/OWNERS OF CONVERTED
B1 BARNS.
P Newton
Statutory 8 week date: 17 April 2007
DECISION: DEFERRED RE-ADVERTISEMENT OF APPLICATION RE NEW
DESCRIPTION AND FOR SITE INSPECTION
REASONS FOR GRANTING PERMISSION: The proposed change of use will not
have an adverse impact upon the amenities of the area or upon highway safety and
therefore complies with Policies S1 (b) and (d) and EN3 of the East Sussex and
Brighton & Hove Structure Plan 1991-2011 and Policy EM3 of the Rother District
Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/148/P
RYE YPRES TOWER, CHURCH SQUARE
CONSTRUCTION OF INCLUSIVE ACCESS RAMPS AND
STEPS FOR DISABLED USE
Rye Museum Association
Statutory 8 week date: 12 March 2007
DECISION: GRANT (FULL PLANNING) DELEGATED (CONSULTATION WITH
ENGLISH HERITAGE ON ADDITIONAL PLANS SHOWING LEVELS,
RELATIONSHIP TO TOWER AND HAND RAILING ETC)
1.
Standard commencement condition.
2.
No development shall commence until full details of the following have been
submitted and approved by the Local Planning Authority:23
(a)
3.
the existing and proposed levels of the ramp and courtyard area,
including – within the courtyard area – details of the interface of the
new raised pavement with the tower;
(b)
details of the grading of the embankment including a specification for
planting or seeding including a timescale for such planting;
(c)
details of the alterations to the front brick wall and railings including a
specification of the materials to be used; and
(d)
details of all proposed hand rails.
No development shall take place other than in accordance with the approved
details.
Reason: To ensure a development appropriate to the setting of the Ancient
Monument and the character of the Conservation Area in accordance with
Policy S1(m) of the East Sussex and Brighton & Hove Structure Plan 19912011 and Policy GD1(viii) of the Rother District Local Plan.
The existing tree on the site shall be retained and shall be protected in the
whole course of development in accordance with details first approved by the
Local Planning Authority in accordance with BS5837:2005 Trees in relation to
construction.
Reason: To ensure retention of the cedar tree which contributes to the
character of the Conservation Area in accordance with Policy S1(j) and (m) of
the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy
GD1(viii) of the Rother District Local Plan.
REASONS FOR GRANTING PERMISSION:
The proposed alterations are
considered not to impact adversely upon the historic character and appearance of
the building in compliance with Policy S1(j)(m) of the East Sussex and Brighton &
Hove Structure Plan 1991-2011 and Policy GD1(viii) of the Rother District Local
Plan, and accords with advice contained within PPG15.
View application/correspondence
___________________________________________________________________
RR/2007/543/P
RYE 25 UDIMORE ROAD, MAGNOLIA COTTAGE
ERECTION OF SINGLE STOREY REAR EXTENSION TO
PROVIDE STUDY.
Mr Granville Bantick
Statutory 8 week date: 25 April 2007
DECISION:
GRANT
(FULL
PLANNING)
DELEGATED
(EXPIRY
OF
CONSULTATION PERIOD 27 MARCH 2007/NO ADVERSE COMMENTS FROM
CONSULTEES)
1.
The development must not begin later than the expiration of three years
beginning with the date of this permission.
Reason: In accordance with section 91 of the Town and Country Planning Act
1990.
2.
CN7C (Matching external materials)
3.
No windows shall be inserted into the north east elevation of the extension
unless agreed in writing beforehand with the Local Planning Authority.
Reason: To prevent any change that might involve direct overlooking of
adjacent properties in accordance with policy GD1 (ii) of the Rother District
Local Plan.
24
REASONS FOR GRANTING PERMISSION: The proposed development is of an
appropriate design and will not adversely affect the character of the area or the
amenities of adjoining properties and therefore complies with policy GD1 and HG8 of
the Rother District Local Plan.
View application/correspondence
___________________________________________________________________
RR/2007/296/NA
SHEPWAY CONSULTATION LONDON ASHFORD AIRPORT,
LYDD, ROMNEY MARSH
CONSTRUCTION OF A 294 METRE RUNWAY TOGETHER
WITH AN ADDITIONAL 150 METRE STARTER EXTENSION.
London Ashford Airport Ltd
Statutory 8 week date:
RR/2007/297/NA
SHEPWAY CONSULTATION LONDON ASHFORD AIRPORT,
LYDD, ROMNEY MARSH
THE ERECTION OF A PASSENGER TERMINAL TOGETHER
WITH A CAR PARK ON THE EXISTING BRAVO APRON
COMPRISING A CAR PARK.
London Ashford Airport Ltd
Statutory 8 week date:
DECISION: THAT SHEPWAY DISTRICT COUNCIL BE ADVISED THAT ROTHER
DISTRICT COUNCIL WOULD SUPPORT THE PROPOSALS TO EXTEND
LONDON ASHFORD AIRPORT ON THE BASIS OF THE ECONOMIC AND
REGENERATION BENEFITS OF THE PROPOSALS TO THIS AREA OF EAST
SUSSEX AND KENT. HOWEVER ANY SUCH EXPANSION SHOULD ONLY TAKE
PLACE ON THE BASIS THAT THE SURROUNDING TRANSPORT
INFRASTRUCTURE BE IMPROVED AS NECESSARY AND THAT SHEPWAY
DISTRICT COUNCIL IS SATISFIED THAT AN INCREASE IN AIR TRAFFIC CAN
BE ACCOMMODATED WITHOUT ADVERSE ENVIRONMENTAL IMPACT ON THE
ADJOINING AREA AND THAT APPROPRIATE CONTROLS ON NIGHT FLIGHTS
AND FLIGHT PATHS ARE IMPOSED.
(Councillor C.N. Ramus declared a personal interest in this matter and in accordance
with the Members’ Code of Conduct remained in the room during consideration
thereof.)
View application/correspondence