The EIS and SEIS which have been prepared for the Shute Harbour Marina Resort proposal do not
adequately address the many economic, social or environmental impacts that the approval of this
proposal would have. The proponents have not fulfilled the requirements of their Terms of
Reference and the ‘integrated, master-planned facility’ being heavily promoted would not be built
by the proponent.
The SHMR proposal, therefore, should not be permitted to proceed:
ALL COMMUNITY RISK. NO COMMUNITY BENEFIT
The SEIS list of Project Objectives includes:
“To provide a world class integrated marina and tourism facility…’
“to provide a balanced, master planned marina resort environment.”
The SEIS includes a Concept Development Masterplan, a Development Model and a proposed
SHMR Development Code all of which confirm that this proposal would not be ‘integrated’ or
‘master-planned’ by the proponent, as claimed, but, after reclamation of the World Heritage
seabed, would be on-sold to several unspecified, third party developers, as freehold land to
use more or less as they see fit.
It is clear that the sole intention of the proposed SHMR Development Code is to over-ride any
provisions of the Whitsunday Planning Code that may get in the way of the proponents achieving
their third party sell-on strategies; regardless of what the site then becomes, or may become in the
future.
In light of the above facts and prevailing economic conditions, the economic benefits claimed for
this project are not credible. Instead it is far more likely that this proposal would join the significant
list of the region’s failed major projects and, once again, cost the Whitsunday community dearly in
social and economic terms. Following is significant evidence to support this contention:
• Failed marinas. Several residential/marina complexes have gone into receivership in Queensland
over the past few years. There are two in our Whitsunday mainland area alone. The Port of Airlie
and Abel Point.
• Port of Airlie. Cost to community. Ten years ago the Port of Airlie developer promised the
community, among other things, a major resort in exchange for the loss of their precious Coconut
Grove environment. Ten years later the developer, Meridien, is in receivership, the project has cost
our council and therefore our community many thousands of dollars, the area is a vast, unsightly,
unused paddock and the community is still waiting with no resolution in sight.
• Abel Point bargain basement sale. The nearby Abel Point marina, which Meridien bought for
around $75million, was sold recently for some $28million. A write down of nearly $50million.
And yet the Shute Harbour proponent would have us believe their unfunded $252 million (or more)
project is financially viable!
• Failure at Funnel Bay. A major $500million “integrated resort” and residential development
over 25 hectares was commenced around 2007 at Funnel Bay between Airlie Beach and Shute
Harbour. In 2009 the developer went into administration, leaving yet another unsightly, unfinished,
unoccupied precinct. The frequently used public access of the past, to the public beach and
foreshore, has for several years been rendered virtually impossible. Although the land has finally
been on-sold (having been on the market for over three years), it remains desolate and there appears
to be no sign of anything happening in the location any time soon.
• Developer bail-out. Since Cyclone Yasi devastated Port Hinchinbrook and its marina and left
many boats destroyed or damaged the location has been in a state of major disrepair and now the
private owners are demanding that the state government bail them out.
• Insurance and legal liabilities relating to climate events and storm surge – particularly in these
cyclone prone, waterfront areas – become more complex and perilous by the day. Strata title
insurance in North Queensland seems, even now, to be virtually impossible to achieve and appears
to have a deeply troubled future.
• Council Levies. The Whitsunday Regional Council has voted six to one against the SHMR
proposal lease being renewed. They, more than anyone and through bitter experience, are acutely
aware of the cost to the community of these commercially impractical and inappropriate schemes.
They have a current debt of around $20 million. Ratepayers are about to be subject to a levy of
$140 per annum.
This community does not need to be exposed to even more financial risk so that a private developer
can indulge in a waterfront land grab at Shute Harbour.
Other issues evident from review of the SEIS are; no proof of need, questionable social
benefits, environmental concerns, the negative impact to values of a World Heritage area and
a lack of accuracy in many of the proponents claims.
The Shute Harbour proponents’ Supplementary EIS is a deeply unsatisfactory document. A fair
assessment would be that it is indefensible.