Nambour Showgrounds Master Plan 2013 – 2023 (Part 2) September 2013 Nambour Showgrounds Master Plan 2013 - 2023 3. S OCIAL AND E CONOMIC B ENEFIT T REND A NALYSIS Page | 2 AND An assessment of the social and economic benefits of Nambour Showground was undertaken by Urbis as part of this project. A detailed report including the assumptions and references underpinning conclusions is attached at Appendix 1. A brief overview of this analysis is provided below. 3.1. E CONOMIC B ENEFITS OF N AMBOUR S HOWGROUND Nambour Showgrounds makes a significant economic contribution to the region. It is estimated that the Showgrounds contributes $38.8 million to the region’s economy from direct expenditure and type 2 multipliers1. Of this, events account for $34.2 million while regular user groups account for $4.6 million. The total direct expenditure at the Nambour Showgrounds is estimated at just over $15.1 million per annum. The majority of this turnover is forecast to originate from the direct expenditure at the Queensland Garden Expo – regarded as one of the top three gardening events in Australia. Additional visitor expenditure that can be attributed directly to events held at the Showgrounds amounts to an estimated $5.6 million per annum. This is expenditure on accommodation, meals, food and drinks, other entertainment, personal and transport items within the region. An additional $18.1 million in value added benefits as a result of events undertaken at the Showgrounds is estimated. Major and significant events account for an estimated 109,000 of the total visitations to the Showgrounds per annum. Four major events make up an estimated 77,000 of these visitations, namely: Queensland Garden Expo 30,500 Sunshine Coast Agricultural Show 25,000 Sunshine Coast Home, Caravan, Camping and Boating Expo 14,000 Sunshine Coast Car Antique Club Swap Meet 7,500 An estimated additional 32,100 visits is generated from other significant events including: 1 Annual Pet Expo Annual Rodeo Collectorama Gemfest International Rally of Qld Shakedown/Shootout and Media event Relay for Life Nambour Christmas Carols Annual Junior Development cricket carnival Sunshine Coast Antique Car Club display days Various equestrian events Larger darts events Refer p6 of Social and Economic Benefit Assessment report attached at Appendix 1 for explanation of Type 1 and Type 2 multipliers Nambour Showgrounds Master Plan 2013 - 2023 Page | 3 The events and activities hosted at the Showgrounds have a strong local profile and are well known with their target groups and audiences. The showground’s profile at the broader city and regional scale is less prominent, however the growth of events such as the Queensland Garden Expo, Collectorama, Rally Qld, Sunshine Coast Home, Caravan, Camping and Boating Expo, Sunshine Coast Antique Car Club Swap Meet, and some equestrian events, does attract numerous visitors from outside the Sunshine Coast region. Events such as the Sunshine Coast Agricultural Show and the Queensland Garden Expo promote the local produce, businesses and community groups. Events also attract outsiders to Nambour and promote the local area through experience with accommodation, food and services in town. Money raised by fundraising at the events goes back into the Showgrounds through user groups or into the community. The Queensland Garden Expo attracts visitors from outside the region due to its state wide draw. The higher the profile of an event the greater the attraction for external visitors. The more local an event the less additional expenditure from external visitors it is likely to attract. From an economic benefit perspective, if the opportunity exists to attract other major events hosted within the Showgrounds (similar to the Queensland Garden Expo), the flow-on benefits experienced within the region are significant. 3.2. S OCIAL B ENEFITS OF N AMBOUR S HOWGROUND Community facilities, such as the Nambour Showgrounds, are an important part of the hard social infrastructure assets of the Nambour and Sunshine Coast community. They encourage community health and social wellbeing, meet the needs of different interest groups and contribute to the development of social fabric, identity and values associated with the community. A number of research papers highlight the value that social infrastructure and community facilities have on the community, including social cohesion, wellbeing, identity and sense of place, diversity, sustainability and civic engagement.2 These are all elements that make up the social capital of a place or neighbourhood. Facilities such as the Nambour Showgrounds are critical components that contribute to the social capital of a community. The social benefits of the Showgrounds include: 2 Contribution to Community Events o Allow for social interaction of volunteers, visitors, participants and attendees of events and activities o Provide opportunities for different groups in the community to promote their produce and fundraising cause, be it a school, church, bowls club, rotary or an art club o Provide opportunities to participate in friendly competition o Facilitate personal development of young people and community groups through employment, partnerships and volunteerism Central Meeting Location o School, child and youth friendly space that is accessible for young people o Encourage passive and active recreation and social interaction o Group fundraising goes back into the Showgrounds or into the community McShane, I 2008, “Brining in the Public: Community Facilities and Social Value”, Thesis submitted with the Institute for Social Research, Swinburne University of Technology. Nambour Showgrounds Master Plan 2013 - 2023 Page | 4 Accommodation for Community Organisations o Provide space for a wide range of user groups at a highly subsidised rate o Provide opportunities to participate in various recreational and leisure activities o Provide access to space with a degree of tenure security Supportive Environment for Physical Activity o Formal and informal activities that occur on site encourage passive and active recreation, social interaction and skill building o Community of Nambour are able to access supportive environments for physical activity at affordable rates Community Development o Skill development through managing and volunteering at events o Skill development and hobby facilitation via on-site sport and leisure clubs The facilities at the Showgrounds are affordable, accessible and are available for a variety of community groups of all different sizes and backgrounds. They are used on a regular basis and the clubs contribute to ongoing development of social capital by building skills through training, social cohesion, development of community identity and promotion of community health and social wellbeing. Different uses of the site are conflicting at times. For instance, the Cricket Club use all three ovals during the cricket season (including some Sundays). This limits the opportunity for the Showgrounds to be leased as an event space over weekends. It is important to meet the expectation of the local community groups as well as manage the income stream that is evident from events. While there is an argument that supports the further promotion of economic benefit for the region through hosting of large events, this must be weighed carefully against the significant role the Showgrounds and the associated regular user groups contribute to the community in terms of health, wellbeing and community connectedness. 3.3. S OCIAL AND E CONOMIC B ENEFIT OF A GRICULTURAL S HOWS A review of “An Economic and Social Impact Study of Australian Agricultural Shows” put together by the Queensland Chamber of Agricultural Societies Inc was undertaken. The document provides an overview of previous work undertaken as well as a summary of findings from consultation with around 1,900 people. Despite show benefits, Australian Agricultural shows could be in decline. Recent statistics have shown fewer shows are operating and fewer people are attending agricultural shows. Since 2000 attendance to shows throughout Australia has experienced a rapid decline with an estimated 5.9 million people visiting a show in 2011, compared with 10.7 million in 2000. Interestingly however, Queensland is bucking this trend with recent figures showing growth in attendance numbers of 13.7% per annum during the 2009-2011 period. The study estimates that Australian shows currently contribute around $631 million of direct expenditure and a further $334 million in indirect economic benefits. This estimate does not factor in the contribution that volunteerism has on the economy. The three most prevalent social benefits of agricultural shows identified in the report were family fun and wellbeing, promotion of local produce, and community participation in local community events. Nambour Showgrounds Master Plan 2013 - 2023 Page | 5 The Sunshine Coast Agricultural Show has a strong identity with the agricultural history of the region, having started as an event to showcase the local produce and talent of the area. Nambour Showgrounds remains the connection to the past agricultural shows and has responded to the community’s expectations for a show, including different entertainment and night time activities. The Sunshine Coast Agricultural Show recognises that whilst their focus is on agricultural heritage, there is a need to “continually ensure that the event is relevant for today’s show goers and has successfully made the transformation to a modern three day show full of agricultural, community and entertainment features”3. 3.4. S HOWGROUND T RENDS The 2012 Situational Analysis Report for Nambour Showgrounds included an analysis of trends in outdoor event spaces (showgrounds).4 These included: 3 4 Outdoor event spaces and showgrounds are increasingly being redeveloped as venues that support a range of community functions Facilities are becoming more flexible so that they can provide for different user requirements as well as for a variety of types of events of differing sizes (thereby optimising use and revenue) Asset management is important and designs that are low maintenance make the facility more viable Facility managers (and Councils) are being proactive in securing events—it is no longer appropriate to sit and wait for a booking Contemporary expectations of facility quality, as well as legal and code requirements, demand a higher standard of facility than has been provided, or accepted, in the past Caterers are requiring larger, more sophisticated kitchens to meet legislative requirements Storage requirements, car parking and public amenities are a key component of facility design Recent Biosecurity Guidelines outline the importance of more stringent control of livestock facilities (particularly at showground sites) Importance of green technologies (e.g. water harvesting, solar power, energy efficient lighting) Provide facilities that can generate income (e.g. activities such as caravan and camping, kiosk/ canteen to service events etc) Exhibition buildings with large clear-span floor space that is flexible enough so that it can be divided into smaller areas to suit differing user needs Consider alternatives to fixed stadium/grandstand seating. Fixed seating is one of the more costly pieces of infrastructure to install and maintain and is often rarely used Include an appropriate events centre that will attract various cultural events, meetings and training events, host large social functions, conduct seminars, meet the needs of businesses and commercial activities and to play an integral support role in events held on the site Provide a facility that the general community can utilise, for example to provide for recreation activities such as walking and cycling Consider shade without reducing the use of event open space. Sunshine Coast Agricultural Show: http://www.sunshinecoastshow.asn.au/aboutus.php op cit. Nambour Showgrounds: Situational Analysis Report, p6. Nambour Showgrounds Master Plan 2013 - 2023 4. B ACKGROUND R ESEARCH 4.1. L ITERATURE R EVIEW Page | 6 A range of documents were reviewed as part of the background research to set the study in context and to ensure study outcomes are aligned with Council’s corporate direction. Study findings and recommendations seen as relevant to the Nambour Showgrounds Master Plan are summarised in the Table 1 below. Some of the key issues to emerge from this analysis are as follows: 1. The Sunshine Coast Major and Regional Events Strategy 2013 seeks to retain existing major events and protect them from being lost to the region. Other strategies include maximising the value of existing major events and enable them to grow; securing new major events and facilitate/ develop opportunities in association with these events; identifying regionally significant major events to transition to hallmark/signature major events (defined as having more than 30% of participants from outside the region and containing substantial economic, media, social and community benefits); and better planning and facilitating the development of major event infrastructure and services. 2. The Sunshine Coast Social Infrastructure Strategy 2011 reaffirms the concept of Nambour as a community hub. In respect of Showgrounds generally, the document comments on the protection of existing showgrounds; encouraging a balance of compatible and complementary spaces; and suitably designed and built spaces that enable events, displays and exhibitions to meet community needs. 3. A Social Infrastructure Design Charette for Nambour 2012 noted the need to confirm the role and function of the Showgrounds. The Nambour Alliance, as part of its Nambour Town Vision, envisioned a more vibrant Showground featuring community sport, recreation, tourism and economic activity connecting to the town square. 4. The Sunshine Coast Sport and Active Recreation Plan 2011 – 2026 recommended that if demand for the use of Nambour Showgrounds for major commercial/cultural events such as motor shows/home shows increases, and there are no alternative plans for indoor/outdoor venues to cater for these activities, a master plan which maximises its use for show, commercial and cultural activities should be considered. The Plan also recommended consideration of securing additional land in the Nambour area to re-establish and develop any displaced sports. 5. A feasibility report into the development of an Entertainment, Convention and Exhibition Centre on the Sunshine Coast 2011 presented Maroochydore CBD as a preferred option. The facility would include main auditorium with seating ranging from 1,000 to 4,500, flat floor flexible exhibition hall up to 3,000m2, commercial kitchen and satellite kitchens and 12-15 meeting rooms. The Nambour Showgrounds Master Plan is cognisant of not duplicating or impacting on the viability of other facilities. Nambour Showgrounds Master Plan 2013 - 2023 Page | 7 6. The Draft Land Management Plan 2012 for the Showgrounds provides for recreational vehicles (RV’s) to be accommodated on the site. This would be restricted to RV association members, limited to a maximum of three nights (although potentially extended to seven nights on the proviso that there is no adverse impact on local licensed caravan and/or tourist park operators) and exclude on-site kiosk, laundry and associated facilities. To ensure that the reserve is not compromised by unforseen outcomes, an initial trial period and evaluation is proposed. Consistent with (former) Department of Environment and Resource Management policy on secondary use of trust land, the Draft Land Management Plan proposes the continuation of the hiring out of the Showgrounds for both commercial and community events. 7. A Master Plan for Nambour Showgrounds (not adopted by the former Maroochy Shire Council 2007) recommended three ‘hero’ projects namely, the removal of the old main pavilion and construction of a new main pavilion, offices and entry area; reconfiguration of the equestrian area to provide a new covered arena with spectator seating, catering and equestrian administration facilities; and relocatable spectator stands. Several other infrastructure improvements to common areas and user group areas were proposed, together with general design principles, criteria for traffic management plans, an environmental plan, landscape plan, and management recommendations. 8. A Draft Master Plan for Nambour Central Park Petrie Creek 2012 provides a framework for the revitalisation of Petrie Creek as a major recreational space and corridor linking Nambour’s open space parkland to adjacent residential areas, community facilities and the town centre. Nambour Showground is adjacent to the study corridor and provides an opportunity for a major recreational linkage. Table 1: Strategic context emerging from background literature ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS The Corporate Plan 2009-2014 is a key planning document outlining the priorities and strategies Council will pursue over time to achieve its vision to become Australia’s most sustainable region. One of the key themes of the Plan is in the area of “Health and Wellbeing”, which defines an active and healthy community as being one that is resilient and enhances people’s quality of life. Council plays a role in community wellbeing through safety initiatives, preventative health and education programs, provision of community sport and recreational opportunities and facilitating community interaction. It also has responsibility for ensuring the region’s preparedness to deal with natural disasters. The emerging priorities are: Safe and healthy communities - Adopt and encourage ‘crime prevention through environmental design’ principles in the design of public and private spaces Active lifestyles - Promote physical activity and recreation and support community-based sport and recreation organisations and programs. The Sunshine Coast Open Space Strategy concentrated on Council controlled and managed open space and identified the key challenges and issues shaping open space on the Sunshine Coast. Further, the Strategy provides policy direction to grow and enhance parks, sports grounds, recreation trails and reserves. The actions relevant to this study include: Investigate the establishment of district recreation parks to service district needs. Nambour is flagged as a location for investigation. Continue to investigate the establishment of district sports grounds. Nambour is SOURCE Sunshine Coast Regional Council Corporate Plan 2009-2014 Sunshine Coast Open Space Strategy 2011 Nambour Showgrounds Master Plan 2013 - 2023 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS flagged as a location for investigation. Strengthen pedestrian links to parks and community hubs to improve transport options Identify park locations with opportunities for public transport, cycle links, and integration into transport planning. Continue to apply the DSS to ensure the land and embellishments are responsive to community values and changing needs. Integrate whole of life costs into open space planning, landscape development and infrastructure selection. Apply resource efficient and effective strategies in park and sports ground development (e.g. water reuse and native planting). Ensure development in the open space network is accessible using the standards of universal access and safety. Actively seek to reduce space lost to secondary uses such as car parking, commuter paths, storage areas. Continue to engage with communities on detailed planning, management, and delivery in accordance with Council’s Community Engagement Policy. The Sunshine Coast Sustainable Transport Strategy outlines the emerging priorities and key strategies Council will pursue to deliver a sustainable transport system. Any parking and access solution for the Nambour Showgrounds will need to ensure the goals of this Strategy are addressed. The Strategy provides a user hierarchy as detailed below: Page | 8 SOURCE Sunshine Coast Sustainable Transport Strategy 2011-2031 The Strategy maps the proposed hierarchy and function of transport corridors for the Sunshine Coast for 2031 and beyond and guides the planning and implementation of transport to achieve the sustainable transport vision. The Strategy identifies a fundamental objective in active transport planning is to improve community mobility and amenity by providing connected networks and facilities based on people’s needs and location. The goal within the Strategy is to provide pedestrians and cyclists with safe, comfortable, direct connections to where they want to go including homes, schools, work places, shopping areas, services, recreational opportunities and public transport. The Strategy outlines that planning will support and encourage walking and cycling as an alternative to private car use and as healthy recreational activity for all ages. The Strategy incorporates the Sunshine Coast Active Transport Plan 2011-2031 (Active Transport Plan) which provides additional detail and guidance in support of this Strategy. The Access and Inclusion Plan 2011-2016 sets out five key focus areas and aims to guide Council towards improving access and inclusion for community in the region. Under each of these focus areas a table of strategies has been developed that will direct actions to reduce physical, social and economic barriers. The Plan identifies a series of elements for consideration aimed at reducing access barriers, including relating to the following focus areas: Focus Area 1: Pedestrians, Parking and Transport Sunshine Coast Access and Inclusion Plan 2011-2016 Nambour Showgrounds Master Plan 2013 - 2023 Page | 9 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS Focus Area 2: Community Facilities, Amenities and Open Space Focus Area 3: Planning and Services Focus Area 4: Training, Employment and Participation Focus Area 5: Communication and Community Engagement. SOURCE This strategy outlines Council’s position on, and proposed strategies to address, affordability on the Sunshine Coast. It proposes actions that: Improve quality of life, are equitable and inclusive; Reduce our greenhouse gas emissions, reliance on fossil fuels and consumption of resources; Encourage our economic growth to be sustainable and fairly distributed with efficient allocation of resources. The strategy provides an Affordable Living Framework as per below: Sunshine Coast Affordable Living Strategy 2010 Outcome Principle Housing diversity Diverse housing for a diverse community Every neighbourhood encourages housing diversity. Housing affordability Housing to suit all outcomes Every neighbourhood supports housing affordability and housing choices are provided for all income levels. Self contained neighbourhoods Local opportunities Local goods, services and employment opportunities are provided within walking distance of homes. Transport options A range of transport choices Sustainable transport modes are prioritised with pedestrians as the primary focus. Supportive environments Great places and spaces Every local neighbourhood is inclusive, accessible and safe with good access to parks, facilities and services. There are networks of linkages providing opportunities for social and cultural interaction, participation and improved wellbeing. Social infrastructure is provided on an equitable basis. Resource efficiency A minimal environmental footprint Resources are used efficiently. Every neighbourhood and household maximises land, water, housing and energy efficiency. Waste is minimised and our natural assets are protected. Development is sustainable and contained. Economic development Shared prosperity The local economy stimulates inclusion and supports affordability. This Plan outlines Council’s undertaking to honour a commitment to reconciliation and specifically: In partnership with industry, review the nature, purpose and governance of Sunshine Coast peak tourism entities to better market the region and its destinations. To work with the Indigenous community to promote reconciliation. Sunshine Coast Reconciliation Action Plan 2011 This strategy aims to ensure the needs and aspirations of young people are incorporated into the functions and services of Council. The strategy has a number of guiding principles: Youth voice and action Access and opportunity for all Speaking up for youth Sunshine Coast Youth Strategy 2010-2015 Nambour Showgrounds Master Plan 2013 - 2023 Page | 10 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS Working together Youth and community consultations SOURCE This Strategy outlines Council’s commitment to older people on the Sunshine Coast and is underpinned by seven ‘positive ageing principles’: Equitable access for all Dignity and respect Diversity Safety Participation and connectedness Opportunities for all to an independent lifestyle Collaborative partnerships Sunshine Coast Positive Ageing Strategy 2011-2016 This Wellbeing Charter identifies Council’s goals and commitments to contributing to the wellbeing of residents. Council’s wellbeing goal is “to be an active and healthy community which is resilient and enhances the quality of people’s life.” Council’s commitment to enhancing quality of life for residents includes: Providing strong leadership and always improving Sharing the responsibility and welcoming new partnerships Creating supportive healthy spaces and places Being innovative, adopting evidence based approaches and being open to positive change Sunshine Coast Wellbeing Charter A core objective of place making is to preserve and enhance the unique character of each place, which reflect the values of the local community. Infrastructure contributes significantly to the character of a place, the design of which requires a context sensitive approach that balances unique design solutions with standardised treatments. Sunshine Coast Place Making Charter to 2030 This report examined the feasibility of constructing an Entertainment, Convention and Exhibition Centre on the Sunshine Coast. It presented a “preferred option” locating the centre within the Maroochydore CBD’s civic cultural precinct. The facility would include: Main auditorium/arena with flexible walls and seating systems that allow the auditorium to offer seating capacity ranges between 1000 and 4500. A flat floor exhibition hall with flexible walls allowing expansions and reductions in room size to a maximum of 3000 square metres. A full commercial catering kitchen (plus satellite kitchens). Meeting rooms (12 to 15 in number) with capacities ranging from 20 to 360 in variable modes. Provision for 706 car parks (noting that there will be significant additional car parking spaces available within easy walking distance of the centre). The facility would be located in close proximity to: A civic plaza, concourse and parkland spaces. Retail and commercial uses including a hotel. Civic, community and cultural uses, which may include a library or learning centre, art gallery, community meeting and performance spaces, Council customer service centre, enterprise incubator, child care, markets, cafes, design centre, recording studio, community garden and recreation areas and playgrounds. Sunshine Coast Entertainment, Convention and Exhibition Centre Feasibility Report, October 2011 This document provides implementation guidelines for the development of the Sunshine Coast Entertainment Convention and Exhibition Centre, in terms of: Confirmation of the project – multi-functional, facility size, interactions, precinct. Site requirements including, location, transport, connectivity, complementary facilities, future expansion, car parking. Delivery timing – considering demand, land acquisition, associated facilities/requirements such as a hotel, airport upgrade, public transport, car Sunshine Coast Entertainment Convention and Exhibition Centre Implementation Strategy, October 2011 Nambour Showgrounds Master Plan 2013 - 2023 Page | 11 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS parking etc. Procurement options. Implementation strategy. SOURCE Major events are classified as follows: Hallmark/signature events o Attract significant visitors from outside the region o Result in substantial economic, media, social and community benefits for the Sunshine Coast o Generally three or more days duration o More than 30% of participants from outside the region. Regionally significant events o Strongly resonate with the image and brand of the Sunshine Coast and generate support from local organisations o May have potential to become hallmark/signature events o Usually recurrent and support economic and community development outcomes o Generally two days or more duration o At least 30% of participants and visitors from outside the region. Regional events o Attract less numbers than regionally significant events o Media exposure is limited to State or South-east Queensland o Generally one to two days duration o Between 15% and 30% participants and visitors from outside the region. The Strategy does not address Community events, which are smaller-scale events, including festivals, primarily delivered for the enjoyment and participation of the Sunshine Coast community, are often run by volunteers and bring limited economic stimulus to the region. The Strategy does not address Business events, which are primarily delivered as an organisation-specific or industry development activity (e.g. conferences, conventions, congresses, trade shows, product launches etc.). The document contains the following key strategies: Retain existing major events and protect them from being lost to the region. Maximise the value of existing major events and enable them to grow. Secure new major events and facilitate/develop opportunities in association with these events. Identify regionally significant major events to transition to hallmark/signature major events. Better plan and facilitate the development of major event infrastructure and services. Provide clear, cost-effective and contemporary development arrangements which inspire confidence. Sunshine Coast Council Major and Regional Events Strategy 2013 Operating revenue and expenditure for the Nambour Showgrounds for the year ending 30 June 2013 was: Total Revenue $142,711 Total Operating Expenditure $783,578 Operating Surplus/Deficit ($640,867) Nambour Showgrounds Budget Profile Major maintenance items listed in Council’s Maintenance Register for the Nambour Showgrounds include: Rotary building and patio – upgrade all 6 counters to stainless steel tops (2012). Caretaker’s House – complete external re-paint (2013). JD Grimes Grandstand – treat rust and paint all steel to roof structure (2013). JD Grimes Grandstand – treat and re-paint all rust affected hand rails or replace Maintenance Register – Nambour Showgrounds (2012-) Nambour Showgrounds Master Plan 2013 - 2023 Page | 12 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS with glass safety walls (2013). Pavilions and buildings are on an 8-year external painting cycle and a 10-year internal painting cycle. Several other minor maintenance items including servicing and replacing air conditioning, washing rooves and external walls, replacing roof screws, replacing carpet, gutter maintenance, electrical maintenance. SOURCE The Venue Use Reports from 2009, 2010 and 2011 indicate that the facilities at the Nambour Showgrounds are used for a variety of purposes by a range of users. These include: The annual Sunshine Coast Agricultural Show. Queensland Garden Expo. Sunshine Coast Antique Car Club Swap meets. A range of trade shows, expos, fairs and activities that attract regional participation. A range of equestrian related events and activities, including private horse trainers. Numerous sporting and community activities. School sporting activities. Informal recreation and other activities including cycling, running and learner driving. Meetings of community clubs and various other organisations. Venue use reports also indicate that some facilities within the Nambour Showgrounds are not functioning at their maximum capacity. Venue Use Reports and Calendar of Events – 2009-2011 This document reviews all previous work and analyses the current status of the Nambour Showgrounds. Its purpose was to guide the development of a future Master Plan. Below is a summary of the document for background purposes only. Where additional information has emerged since the completion of the May 2012 report, this is indicated in brackets. This document indicates the status of proposed Infrastructure and Urban Design projects outlined in the 2007 Showgrounds Master Plan as follows: New main pavilion, offices and entry forecourt – not progressed but still relevant. New undercover Equestrian Arena – may no longer be relevant. (Consultation outcomes indicate that this may still be relevant). Relocatable spectator stands – not progressed but still relevant. Electricity upgrades – has been addressed. All ability access upgrade – not progressed but still relevant. Formal access through adjacent football oval and new Gate 3 – not progressed but still relevant. New ring road between ovals with drainage improvements – may still be relevant. Grandstand catering and dressing rooms – no status noted. (Officers advise that the dressing room component has been addressed). Reconfiguration of internal set up of poultry pavilion – may no longer be relevant. Re-fencing of main oval – has been addressed. Addressing lack of street signage – not progressed but still relevant. Upgrade pedestrian connections – not progressed but may still be relevant. Restoration of vehicle access beside badminton hall – not progressed but may still be relevant. Key points to note from the “Site Overview” provided in this document are: The Showgrounds covers an area of 16.8ha and comprises both State and Council land. The majority of the site lies within Council’s trust with a parcel on the north-east Nambour Showgrounds Situational Analysis Report, May 2012 (Not endorsed, background document only) Nambour Showgrounds Master Plan 2013 - 2023 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS being owned in freehold. There are a number of easements that run over the site. The Planning Scheme designates the site as a special purpose precinct within Planning Area No. 2 (Nambour), which allows for: o Showgrounds. o Other outdoor and indoor recreation. o Schools. Native title is extinguished over the Showgrounds. Use of the Showgrounds includes the annual Sunshine Coast Agricultural Show, Home Queensland Garden Expo and other trade shows, expos and a range of sporting activities and events. The site is also used as a park and ride facility (temporarily). Many of the buildings are ageing and have been developed in an ad hoc manner over the years. The site is serviced with electricity, lighting (of 1 oval), water and sewerage. There are no clear entry signs. There is no dedicated pathway for cyclists and pedestrians to access the site from the CBD. Navigation is difficult within the site. There is a lack of signage and no allowance for pedestrian routes, thus causing safety issues between vehicles, pedestrians and horses. Few dedicated parking areas creating parking issues during events. Visibility within the site is good, but from the road is poor. The document provides a Facilities Snapshot, which is pertinent to the preparation of the Master Plan. Facilities and their associated users are documented in the Site Analysis document. In brief, facilities and their ‘permanent’ users include: Old caretaker’s residence – currently vacant. Main Pavilion (upper level) – darts, swap meet, Queensland Garden Expo, Collectorama, Show Society. Main Pavilion (lower level) – Show Society, Collectorama, Gem Festival, Swap Meet and Queensland Garden Expo. Show Society Office – solely used by Show Society. J.D. Grimes Grandstand – Leased by the Cricket Club. Also used during the Annual Show, Queensland Garden Expo and Swap Meet events. Gavin and Sylvia Marshke Pavilion – cricket headquarters. Rotary Building – exclusively used by Nambour Rotary Club Apex Building – used during main annual events. Tennis Courts – exclusive use by Nambas Tennis Club. Fergus Scott Pavilion – North Coast Active Riders Group, Show Society (lease), Sunshine Coast Showjumping and Equestrian Club (lease). Les Dowdle Pavilion (Poultry) – Used during the agricultural show and poultry show. Badminton Complex – Purchased in 1990 by Badminton Club – used by Sunshine Coast Badminton Association and Nambour Badminton Club. Old Schoolhouse – Sunshine Coast Antique Car Club (lease). Also used by a range of other groups primarily for meetings. Nambour Lapidary Club Pavilion – Built and financed by the Nambour Lapidary Club – exclusive lease. Nicklin House – Used during large events. Upstairs used weekly by Craft Creations. Showgrounds Administration on ground floor. Wallace House – Meeting room for various groups. Catering area during Show and Queensland Garden Expo (used by Rotary). Old Scout Hall – Used as a meeting room by equestrian groups and Driving School. Used during equestrian events. Ovals – primarily used by Nambour Cricket Club. Various other users during large events and some smaller groups. Camping on ovals 2 & 3. SOURCE Page | 13 Nambour Showgrounds Master Plan 2013 - 2023 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS Equestrian Area (inc Moss Day Pavilion) – used by equestrian clubs and private trainers and during large events. Trade Pavilions – Ray Grace & Jim Carolyn Pavilions – open pavilions used for various events and Council parking on weekdays. Tennis Courts – used solely by Nambas Tennis Courts Stables, storage sheds, amenities blocks, bars, ticket boxes, woodchop area, jumps practice area, horse washbays. The document contains a summary of the site’s ‘Natural Systems’, including: Site characteristics Vegetation Drainage, erosion and flooding A detailed overview of the formal and informal users of the site are provided, including tenure details of formal users and an overview of events. Current site operation is summarised in terms of: Management – undertaken by a Council Facilities Coordinator located on site. Nambour Showgrounds Advisory Group represents each organisation that holds a tenure agreement over the reserve and meets quarterly. Maintenance – Council is responsible for ground maintenance. Poor drainage issues cost the Council an additional $30,000 in 2011 in bringing the ovals back to playable cricket standards. Council invests capital into the site and encourages users to contribute via fee levies towards development items. Use and viability – fields and outdoor spaces are heavily used, while some indoor spaces are under-utilised, creating financial inefficiencies. Expenditure and Revenue – approximately $140,000p.a. generated from facility hire, electricity use and the development levy; operational expenditure of approximately $800,000p.a; the capital budget varies, but in recent years has ranged between $260,000 and $490,000 depending on site needs and developments. A range of opportunities and constraints critical to the development of the Master Plan are documented under the following headings: Roads and Access Entry Facilities and Use Safety Environmental Sense of Place Benchmarking of a number of other show facilities on the Sunshine Coast and elsewhere is included. The following Plans are provided: Existing Land Use and Ownership Plan Facilities and Services Plan Existing Entry and Access Plan Existing Natural Systems Plan. This document provides outcomes of a planning Charette conducted with Sunshine Coast Council staff with interest in, and responsibilities for, the planning and delivery of social infrastructure and programs in Nambour. A number of outcomes relevant to the Showgrounds were raised, with the key points being: The Showgrounds could form an important link/hub for cultural and arts facilities. An opportunity for a PPP to provide combined facilities for a skate plaza, indoor/outdoor lap pool, gym and hydrotherapy pool, at either the Showgrounds or Crusher Park. The Showgrounds could be the venue for major SCC wide festival space with better connections back to town centre. A key direction emerging from the Charette is to confirm the role and function of Page | 14 SOURCE Nambour Social Infrastructure Design Charette Report, April 2012 (Not endorsed, background document only) Nambour Showgrounds Master Plan 2013 - 2023 Page | 15 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS the Showgrounds and civic centre. SOURCE The Nambour Alliance “Nambour Town Vision” includes 5 key urban design objectives: A More vibrant showground – a revitalised multipurpose showgrounds precinct featuring community sporting and recreation, tourism, and alternative economic activity connecting to the town square. A place making review of the CBD – including the Nambour Civic Centre and the Town Square – main streets are active through the day and into the night. Connections, parks, links – developing Council’s parks, links, nature walks and passive recreation links to the Showgrounds. Art and entry statements – establishing prominent artistic entry statements and a sense of place (particularly the northern entry). Traffic-image corridors – improving traffic movement, parking, image corridors and road networks (including the Windsor road loop). Common design threads presented by the Nambour Alliance to the 5 components of the vision are: Beauty. Character and context. Fit for purpose and future looking. Legibility and permeability. Adaptable and diverse. The Nambour Alliance believes 3 pillars are needed: Community and stakeholder unity and action. Political support. Internal government officer and champion support. The Nambour Alliance believes: “A multipurpose showgrounds precinct with sustainable walks, paths, things to do connecting to the town centre catering for all forms of traffic will mean a suitable playing surface and connections for unique Nambour places and unique activity main streets with more people, better business, more life.” Nambour Alliance – Nambour Town Vision (2012) (Not endorsed, background document only) The purpose of this Draft Land Management Plan is: Provide clear information to the Department of Natural Resources and Mines (DNRM) on future planned development Assist Council in the management of tenure arrangements over the reserve Identify and address current and future land management issues Guide Council in future development, maintenance and management of the Showgrounds in accordance with the designated use of the reserve by DERM The draft plan is proposed for the period 1 July 2010 to 30 June 2020 The Draft Land Management Plan recommends that: DERM approve a new 10 year lease for the Nambas Tennis Club. Support the concept of the Nambour Showgrounds providing an RV friendly venue to visitors to the area. Draft Land Management Plan Nambour Showgrounds, 2012 This comprehensive strategy provides a future direction for sport and recreation facilities and services across the Sunshine Coast region over a 15 year period. The Strategy has a number of guiding principles: Economic and environment sustainability Infrastructure provision and club sustainability Accessibility and mobility Urban character and amenity Social equity Community involvement and inclusion. One of the key findings pertinent to Nambour was: Sunshine Coast Sport and Active Recreation Plan 2011-2026 Nambour Showgrounds Master Plan 2013 - 2023 Page | 16 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS SOURCE There are growing demands for the use of existing regional sporting facilities such as Quad Park and Nambour Showgrounds for non-sport uses (e.g. markets, exhibitions). The following recommendations from the Strategy are particularly relevant to the preparation of a Master Plan for Nambour Showgrounds: Consider the establishment of a Major Venues Unit for higher level facilities (e.g. Nambour Showgrounds, Maroochydore Multi Sports Complex, Noosa Leisure Centre, Caloundra Indoor Stadium, Quad Park). If demand for use of Nambour Showgrounds for major commercial/cultural events such as motor shows/home shows increases, and there are no alternative plans for indoor/outdoor venues to cater for these activities, consider: o Preparing a master plan for the Nambour Showgrounds to maximise its use for show, commercial and cultural activities o Securing additional land in the Nambour area to re-establish and develop any displaced sports. Consider additional economic investigation and/or research projects on sport and active recreation which further inform Council’s knowledge of the value of commercial events (e.g. home show, motor show) held on major sporting facilities (e.g. Quad Park, Nambour Showgrounds) and provide a tool for ongoing economic benefit assessment for future events. Two specific recommendations were provided in relation to the Nambour locality: o Encourage greater use of the sports field adjacent to Nambour PCYC, possibly for junior AFL, little athletics or cricket. o Liaise with DERM to support efforts to involve stakeholders in upgrading and developing mountain bike trails in Parklands Conservation Park; and identify and develop safe linkages to Parklands State Forest from Nambour. Specific needs identified by clubs during consultation for the Sport and Recreation Plan included: Cricket expressed a need for practice facilities in the medium term. Darts indicated a desire to use the ex-caretaker’s residence as its base and expressed dissatisfaction with the large rent charged. Nambas Tennis Club expressed concerns due to a lack of access to club facilities during showground events, substandard ablution facilities and a need for a fourth tennis court. Sunshine Coast Showjumping and Equestrian Club indicated that sharing causes restrictions on grounds availability. The club priority is to have its own grounds to further develop showjumping, hold more training days and events. The Social Infrastructure Strategy seeks to identify Council’s long-term direction for social infrastructure over which Council has primary responsibility. The strategy provides the framework for the planning and delivery of Council’s social infrastructure. The strategy provides the following future direction in relation to Nambour: Reaffirm and continue to develop and strengthen the concept of the community hub in Nambour. Prepare a precinct plan for a community/cultural precinct to identify function and roles, preferred sites, key linkages and complementary activities. This would include the Nambour Library, Council administration building, and performance and meeting spaces. Upgrade/refurbish local community centres to district level functionality. The following direction is provided in relation to showgrounds generally: Develop suitably designed and built spaces that enable events, exhibitions and displays to meet community needs. Encourage the balancing of compatible and complementary spaces. Ensure showgrounds are well located on transport corridors to encourage public Sunshine Coast Social Infrastructure Strategy 2011 Nambour Showgrounds Master Plan 2013 - 2023 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS transport access. Protect existing showgrounds and continue to monitor needs. This report was not formally adopted by Council. However it contains information which was able to inform the initial direction and development of the Master Plan. It contains the vision statement: “The Showgrounds is the premier regional multipurpose community, sporting, recreational and event facility in the Sunshine Coast hinterland.” Other notable points from the ‘Vision’ include: The Showgrounds is committed to providing cost effective and well managed facilities for community use for a wide variety of recreation and development activities. The venue is sought after for regional events and attractions. The facility is fit-for-purpose and targeted at the value end of the market. The Showgrounds operates under an entrepreneurial business model, balancing community benefit and cost recovery. The document contains four key strategies: Adopt a new entrepreneurial business model, directed by a community-based Board and advised by Showgrounds Users Advisory Group. Removal of the old pavilion, and building a multipurpose exhibition and function venue, including offices and meeting rooms. Redevelop the equestrian areas to create a regional equestrian facility. Increase utilisation of underused Showgrounds buildings by community groups. A Business Plan is provided, which includes: Establishment of a Board of Management to take on an advisory role in the management of the Showgrounds. Appointment of a Showgrounds Venue Manager to champion the development of the Showgrounds. Review of current lease arrangements and introduction of new agreements that address: o Security of tenure (use categories include Lease, Permit to Use and Hiring Agreement). The document contains Recommended Tenures for existing users o Infrastructure and maintenance responsibilities o Community/Economic Development Development of an umbrella organisation including all 5 equestrian groups. Guidelines to manage user conflicts for common areas. Potential funding sources. A marketing strategy. An Infrastructure and Urban Design Plan is provided that aims to make better use of existing infrastructure with basic functional improvements and maintenance; ensure safety of users; and ensure the Showgrounds remain fit for purpose. Three ‘hero’ projects are proposed: 1. Construction of a new main Pavilion, offices and entry area. 2. Reconfiguration of the equestrian area to provide a new covered multi-purpose arena, including spectator seating, catering and equestrian administration facilities. 3. Relocatable spectator stands. Common area infrastructure proposed improvements included: Electricity upgrade – including lighting and PA system. All ability access including new disabled toilets at north western area. Formal access and gates through adjacent football oval. New ring road between main and second/third oval (including drainage improvements). Page | 17 SOURCE Showgrounds Master Plan, Maroochy Showgrounds, Nambour 2007 Onwards (Not endorsed, background document only) Nambour Showgrounds Master Plan 2013 - 2023 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS SOURCE Basic improvements to grandstand, catering and dressing rooms. Reconfigure internal set up of poultry pavilion so that it is more multipurpose. Re-fence main oval. Install street signage. Upgrade pedestrian connections. Upgrade main oval drainage. Restore vehicle access along western boundary of Badminton Hall. Some infrastructure preferences for specific user groups are listed: Additional cricket practice nets. Expand cricket clubhouse. Allowing sheds for Sunshine Coast Antique Car Club (either access to existing or development of new sheds). Installation of an additional tennis court. Minor extension to the Lapidary Club. Infrastructure design and maintenance criteria are provided. New infrastructure (other than ‘hero’ projects) shall not occupy flat open land. Planting on flat open land should not include shrubs and groundcovers but clear stemmed street trees only. Flooding constraints are carefully evaluated as a large portion of the site is subject to flooding. Ensure all ability access to any new building infrastructure. New infrastructure to be designed for energy efficiency and integrated water management. New buildings, alteration and landscaping require review and endorsement by the board. Lessees are responsible for the maintenance and any extensions to their exclusive-use buildings. Also included in the Infrastructure and Urban Design Plan are: Land tenure recommendations: o To create freehold tenure at the eastern entrance of the site over the area of the proposed new Pavilion to allow ongoing profit making activities including offices for tenants, function rooms and meeting rooms; and o Resolve appropriate tenure for the new equestrian arena. Criteria for content of traffic management plans for major events including: o Visitor access and parking. o Managing safety conflict and site access for pedestrian spectators and vehicles and livestock. o Allowing site access for other site users. An Environmental Management Plan including: o A detailed energy efficiency audit. o A detailed integrated water management plan including reduction in consumption; stormwater capture, treatment and re-use; and nutrient pollutants from equestrian areas. o Site erosion and sediment control to stabilize existing exposed areas through planting and install sediment fences and/or vegetated sediment entrapment. o Remove bushland weeds. o Support environmental groups to rehabilitate Petrie Creek. A Landscape Master Plan, including detail on: o Landmark trees. o Embankment planting. o Site entries. o Site visibility. Page | 18 Nambour Showgrounds Master Plan 2013 - 2023 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS o Bushland weeds. o Petrie Creek rehabilitation. o Pedestrian connection along Petrie Creek. o Redundant signs. The Master Plan expressed that due to the additional demands of population growth the facilities at Nambour Showgrounds will be beyond capacity and shared use will be difficult in the longer term. Accordingly it recommends that long term planning for sport and recreation facilities for the Sunshine Coast hinterland to accommodate sports and recreational growth. A Five Year Financial Strategy and Implementation Schedule was provided. This document includes the following common themes relevant to the current Master Plan: The Showgrounds are heavily used by community groups and individuals undertaking passive recreation. Events attract many people from outside Nambour. Frustration with short leases – not comfortable committing funds to facility improvements and maintenance. Confusion over maintenance responsibilities. User view that Council management should include improved general maintenance (e.g. toilets, gardens, roads, grounds). Various individual user groups needs are summarised. These are outlined in a separate document. Pertinent key findings listed in this document include: Q100 inundation is a major constraint. There is a significant opportunity for a land tenure exchange to allow broader use options at the main entry to the site. Any urban design should not diminish the site’s robustness and flexibility. Some simple design approaches to improve site legibility and visual appeal would significantly improve visitor experience and comfort levels. Desires of smaller groups for new/expanded infrastructure need to be considered against overall desire to keep the site flexible for major events. Page | 19 SOURCE Maroochy Showgrounds Master Plan 2007. Report on Consultation Findings (Not endorsed, background document only) Maroochy Showgrounds Master Plan 2007. Report on Findings: Infrastructure (Not endorsed, background document only) Nambour Showgrounds Master Plan 2013 - 2023 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS This document summarises submissions received from user groups and the public on the draft Master Plan. Key themes raised in the feedback were: Varying views on the name change of the venue. Perceived lack of consultation with user groups (other than equestrian groups). Some support for the combined management approach and better management of the Showgrounds. Reluctance by some groups to change ‘current’ management arrangements Need to clarify lease terms, lease areas, lease responsibilities, hire etc. (i.e. a consistent model for all users). A number of concerns re tenure terms and lease areas were raised. Need for better clarification of maintenance and upkeep responsibilities. (comments re inconsistencies of responsibilities in the past). Support for the Board of Management and Project Officer for Equestrian but concern that some groups could monopolise, hence a need for equal, unbiased representation. Concerns re event clashes, particularly during cricket season. A number of comments relating to the proposed infrastructure and design were received with many relating to: o The main pavilion; o The poultry pavilion; o Parking and traffic management; o The equestrian area (particularly the lease area, roof and maintenance); o The need for additional seating; o Beautification and landscaping; and o Water (i.e. tanks) Maroochy Plan was adopted by the former Maroochy Shire Council in the year 2000. It outlines the assessment levels and requirements for undertaking development in the former Maroochy Shire. Desired Environmental Outcomes relate to seven areas: Environmental Management Social Equity and Liveability Economic Sustainability Transport and Accessibility Community and Cultural Development Urban Design, Heritage and Character Development Infrastructure The Plan identifies the Nambour Showgrounds precinct as “special purpose”. Specific points to note include: Any new development will be assessed having particular regard to potential adverse impacts on the quality of water entering or likely to enter Petrie Creek and measures to avoid or minimise such impacts. Particular consideration will be given to flooding and the maintenance of the hydraulic and environmental capacity of the creek and its environmental values. Preferred uses for the precinct are: o Showgrounds. o Other outdoor and indoor recreation. o Schools. Other uses may be considered consistent with the intent and desired character of the Precinct. New development should achieve high standards of siting, design and landscaping especially along Coronation Avenue and the Nambour-Bli Bli Road. Stormwater drainage needs to be well managed, both for construction works Page | 20 SOURCE Maroochy Showgrounds Master Plan 2007. Summary of Submissions (Not endorsed, background document only) Maroochy Plan 2000 Nambour Showgrounds Master Plan 2013 - 2023 Page | 21 ISSUE/ STRATEGY RELEVANT TO NAMBOUR SHOWGROUNDS and on-going use of the land, to prevent sedimentation and other pollutants from entering Petrie Creek. A well vegetated open space corridor along the creek is desired to assist in stormwater management and enhance visual amenity of the locality. The plan contains the following open space and recreation planning elements to address key open space planning issues: Distinguishing the two layers of the open space system in the Shire Identifying a coherent and inter connected physical system of open space which serves a number of broad functions. The classification of open space areas as regional, district or local. Notwithstanding the general distinction between the levels of significance of the different types of open space, adoption of criteria for allocating local, district and regional open space classifications Applying three key principles relating to equity of opportunity, access and diversity to guide the distribution, level of provision and quality of open space to meet community needs and expectations at a settlement or micro level. The implementation of an equitable and effective system for funding, designing, developing and managing open space, having regard to a range of guiding principles. SOURCE This report provides a framework for the revitalisation of Petrie Creek as a major recreational open space corridor linking Nambour’s open space parkland to adjacent residential areas, community facilities and town centre. It also provides a framework for detail design and construction of future stages. The Nambour Showgrounds are one of the major features adjacent to the corridor. Key features of the Master Plan include: Pedestrian/cycle network – path upgrades and strategic linkages: o Doolan Street to Model Railway Park. o Howard Street to New Council Park. o Sundale Park to Model Railway Park. o Webster Road to Jubilee Park. Model Railway Park – BBQ and picnic shelters, formalize parking area. Petrie Park Parking and Picnic Area – upgrade picnic areas and formalise car parking. New Council Park. Skate Facility upgrade/relocation and associated landscape works. Industrial art sculptures using mill artefacts potentially in Apex Park, Model Railway Park and at the skate facility. Petrie Park exercise Circuit – installation of exercise stations and pathway construction. Upgrades and new infrastructure at Quota Park, including toilets, entrance statements, extension of amphitheatre seating, path and footbridge constructions. Decommissioning and removal of Apex Park playground. Nambour Central Park Petrie Creek, Nambour – Open Space Master Plan, Draft Report – January 2012 Nambour Showgrounds Master Plan 2013 - 2023 5. C ONSULTATION 5.1. U SER G ROUPS AND S TAKEHOLDERS Page | 22 Individual and/ or group meetings were held with existing Nambour Showgrounds user groups (refer section Error! Reference source not found.), Councillors, Council officers, representatives of nearby facilities (e.g. schools, bowls club, croquet club, Crushers rugby league), and other stakeholders including event promoters/ organisers and Nambour Alliance. These meetings generally discussed: Future vision for the Showgrounds Activities that should be continued or stop happening Activities that would improve usage/viability Traffic/parking issues User group demands Future management arrangements Prior to meetings being held with user groups, a regular meeting of the Nambour Showgrounds Advisory Group was attended to introduce the project and the study team. In order to acknowledge issues/needs previously identified by user groups as part of the preparation of the 2011 Sport and Active Recreation Plan and/or the 2007 Nambour Showgrounds Master Plan, a summary of earlier feedback provided by clubs/users was prepared and used as a starting point for discussion. Many issues raised related directly to the user groups specific activity; others related to the Showgrounds as a whole; while some were of a more day-to-day management nature best dealt with by on-site management. An abbreviated summary of key themes and issues to emerge is outlined below. EVENT ORGANISERS Need for additional parking Turnstiles and main entry are in urgent need of redesign including additional congregating space outside main gate Road verge drains needed upgrading throughout, especially in high use areas on Exhibition Street and Cattleman’s Drive Drainage across ovals and at other key points needs upgrading The road from Crusher Park is used as an exhibitor entry by trucks and large vehicles. It is single lane only with unstable verges. Needs to be widened, sealed and lit Neighbouring school, bowls club, croquet club and churches are used for car parking during large events Main Pavilion is not functional for events. It has poor accessibility and is set up for specific uses. Needs to be replaced with a larger building including provision for exhibition space, storage, office space for event management and secure money handling area Most other buildings are constrained by poor access or single purpose use by on-site user groups. Caretaker’s House is rarely used There is less and less usable space for events/displays as more users are placed at the Showgrounds. There is some opportunity to create additional usable areas by terracing on sloped areas Improve external visibility to Showgrounds and external and internal signage Nambour Showgrounds Master Plan 2013 - 2023 Page | 23 Single purpose use of buildings Events utilise temporary fencing. Provide permanent sleeving for temporary fences in critical movement areas Improve internal road connectivity Grounds are available for events outside cricket season only (from discussion with Council officers some events have been turned away). USER GROUPS Incompatibilities exist between use of ovals for events and cricket. At present events are restricted to outside cricket season and ovals are restored after events. Parking on ovals in wet conditions in the past has caused rehabilitation issues for council grounds maintenance and cricket Unavailability of grounds during cricket season restricts staging of equestrian activities/events Events impact on user groups due to them having to vacate buildings during events or being unable to access their areas There is a common view that there needs to be a clear vision for the Showgrounds and that future development reflects that vision Some user groups perceive inconsistencies in tenure arrangements and greater consistency and management of usage conditions is required General issues raised by user groups included: o Difficult to quarantine access for event users and regular user groups o Seal access road from Crushers Park o More shade o Upgrade signage o More dedicated parking areas o Improve access and visibility off Bli Bli Road o Pick up and set down area at either main entry or Bli Bli Road entry o Bus turnaround area o Better notice of events requiring buildings to be vacated o Better use of underutilised facilities Improvements to equestrian arenas would provide enhanced opportunities for equestrian events and would also benefit the Show Society events. Key improvements sought include: o Seating on the eastern side of covered equestrian arena o Enclosing the southern end of the covered arena to prevent rain compacting the arena surface and causing a safety issue. Need to retain two entry gates for rodeo purposes o Judges box Cricket wants to ensure grounds are retained for cricket, future uses are compatible with cricket, fields are restored to pre-existing conditions after events, and not used for parking if wet. Key improvements sought by cricket are: o Removal of trotting track o Disability access to grandstand o Extend clubhouse o Upgrade lights on main arena for 20/20 cricket Nambour Showgrounds Master Plan 2013 - 2023 5.2. Page | 24 Other specific improvements sought by user groups include: o Extend existing Sunshine Coast Antique Car Club storage space o Maintenance issues at tennis clubhouse o Kitchen upgrades (stainless steel benches) in service club buildings which are used as catering outlets for events o More permanent picnic tables/shelters and undercover seating, especially for events in proximity to catering buildings o Disability access to Main Pavilion o Small expansion of community garden area to west. C OMMUNITY C ONSULTATION Simultaneously, early in the study, Sunshine Coast Council used an appreciative enquiry approach to gain a perspective about what the community values about Nambour Showgrounds. Residents were asked the following questions: 1. Which uses happening at the Nambour Showgrounds do you most value? 2. Which current uses at the Nambour Showgrounds could be discontinued or limited? 3. Which new uses could the Nambour Showgrounds support in the future? The consultation was undertaken over a 30 day period in January and February 2013 and was promoted by way of media releases, launch of a Council webpage, radio appearance by the Divisional Councillor, promotion via the Nambour Alliance, and a letter box drop of approximately 220 surrounding residences and businesses. The community was able to provide input via an on-line discussion forum on Council’s ‘Have Your Say’ website, email, or by contacting the Council by phone. Thirty-five (35) responses were received. The Showground uses which respondents most valued were: The role of the Nambour Showgrounds as a sporting hub for the surrounding community Continued presence of the Nambour Cricket Club Major events being held at the Showgrounds Only four respondents provided comment about uses that should be discontinued or limited. These related to limiting activities that compromise the quality of the fields or activities that interfere with the use of present long term tenants. The most prominent suggestions for new uses at the Nambour Showgrounds were: Well-equipped RV-friendly site Accommodation of soccer activities An indoor, multi-purpose facility Other issues raised for consideration in the planning process included: Financial investment made by cricket and other user groups towards the Showgrounds Some infrastructure not up to standard (e.g. poor accessibility of Main Pavilion, front entry ticket sales area, and main grandstand) Accessibility into and throughout the site and parking issues Nambour Showgrounds Master Plan 2013 - 2023 5.3. Page | 25 O THER S TAKEHOLDERS A general observation was made that the Showgrounds infrastructure appeared tired and could better contribute to the revitalisation of Nambour and create greater economic activity. The Nambour Alliance submitted a concept plan for the redevelopment of the Showgrounds and a subsequent meeting was held with them. The essence of their development suggestions is as follows: Year round sporting use of the outdoor areas and integration with neighbouring Crushers Rugby League fields to attract national/international carnivals Upgrading of ‘outdated’ grandstand and provision of corporate seating and facilities to attract large professional and amateur sporting events (including National Rugby League and Australian Rugby Union games) Event facility with air-conditioned exhibition halls, kitchen, central grandstand and observation deck catering for conferences, exhibitions, trade shows, product demonstrations, dinners, corporate events etc. The building would be situated on the eastern side of the main arena in the area presently comprising stables, scout hall, Nicklin and Wallace Houses and the warm up arena. Vegetated buffering Resumptions for car parking Road linkage to Bowls Club, and multi-modal link over Petrie Creek to Quota Park and Town Centre. Nambour Showgrounds Master Plan 2013 - 2023 6. S TRATEGIC D IRECTION 6.1. P RELIMINARY O PTIONS Page | 26 The central challenge in establishing a future direction for Nambour Showgrounds lies in determining the emphasis placed on seeking economic activity from events, versus social benefits from community sport. As demonstrated at section 3 of this report, the Showgrounds generate substantial social and economic benefits. There are compelling arguments for emphasising outdoor events and retaining community sport. Taking into account the findings of the background research and consultation, three alternative preliminary design options were developed, each providing a different long term focus for the Showgrounds. Each option was underpinned by a “Base Strategy” which retained existing users and featured enhancements that were common to all design options. Key elements of the “Base Strategy” comprised: Retention of community, sporting and event uses in a manner that improved the overall functionality of the site Improved site access, internal movement and parking Improved connectivity to Crusher Park and CBD Demolition of the existing Main Pavilion and conversion to green plaza space New multi-use facility developed for a range of events, functions and meetings Improvements to equestrian areas Additional outdoor display space through the creation of terraced areas that could double as RV sites outside event times. Nambour Showgrounds Master Plan 2013 - 2023 Page | 27 The three alternative design options were as follows: 1. Option A: Base Strategy + Focus on Events (Cricket Relocated) This design approach enabled the site to cater for expanded event opportunities in summer months and required cricket to be relocated to an alternative location. Flexible and level spaces would become a priority for open space making the site more desirable for more regional events as well as expanding events currently held on the site. Spaces could be used as passive recreational areas, open green spaces, display stall spaces and various other event-themed activities. The base strategy still underpinned the general spatial arrangement, key node points and circulation of the site. 2. Option B: Base Strategy + Retention of Cricket This design approach enabled the retention of cricket within the site and continued shared use of all three ovals for cricket and events. It emphasised a combination of community sport and events but in a manner that improves their functionality. The cricket clubhouse would be expanded and upgraded, and field lighting for cricket activities installed (if demand warrants). As per the current situation, events would generally be restricted to outside the cricket season. A continuation of the practice of restoring the condition of ovals to a ‘fit for play’ standard after events would occur. The enhanced functionality from other improvements in the “Base Strategy” were still delivered. Nambour Showgrounds Master Plan 2013 - 2023 Page | 28 3. Option C: Base Strategy + Reduced Cricket The combined strategy enabled the retention of the Main Arena (ovals 1 and 2) for shared use by cricket and other events. The existing oval 3 would no longer be available for cricket and would incorporate a turf cell to enable its use for informal parking, event space, temporary yards for equestrian activities or other multi-use activities. This design approach retained two fields for cricket and enabled greater flexibility for event uses. As per the current situation, events would generally be restricted to outside the cricket season with the exception of major events which require the grounds as a whole. A continuation of the practice of restoring the condition of ovals to a ‘fit for play’ standard after events would occur. The enhanced functionality from other improvements in the “Base Strategy” were still delivered. Nambour Showgrounds Master Plan 2013 - 2023 Page | 29 The “Base Strategy” and three alternative preliminary design options were presented and discussed at a workshop of all user groups and major event organisers on 4 April 2013. A snapshot of study findings was also presented at this workshop. The workshop was facilitated by Strategic Leisure and Urbis staff. In addition to reactions and comments provided on the evening of the workshop, participants were asked to share the alternative design options with their organisation colleagues and provide further feedback on the Base Strategy and three design options. A feedback form was designed for this purpose. Over a three week period, many groups submitted responses and, predictably, comments favouring or opposing different options varied from group to group. In relation to the “Base Strategy” design (i.e. improvements common to all options) the following general points were raised: Event organisers o Supported the new main pavilion, upgrading of the main entrance, access/parking improvements, provision of event office space, and terraced spaces for use by RV’s and events; But…. o Emphasised the importance of central administration building being located near the main entrance and the need to design the new Multi-Use Events Centre in conjunction with event organisers; stressed the importance of ensuring terraced spaces were well drained and easily accessible to make them useable for events; and pointed out the need to upgrade fencing along Coronation Avenue to ensure secure access if bamboo is removed User groups o Supported upgraded main entry, improved aesthetics, shade, internal movement, equestrian area improvements and upgrade of access road to Crushers Park Drive; But…. o Were opposed to the demolition of buildings and their activities being relocated; and had concerns about original proposals to locate parking along Cattleman’s Road, and the proposed relocation of the equestrian warm-up arena The positive and negative aspects of the three alternative preliminary design options, incorporating feedback from stakeholder groups, are summarised at Table 2. Nambour Showgrounds Master Plan 2013 - 2023 Page | 30 Table 2: High level assessment of alternative preliminary design alternatives Pros Cons Option A: Base Strategy + Focus on Events (cricket relocated) Enables additional events which can contribute to the revitalisation of Nambour and the regional economy to be secured or created. Removes user conflicts and access constraints by opening up grounds to other uses between October and March Enables existing events to make more efficient and cost effective use of space (e.g. protection of turf wickets not required, removes cost of reinstating ovals to fit-for-play standard for cricket) Provides parking, display, camping space for additional events in summer months Consistent with Draft Sunshine Coast Major Events Strategy which seeks to retain existing major events and protect them from being lost to the region; maximise the value of existing major events and enable them to grow; and secure new major events More consistent with Nambour Alliance - Nambour Town Centre vision to create a revitalised multipurpose Showgrounds precinct than other options Events option is favoured by major event organisers who advise that tourism body is also supportive Preferred option by most equestrian groups and enables more and larger equestrian events Cricket clubhouse and Caretaker’s House are able to accommodate any community groups displaced from Main Pavilion or other buildings Opposed by cricket club Loss of social benefit of catering for local sporting club needs Loss of historic cricket connection to the venue (80 years) High cost of relocating cricket to a facility of similar standard Loss of economic benefit from junior cricket carnivals held annually at the Showgrounds. Potential loss of another sporting group from Nambour (Wildcats soccer relocated to Mudjimba) If not relocated to a facility within Nambour proximity the club may lose its identity with Nambour Cricket club has contributed to infrastructure shared by other users (e.g. grandstand, main oval lights, clubhouse, oval 2 upgrade) Cricket’s presence as a regular user may reduce vandalism Additional events could cause disruption to some regular users. Option B: Base Strategy + Cricket Retained ( continued use of all three ovals by cricket) Retains historic cricket connection to the venue (80 years) and the community Avoids cost of relocating cricket to a suitable venue Grounds continue to be used on a regular basis Retains social benefit of community sporting use Retains economic benefit from annual junior cricket carnivals Existing user groups (other than Show Society and most equestrian groups) support retention of cricket Does not maximise potential economic benefit from securing or creating additional outdoor events Most equestrian groups and Show Society see no advantage to this option. Not favoured by event organisers Equestrian and other events remain restricted due to limited access to main arena Does not resolve ongoing constraints of event access to ovals, protecting turf pitches, and cost of reinstating fields after events Option C: Base Strategy + Reduced Cricket (Oval 3 not available for cricket) Provides additional parking area for events Enables use of oval 3 for temporary yards, truck parking and camping. Requires establishment of an additional cricket field elsewhere Loss of a field would put the annual junior cricket carnival in jeopardy with consequent loss of economic benefit to the town Loss of field limits future expansion of cricket and separated fields may discourage participation Reduced viability of cricket canteen and ability to contribute to ground improvements Duplication of cricket equipment and less economical maintenance Nambour Showgrounds Master Plan 2013 - 2023 Page | 31 Seen as a compromised position and not favoured by equestrian groups, cricket or event organisers. 6.2. P REFERRED D IRECTION After consideration and discussion of stakeholder feedback and further analysis of options, a preferred strategic direction which broadly favoured a focus on events was determined. More detailed concept plans describing the vision, strategic guidelines and principles, and key initiatives were then prepared together with a draft report. 6.3. F EEDBACK ON D RAFT M ASTER P LAN Council sought broader community feedback on the draft Master Plan during a public review period which was conducted from Saturday 3rd August to Friday 30th August 2013. A number of consultation methods were utilised including: Display of copies of the draft Master Plan on Council’s website and at other Council venues A “Meet us at the Showgrounds” public display of the draft Master Plan, held on Saturday 3 rd August 2013 and staffed by Council officers Provision of a single page feedback form (online and hard copy format) to assist the collection of feedback Accompanying media release, local newspaper advert (Spotlight articles), and appearances in the local Councillor’s column Utilisation of Council’s Community Engagement Register (comprises approx. 700 registered users) to request input from the Sunshine Coast community. Invitation of further input from user groups. Submissions and/ or feedback forms on the draft master plan were received from user groups, caravan industry body and caravan park operators, event promoters, other stakeholder groups, and community members. A number of issues and concerns were raised. It is worth noting that elements of the draft master plan that were supported in some submissions were opposed in others. A brief summary of key issues raised is outlined at Table 3 below. Table 3: Summary of key issues raised in submissions on Draft Master Plan KEY ISSUE RAISED COMMENT Disability Access Need for designated disability access and parking during events Difficulty of movement for wheelchairs within venue Need for seating for people with disabilities The final Master Plan includes a new Guiding Principle to ensure that movement within the Showgrounds and new/ upgraded facilities enable disability access. Council will work with event organisers to ensure PWD parking and access is considered during events. Removal of Main Pavilion/ New Multi-Use Event Centre Opposition to demolition of Main Pavilion due to current use and/ or querying availability of new building for existing activities The new Multi-Use Events Centre will cater for any events utilising the existing Main Pavilion. Regular users should be accommodated elsewhere on site. New building and entry should be in keeping with heritage theme Acknowledgement of site’s history and heritage in building design has been added as a new Guiding Principle Query regarding relocation of Show Society to new The Master Plan notes that relocation of the Show Nambour Showgrounds Master Plan 2013 - 2023 Page | 32 KEY ISSUE RAISED COMMENT Multi-Purpose Events Centre Society to the new Multi-Use Events Centre should be considered and its existing building converted to additional green space. Consider amphitheatre in proposed Green Square It is considered that the Green Square area is not large enough or have the slope needed to develop an amphitheatre. Cricket Relocation A number of submissions opposed the relocation of cricket due to: o Tradition/ history of cricket’s association with the venue o Financial contribution to the venue and infrastructure improvements by cricket o Concerns regarding the lack of suitable alternative site options o Lack of vision for alternative uses or events that would be accommodated when cricket is relocated o The need for the venue to remain as a hub for sporting and recreation activities o Council responsibility to provide sporting facilities o Cost to ratepayers for unnecessary relocation of cricket o Funding needs to be identified Some submissions proposed that equestrian activities be removed rather than cricket and/ or that the equestrian area and Crusher Park be used for major events Some submissions supported the relocation of cricket as a high priority Cricket’s long term use of, and contribution to, the Showgrounds is acknowledged and its desire to remain at the venue is acknowledged. The rationale for the relocation of cricket is to enable more year round use for a range of events and contribute to the revitalisation of Nambour. The Master Plan notes that the relocation of cricket should ensure that cricket remains a key sport within the locality and that infrastructure for the sport is made available. The relocation of cricket is subject to a suitable location in the Nambour proximity being found and funding being available. Relocation of equestrian activities was not considered in any of the preliminary options and equestrian activities have a connection with the Sunshine Coast Agricultural Show. Future management should seek to attract to Nambour Showgrounds existing events and create or attract new events that have potential local and regional economic benefits. Use of Site for Recreational Vehicles (RV’s) The industry body (Caravan Parks Association of Queensland) and a number of private caravan parks are vigorously opposed to the use of the venue for RV’s. The principal objections are: o The venue will unfairly compete with commercial operators who have outlaid their own funds to comply with regulations and maintain facilities. o Provision for RV’s would have an adverse effect on commercial operators, and is inconsistent with competitive neutrality policies o There are adequate private sites for the travelling public in existing commercial caravan parks o Private caravan parks are required to comply with stringent legislative provisions and Local Laws which is a costly and extensive exercise o Provision for RV’s would not comply with state Dept of Natural Resources and Mine policies under the Land Act (ie Secondary Use of Trust Land and Caravan Park Policy) o Free or cheap services offered by Council or other entities makes it extremely difficult for small businesses to compete The Draft Land Management Plan for the Showgrounds proposes that RV use would be restricted to RV association members, limited to a maximum of two nights (although potentially extended to seven nights on the proviso that there is no adverse impact on local licensed caravan and/or tourist park operators) and exclude on-site kiosk, laundry and associated facilities. It proposes an initial trial period and evaluation. Clearly there is substantial opposition to RV use of the Showgrounds by the caravan park industry. Resolution of RV use requires further consultation with the industry as part of the development by Council of a broader policy on RV use generally. The revised Master Plan emphasises that any future RV use of the Showgrounds is subject to the adoption by Council of a policy on RV use generally and DNRM approval of the final Land Management Plan. Nambour Showgrounds Master Plan 2013 - 2023 KEY ISSUE RAISED Page | 33 COMMENT o Council would need to comply with statutory provisions regarding WH&S, health & safety, onsite management, risk assessments, emergency procedures, environmental issues o Free camping RV market is not a high contributor to the local economy Linkages to CBD and Elsewhere Suggested priority linkages to areas outside the Showgrounds (eg CBD, Petrie Creek, Pool, tramway corridor) Detailed planning of linkages from the Showgrounds to other areas (including negotiations with Nambour State School to access their land to enable pedestrian access to the CBD via Quota Park) is beyond the scope of the study and requires further work. Potential linkages have however been identified. Culture and Heritage Lack of cultural and heritage focus, including native title claimants Native Title is deemed to have been extinguished at the Showgrounds and no items of cultural heritage significance have been identified, and no buildings within the Showgrounds are heritage listed. However an additional Guiding principle “Acknowledgement of Heritage,” has been included in the revised Master Plan which aims to be respectful of the history and heritage of the site in implementing Master Plan elements. Existing buildings named after significant people needs to be addressed in future redevelopment Under an additional Guiding principle “Acknowledgement of Heritage” the revised Master Plan proposes that historic contributions be acknowledged by rededicating buildings and/ or erecting plaques. Traffic and Parking Provision for on-site parking is seen as an important priority by event promoters. Others were not supportive of on-site parking due to the availability of off-site parking and associated fund raising opportunities. The Master Plan makes provision for some additional parking spaces on site. Allow bus traffic to traverse the Showgrounds as part of public transport corridor/ routes This is an opportunity to be investigated in the future, and this is addressed within the Access and Circulation guiding principle. Access for public transport needs to be provided externally as well as internally for events that use all internal space Drop off zones for public transport have been included in the master plan. Ongoing Management Concern regarding user groups expanding and sectioning off facilities during events This matter is acknowledged and will be addressed as the need arises at the operational level. Disagreement with recommendations regarding no long term leases A suggested management model is outlined in the Master Plan at section 8.1. Leasehold tenure to user groups is not recommended in order to maximise Council’s ability to be flexible to emerging needs. Show Society management rights and involvement in management of grounds Levelling and modifications to areas should not be to the detriment of existing users or create a financial burden for them (ie need to retain infrastructure set aside for periodic use for their event without financial burden eg wood chop). Funding Priorities This matter is acknowledged and will be addressed as the need arises at the operational level. Nambour Showgrounds Master Plan 2013 - 2023 Page | 34 KEY ISSUE RAISED COMMENT A number of different items were described as a high priority for funding in some submissions Ensure Council support and funding is commensurate with the venue’s regional importance One submission felt that the plan is “deliberately narrow” A suggested Action Plan is outlined at section 9. Implementation of many elements of the Master Plan is dependent on the timing and availability of funding for, and a suitable location in the Nambour proximity for, the relocation of cricket. It is assumed that this would be a medium to long term proposition. In reality implementation of some elements may be opportunistic and potentially brought forward; in other cases the availability of funding or unforseen constraints may prevent or delay implementation. Other Suggestion to sell the Showgrounds to fund the development of a larger facility out of town to cater for one regional Show The majority of the Nambour Showgrounds is owned by the State with a Deed of Grant in Trust to the former Maroochy Shire Council. This situation makes this option not practical. Amendments to the Draft Master Plan in response to community and stakeholder were discussed and agreed prior to the development of the final revised Master Plan (refer section 7). Nambour Showgrounds Master Plan 2013 - 2023 7. M ASTER P LAN 7.1. O VERVIEW Page | 35 The final Master Plan outlined in this section is illustrated visually in the concept plans attached at Appendix 2. The Master Plan should be implemented in association with management recommendations at section 9. Key elements of the Master Plan are as follows: 7.2. 1. Vision Statement – outlines the long-term outcomes sought for the Showgrounds. 2. Strategic Guidelines and Principles – have been derived from the research, stakeholder consultation and best practice design principles. 3. Key Master Plan Initiatives – are the priority areas to be considered for investment over the next 10 years (and beyond), particularly related to building and infrastructure improvements, transport and access, and increasing the functionality of the Showgrounds for events. 4. Major Projects and Priority Areas – are the most significant opportunities for investment that will enhance the functionality of the Showgrounds for events and activities in the long-term and include improving the main entry, adding a new ‘green square’, construction of a new multi-use events building, and reuse of the areas currently used for cricket (subject to the relocation of the cricket facilities) for events and exhibition space. V ISION S TATEMENT While acknowledging the important social benefit of the Showgrounds, a higher weighting was attached to the potential generation of greater event usage and associated economic benefit. Both Sunshine Coast Council and other agencies have identified the importance of revitalising Nambour. Events can play an important part in this process. The importance of retaining the Queensland Garden Expo and assisting this event to grow is an important consideration due to the substantial contribution this event makes to the local and regional economy (refer section 3.1). The Showgrounds has the capacity to generate additional events with potential local and regional economic benefits. Some events have not been accommodated in the past due to unavailability of grounds (e.g. caravan rallies, equestrian events, circuses and motorsport). The following vision statement underpins the Master Plan for Nambour Showgrounds. The Nambour Showgrounds will be revitalised to enhance its economic development potential and value as a community hub within the Nambour and greater Sunshine Coast community. The facility is seen as a significant asset to the community, which contributes to the sustainability of the region – economic, environmental and social. It is a great place to visit, recreate and celebrate the local community and contributes to the vibrancy of Nambour. The residents of Nambour are proud of the facility, due to the activities it accommodates and its contribution to the local sense of place. The Nambour Showgrounds will continue to accommodate major community events such as the Queensland Garden Expo and Sunshine Coast Agricultural Show. Opportunities to secure or create new events which contribute to the revitalisation of Nambour will be sought. This will be balanced against the important day to day function of the venue as a destination for a range of community and recreational uses. The functionality of the Nambour Showgrounds is increased through improvements, renewal, expansion or replacement of existing features such as roads, infrastructure, buildings and facilities. Nambour Showgrounds Master Plan 2013 - 2023 Page | 36 Central to the achievement of the vision is the need to relocate cricket when a suitable location in the Nambour proximity can be sourced. This facility should provide the club with access to playing fields, clubhouse and practice facilities of similar standard. While the Master Plan is generally intended to have a 10 year horizon, the realities of the current funding environment and the challenge of finding an acceptable solution for the relocation of cricket may mean that full implementation of the vision exceeds this time frame. Moreover, some elements of the Master Plan are triggered by longer term asset management considerations. Events which take advantage of the outdoor display areas and existing and proposed infrastructure of the Showgrounds would be sought. It will be important for venue management to proactively seek to secure, or create new, events. This would require partnering with other agencies such as Sunshine Coast Destination Ltd and requires consideration in the future management arrangements (refer section 9). 7.3. G UIDING P RINCIPLES The following guidelines and principles have been derived from the observations during site visits and investigations, analysis of the site conditions, stakeholder consultation undertaken throughout this project, and research undertaken in the preparation of the Master Plan. These principles are reflected in the Master Plan elements and initiatives identified. ALIGNMENT WITH ENDORSED COUNCIL POLICIES + STRATEGIES The Master Plan will reflect and align with current Sunshine Coast Council policies, plans and strategies that are relevant to the design and activities at the Showgrounds. Of particular importance is the Sunshine Coast Major and Regional Events Strategy which seeks to retain and grow existing major events and protect them from being lost to the region, as well as securing new events. FINANCIAL + ENVIRONMENTAL SUSTAINABILITY Facility Improvements Review current facilities to enable a more compact layout, multiple uses and improved functionality. Establish new buildings where necessary and re-design main arrival node/s and associated infrastructure. Ensure facilities are in place and situated appropriately to meet future needs and usage of the site. Retain and Re-use Improve current facilities on site where possible and feasible to ensure elements that adequately service the community are kept in place. Ensure healthy existing vegetation is retained or improved where necessary. Water Sensitive Urban Design Incorporate Water Sensitive Urban Design principles that have both functional and amenity value. Ensure drainage is well designed and ensure flexible event spaces are kept ‘high and dry’. Flexible Spaces Provide a range of flexible, level spaces that improve functionality and cater for a range of usage types (eg display space and possible RV parking). This includes allowing the Showgrounds to be used for multiple events and activities at any one time. Ensure services and infrastructure are designed for flexibility including electrical and water access points for event exhibitors, additional power boards in equestrian areas, and relocation of services to be flexible in any area enhancements or additional buildings. Nambour Showgrounds Master Plan 2013 - 2023 Page | 37 ACKNOWLEDGEMENT OF HERITAGE Be respectful of the history and heritage of the site in implementing Master Plan elements. Acknowledge historic individual contributions by rededicating new buildings after significant people and/ or erecting plaques. ACCESS AND CIRCULATION Improve access, circulation and connections, both vehicular and pedestrian within the site and to adjacent ‘hubs’ such as the CBD and adjacent sporting facilities, schools and transport nodes (further work on precise routes will be required). Ensure movement within the Showgrounds enables disability access and new/ upgraded facilities meet accessibility requirements. Consider the potential to link with any future Nambour tramway corridor. Create a site specific way-finding strategy across the site based on the eventual final design of the site, which includes improving all internal and external signage. Ensure connectivity to future pedestrian linkages along Petrie Creek. CENTRALISE FUNCTION AND ACTIVITY Incorporate a range of uses within a centralised ‘hub’ (e.g. day-to-day administration, event administration, meeting rooms, workshop space, display space etc.). SENSE OF PLACE Develop a sense of place for the Nambour Showgrounds. Deliver to the community and visitors a node with functionality, amenity and activity. CONSIDERATION OF NEIGHBOURING USES Create buffer zones along residential edges and ensure physical connections are made to adjacent existing community use land. 7.4. K EY M ASTER P LAN I NITIATIVES There are a variety of projects that can be undertaken in the Nambour Showgrounds that will contribute to the achievement of the overall vision outlined above. The following revitalisation initiatives reflect the key areas of improvement for the Showgrounds – buildings and infrastructure, transport and access, and supporting long-term growth of events. The Master Plan envisages that in the medium to long term, cricket will be relocated subject to a suitable location in the Nambour proximity being found for that sport and funding being available. [Community feedback on the Draft Master Plan indicated substantial opposition to the removal and relocation of cricket from the Showgrounds by the cricket fraternity and others, and support for its relocation from other stakeholders – refer section 6.3]. The key master plan elements are illustrated in the attached draft Concept Plan. The cost of implementing the Master Plan would be beyond the resources of Council to fund in its own right and would no doubt require external funding and/ or support from stakeholders. BUILDINGS, LANDSCAPE TREATMENTS AND SUPPORTING INFRASTRUCTURE There are a large number of buildings distributed throughout the Showgrounds currently. The vast majority of these buildings can be retained on the site and their usage improved through better management and shared use. Some buildings/structures should be enhanced or upgraded to better utilise available space including: Provision of tables/seating adjacent to the Rotary building Nambour Showgrounds Master Plan 2013 - 2023 Page | 38 An integrated plan that better utilises the available space in the upper western area for existing users/community groups; Improvements to the Equestrian arena, and Upgrade of the cricket clubhouse for community use/displays (if and when cricket is relocated). The Equestrian Arena requires specific enhancements including installation of a relocatable grandstand on the eastern side of the covered arena, incorporating a new judge’s box, and enclosure of the southern end of the arena to protect the surface from weather, whilst ensuring two entrance ways are retained at suitable height for rodeo. Upgrade also is required to the fencing around the indoor arena, and to the lighting of the rodeo arena. The only buildings proposed to be demolished in the short-medium term are the existing ticket booth at the main entrance and the Main Pavilion (to be replaced by new multi-use events centre, see ‘Major Projects’ below). There is only one completely new building proposed for the site and that is the Multi-Use Events Centre, near the Showgrounds grandstand (see Major Projects). The Caretaker’s House is under-utilised and the Old School House appears to be incompatible with current activities and the size of groups using the building. Both buildings are however retained. A short-term opportunity is to encourage community group use of the former Caretaker’s House with the building freed up for use during major events if required. Improved landscape treatments and upgrades around the showgrounds will improve the amenity and legibility of the site. Remove bamboo along Coronation Avenue boundary to improve views into the site and upgrade fencing to ensure venue security. Along Bli Bli Road boundary, improvements will be required to landscaping and drainage. Landscape and drainage improvements are required along the road and steep slopes along Sports Parade. Landscape buffer and/or acoustic fencing to neighbouring residential properties should also be provided. TRANSPORT AND ACCESS The Showgrounds is an area which is relatively open for public access when events aren’t taking place. This increases the usage of the precinct for both informal and formal activities. For example, local residents access the showground for walking and exercise, when events are not underway. The current road and pedestrian network requires enhancement and improvements over time. It is recommended that road verges throughout the site be upgraded – priorities are along Exhibition Street and Cattlemans Road. The Main Entry should be enhanced to include an added lane and some realignment to enable kerb side dropoff, however the existing round-about is retained. Parking on the site is an important issue to be addressed and is required to support the existing activities as well as improve the usage of the site for future expansion of events and activities. There are a number of existing car parking spaces which require improvements including the front of the Badminton building and at the cricket club house. New car parking areas are required on Rodeo Drive adjacent to Rodeo Arena in the Equestrian precinct, and also adjacent to new Multi-Use Events Centre once it is constructed. Access from Bli Bli Road to the Showgrounds can be improved by providing a sealed road and pedestrian paths on the existing path from Crusher Park to Showgrounds. This road will be the primary service entry/access for event competitors, event vehicles and horse floats, and an additional access for emergency services and other service vehicles. Informal exhibitor parking and occasional spectator parking on Crusher Park fields is required for large events (in consultation with users of the facility). Improved signage and way-finding is required across the site, both permanent and ‘events specific’ to improve legibility across the Showgrounds generally. Upgraded and signed entry for event vehicles, horse Nambour Showgrounds Master Plan 2013 - 2023 Page | 39 trucks/floats, emergency services and other service vehicles at service road entrance on Crusher Park Drive is provided. Negotiations with Nambour State School to access their land will create improved pedestrian access to the CBD via Quota Park. Access from the tennis courts to the bowls club could be investigated in the long term, but would need to be subject to further investigations including a demand assessment and cost-benefit analysis. Access for buses and public transport, particularly during events is required to relieve the demand for car parking on site, and encourage greater use of public transport services, particularly bus and train services from the broader region to Nambour Rail Station. Spectator parking should be encouraged off-site, and use of rail station for major events should be encouraged to maximise benefit to the Nambour CBD. This includes the provision of formal bus stops and drop-off zones internal to the site, and a specific bus entry point at Crusher Park Drive. Any service buses for events are to be encouraged to park off-site. Park and ride facilities are an existing use on site. This service will continue on site, with the running of key events and regular activities taking precedence over this service. Pedestrian connectivity should be improved on site, with an all-access pathway to connect the ‘Old School House’ to Sportsmans Parade to be provided through the terraced community gardens. Movement within the Showgrounds generally needs to ensure disability access is accommodated. Recreation vehicle (RV) camping at the Showgrounds could potentially be created by providing reinforced turf-cells in a number of areas around the Showgrounds which could also be used as flat stall space for events. Any use of Showgrounds for RV’s would be subject to the adoption by council of a broader policy on RV use of areas and facilities throughout the region and approval by the Department of Natural Resources and Mines of the final Land Management Plan for the Showgrounds. The Draft Land Management Plan proposes that RV use be restricted to RV association members, subject to an initial trial period and evaluation, with restrictions on the length of stay and no adverse impact on local licensed caravan and/or tourist park operators (refer section 4.1(6)). [There is substantial opposition to use of the Showgrounds for RV’s from caravan park operators and peak bodies – refer section 6.3]. SUPPORTING GROWTH IN EVENTS In the medium-long term it is proposed to relocate cricket to an alternative location within the Nambour proximity subject to funding availability. The relocation of cricket should ensure that cricket remains a key sport within the locality and associated infrastructure and facilities such as training nets, clubhouse, and playing surface are available. The relocation of cricket will open access to the existing Ovals 2 and 3 for events, temporary yards for equestrian activities (and associated) camping or parking during events. The Main Arena will also be available for more community events year-round. The proposed new Green Square will be another outdoor area which is designed to accommodate temporary structures and infrastructure for events and exhibitions. The proposed new Multi-Use Events Centre (refer to Major Projects) will add to the area of formal events space that can be accessed for numerous types of events, including exhibitions, weddings and other functions, and conferences etc. In the longer term, when major asset maintenance of Nicklin House and Wallace House becomes necessary, it may prove more beneficial to demolish both buildings and construct a single, more functional building which can accommodate meetings, community uses, event uses and catering. When this occurs, the Scout Hall should be relocated off site, the area of land converted to a flexible open space for displays etc. Nambour Showgrounds Master Plan 2013 - 2023 7.5. Page | 40 M AJOR P ROJECTS /P RIORITY A REAS The following projects and priority areas have been identified as the most significant projects that can be undertaken to improve the overall functionality and amenity of the Nambour Showgrounds. MAIN ENTRY The main arrival precinct is seen as the ‘traditional welcome mat’ to the Showgrounds site. The key elements of the redesign for this space should include: Demolition of the existing ticket booth and improve ticketing infrastructure for major events. Improved access for mobility aids and prams. Relocation and repurpose existing artwork at main entry to enable larger, safer congregation space. Upgrade signage at main entry points and areas of high visibility as part of internal/external wayfinding/signage strategy. Widen the entry to enable an added vehicle lane and a curb-side drop-off point. NEW GREEN SQUARE The Main Pavilion building currently cannot adequately service all members of the community due to poor accessibility. It is recommended to demolish the Main Pavilion and convert it to a formalised Arrival Plaza and Green Square. The Green Square should be designed to accommodate temporary exhibition and events spaces for major events, but be suited to passive recreation activities and formal open space when not in use for events. Regular users displaced from the existing Main Pavilion should be accommodated elsewhere on site. NEW MULTI-USE EVENTS CENTRE A new Multi-Use Events Centre is designed to replace some of the functions currently served by the existing Main Pavilion, as well as accommodate a greater range of displays, functions, events, meetings etc. The building should incorporate a commercial kitchen, flat floor space, central administration (relocated from Nicklin House), office and secure money-handling area for event organisers, meeting rooms, storage and amenities. Provision for visitor parking adjacent to new Multi-Use Events Centre is required. Consideration could be given to relocating the Show Society office to the new building and demolishing their existing building to add to green space. REUSE OF CURRENT CRICKET SPACES FOR FUTURE EVENTS SPACE If and when cricket is relocated, it will reduce the existing conflicts that currently exist with demands on outdoor space for sporting activities as well as for events all year round. The existing ovals and main arena will be able to be used for event space, temporary yards for equestrian events and associated camping, and parking for large events. It is suggested that there will be investment in some infrastructure required on site with cricket removed, including access to services for events such as water and power and treatment of surfaces to accommodate events year-round. The clubhouse will be available for regular use by community groups and as an event space during large events. Nambour Showgrounds Master Plan 2013 - 2023 8. Page | 41 F UTURE M ANAGEMENT Key issues, risks and benefits of options for the future management of Nambour Showgrounds are summarised at Table 4. Table 4: Future management options for Nambour Showgrounds 5 MANAGEMENT OPTION STRUCTURE KEY ISSUES RISKS/BENEFITS Council Management (Current Model) Council responsible for day-today management, major maintenance and operations User groups enter into licence arrangement/hire agreement with Council Licensees responsible for minor maintenance and specialist facilities for their activity Facilities Co-ordinator continues to manage day-today Showground operations Advisory Group maintained Facilities Coordinator currently gainfully employed servicing existing roles and responsibilities, thus limiting capacity to take on expanded responsibilities Limited new/expansion of focus towards event attraction No specialised management services (e.g. marketing, event attraction and management) Model does not support expanded event attraction and delivery outcomes contained in the vision statement May result in no major increase or expansion to visitation and site use as a result of no change to operating arrangements No increase in staffing/service delivery investment Unlikely major increase in operating revenues Major Venues Unit (Council) Staged transition of management responsibilities of higher level Council owned facilities (e.g. Nambour Showgrounds, Maroochydore Multi Sports Complex, Caloundra Indoor Stadium, Quad Park) to a Council Major Venues Unit (as per Sunshine Coast Sport and Active Recreation Plan 2011-2026) Major Venues Unit to have dedicated responsibilities for marketing and promotion, event generation and management, financial management, bookings, administration As a first stage towards the establishment of a Major Venues Unit, an events professional to be engaged to oversee event attraction and management at Council’s higher level facilities, including Nambour Showgrounds Council responsible for day-today management, maintenance and operations Facilities Co-ordinator role maintained Licences/hire agreement with Council maintained Advisory Group maintained Development of a Major Venues Unit within Council would remove duplication of management services, reduce operating costs, consolidate operational systems, bookings, marketing and asset management and maintenance arrangements5 Model supports service delivery by specialist officers with dedicated areas of responsibilities Supports leveraging events across multiple facilities Partnering with other agencies would be necessary to maximise event potential (e.g. Sunshine Coast Destination Ltd) It may take time for the proposed increased Council investment necessary to support a new Major Venues Unit to be off-set by increased revenues Council may consider that its core business does not include the direct management of higher level facilities Economies of scale savings through shared management costs across multiple facilities Specialised responsibilities would likely result in increased management performance and event attraction, thus generating higher revenues and operational costs savings for Nambour Showgrounds and other venues Sunshine Coast Sport and Active Recreation Plan 2011-2026 Nambour Showgrounds Master Plan 2013 - 2023 Page | 42 MANAGEMENT OPTION STRUCTURE KEY ISSUES RISKS/BENEFITS Not-for-profit Management Council leases the Nambour Showgrounds to a not-for-profit organisation (e.g. Nambour Show Society) NFP responsible for day-to-day management, maintenance and operations NFP enters into licence, sublease or hire arrangements with other user groups A NFP may not be best placed to manage the current and proposed expanded facility mix in line with the vision statement NFP more likely to focus on their core organisational areas as opposed to a more holistic site approach NFP management approach may differ from Council’s management standards NFP may not have sufficient funds to cope with fluctuation of trade and to invest in necessary start-up costs associated with the proposed new facilities NFP may not have the capability, expertise or experience to professionally manage a higher level facility Council will be looked upon to maintain management of the site should the NFP model fail Short term operating savings for Council as day-to-day management shifted to NFP Council may be required to provide major investment in the long term, particularly if the appropriate level of cyclical maintenance is not undertaken by the NFP The potential lack of broader event expertise by the NFP may result in lower than potential revenues being achieved Commercial Management Council leases the Showgrounds to a third-party, professional Commercial Operator Commercial Operator responsible for day-to-day management, maintenance and operations Commercial operator enters into licence, sub-lease or hire arrangements with other user groups Council is able to divest itself from the day-to-day management of the site Management of public facilities are likely to be the core business of the Commercial Operator Council will still need to invest in the site through the development and oversight of the contract Shared resourcing across other Council managed higher level facilities is less likely to be achieved Council does not have the ability to capture base performance data of the improved site following its development in line with vision statement Community outcomes and access may be diminished should the Commercial Operator focus on those activities that provide the greatest financial return Any fluctuations in the financial performance of the site are transferred to the Commercial Operator Council is able to accurately budget its annual investment Council needs to allocate sufficient resourcing to manage the contract with the Commercial Operator Council may be called upon to develop alternate solutions for existing user groups should current community access be diminished as a result of an increased commercial focus from the Commercial Operator The market may dictate that Council may be required to provide an annual operating subsidy to the Commercial Operator Independent Board An independent board is established with representatives from the community Board responsible for providing strategic direction for the site, and reports to Council on operating performance Council staff to be engaged to undertake the day-to-day management of the site and to implement the Board’s strategies and direction Advisory Group maintained Licences/hire agreements maintained Expanded staffing structure needs to be implemented and funded by Council to support the day-to-day management of the site Representatives on the Board could be targeted to support a cross section of commercial and management expertise May be confusion in delineation of reporting charter for site staff given they are Council employees, yet responsible to an independent Board Community are unlikely to differentiate from Council being fully responsible for the site under an independent Board model where Council staff are engaged Independent Board structure may be excessive for a single site of the scale of Nambour Showgrounds Changes to representatives on the Board may result in instability and major directional changes for the site An expanded staffing model would allow for specialised roles and facilitate increased revenues Nambour Showgrounds Master Plan 2013 - 2023 8.1. Page | 43 R ECOMMENDED M ODEL Sunshine Coast Council recently decided to wind-up the Quad Park Corporation, a company wholly owned by the Council, which was responsible for the management of Stockland Park. The rationale for this decision was to allow for a more strategic, planned and coordinated approach to the region’s sports and recreation facilities. Given this recent strategic direction (and in order to not create a competing management model) it is considered that Nambour Showgrounds should be managed by Council as part of its broader portfolio of Council owned facilities. To that end, the recommended management model for Nambour Showgrounds is to transition to a Major Venues Unit within Sunshine Coast Council. This model will enable: Consistent, stable direction for all Council-owned facilities that may not have been the case within a Board or NFP environment Competition with other Council owned assets to be avoided Access to specialist marketing and event promotion expertise to achieve the vision for the Showgrounds Site staff to have clear reporting relationships being part of and responsible to the broader hierarchy Potential economies of scale savings through the sharing of resources across multiple facilities Council to retain the base performance data of facilities to assist in informed decision making Ongoing commitment to community uses that do not generate significant income but maintain the social benefits of the venue The Showgrounds to be managed in accordance with Council standards, policies and procedures Cyclical maintenance to be addressed to an appropriate level Leveraging between Council owned facilities to attract additional events. In transitioning to a Major Venues Unit it will be important for this Unit to have an event management professional whose responsibility would be to secure existing events, and collaborate within Council and other agencies (eg Sunshine Coast Destination Ltd) to create or attract new events for the Showgrounds which have potential local and regional economic benefits and which take advantage of the outdoor display areas and existing and proposed infrastructure. It is envisioned the Major Venues Unit would be responsible for: Venue management Marketing and promotion Procurement and supplier arrangements Event attraction, oversight and management Financial management and administration Council could elect to establish the Major Venues Unit as either: 1. A business unit within an existing Council department; or 2. A company wholly owned by Council with an independent Board reporting to Council. Existing Council staff and their entitlements could be novated to this entity Nambour Showgrounds Master Plan 2013 - 2023 Page | 44 A Major Venues Unit operating on a commercial basis would enable Council to realistically assess the value and potential of the combined facilities. Should Council decide at a future point to seek external operation of these facilities, this knowledge would be beneficial in negotiating the best outcome. It is also recommended that future management arrangements: 8.2. Do not provide long term leasehold tenure to user groups in order to maximise the ability to be flexible to emerging needs Retain the existing short term licensing and hire arrangements for user groups. Conditions should be written into license agreements which require areas/facilities utilised by user groups to be made available for events of significant economic benefit (subject to adequate notice being provided) Retain the existing Advisory Group to ensure effective communication between site user groups and Council. Meetings of the Advisory Group should be formalised by way of preparation of agenda and minutes. Ensure Traffic Management Plans for major events are prepared to the satisfaction of venue management (refer section 8.2). T RAFFIC M ANAGEMENT It will be important to ensure that hire of the Showgrounds for future major events deals effectively with traffic management issues. The core elements of the Traffic Management Plan (TMP) should include: 1. PLANNING For large events a reference group of key agencies and stakeholders should be established by Venue Management. This group acts as the forum for TMP planning, information dissemination and delegation of responsibilities. Group membership should include key stakeholders, which could include the Event Manager, Queensland Police, Qld Fire and Rescue, St John Ambulance, event security, event traffic control contractor, car park supervisor, event communication specialists, Council officer/s responsible for approving road closures, Risk Management and WH+S Advisor and the traffic engineer designing and documenting the TMP (which is required for the permit approval). Prior to the event occurring planning of the traffic management plan needs to consider a range of factors including: Timing and duration of the event – To ensure no conflicts exist a cross check should be conducted to confirm: o there are no other approved planned events which may pose a conflict or limitation on the planned event; and o there are no approved construction works and scheduled maintenance road works which may adversely impact the event. The expected daily number and age range of event patrons, if possible for different periods (eg AM, PM, evening). The expected arrival mode of the event patrons. Issues to consider: o Can patrons arrive by bus or train? If so, what proportion will use the bus or train? o Should shuttle services be provided, particularly if off-site parking facilities are to be provided? Nambour Showgrounds Master Plan 2013 - 2023 Page | 45 o Will bus travel be included in the entry price? o What percentage of patrons is expected to arrive by taxi or will seek access to a set down/ pick up zone? Any special needs of event patrons and VIPs. Will there be a high proportion of elderly people or people with a disability which may need special access? Are there any VIPs with security requirements? Car park layout – A car park layout plan within the proposed area designated for parking should be prepared to determine capacity. Determine if off-site parking is needed or possible. Bus Access Route and Bus zone – Buses need a separate location for a bus zone and turn around area. Provision for bus layover may need to be provided on-site or off-site (preferable). Taxi Rank location and ‘Kiss n Ride’ zones – Provision for these zones should be made and kept separate from the parking area. Emergency vehicle access – Fire and ambulance need separate access to ensure quick access/ egress (use of bus route access suitable). Emergency vehicles should not use car park access. [Road from Crusher Park has been designated for this purpose] Parking restrictions – consideration may be needed as to how to manage/ limit overflow parking in local streets, particularly streets designated as a bus access route. Permit Approval – the Queensland Police issue permits where road closures are proposed or occupancy of public roadway is proposed. Police require the local authority to first approve the TMP and associated traffic control plans. A TMP has to be submitted and approved by the local authority. Pending the size of event, preparation of the TMP and obtaining approvals could take up to four (4) weeks. Consultation – Neighbours directly impacted by the TMP will need to be consulted in formulating the TMP. Public Notification – there are legislative requirements to issue public notification of any road closures for events. Pre Event advice to Patrons – Event advertising should include advice to patrons of bus and rail access, parking locations, access and recommended routes to approach the parking areas. 2. CAR PARK SIGNAGE, ACCESS AND OPERATION: Signage – directional signage (mobile variable message boards) or on-site traffic controllers should guide patrons to the car park access or to an alternate parking location when one area reaches capacity. Access: o o The design of the car park access will need to take account of external roads: - Parking on external roads should be prohibited for a reasonable distance each side of the access, with signage, and policed. - Traffic control devices may need to be installed to limit the access to left in/ left out Where possible the ingress should be located separate to the egress to minimise turn movement conflict. - Keep the pedestrian entrance from the roadway well clear of the car park entrance. Nambour Showgrounds Master Plan 2013 - 2023 Page | 46 o Ideally have bus access separate from car park access. If bus access is to share car park access, have the ability for buses to divert and travel to a temporary bus stop area. o If night event, lighting may need to be provided. Car Park Operation o Queue management is critical. Measures to be implemented to maximise service rate on entry and hence minimise entry queues: - Only accept cash payment on entry and ideally it should be a round value (eg $5, not $3.50) - Based on expected demand, ideally have at least two lanes of collection (one entry lane diverting into two lanes), with a traffic controller to direct traffic and keep motorists moving. - In addition to two collection lanes, have two or possibly three people standing in series collecting money (a 2 x 3 matrix of people collecting money). - Numerous parking attendants will be able to guide motorists to parking spots. Park cars in tandem, leaving a sufficient gap between rows. - If only one entry lane, have ability to push an immobilised vehicle to one side if needed. - Ideally the collection points should be well inside the parking area. Erect barriers each side of entry storage area to keep area preserved for one-way or two-way traffic flow. - If more than one car park, have VMS sign to direct motorists to other car parks. - When car park is full, have traffic controller, commence directing traffic to other car parks 3. BUS ZONE OPERATIONS Management o Bus inspector should be based at the zone to manage movements and ensure no delays. o Temporary bus stop infrastructure may be required. 4. BUMP IN / BUMP OUT Stall displays, rides, etc need to bump in and bump out before and after the event. TMP to be established over the bump in/ bump out period. 5. DEBRIEFS For multiple day events, debriefs of the event reference group should be held at the end of each day to review the TMP and identify if any tweaking is required. o Debrief should be held at end of event and lessons documented. Nambour Showgrounds Master Plan 2013 - 2023 9. Page | 47 A CTION P LAN An action plan is outlined in the table below. Implementation of many elements of the plan is dependent on the timing and availability of funding for, and a suitable location in the Nambour proximity for, the relocation of cricket. It is assumed that this would be a medium to long term proposition, hence many items are not scheduled until later in the Master Plan time frame (or beyond). The following notional time frames have been proposed: Ongoing Short term: Within next 5 years Medium term: 5 – 9 years Long term: 10 years + In reality, implementation of some elements may be opportunistic and potentially brought forward; in other cases the availability of funding or unforseen constraints may prevent or delay implementation. Indicative-only estimates of capital costs are illustrated at Table 5. Further specialist advice is required in order to scope and cost a number of items (eg hydraulic services, electrical services, civil engineering services). As such a number of items are not costed pending the completion of further analysis by these specialists. Indicative cost estimates exclude: Council project management fees Stormwater management Drainage upgrade Upgrading site services infrastructure - hydraulics and electrical Road verges upgrades Headworks Design, development and construction contingency Future cost escalation Loose furniture and equipment (FF&E); and GST. Excluding those items which require further specialist advice in order to scope and cost, and the other exclusions listed above, the indicative-only capital cost of other items is $9.26m. The cost of implementing all recommendations in this Master Plan would most likely be beyond the capacity of Council to fund in its own right and would no doubt require external funding and/ or support from stakeholders. Recommended actions should be reviewed bi-annually with a major review every five years. Nambour Showgrounds Master Plan 2013 - 2023 Page | 48 Table 5: Notional time frame and indicative cost estimates (subject to exclusions listed and further specialist required in some areas) ITEM/ NOTIONAL TIME FRAME Master Plan Element INDICATIVE-ONLY CAPITAL COST Ongoing Retain existing major events (eg Queensland Garden Expo, Sunshine Coast Agricultural Show, Collectorama, Rally Qld, Sunshine Coast Home, Caravan, Camping and Boating Expo, Sunshine Coast Antique Car Club Swap Meet). Note retention of the Queensland Garden Expo event (consistent with the definition of a ‘hallmark’ event as defined in the Sunshine Coast Major and Regional Events Strategy) and assist it to grow. N/a (Facility improvements noted below will assist event operations and planning) Actively seek to retain existing events held at the Nambour Showgrounds, and actively seek to attract and create new events with potential local and regional economic benefits and which take advantage of the outdoor display areas and existing and proposed infrastructure. N/a Partner with other agencies such as Sunshine Coast Destination Ltd in attracting or creating events. N/a Encourage greater community use of the Caretaker’s House. N/a Require Traffic Management Plans to be prepared for events, using the traffic management considerations within section 8.2 as a template. Continue to utilise Crusher Park, schools, bowls club, croquet club and church grounds for major event parking. N/a Continue to utilise the site for park and ride services, subject to key events and regular activities taking precedence over this service. N/a Encourage service buses for events to park off-site. N/a Implement the suggested management model and management recommendations outlined at section 8.1. N/a Short Term Undertake a specialist study and review of hydraulic services infrastructure including stormwater management, bio-retention, treatment of effluent and rainwater collection in order to inform civil and hydraulic services infrastructure planning. Prepare a way-finding and signage plan to improve internal movement and external access. Implement the recommendations of the way-finding and signage plan. Ensure services and infrastructure are designed for flexibility, including electrical and water access points for event exhibitors. In consultation with user groups, prepare an integrated plan that better utilises the available space in the upper western area for existing users/community groups. Develop opportunities which enable the expansion of the Antique Car Club in consideration of the other user groups and stakeholders who Not costed $15,000 Not costed [Subject to outcome of specialist study] Not costed [Subject to outcome of specialist study] $7,500 $225m2 Nambour Showgrounds Master Plan 2013 - 2023 ITEM/ NOTIONAL TIME FRAME Page | 49 Master Plan Element INDICATIVE-ONLY CAPITAL COST utiltise the upper western area/precinct. Any extension should not impinge on existing usable carparking space in this precinct/area. [Rate only. Extent to be determined through integrated plan]. Establish a drop off zone for buses at the intersection of Cattlemen’s Drive and Exhibition Street. Widen asphalt area on both sides of Exhibition Street at this point (approx. 50m x 5m to both sides of roadway). Reconfigure the main entry of the Nambour Showgrounds, which includes: $60,000 $250,000 Demolition of existing ticket booths and the provision of improved ticketing infrastructure (may require the relocation of electrical boxes) Reconfigure access Include an additional lane to enable kerb side drop off Relocate or reposition existing public artwork at main entry to create larger, safer congregation space and improve access for mobility aids and prams at main entry. Specialist advice required Install reinforced turf cells east of Apex Building and existing Main Pavilion to provide additional flat spaces on site. These could serve as potential stall spaces during events, as well as potential RV parking (RV use subject to adoption by Council of a broader policy on RV’s and approval of Land Management Plan by DNRM). $84,000 Upgrade road verges throughout site (extent of work subject to specialist’s review of stormwater management and subsequent civil engineering design including bio-retention and treatment of run-off to Petrie Creek). Install relocatable grandstand bays along eastern side of covered equestrian arena, and incorporate a judges’ box in this area. $120 per m2 [Rate Only. Further specialist advice required] $120,000 Enclose southern end of covered equestrian arena. Include provision for 2 x 4m high entry points at existing gate locations for rodeo requirements. $60,000 Formalise asphalt car park spaces on Rodeo Drive (20 spaces). $72,000 Establish an all access pathway connecting the Old School House to Sports Parade (concrete path and accessible balustrading). $168,000 Widen and seal service road from Crusher Park Drive to equestrian area (3m wide + extra for passing bays). $180,000 Establish a pedestrian path adjacent to the service road from Crusher Park Drive. $36,000 Revegetate heavily sloped area east of Badminton building on Sports Parade (Organic blanket hydro mulch native seed mix. Total 2,200m2). $26,400 Revegetate area between the Old School House and Sports Parade (Tubestock in jute mat with mulch. Total 1,960m2). Terrace the area west of Trade Pavilion and Rotary building to Sports Parade and install seeded turf and topsoil (Total 1,000m2). Improve hard and soft landscaping adjacent to Rotary building (Total (to be funded by SEQ Water offset) $48,000 $112,000 $24,000 Nambour Showgrounds Master Plan 2013 - 2023 ITEM/ NOTIONAL TIME FRAME Master Plan Element Page | 50 INDICATIVE-ONLY CAPITAL COST 150m2). Install picnic shelters with tables and seating at appropriate locations throughout the whole of site (x6). Upgrade drainage throughout the site, including: Main Arena and Ovals 2 and 3. This could include possible sub-surface drainage swale between ovals 2 and 3. In the north-western area of the site, near the corner of Bli Bli $72,000 Not costed [Subject to outcome of specialist engineering study] Road and Coronation Avenue. Undertake a feasibility study and detailed design of a new multi-use events centre, which is able to accommodate a greater range of displays, functions, events, meetings. $75,000 This should determine the appropriate amount of gross floor area, and should include air-conditioned display space, central office administration, event office, secure money handling area, storage space and amenities. This should also consider the potential relocation of the Show Society Office. Medium Term Relocate cricket when a suitable location in the Nambour proximity and funding can be secured (Indicative cost for ovals, practice wickets including lighting, clubhouse and change rooms). Ovals 2 and 3 to be made available to use for events, temporary yards for equestrian activities, and associated camping or parking during events. Demolish Main Pavilion. $2,304,000 Excludes site specific costs (eg site preparation/ earthworks, site access, fencing & security, stormwater management, rainwater collection and irrigation) N/a $60,000 Convert Main Pavilion area to a formalised arrival plaza and Green Square. This includes: A-grade turf and topsoil (800m2): $14,400 Soft landscaping, paving and furniture (500m2): $222,000 General landscaping trees at average 1/ 20m2 (1,300m2): $156,000 Establish a new multi-use events centre to accommodate a greater range of displays, functions, events, meetings. This should also consider the potential relocation of Show Society Offices (not costed). Commercial kitchen provided within new multi-use events centre (if determined to be required). Car park spaces to new multi-use events centre – asphalt (10 spaces). Replace lighting at the rodeo arena. Should the lighting in the rodeo arena become an imminent safety $4,032,000 [Based on 800m2] $240,000 $36,000 $100,000 Nambour Showgrounds Master Plan 2013 - 2023 ITEM/ NOTIONAL TIME FRAME Master Plan Element Page | 51 INDICATIVE-ONLY CAPITAL COST concern, undertake this replacement in the short term. Upgrade fencing around the indoor arena. $75,000 Establish a vegetation buffer or acoustic fence to residences north of Rodeo Drive. $48,000 Remove bamboo along Coronation Avenue to allow for improved visibility to the Showgrounds, and install security fencing. $31,200 Improved landscaping to whole of site (Allowance only - based on 400m2). $48,000 Install retaining walls (insitu concrete) where determined to be required (as per specialist study) $96,000 Formalise car park spaces adjacent to existing cricket clubhouse (asphalt). [Allowance only] $43,200 Upgrade of badminton carparking area (asphalt). $120,000 Establish shared concrete pathways along roadways. $172,800 Long Term [Allowance only) When major asset maintenance of Nicklin House and Wallace House becomes necessary, consider demolishing both buildings and construct a single, more functional building for meetings, community uses, event uses and catering. When this occurs, relocate Scout Hall off site and convert area to flexible open space for displays etc. Not costed If site access during events presents an ongoing management issue for the Nambour Tennis Club, consider a pedestrian access bridge across Petrie Creek (approx. 35m span). This would need to be subject to further investigations including demand assessment and cost-benefit analysis. $60,000 Potential new pedestrian access from Petrie Creek pedestrian bridge to CBD via Quota Park (subject to resolution of access to school land and subsequent design). [Preliminary allowance only. Specialist design advice required] Not costed [Subject to further planning] Nambour Showgrounds Master Plan 2013 - 2023 Page | 52