General Manager, IT Project Circle, Telephone Exchange Building, Osmania University Campus, Hyderabad – 500 007. Ph.:040-27072277 FAX 040-27073399 E-mail: ramchand@bsnl.co.in K.RAMCHAND General Manager GM(IT)/ Hyd/CDR/Project/17 Dt. 9.11.2009 Minutes of the Meeting held at O/o CGM, Uttaranchal Circle, Dehradun on CDR Project implementation on 7.11.09. A meeting was held on CDR Project Go Live preparations at Dehradun on 7.11.09. GM TD, Dehradun, GM CFA Circle Office and other senior officers from Circle Office, District and TCS were present. Dehradun is all set for Go Live on 16.11.09. The preparations as per the guidelines provided by IT Circle are going on. Some of the important action items discussed on that day are as follows:1. It is reported by TCS and Dehradun District that Outdoor inventory as required for CDR Project is completely verified and is as per the requirement. However, GM IT requested TCS to do sample data checks on the inventory data as listed below and provide the data to the SSA for any correction in Dotsoft. a. The total number of Localities and Sub Localities. b. The total number of exchanges not mapped to Locality or Sub Locality c. Total number of JTO Codes not mapped to Sub Locality. d. Number of exchanges mapped to Sub localities but JTO Code of these exchanges not mapped to Sub Localities. e. Pillars not mapped to JTO Code f. Number of telephones where pillar number is not identified. 2. Dotsoft Online Counters will work till 14.11.09. A few Online Counters which work on Sunday shall be closed on 15.11.09. Suitable instructions will be given by O/o GM TD. 3. SSA will close the Sub Ledger of October before 12th. The migration activity will start at 00 Hrs of 12th. The Sub Ledger process for November also will be run before 12th i.e. on 11th evening after the closure of all Online Counters. 4. After 11th evening no TR transactions i.e. any adjustment, cancellation or write off will be made in Dotsoft. Hence the SSA will have two Sub Ledgers for the month of November one from Dotsoft till 11th Nov. and the other from CDR from 11th Nov. The SSA will combine these two and then send the Sub Ledger report for the month of November to the Circle Office. This is a one-time activity. Henceforth the Sub Ledger from December onwards will come monthly from the CDR system. 5. The Online payments posted into Dotsoft on 12 th, 13th & 14th will be taken separately and posted as a Delta update into the CDR system on 15.11.09. 6. The outstanding transferred to CDR system will be as on 11th evening. 7. SSA will complete all the Work Orders which have crossed the Indoor stage, i.e. no Work Order with Test Desk pending stage should be present in Dotsoft as of 11.11.09. 8. Work Orders like disconnections which cross the Indoor stage as a first step must also be completed before migrating to CDR. 9. All pending Work Orders of NPC, NPC with Broadband, shift, Broadband on existing Landline and pending disconnection Work Orders (which have not reached Indoor) will all be migrated as it is to the CDR system. All other work orders of other activity types will not be migrated. SSA has to manually feed these requisitions into the CDR system on 16 th and execute the work. Since most of the work orders are covered for activities listed above, such work orders which have to be fed manually will be very less. 10. After the migration of CDR, the NIB provisioning will become automatic for P3 customers. Therefore, all pending Broadband Work Orders which have crossed NIB stage must be completed in Dotsoft before migration itself. In case any work order remains pending at Outdoor then SSA has to ensure cancellation of the Work Order in Dotsoft and disconnection of these customers from NIB (2.2 or P3) and feed the requests once again into CDR. 11. Pending tariff change orders for Broadband in Dotsoft take effect from first of the next month. Hence all the requests taken during November will be migrated to CDR with the date of effect as 1 st of Dec.2009. After the introduction of CDR the tariff plan change is possible on any day. The requests taken into CRM will therefore get affected on the same day or by next day. This must be educated to the CSR Operator as well as the customer. 12. Perfect identification of exempted category and VIPs as far as temporary disconnection and reconnections must be done properly in Dotsoft. 13. For bimonthly customers getting covered in October – November Cycle the following procedure will be adopted – Dotsoft will generate the bill of October based on the meter readings. This bill will have a pay by date of December 27th. The first bill from the CDR system will come out in the month of December. That will have the usage charges for the month of November based on the CDRs received from 1st of November. The monthly bill amount of October will be carried forward to the November bill generated from CDR. The customer will get the bimonthly bill in the month of December. This bimonthly bill will have the details of the usage for the month of November and the consolidated amount for the month of October. SSA is advised to send the bill for the month of October from Dotsoft to the customer with a separate letter explaining that he will get the bimonthly bill as usual in the month of November and the system is getting migrated from meter based billing system to CDR based billing system. The letter should also explain that the bill being sent is based on meter readings and is only for information purpose. The amount will be added to the November bill and he will get the normal bill in December. If the customer chooses to pay the October bill which has the pay by date of Dec.27th then the amount will be given as credit in the next bill. 14. It is intimated that there are 12 Group billing customers with around 1000 connections. Some of them get a consolidated bill and make a single payment against the Group Bill. Some of the customers make individual bill payments through they are under Group Billing. TCS should take care of such scenarios in the solution provided by them through ES. As agreed earlier the Group Billing solution must be implemented by using the account hierarchy solution of the Billing system in future. 15. All reconnections (done after payment by DNP customers) will be completed in Dotsoft by 11th evening. Reconnections will be stopped for one day – on 14th Nov. The reconnections done on the 12th and the 13th will be separately listed and provided to TCS. TCS will update the status of the customer in CDR. This is being done because we cannot stop reconnections for 4 days. 16. Parallel bill will be prepared in Dotsoft for the month of November and December also. TCS and SSA / ITPC will verify all the invoices generated by Dotsoft and CDR for these two months for all those customers for whom there are no commercial transactions. This will be done because Dehradun is the first SSA going Live in the North Zone. The comparing scripts used at Hyderabad will be shared by the Dotsoft Core Group. The bills will be dispatched only after ensuring that both the Dotsoft and the CDR bills are more or less tallying to the satisfaction of the AO TR, Dehradun SSA. If the difference is due to the target system then the invoice must be corrected in the target system. If the difference is traced back to either Dotsoft or to the configuration / status in the switch then the CDR invoice can be taken as correct and sent to the customer. 17. TCS must provide training on Service Manager to the Core Group of the SSA. 18. TCS to provide one day training before 15.11.09 on CDR Project Basics and CDR Project Reports in particular to the DGMs and GMs of SSA and Circle Office. 19. SSA to verify the connectivity to IVRS and Call Centre and proper routing of calls. 20. TCS to demonstrate the printing of Work Order and Lineman Docket. 21. ITPC Chandigarh to verify the connectivity with GSM billing system and data transferred between the two systems for bills generated in GSM and payments received in the CDR system. 22. Existing IVRS system for trunk call booking will henceforth be migrated to CDR Project for Dehradun SSA. The trunk calls will be routed to IVRS of Chandigarh. 23. TCS is requested to supply a text file containing the following fields to the SSA after the migration so that data migration activity can be verified with respect to the source system – i. Unique_id_no ii. Crm_account_no iii. Billing account_no iv. Customer_name v. Active_inactive_status vi. Migrated_OS vii. Total_deposit_amount viii. Migrated_credit_amount 24. DGM ITPC, Chandigarh and Dehradun SSA should ensure collection of the following scripts from the Dotsoft Core Group. i. Deposit Migration scripts ii. Pending Work Order Cancellation scripts iii. Invoice comparison scripts iv. Cases of customers not billed but usage recorded in monthly bill details - Scripts for migrating to the CDR system v. Scripts to run on 14th evening to stop all transactions in Dotsoft from 15th onwards. Dotsoft will be available only for enquiry purposes. 25. It is informed that around 24 DSPT connections are working in Dehradun. Till such time TCS provides a solution for customer creation and billing and accounting for DSPT, the SSA is requested to continue the manual billing that is being done now. 26. GMTD SSA was requested to send letters to all the customers intimating the change over from meter based billing system to CDR based convergent billing and customer meter system. The sample letter used at Hyderabad and Bhubaneswar are already provided to the IT Team of the SSA. The meeting ended with an appeal from GM TD to all to cooperate and make sure that this project is a success in Dehradun SSA. ( K. RAMCHAND ) GM(IT), ITPC, Hyderabad. To All participants CGM, Uttarakhand circle / CGM ITPC Pune. GM IT- CFA, Corporate office. GM IT Circle, Chandigarh.