Risk assessment template for building and infrastructure works

advertisement
Risk assessment template for building and infrastructure works
Use this template to assist in deciding whether:

an existing building or infrastructure asset should be brought into total or partial
conformity with relevant standards when undergoing alterations and additions

infrastructure works with a capital value less than $200,000 warrant certification
using the Construction Assessment Procedures.
Project title
Location
Project manager
Risk assessment
Step 1: Identify the risks
Hazards
Events
Consequences
Causes
Controls
When will risk occur?
Briefly summarise the risk. For example: the {hazard} could lead to an {event}
resulting in {consequences}.
Step 2: Determine the
probability of risk
likely
probable
possible
unlikely
rare
Step 3: Determine the
consequence of risk
insignificant
minor
moderate
major
catastrophic
Step 4: Rate the overall
project risk
Match the probability (step 2) with the consequence
(step 3) and refer to the risk matrix in Table 7.
low
medium
high
extreme
Result
Low- and medium-rated projects will not require certification in accordance with the
Construction Assessment Procedures, but must still be undertaken in accordance
with the BCA and Australian Standards.
High and extreme rated projects will require certification in accordance with the
Construction Assessment Procedures.
Risk assessment completed by:
Name:
Position:
Signature:
Date:
Published by:
Office of Environment and Heritage, Department of Premier and Cabinet
59–61 Goulburn Street, Sydney
PO Box A290, Sydney South 1232
Phone: (02) 9995 5000 (switchboard)
131 555 (environment information and publications requests)
1300 361 967 (national parks, climate change and energy efficiency information and
publications requests)
Fax: (02) 9995 5999
TTY: (02) 9211 4723
Report pollution and environmental incidents: Environment Line: 131 555 (NSW only)
or email info@environment.nsw.gov.au
Website: www.environment.nsw.gov.au
OEH 2011/0937
November 2011
Download