FieldGuideRFP

advertisement
County of Asotin
Regional Stormwater Program
P.O. Box 160
135 2nd Street
509-243-2074
Asotin, WA 99402
Fax 509-243-2003
ASOTIN COUNTY REGIONAL STORMWATER PROGRAM REQUEST FOR
PROPOSALS (RFP) TO DEVELOP AN EROSION PREVENTION AND SEDIMENT
CONTROL FIELD GUIDE
The Asotin County Regional Stormwater Program (RSP) has received a grant from
Department of Ecology to develop a field guide to assist Phase II Stormwater
Permittees, contractors, developers, inspectors, and other parties implementing the
requirements of state and local stormwater construction permits.
The field guide will be based on requirements in the Stormwater Manual for Eastern
Washington (Stormwater Manual), the Eastern Washington Phase II Stormwater Permit
(Phase II Permit), Appendix A of the Phase II Permit (Appendix A) and the Ecology
Construction Stormwater Permit (Construction Permit). The field guide will be
developed with the help of an advisory group consisting primarily of Phase II Permittees
and Ecology staff.
Project Goals

Develop a construction field guide that is transferrable regionally and that is
accepted, used and promoted by Eastern Washington Phase II Permittees.
 The field guide should provide easy to understand guidance for choosing,
installing and maintaining erosion and sediment control best management
practices (BMPs).
 Field guide should provide easy to understand guidance for developing a
construction stormwater pollution prevention plan.
Qualifications
The successful candidate will be able to:

Describe your knowledge and experience working with:
• Eastern Washington Phase II Stormwater Permit
• Appendix A of Phase II Permit
• Stormwater Manual for Eastern Washington
• Ecology Construction Stormwater Permit

Describe your experience convening and managing an advisory group.

Describe your experience meeting deadlines and developing a final product from
input received from many sources including advisory groups, technical manuals
and your own expertise.
Serving:
Asotin County
City of Asotin
City of Clarkston
Project Deliverables
The following deliverables must be considered when developing your proposal.

Convene advisory group composed primarily of Eastern WA Phase II Permittees
and Department of Ecology staff.
• Contact potential advisory group members.
• Schedule up to three meetings.
• Set up meetings in central location to advisory group members.
• Coordinate distribution of information and meeting materials.
• Record minutes and document action associated with each meeting.
• Provide digital files of all materials to RSP.

Develop drafts and final version of Eastern WA Erosion Prevention and Sediment
Control Field Guide.
• Evaluate the Kentucky Field Guide and compare to the Eastern WA
Stormwater Manual. The Kentucky Field Guide will be provided by RSP.
• Develop recommendations for chapters to be included in the field guide.
• Draft chapters for field guide based on technical review and advisory group
recommendations.
• Provide digital files of final field guide. Phase II Permittees will add
information from their local construction permit requirements.
Consultant Selection
Consultant selection will be based on evaluation of the proposal. Selection criteria will
include, but not necessarily be limited to, key personnel (and their related
experience/qualifications) who will be directly involved with the project and project team;
knowledge of Phase II Permit requirements, Appendix A, Stormwater Manual and
Construction Permit; project approach; ability to execute and deliver the project on
schedule; proposal quality; and any other factors Asotin County Regional Stormwater
Program considers significant to be in the best interest of the program. The Regional
Stormwater Program may request consultant interviews from short-listed firms as part of
the evaluation.
Proposals shall be limited to 15 pages, including resumes. Please submit 5 copies of
your proposal to the Asotin County Regional Stormwater Program, Attn: Cheryl
Sonnen, P.O. Box 160, Asotin, WA 99402, no later than 12:00 p.m. PDT on April 27,
2010. Consultant selection is anticipated in May 2010. Contact Cheryl Sonnen for
more information.
Serving:
Asotin County
City of Asotin
City of Clarkston
Download