RETURN TO: Gina M. Bailey Foothill De Anza Comm. College Dist. 12345 El Monte Rd. Los Altos Hills, CA 94022 (650) 949-6165 (650) 948-5194 fax RFQ #: R93543 DUE ON: November 9, 2004 FIRM: INSTRUCTIONS TO BIDDERS: COMPLETE, SIGN, AND SUBMIT ALL PAGES OF THIS RFQ TO DISTRICT PURCHASING SERVICES BY THE DUE DATE SHOWN ABOVE AND TO THE INDIVIDUAL LISTED ABOVE. LUMP SUM - REQUEST FOR QUOTATION FOR PUBLIC WORKS PROJECTS UNDER $15,000 TO: Foothill De Anza Community College District, herein called Owner: Pursuant to and in compliance with our Contract Documents relating to: Miscellaneous striping and stenciling for on-going traffic flow requirements Contractors Scope of Work: Perform re-striping on a time & material basis as traffic requirements change at Foothill College in Los Altos Hills, CA and De Anza College in Cupertino, CA. Work will include striping and stenciling requirements for directional traffic flow on an as needed basis throughout the 2004 – 2005 fiscal year. There may also be occasion to provide metal signs mounted on aluminum poles. An Open Purchase Order will be issued and will be valid through June 30, 2005. Open Purchase Orders may be issued on an annual basis for up to two (2) additional years, upon mutual agreement between the District and the awarding contractor. Should the contractor not perform to the satisfaction of the District, the District reserves the right to cancel the agreement and seek services elsewhere. Labor rates are subject to change pursuant to current prevailing wages for each trade specified. 1 OF 6 All traffic and safety precautionary measures must be taken to protect contractors’ employees, students, staff and the general public while work is to be performed. Traffic barriers and/or flagpersons may be required to perform work All work to be performed during regular business hours and at regular pay, Monday –Saturday, from 7 am – 9 pm unless otherwise determined. All work is to be scheduled and coordinated through District Representative. Contractor must maintain through traffic at all times. All pricing shall include labor, materials, equipment, apparatus, travel, taxes and licenses. Typical Paints for Application: Black out Yellow Yellow Reflective White White Reflective Red Blue Typical stenciled sign requirements: “Stop” and bar “Ped xing” Crosswalk Right/Left turn arrows Single/double yellow line, 25’ increments “No parking” Red curb, 25’ increments Single stall lines “Fire lane” X-hatch “Exit” “No Exit” “Staff Only” “20-minute parking” “30-minute parking” “Loading zone” “Slow” Handicap parking CONTRACT DOCUMENTS: The following listed (X) documents are attached here to and are incorporated herein by this reference. In addition to this RFQ Form, said documents constitute the Contract Documents and are the terms and conditions. _x___Labor & Materials Contract Terms and Conditions (2 Pages) ____General Conditions Construction/Service ____Drawings (1 Sheet ) 2 OF 6 ____Designation of Subcontractors Exhibit "DS" ____Liquidated Damages Exhibit "LD" at ____ per day ____A standard for telecommunications wiring for facilities operated by the Owner ____W-9 form ____Mandatory pre-bid conference and site inspection CONTRACT COMPLETION: All Work/Performance under the Contract shall commence as negotiated on a project-by-project basis following the Notice to Proceed. Notice to Proceed will be issued in the form of a Purchase Order on an as need basis. PAYMENT: Lump sum payment following final completion by the contractor and acceptance of the project by the District. BASIS FOR AWARD OF CONTRACT: Contract shall be awarded to the "responsible bidder" submitting the lowest Base Quotation and the contract shall be for that amount. Customer references may be a factor in the evaluation and award of this bid. The Owner reserves the right to reject any or all bids. Attendance at pre-bid conference/site inspection ___ Required _X_ Not Required 3 OF 6 BASIC WAGE RATES: Workers employed in the work must be paid at the rate at least equal to the prevailing wage rates determined by the Director of Industrial Relations, State of California, pursuant to Labor Code Section 1773, which are on file at: Foothill De Anza Community College District Purchasing Services (650) 949-6164 and The State of California, Division of Labor Statistics and Research www/dir.ca.gov/dlsr/statistics_research.html (415) 703-4780 The undersigned bidder, having become thoroughly familiar with the terms and conditions of the Contract Documents and with local conditions affecting performance and the costs of the Work at the place where the Work is to be done and having fully inspected the site in all particulars, hereby proposes and agrees to fully perform the Work within the time stated and in strict accordance with the Contract Documents (including the furnishing of any and all labor and materials) and do all the work required to construct and complete said work in accordance with the Contract documents, for the below stated sums of money: BASE QUOTATION: Determination of the lowest responsible bidder will be based upon the prices provided for a “TYPICAL JOB” as described below. Price shall include all labor, materials, services, taxes, permits, fees, licenses and equipment necessary for the completion of the work. ACTUAL WORK shall be quoted on a project-byproject basis, based upon the labor and material rates provided. Contractor may be required to visit the specific sites prior to providing final quotes. SCOPE: In a typical parking lot with 220 parking spaces, 1 exit, 1 entrance and an approximate square footage of 72,000 provide the following stenciling: 4 each 8 each 20 each 40 each Black-out “staff only” stalls Black-out white lines and paint yellow Stencil “Staff Only” in designated stalls Single stall lines 4 OF 6 2 each 2 each Handicapp stalls painted Wheelstops painted blue in handicap stalls 4 each 2 each 3 each 2 each 1 each 150’ Right arrows Stop & Bar Crosswalks Ped Xing “Fire Lane” Red curb Provide traffic barriers to block off one lane of traffic at one entry point and provide for a flagperson for approximately 4 man-hours. All work to be completed within 2 working days maximum. All areas will be clean, dry and clear of debris prior to the commencement of work. TOTAL BASE QUOTATION _________________________ DOLLARS UNIT PRICES: Material Rates: Provide material rates for the following: Non-reflective paints o $/Gallon Reflective paints o $/Gallon Labor Rates: Provide journeyman/apprentice labor rates for: Supervisors o $/hour Laborer o Journeyman $/hour o Apprentice $/hour Traffic Control Flag Person o Journeyman $/hour o Apprentice $/hour 5 OF 6 Striper; layout and application o Journeyman $/hour o Apprentice $/hour ADDS AND/OR DELETIONS: The following adds and/or deletions may be selected at the Owners sole discretion: NOT APPLICABLE ADDENDA: If an addendum is made to this bid by the Owner, Bidder must acknowledge receipt here. Bidder acknowledges receipt of Addendum # ____, ____, ____. FIRM: ______________________________ PHONE: ( ) ________________ ADDRESS: ______________________________________________________ Street Suite # ______________________________________________________ City State Zip Code AUTHORIZED SIGNATURE: _____________________________ DATE: ____________ PRINT NAME:____________________________________________________ CONTRACTOR'S LICENSE #: ____________ EXPIRATION: _____________ CONTRACTOR'S LICENSE CLASSIFICATION: _______________________ CASH DISCOUNT TERMS: ____ % ____ DAYS ACCEPTED BY: (print name) (signature) DATE: 6 OF 6