KWTPL Monthly Progress Report September 2015 CONTENTS CHAPTERS Chapter 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Description Executive Summary Project Overview Project Financials Pre-Construction Activities Designs & Drawings Mobilization Construction Activities Project Progress Change of Scope Quality Control Road Safety, Traffic Management & Accident Data Details of Submittal and Approvals Correspondence exchanged during the month Visits and Meetings Page No. 03 09 13 15 17 19 23 25 28 29 29 30 31 31 – 08 – 12 – 14 – 16 – 18 – 22 – 24 – 27 – 28 – 29 – 29 – 31 – 31 – 31 TABLES Table 1.1 1.2 1.3 1.4 1.5 1.6 2.1 2.2 2.3 3.1 3.2 3.3 3.4 4.1 5.1 6.1 6.2 6.3 6.4 8.1 8.2 8.3 12.1 14.1 14.2 Description Details of land handed over to Concessionaire till 14.03.2013 Summary of Road Progress-Four lane completed Physical Progress of Road (MCW) Physical Progress of Road (S.R.) Progress of Works – Structures Physical & Financial Progress Project Milestone as Per Schedule G Pavement Composition Rigid Pavement Composition Break of Total Project Cost Source of Project Fund Lender Details of Contribution Expenditure / Contribution made by agency as on date September, 2015 Details of land handed over to Concessionaire as on September, 2015 Summary of Design and Drawings Status Status of Plants / Crushers Summary of Machineries / Vehicles Mobilization Project Monitoring and Quality Control Team List of Key Personnel of EPC Contractor Drawn down Schedule Comparison of Financial Progress against planned vs achieved IPC Certified as on date of EPC Contractor Source Approvals Visits Meetings Page No. 04 05 05 05 06 08 11 12 12 13 14 14 14 15 17 19 19 21 22 25 25 26 30 31 31 – 04 – 05 – 05 – 05 – 06 – 08 – 11 – 12 – 12 – 13 – 14 – 14 – 14 – 15 – 18 – 19 – 20 – 21 – 22 – 25 – 26 – 27 – 31 – 31 – 31 Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 1/31 KWTPL Monthly Progress Report September 2015 ANNEXURES Annexure 1.0 4.1 4.2 4.3 4.4 6.1 6.2 6.3 6.4 6.5 7.1 7.2 7.3 7.4 7.5 8.1 8.2 8.3 8.4 8.5 8.6 8.7 10.0 11.0 12.0 13.0 Description Project Location Map List of Obstacles and Encroachments Details of Tree Cutting Status of Electrical Shifting Status of Water Pipe Line Shifting Line Diagram of the Project List of Machinery and Vehicles List of Manpower SPV Organization chart EPC Organization chart Status of Pipe & Box Culverts, Minor Bridges, Underpasses, Major Bridges and Grade Separators Highway Physical Progress Chart List of Lab Equipments Statement of Monthly Quality Control Conducted Weather Report “S” Curve Progress Vs Achievement against Scope Progress Vs Achievement against Scope (Service Road) Linear Wise LHS & RHS Main Carriageway Status Linear Wise LHS & RHS Service Road Status Pictorial Drawings of Structures Strip Chart of Project Highway RFI Status Accident Report Correspondence exchanged during the month Photographs on Site Activities Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 2/31 KWTPL Monthly Progress Report September 2015 CHAPTER 1: EXECUTIVE SUMMARY 1.1 Brief Description of Project National Highway No.47 (NH-47) is a 620 Km long highway running from Salem to Kanyakumari is an important artery passing through the States of Tamilnadu and Kerala and it passes through important towns such as Salem, Coimbatore, Palakkad, Thrissur, Kochi, Alappuzha, Kollam, Thiruvananthapuram, Nagerkoil and Kanyakumari. To provide better level of service to the vehicular traffic, the existing 2 lane carriageway road has been proposed to be widened to four lane dual carriage way including strengthening of the existing 2 lane carriage way. Ministry of Shipping, Road Transport & Highways, Government of India, through National Highways Authority of India, have been contemplating to enhance the traffic capacity and safety of goods and passenger traffic on selected, heavy traffic dense corridors in India, and had identified one such stretch of road in Kerala State i.e., existing 2 lane highway of NH-47 between Walayar -Vadakkancherry Km. 182+250 to Km. 240+000, (approx. 54 Kms.) to 4 laning under NHDP Phase II. Project Location Map enclosed as Annexure 1. Accordingly, NHAI invited Requests for Proposal (RFP) from short listing of Bidders in RFQ for 4 laning of above stretch of highway, on Design, Build, Finance, Operate and Transfer (“DBFOT”) Toll Basis, M/s. KNR Constructions Ltd. submitted their bid on 30th June, 2010, and become highest bidder. National Authority of India (NHAI) has awarded the contract of four laning of existing road on NH-47 between Km.182.250 to Km.240.000, approximately 54 Km, under North – South Corridor (NHDP Phase-II), package KL2 on DBFOT (Toll) Basis in the State of Kerala, vide their letter no NHAI/Tech/NS-2/NH-47/BOT/KL-2/2006/07 dated 03.08.2012 by issuing Letter of Acceptance to the KNR Constructions Limited. Consequent to the above, a Special Purpose Vehicle (SPV) was formed in the name of M/s. KNR Walayar Tollways Private Ltd., for implementation/execution of the project, registered under the companies act on 16th August 2012 and Concession Agreement dated 17th September 2012 is signed between M/s KNR Walayar Tollways Private Ltd (KWTPL) the Concessionaire. And M/s National Highways Authority of India (NHAI), the Employer. NHAI Vide their letter No NHAI/Tech/NS-2/NH-47/BOT/KL-2/IE/2006/131 dated 21st May 2013 declared the appointed date as 18th May 2013 and was scheduled to be completed by 13th Nov 2015 (Construction period of 910 days). Further NHAI Vide their letter No NHAI/11033/154/CGM(fin)/2013 dated 17 th July 2013 declared the Financial closer for the project is achieved on 7th June 2013. Subsequently, M/s. KWTPL, awarded Design and Execution of project to M/s. KNR Constructions Ltd. (Herein after called as “KNRCL”, as EPC Contractor, to execute the project under their Agreement dated: 28th November 2012 on Lum-sum Turnkey Basis. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 3/31 KWTPL 1.2 Monthly Progress Report September 2015 Salient Features of the Project The salient features of the project are as under: 1.3 Date of agreement NHAI TPC Concession Period Appointed Date Scheduled date of completion Construction period Project Length Client Consultant (IE) Concessionaire EPC Date of EPC agreement Date of financial closure Date of financial closure EPC cost Loan amount Grant Project Equity Capital Concessionaire’s TPC Lead Banker : : : : : : : : : : : : : : : : : : : : 17-09-2012 Rs. 682 crores 20 years including construction period. 18-05-2013 13-11-2015 910 days 53.885 Kms (from Km 182.250 to Km 240.000) National Highways Authority of India Artefact Projects Limited KNR Walayar Tollways Private Limited KNR Constructions Limited 28-11-2012 16-03-2013 (Scheduled) 13-05-2013 (Actual) Rs. 790.50 Crores 500 Crores 264.60 Crores 135.91 Crores Rs. 900.51 crores Central Bank of India Status of Land Acquisition The details of land handed over till is as given under detailed description is given Chapter 4 of this report. Table 1.1 Details of land handed over to Concessionaire upto 14.03.2013 S. No. 1.4 Description Area in Sqm In % 1 Required area to be made available 2608539 100.00% 2 Made available area at site as on 14.03.13 2406765 92.00% 3 Area of ROW not made available 201773 8.00% Physical Progress - Road EPC contractor has taken up works in almost all hindrance free lands along the stretch. The Detailed status of physical progress of various items of road works is described in Chapter 7 and the summary of road progress in Main Carriageway is as given below: Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 4/31 KWTPL Monthly Progress Report September 2015 Table 1.2 Summary of Road Progress-Four lane completed Sl. No. 1 2 3 4 5 6 Item Embankment Subgrade Granular Sub Base Wet Mix Macadam Dense Bituminous Macadam Bituminous concrete Total (Kms) Completed (Kms) Balance (Kms) Percentage of Completion 53.885 53.885 53.885 53.885 53.885 53.885 53.885 53.885 53.885 53.885 53.885 53.885 0.000 0.000 0.000 0.000 0.000 0.000 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Table 1.3 Physical Progress of Road (MCW) Left Side Sl No. Item 1 2 3 4 5 6 Embankment Subgrade Granular Sub Base Wet Mix Macadam Dense Bituminous Macadam Bituminous concrete Length (Kms) 53.885 53.885 53.885 53.885 53.885 53.885 Comp. (Kms) 53.885 53.885 53.885 53.885 53.885 53.885 Right Side Bal. (Kms) 0.000 0.000 0.000 0.000 0.000 0.000 Length (Kms) 53.885 53.885 53.885 53.885 53.885 53.885 Comp. (Kms) 53.885 53.885 53.885 53.885 53.885 53.885 Bal. (Kms) 0.000 0.000 0.000 0.000 0.000 0.000 Table 1.4 Physical Progress of Road (Service Road) Left Side Sl No. 1.5 Item Right Side Length (Kms) Comp. (Kms) Bal. (Kms) Length (Kms) Comp. (Kms) Bal. (Kms) 1 Embankment 25.695 25.695 0.000 23.885 23.625 0.260 2 Subgrade 25.695 25.695 0.000 23.885 23.625 0.260 3 Granular Sub Base 25.695 25.695 0.000 23.885 23.625 0.260 4 Wet Mix Macadam 25.695 25.695 0.000 23.885 23.625 0.260 5 Dense Bituminous Macadam 25.695 25.695 0.000 23.885 23.625 0.260 6 Semi Dense Bituminous Concrete 25.695 25.695 0.000 23.885 23.625 0.260 Physical Progress – Structures Work on Culverts (Pipe & Box), Bridges (Major and Minor), Flyover, Vehicular Underpasses and Cattle Underpasses have been started and all are completed, and the quality of works has been found to be satisfactory. Grade Separator/Flyover at Km. 203+900 have been completed 2 Major Bridges at Km. 198+875 & 207+900, have been completed. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 5/31 KWTPL Monthly Progress Report September 2015 All the 12 Nos. of Minor Bridges have been completed. Similarly, all the 4 No’s of CUPs and 7 Nos. of VUPs (i.e. including 3 No’s of VUP’s under Change of Scope) have been completed. The cumulative progress of structural works till end of is as shown in the Table below: Table 1.5. Progress of works – Structures Sl. No 1 I II III 2 I II III IV 3 (A) I II III IV (B) I II III IV 4 I II III IV 5 I II III IV 6 I II III IV 7 I II III IV CD Work / Bridges Culverts Pipe culverts Box Culverts – Widening Box Culverts – Reconstruction Grade Separators @ Km. 203+900 Foundation Sub structure Super structure Approach slab, Crash Barrier Major Bridges Km.198+890 Foundation Sub structure Super structure Approach slab, Crash Barrier Km.207+900 Foundation Sub structure Super structure Approach slab, Crash Barrier ROB Foundation Sub structure Super structure Approach slab, Crash Barrier Minor Bridges – 12 numbers Foundation Sub structure Super structure Approach slab, Crash Barrier VUP Foundation Sub structure Super structure Approach slab, Crash Barrier CUP Foundation Sub structure Super structure Approach slab, Crash Barrier Total in Nos. Completed in Nos. Balance in Nos. 58 116 19 58 116 19 - 16 16 15 2 16 16 15 2 - 5 5 4 2 5 5 4 2 - 9 9 8 2 9 9 8 2 - 2 2 1 2 2 2 1 2 - 33 33 21 24 33 33 21 24 - 26 26 13 26 26 26 13 26 - 8 16 8 16 8 16 8 16 - Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 6/31 KWTPL 1.6 Monthly Progress Report September 2015 Change of Scope Concessionaire identified the COS and value of Change of Scope proposed and recommended by NHAI. Detailed description on change of scope is given under Chapter 9 of this report. 1.7 Equity Support from NHAI (Grant) Particulars Amount 1st Tranche 89,90,00,728.00 2nd Tranche 59,47,14,693.00 3rd Tranche 39,32,30,746.00 4th Tranche 26,03,35,753.00 5th Tranche 17,22,44,743.00 6th & Final Tranche 32,64,73,337.00 Total Grant released as on date: 264,60,00,000.00 Total Grant to be released: 264,60,00,000.00 % of Grant released as on date: 100.00% Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 7/31 KWTPL 1.8 Monthly Progress Report September 2015 Physical & Financial Progress Financial progress of work based on EPC cost terms is given below Table 1.6. Physical & Financial Progress Description Till last month (August 2015) Cum. Cum Planned Achieved During the Month (September 2015) Up to Date Planned Achieved Cum. Planned Cum Achieved Physical Progress 94.53% 97.63% 2.63% 1.94% 97.16% 99.57% Financial Progress 94.22% 98.38% 2.78% 1.52% 96.99% 99.90% Physical Progress achieved as on September 2015 – 99.57% against 97.16% planned. Financial Progress achieved as on September 2015 – 99.90% against 96.99% planned. 1.9 Constraints There are no factors seen as on date which can negatively influence the project completion. However the delay in handing over of Balance Land, and any delay in approval Change of scope may leads subsequent delay in project completion. There is no such risks are also identified as on date. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 8/31 KWTPL Monthly Progress Report September 2015 CHAPTER 2: PROJECT OVERVIEW 2.1 Agencies Involved Client : General Manager (Kerala) National Highways Authority of India, G5 & 6, Sector – 10, Dwaraka, New Delhi – 110 075. PIU : Project Director, National Highways Authority of India, Project Implementation Unit (PIU), No. 8/1187, Arumughan Colony, Chandranagar, Palakkad, Kerala – 678 007. Independent Engineer Head office : : Artefact Projects Limited “Artefact Towers”, 54/3, Chhatrapati Square, Wardha Road, Nagpur – 440 015 (Maharashtra) Site office : “SRIVATSAN" 6/642, Chandranagar Extn., Pirivusala, Palakkad – 678 007 Concessionaire Head Office : KNR Walayar Tollways Pvt. Ltd, (KWTPL) KNR House, 3rd & 4th Floor, Plot No. 114, Phase-I, Kavuri Hills, Jubilee Hills, Hyderabad – 500 033, Andhra Pradesh. Site Office : KNR Walayar Tollways Pvt. Ltd, (KWTPL) Opp. Walayar Police Station, Vattappara, Walayar Dam Post, Palakkad – 678 624, Kerala. Lead Banker : Central Bank Of India Corporate Finance Branch, Bank Street, Koti, Hyderabad-500095 Lenders Independent Engineer (LIE) : M/s. Feedback Infra Limited, Bengaluru No.93, K.H. Road, Opp. KSRTC Central Office, Bangalore – 560027 Lenders Legal Council (LLC) : M/s. India Law Services, New Delhi Thapar House, Central Wing, First Floor, 124 JANPATH, New Delhi 110001 Lenders Insurance Advisor (LIA) : M/s. India Insurance Risk Management & Insurance Broking Services Pvt. Ltd., 405, Archana Arcade, St. John’s Road, Secunderabad – 500 025 (Andhra Pradesh) Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 9/31 KWTPL 2.2 Monthly Progress Report September 2015 Scope of Work of concessionaire The scope of works involves – Four laning of Walayar Vadakkancherry section from Km 182.250 to Km 240.000 on NH-47 in the State of Kerala. The work shall, include the following: 2.3 i) Construction of the Project Highway on the Site set forth in Schedule-A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D, all in the Concession agreement dated 17th September 2012; ii) Operation and maintenance of the Project Highway in accordance with the provisions of this Agreement dated 17th September 2012; and iii) Performance and fulfilment of all other obligations of the Concessionaire in accordance with the provisions of the Concession Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Concessionaire under Concession Agreement. Salient Features of the Project The salient features of the project are as under: 2.3.1 2.3.2 Project Details Name of Project : Four Laning of Walayar – Vadakancherry Section in Kerala from Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 – Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II. (Total Length 53.885 Kms) Construction Package No. : NS-2/BOT/KL-2. Performance Security : Rs. 34.10 Crores, (To be Refunded after 1 year or earlier upon expending 20% of the Total Project Cost i.e. 136.40 Crores) Project Timelines Date of Submission of Bid Date of LOA Date of Concession Agreement Appointed Date Construction Period Scheduled Project Completion Date Date of COD : : : : : : : 30th June, 2010 03rd August, 2012 17th September, 2012 18th May, 2013 910 Days 13th November, 2015 18-05-2015, Provisional Completion Certificate for partial length of the Project i.e. 46.750 Kms out of 53.885 Kms (86.76%) has been issued by the Independent Engineer on 18-05-2015, and collection of User Fee (Toll) started on 23-05-2015. Anticipated Date of COD for 100% Project length Concession Period End of Concession Period : : : 10-10-2015 20 Years (Including Construction Period) 17th May 2033 Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 10/31 KWTPL 2.3.3 Monthly Progress Report September 2015 Project Mile stones Under the provisions of concession agreement as per SCHEDULE - G concessionaire shall achieve the mile stone progress as given under in Table 2.1 Table 2.1 Project Mile stones as per Schedule – G 2.4 Sl No. Mile stone 1 I 2 II 3 III 4 IV Target Date Target Percentage Achieved Percentage on Target Date 10% 17.08% 35% 58.66% 70% 99.90% (As on Sep 30, 2015) 100% N.A. 180 Days from the Appointed date (November 13, 2013) 400 Days from the Appointed Date (June 21, 2014) 650 Days from the appointed date (February 26, 2015) 910 Days from the Appointed date (November 13, 2015) Geometric Features of the Main Carriageway Project Length : 53.495 Kms Service Roads : As per CA Change of Scope Total Widening Pattern as per (Given in CA) a) Concentric : b) Eccentric : LHS RHS Total : : : 47.230 Kms 02.350 Kms 49.580 Kms : : : 28.857 Kms. 13.578 Kms 11.450 Kms 53.885 Kms Design speed : 100 KMPH (except few locations) Main Carriageway Width : 7.25 m Median : Varying from 1.5m to 4.50 m Paved Shoulder : 1.50 m Earthen Shoulder : 1.50 m Minimum Camber : 2.5% Maximum Camber at curves : 7.0% Service Road Width : 7.0 m Length of Service Road : 49.580 Kms Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 11/31 KWTPL 2.5 2.6 Monthly Progress Report September 2015 Provisions as Schedule B & Schedule C Major Bridges Minor Bridges ROB’s VUP’s CUP’s Culverts : : : : : : Toll Plaza Major Intersections Minor Intersections Grade Separated Intersections HTMS : : : : : 2 Nos. 12 Nos. 1 No. 7 Nos. (including 3 Nos. in Change of Scope) 4 Nos. Pipe Culverts : 051 Nos. Box Culverts (Widening) : 122 Nos. Box Culverts (Reconstruction) : 020 Nos. Total (i.e. including COS) : 193 Nos. 1 No. (@ Km. 189+370) 9 Nos. 36 Nos. 1 No. Not required till Traffic Reaches 40,000 PCU Pavement Composition Pavement Design (revised) is completed and submitted to NHAI/IE vide letter no. KWTPL/HO/KL-2/NHAI/2013/222 dated 12th October 2013 and has been approved by the Independent Engineer vide letter No. IE/APL/NH-47/2013/153 dated 18th October 2013 and the pavement composition is given in Table 2.2 as follows: TABLE 2.2: Pavement Composition Homogeneous Section HS-01 HS-02 182.250 - 204.000 204.000 -236.140 10 10 73 76 (15 yrs) (15 yrs) BC in mm 50 50 DBM in mm 120 120 WMM in mm 250 250 GSB in mm 200 200 Subgrade in mm 500 500 Design Chainage (From -To) Design CBR in % Design Traffic in MSA Rigid pavement composition at toll plaza location is shown as under in Table 2.3 : TABLE 2.3 RIGID PAVEMENT COMPOSITION Layer Thickness (Tentative) PQC 300 mm DLC 150 mm GSB 150 mm Sub Grade 500 mm Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 12/31 KWTPL Monthly Progress Report September 2015 CHAPTER 3: PROJECT FINANCIALS 3.1 Total Project Cost (TPC) Breakup Based on the available data it is learnt that NHAI under taken the feasibility study of the project in the year 2004 and subsequently made various additions and deletions from the original proposal and in the year 2010 the NHAI calculated the Total Project cost as Rs 682 crores. Due to various reasons award of the project was delayed and concession agreement was signed on 17th September 2012 and appointed date (construction start date) is fixed on 18thn May 2013. Based on the current construction material rates and lenders interest rates concessionaire assessed the TPC of project is Rs 900.51 crores accordingly Financial close was achieved. As per Financial Close and the Approved Financial model Total project cost of concessionaire breakup is shown in Table 3.1, below: TABLE 3.1 Breakup of Total Project Cost Description Amount in Rs. Cr. EPC Costs Civil Construction Costs Contingency (as % of Civil Construction Costs Total EPC Cost 775.00 15.50 790.50 Non – EPC Cost Insurance during Construction 2.37 Preliminary Exp. 7.75 Other SPV Overheads 17.44 Total Non-EPC Cost 27.56 Premium to be paid on COD Total Capital Cost (excluding IDC) 818.06 Interest During Construction (IDC) 82.46 Total Project Cost (including IDC) 3.2 0 900.51 Project Funding As stated above the total project cost is estimated to be Rs.900.51 crores including Rs 790.5 crores towards Cost of construction, Interest during construction, SPV over heads and Independent Engineer costs etc. The project cost is to be mobilised by loan from the Lender, Sub-debt and Equity. The entire project cost is envisaged to be funded in the pattern with a debt equity ratio of 1.25:1. There is a component of interest free equity support from NHAI amounting to Rs.264.60 Cr to be used for implementation of the project. Concessionaire’s arrangement for project Funding is given under Table 3.2. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 13/31 KWTPL Monthly Progress Report September 2015 TABLE 3.2 Sources for Project Fund Amount Particulars 3.3 % (Rs. Crores) KNR CL (Promoter’s Equity) 135.91 15.09% of TPC Grant ( By NHAI) 264.60 29.38% of TPC Senior Debt (Loan) 500.00 55.52% of TPC Total Project Cost 900.51 100% Debt arrangement As shown in Table 3.2 or successful completion of the project an amount of Rs 500 crores is required in the form of loan (senior Debt). Based on the proposal given by Concessionaire the consortium of Banks granted a loan of Rs 500 crores to the Project, lenders details and their contribution is given under Table 3.3 below; TABLE 3.3 Lender details & Contributions Sl No. Amount of Contribution Bank Name Remarks (Rs. Crores) 1 Central Bank of India 175 Lead Bank 2 Bank of India 100 Consortium Bank 3 Corporation Bank 90 Consortium Bank 4 Canara Bank 85 Consortium Bank 5 Vijaya Bank 50 Consortium Bank Total Loan Amount 3.4 500 Expenditure Expenditure/Contribution towards project made by the agencies as on is shown in table 3.4 below: TABLE 3.4 Expenditure / Contributions made by agencies as on date Total committed contribution (Rs. Crores) Contributed/ Expenditure made till date % KNRCL (Promoter’s Equity) 135.91 135.91 100.00% Grant (By NHAI) 264.60 264.60 100.00% Particulars Senior Debt (Loan) 500.00 469.00 93.80% Total including interest (in crores) 900.51 869.51 96.56% Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 14/31 KWTPL Monthly Progress Report September 2015 CHAPTER 4: PRE CONSTRUCTION ACTIVITIES 4.1 Land acquisition As per clause 10.3.2 under Article 10 of the Concession agreement, the authority has to handover 80% or more of land required for four laning of the project highway before or on appointed date. Clause 10.3.1 requires Authority and Concessionaire to jointly inspect the site and prepare a memorandum which includes an inventory of vacant and unencumbered land, buildings, structures, road works, trees etc. It must also have an Annexure showing parts of site where vacant access and right of way have not been handed over to the client. A memorandum of inventory was signed on the 14 th March 2013 by the Authority, Concessionaire and the EPC Representative mentioning that 92% of land is available and only 8% is to be handed over. As per Clause 10.3.2 of CA, at least 80% of the land shall be handed over on or prior appointed date. The details of land handed over till is as given under in Table 4.1: Table 4.1 Details of land handed over to Concessionaire as of September’ 2015 S. No. Description LHS (Sqm) RHS (Sqm) Total 1 Total Land to be Made available 1124015 1484524 2608539 2 Area Handed over up to August ' 2015 1123289 1484524 2607813 3 Area made available in September’ 2015 726 0 726 4 Balance land yet to be made available 0 0 0 % of Land to be made Available 4.2 Side 0.00% Shifting of Utilities As per the provisions of CA, 80% of Hindrance free land shall be handed over to the concessionaire on appointed date. The Project is affected by the presence of Tress, Electric Poles, and Water Supply lines. These have to be removed for work to be taken up. 4.2.1 Tree Cutting The tree cutting has been already awarded by NHAI directly to third party agency, and tree cutting is in progress. There are approximately 4365 trees to be cut in the project highway and all are removed. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 15/31 KWTPL 4.2.2 Monthly Progress Report September 2015 Utility Shifting- Electrical Regarding electrical lines, Kerala State Electricity Board (KSEB) has furnished 9 Nos of estimates for shifting electrical utilities in the divisions of Palakkad, Chitur and Alathur for an amount of Rs. 4.156 Cr. Further PIU, NHAI vide their letter no NHAI/PD/Palakkad/KL-2/352 Dt 4th March 2013 entrusted the work of shifting of electrical lines is given to the concessionaire at KSEB approved rates. Concessionaire entrusted the shifting of Electrical to EPC Contractor under variation item. As per approved estimate NHAI paid Supervision charges to KSEB. The shifting of electrical utilities has been started and completed by the EPC contractor. Status of the same is enclosed as Annexure 4.1 4.2.3 Utility Shifting- Water supply lines Similarly, towards shifting water supply utility lines 7 Nos estimates amounting Rs. 4.09 Cr. have been furnished by Kerala Water Authority (KWA) covering Rural Water Supply schemes (RWSS) in seven towns and 5 estimates belonging to 5 local Panchayat. The shifting of water supply utility lines has been begun by the EPC Contractor. PD, PIU, NHAI entrusted the work of shifting of water supply lines is given to the concessionaire at KWA approved rates. Concessionaire entrusted the shifting of Water Pipe Line to EPC Contractor under variation item. The shifting of Water Supply lines has been started and completed by the EPC contractor. Status of the same is enclosed as Annexure 4.2 Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 16/31 KWTPL Monthly Progress Report September 2015 CHAPTER 5: DESIGN & DRAWINGS 5.1 Design Consultants EPC contractor engaged M/s AECOM India Pvt Ltd as Design consultants for preparation of detailed Project report and submission of the drawings. Summary of report is as given in Table 5.1 below Table 5.1 Summary of Design Status S. No Activity 1 Design (HIGHWAY) Unit Total Till last month During the month Balance to be submitted Remarks - - - - - Approved I Typical Cross Sections II Plan & Profile - MCW KM 53.89 53.89 - - Approved III Plan & Profile - Sr Road KM 47.23 47.23 - - Approved IV Major junctions Nos 9.00 9.00 - - Approved V Minor Junctions Nos 36.00 36.00 - - Approved 2 Design & GFC drawings (For STRUCTURES) - Approved I Major Bridges Nos 2.00 2.00 - II Minor Bridges-MCW Nos 12.00 12.00 - III Minor Bridges- SR Nos 7.00 7.00 - - Approved IV Fly over/ Grade separators Nos 1.00 1.00 - - Approved V ROB / RUB Nos 1.00 1.00 - - Approved VI VUP Nos 7.00 7.00 - - Approved VII PUP Nos 4.00 4.00 - - Approved VIII Box culverts Nos 142.00 142.00 - - Approved IX Pipe Culverts Nos 51.00 51.00 - - Approved Approved Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 17/31 KWTPL S. No 3 Monthly Progress Report September 2015 Activity Unit Total Till last month During the month Balance to be submitted Remarks DOCUMENTS & REPORTS I Inception Report Nos 1.00 1.00 - - II Design Philosophy report Nos 1.00 1.00 - - III Hydrology Report Nos 1.00 1.00 - - IV Pavement Design Report Nos 1.00 1.00 - - V Construction Methodology Nos 1.00 1.00 - - VI QA/QC Manual Nos 1.00 1.00 - - VII O & M Manual Nos 1.00 1.00 - - VIII SH&E Manual Nos 1.00 1.00 - - Approved Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 18/31 KWTPL Monthly Progress Report September 2015 CHAPTER 6: MOBILIZATION 6.1 Project office & camp setup The concessionaire and the EPC Contractor established their base camp at Km 187+500 (opposite to Walayar police station) with an additional camp at Km 231+735. Line Diagram showing the locations of plants and camp set ups are enclosed as Annexure 6.1. Status of functioning of all major plants is detailed in Table 6.1. Total list of plant and machinery and Manpower mobilized at site is presented in Annexures 6.2 & 6.3 and summary of Plants and Machinery Mobilised is given under Table 6. Table – 6.1: Status of Plants & Crushers – September’ 2015 S. No Plant / Crusher Name Capacity Chainage Working Status Validity Date 1 Palaturai Crusher Puzzalona, 150TPH 183+150 LHS 10.5 Kms Apart In Operation 30.06.2015 2 Mangalam Dam Crusher Nawa, 250TPH 231+735 LHS 13.5 kms Apart In Operation 30-06-2016 3 Pudussery East Village Puzzalona, 250TPH 187+500 LHS 0.500 Kms Apart In Operation 31-07-2016 4 Batching Plant - 1 Penta, 60 Cum/Hr 187+500 LHS 0.500 Kms Apart In Operation 29-02-2016 5 Batching Plant - 2 Schwing Stetter, 30 Cum/Hr 207+000 LHS 0.100 Kms Apart In Operation 31-03-2016 6 Batching Plant - 3 Miller , 30 Cum/Hr 231+735 LHS 1.5 kms Apart In Operation 07-03-2016 7 Hot Mix Plant - 1 D&G, 240TPH 231+735 LHS 1.5 kms Apart In Operation 07-03-2016 8 Hot Mix Plant - 2 Specco, 160TPH 187+500 LHS 0.500 Kms Apart Permission awaited 9 WMM Plant - 1 New Tech, 150TPH 187+500 LHS 0.500 Kms Apart Permission awaited 10 WMM Plant - 2 New Tech, 150TPH 231+735 LHS 1.5 kms Apart In Operation Remarks 07-03-2016 Table 6.2 Summary of Machineries & Vehicles mobilized Sl No. Name of the Equipment Qty Mobilized Till last month Mobilised During the Month Demobilised During the month 1 Generators 24 2 26 2 Excavators 33 1 34 3 Soil Compactor 21 2 23 Net Available Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 19/31 KWTPL Sl No. Name of the Equipment Qty Mobilized Till last month Mobilised During the Month Demobilised During the month Net Available 4 Tandem Roller 4 1 5 5 Motor Grader 10 1 11 6 Dozers 3 3 7 Weigh Bridge 4 4 8 Tyre Mounted Cranes 8 9 Boom Placer 2 10 Loader 9 11 Lighting Source 4 4 12 Kerb Machines 3 3 13 Paver 2 14 Containers 12 12 15 Cement Silo 2 2 16 Riggers 1 1 17 JCB 18 Hydraulic Breaker 5 19 Piling Machine 1 20 Tippers 115 21 Transit Mixers 12 22 Water Tankers 11 23 Diesel Tankers Tractor with Compressors 3 3 11 11 24 6.2 Monthly Progress Report September 2015 2 6 2 1 1 1 9 3 1 1 1 6 1 6 121 4 2 8 13 SPV Organization Structure 6.2.1 Board of Directors As per the Articles of Association of KWTPL, the Board of Directors shall not be less than 2 and not more than 12 including all kinds of Directors. The Board of KWTPL currently comprises of the following directors: S. No. 6.2.2 Name Position 1 K. Narasimha Reddy Promoter and Managing Director 2 K. Jalandhar Reddy Promoter and Executive Director Board of Directors The Management committee will be headed by Mr. K. Jalandhar Reddy, Director of SPV this committee shall deal with project progress review, lenders related issues and other core critical issues of SPV. The structure of the committee shall be as below: Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 20/31 KWTPL Monthly Progress Report September 2015 S. No. 6.2.3 Name Position 1 K. Jalandhar Reddy Promoter and Executive Director 2 K Saravana Kumar Vice President 3 D Tirupati Reddy General Manager ( contracts) 4 G. Sravan Kumar General Manager ( Finance) SPV Works Committee / Site operations organization structure The Works Committee is appointed by the Board of Directors. The committee will be responsible for ensuring timely and quality construction as per the project development strategy. SPV’s work committee is given below; S. No. Name Designation Position 1 K Saravana Kumar Vice President Over all In-charge of Project execution 2 E. Sreenivasa Rao CPM Site Authorized Representative Dy. General Manager Design & QS Head 3 T R Rajendra Kumar SPV & EPC Organization chart enclosed as Annexures 6.4 & 6.5 6.2.4 Project Monitoring & Control Team For monitoring of day to day work and to have a better co-ordination between the employer, Independent Engineer, EPC contractor and the designer SPV deployed a PMC team consists of experience engineers and having a thorough knowledge of construction. PMC team is selected having at least one expert from each field such as highway, structures, survey, quality control and safety etc. Team listed under table 6.3 is functioning as Project monitoring and quality control team site. Table 6.3: Project Monitoring & Quality Control Team Sl No. 1 2 3 4 5 6 7 8 9 10 Name E. Sreenivasa Rao C. Prabhu Swamy K.D.P. Rao Ajo Abraham T. Gopal Krishna Sudhakar Surendra Sekhar Ravi Prasanth Reddy Designation Team Leader Cum Sr. Highway Engineer Sr. Project Manager (Structures) Sr. Material Engineer Safety In- charge Land Acquisition In-charge Bridge Engineer Highway Engineer Q.C. Engineer Survey Engineer Lab Technician Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 21/31 KWTPL 6.2.5 Monthly Progress Report September 2015 EPC Contractor’s Key staff Total responsibility of construction of Project Highway rests with EPC contractor i.e. M/s KNR constructions Ltd, EPC contractor nominated and mobilized the experience engineers and the list of the Key persons of the EPC contractor is given in Table 6.4 below; Table 6.4: List of Key Persons of EPC Contractor Sl. No. Name Designation 1 V. Venugopal Reddy Director - Projects 2 M. Ramakrishna Reddy Project Manager ( Road) 3 Ch. Yakambaram Project Manager (Structures) 4 C. Rajender Reddy Asst. General Manager (Mech.) 5 Vijay Kumar Pandey Chief Surveyor 6 Ritesh N Sr. Mechanical Engineer 7 P. Surender Reddy Material Engineer 8 Tirupathi Reddy A In-charge Crusher / Plant 9 Panicker R S Admin. Manager 10 Purshottam Dash Accounts Manager Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 22/31 KWTPL Monthly Progress Report September 2015 CHAPTER 7: CONSTRUCTION ACTIVITIES 7.1 Construction Programme The Concessionaire has submitted the work programme for completion of the project and the same have been approved by IE vide letter No. IE/APL/KL-02/2013/123, Dt: 07.09.2013. The project is scheduled for completion on November 13, 2015. The month wise planned financial progress has been submitted along with the construction programme. The progress achieved till end of September’ 2015 is 99.90%. 7.2 Mobilisation of Resources Mobilisation of machinery, materials and manpower is one of the major driving forces for completing a huge project. Contractor has been proactive and has identified sources for all major materials and submitted approval requests to the authority. Approval for source has been obtained for Aggregates, Reinforcement Steel, Cement, Admixture, Spun Pipes, POTPTFE bearings, HDPE sheathing ducts, HT strands and Strip Seal expansion joints as on September, 2015. EPC Contractor has also mobilised adequate equipment like excavators, soil compactors, Asphalt compactors, Motor grader, Dozers, Cranes, Loader, kerb casting machine etc. Adequate technical, skilled and unskilled manpower have been mobilised. There are two base camps set up at Km. 187+500 and at Km. 231+735. The base camps are equipped with office space, laboratory, staff quarters, labour camps etc. It can be safely assumed that EPC contractor is fully equipped as on date to carry out the works as planned in the work programme. 7.3 Bridges and Structures The construction of Pipe & Box culverts, Major Bridges, Minor Bridges, Vehicular Underpass and Passenger Underpass are in progress. The progress charts for Pipe culverts, Box Culverts, Major Bridges, Minor Bridges, Vehicular Underpass, Cattle Underpass and Flyover have been enclosed as Annexure 7.1. 7.4 Road Construction Construction of Embankment, Subgrade and Granular Sub Base and bituminous works has been started. The bar chart of various items of road works has been verified on ground and is presented as Annexure 7.2. 7.5 Quality Control The Concessionaire has set up a well-equipped laboratory at the site camp wherein all the quality assurance tests are performed. List of lab equipment’s is enclosed as Annexure 7.3. The summary of field and laboratory test results referred to as Quality Control Tests conducted during the month is enclosed as Annexure 7.4. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 23/31 KWTPL 7.6 Monthly Progress Report September 2015 Weather Report Weather recorded at the project area during the month is enclosed as Annexure 7.5 7.7 Safety Procedures EPC Contractor has adopted safety procedures at locations where construction work is ongoing. 7.8 Photographs Some of the photographs related to the project are given in Annexure 13.0. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 24/31 KWTPL Monthly Progress Report September 2015 CHAPTER 8: PROJECT PROGRESS 8.1 Project Cost The total project cost is estimated to be Rs.900.51 crores including Rs 790.5 crores towards Cost of construction, Interest during construction, SPV over heads and Independent Engineer costs etc. The project cost is to be mobilised by loan from the Lender, Sub-debt and Equity. 8.2 Planned financial progress / Draw down schedule The drawdown schedule envisaged for the project is as given under: Table 8.1: Draw Down Schedule Quarterly Debt Facing 31-03-2014 31-03-2015 31-03-2016 Total in Cr Quarter 1 51.84 59.61 54.25 91.01 Quarter 2 17.44 37.16 36.41 118.01 Quarter 3 35.51 65.86 16.64 125.27 Quarter 4 63.01 62.26 0 165.7 167.8 224.89 107.3 500 Total 8.3 Financial Progress The month wise financial progress of the project planned vs achieved progress each month is shown in the Table 8.2 and Graphical representation in the form of S-curve is given Annexure 8.1 Table 8.2. Comparison of Financial Progress Planned vs Achieved Sl. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Month May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Progress Planned in % Progress Achieved in % Progress Planned in Rs. Cr 1.04 1.25 1.30 1.38 1.49 2.22 3.33 3.13 3.32 4.24 4.84 5.84 6.69 2.99 3.21 3.02 6.04 3.36 2.80 5.26 1.83 1.40 2.48 3.56 4.11 5.57 6.34 7.66 5.40 4.84 4.09 1.93 1.16 2.46 8.22 9.85 10.25 10.91 11.77 17.59 26.30 24.73 26.25 33.49 38.27 46.15 52.90 23.61 25.39 23.90 47.73 Progress Achieved in Rs. Cr 26.56 22.12 41.58 14.47 11.09 19.59 28.14 32.48 40.04 50.15 60.59 42.69 38.27 32.35 15.25 09.20 19.45 Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 25/31 KWTPL Sl. No 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Monthly Progress Report September 2015 Month Progress Planned in % Progress Achieved in % Progress Planned in Rs. Cr 4.62 3.44 4.03 4.34 4.74 5.16 4.45 3.48 1.47 1.60 1.57 2.78 2.11 0.89 2.56 5.22 6.40 4.57 3.48 6.33 2.20 1.33 2.07 1.52 - 36.55 27.17 31.82 34.32 37.44 40.82 35.21 27.51 11.60 12.61 12.40 21.96 16.72 7.05 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Progress planned upto September’ 2015 Progress achieved upto September’ 2015 8.4 Progress Achieved in Rs. Cr 20.23 41.30 50.58 36.13 27.53 50.03 17.37 10.50 16.38 12.03 96.99% 99.90% Physical Progress As there is no uniform method available to access the physical progress of works concessionaire followed weightage basis physical progress. The progress achieved in each item of work has been given in Annexure-8.2. Linear Wise LHS and RHS Main Carriageway status is enclosed as Annexure 8.3. Pictorial drawings of the structures upto the end of the month are enclosed as Annexure 8.4. Strip chart showing Status of culverts and Bridges, Flyovers, ROB, VUP’s and PUP’s are attached as Annexure-8.5 8.5 Details of EPC contractor IPC certified as on date Table 8.3: As on date IPC Certified of EPC Contractor IPC No. 1 2 3 4 5 6 7 8 9 10 11 12 Month May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 Value of work Done 26,15,63,210.00 22,11,61,336.00 41,58,64,165.00 14,47,99,429.00 11,09,18,900.00 19,58,86,300.00 28,13,65,866.00 32,47,54,624.00 44,04,70,865.00 50,14,55,632.00 60,58,68,876.00 42,69,27,787.00 Deductions & Recoveries 52,31,264.00 44,23,227.00 83,17,283.00 28,95,989.00 22,18,378.00 39,17,726.00 6,07,75,027.00 7,01,46,999.00 9,51,41,707.00 10,83,14,413.00 13,08,67,677.00 9,22,16,402.00 Net Amt. of IPC 25,63,31,946.00 21,67,38,109.00 40,75,46,882.00 14,19,03,440.00 10,87,00,522.00 19,19,68,574.00 22,05,90,839.00 25,46,07,625.00 34,53,29,158.00 39,31,41,216.00 47,50,01,199.00 33,47,11,385.00 Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 26/31 KWTPL Monthly Progress Report September 2015 13 14 15 16 17 18 19 20 May-14 June-14 July-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 38,27,22,965.00 32,35,00,072.00 15,24,93,014.00 9,20,14,745.00 19,45,20,092.00 20,23,27,684.00 41,29,54,639.00 50,58,46,814.00 8,26,68,160.00 6,98,76,015.00 3,29,38,491.00 1,98,75,185.00 4,20,16,339.00 4,37,02,780.00 8,91,98,202.00 10,92,62,912.00 30,00,54,805.00 25,36,24,057.00 11,95,54,523.00 7,21,39,560.00 15,25,03,753.00 15,86,24,904.00 32,37,56,437.00 39,65,83,902.00 21 Jan-15 36,12,55,007.00 7,80,31,081.00 28,32,23,926.00 22 23 24 25 26 27 28 29 Feb-15 Mar-15 Apr-15 May-15 June-15 July-15 Aug-15 Sep-15 27,52,84,585.00 50,03,19,501.00 0.00 17,36,58,037.00 10,50,30,969.00 0.00 16,38,46,863.00 12,03,33,188.00 789,71,45,165.00 5,94,61,470.00 9,72,23,791.00 0.00 34,73,161.00 21,00,619.00 0.00 32,76,937.00 24,06,664.00 131,99,77,902.00 21,58,23,115.00 40,30,95,710.00 0.00 17,01,84,876.00 10,29,30,350.00 0.00 16,05,69,926.00 11,79,26,524.00 657,71,67,263.00 Total Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 27/31 KWTPL Monthly Progress Report September 2015 CHAPTER 9: CHANGE OF SCOPE 9.1 Concessionaire’s proposal COS No. 1 for an Amount of Rs. 32.21 Crore and COS No. 3 (Repair & Rehabilitation of existing bridges) for an amount of Rs. 9.72 Crore has been approved by NHAI, HQ, New Delhi. Partial amount of Rs. 38.05 Crore claimed and has been released by NHAI as on date. COS No-2 Amount Rs. 9.82 Crore 2. CHANGE OF SCOPE: Concessionaire Submitted reply for comments raised by NHAI HQ for 5 No’s works for under Change of Scope Vide Letter No.KWTPL/KL-2/NH-47/NHAI/2015/629, dated 31.08.2015 to IE for recommendation to NHAI. IE Clarification & Recommended to NHAI for 5 No’s works under change of scope vide letter no.APL/W-V/01/2015-16/34, dated.07.09.2015 RO, NHAI recommended to NHAI, HQ vide letter no: NHAI/RO-Kerala/PIUPalakkad/COS/KL-02/2015/400 dated.08.09.2015 requesting for according COS Order. Awaiting In-Principal Approval from NHAI HQ. COS No-4 Amount Rs. 16.21 Crore 4. CHANGE OF SCOPE: Site Inspection of S.K.Sulthania, GM (T), Kerala, dated.21.12.2014 for above 3 Items. Concessionaire Submitted Detailed Cost Estimate for 3 No’s works for under Change of Scope Vide Letter No.KWTPL/KL-2/NH-47/2015/608, dated.23.07.2015 to IE for recommendation to NHAI IE Clarification & Recommended to NHAI for 5 No’s works under change of scope vide letter no.APL/W-V/01/2015-16/26, dated.01.08.2015 RO, NHAI recommended to NHAI, HQ vide letter no: NHAI/RO-Kerala/PIUPalakkad/COS/KL-02/2015/375A dated.13.08.2015 requesting for according InPrincipal Approval. Awaiting In-Principal Approval from NHAI HQ. COS No-5 Amount Rs. 0.73 Crore 5. CHANGE OF SCOPE: Concessionaire Submitted Detailed Cost Estimate for above works for under Change of Scope Vide Letter No.KWTPL/KL-2/NH-47/2014/459, dated.21.10.2014 to NHAI. Recommendation from IE is forwarded to NHAI PIU-Palakkad vide letter no. IE/APL/KL-02/2014/561, dated.24.10.2014. Recommendation from PIU-Palakkad to RO- Chennai is required Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 28/31 KWTPL Monthly Progress Report September 2015 CHAPTER 10: QUALITY CONTROL As per provisions of contract all works shall be executed according to MORTH Specifications Rev 4 and IRC SP-84 Manual of specifications and standards for Four laning works EPC contactor established Full-fledged laboratories at KM 187.500 with all testing equipment for soil, aggregate, cement, bitumen, concrete etc. The lab equipment are calibrated time to time. All construction Materials and construction activities layer wise are tested in the presence of PMC and minimum 10% of quality control is done in the presence of IE. Summary of quality control testing conducted by the EPC contractor under supervision of concessionaire and IE are given in Annexure 7.4 CHAPTER 11: ROAD SAFETY, TRAFFIC MANAGEMENT & ACCIDENT DATA 11.1 Road Safety Road safety has been given due importance for safe movement of traffic. Special safety team is created to monitor round the clock regular patrolling is carried out by safety team for safe movement of traffic. 11.2 Traffic Management In order to regulate the traffic and safety of road user additional cautionary sign boards, barricading, safety cones and safety ribbons reflective tapes have been placed at all vulnerable places and traffic diverted locations. Existing highway is maintained for traffic worthiness. 11.3 Accident Record Road accident record pertaining to project highway is collected regularly from site by safety team and Police stations. The record of accidents during the month is enclosed as Annexure11. Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 29/31 KWTPL Monthly Progress Report September 2015 CHAPTER 12: DETAILS OF SUBMITTAL & APPROVALS Details of status of major approvals of Designs and Materials are listed below Table: 12.1 Source Approvals S.No Company Source 1 Palathurai & Mangalamdam 2 RINL & JSW 3 Chettinad, Penna&bharathi Cement 4 HINCOL Emulsion 5 MRPL VG-30 & CRMB -60 Aggregate Steel Admixture – Fairflo RMC (KR) Asphalt Seal KWTPL-004 Dt:31.12.2012 KWTPL-005 Dt:31.12.2012 KWTPL-005 Dt:31.12.2012 KWTPL-022 Dt:11.03.2013 Approved from Authority Letter No & Date NHAI/680A, Dt:06.05.2013 IE/APL/201, Dt:22.11.2013 IE/APL/201, Dt:22.11.2013 IE/APL/017, Dt:09.07.2013 KWTPL-023 Dt:11.03.2013 IE/APL/018, Dt:09.07.2013 Approved KWTPL-027 Dt:12.03.2013 IE/APL/183, Dt:11.11.2013 Approved KWTPL-035 Dt:03.04.2013 IE/APL/021, Dt:10.07.2013 Approved Issue Letter No & Date Status Remarks Approved Approved Approved Approved 6 FAIRMATE 7 TIKI TAR 8 Z-TECH (INDIA) PVT LTD Expansion joints KWTPL-036 Dt:03.04.2013 IE/APL/023, Dt:10.07.2013 Approved 9 IWL India Limited Cationic Bitumen & Emulsion KWTPL-040 Dt:03.04.2013 IE/APL/022, Dt:10.07.2013 Approved 10 Chennai Spun Pipes Industries NP4 RCC Hume Pipes KWTPL-048 Dt:10.04.2013 IE/APL/184, Dt:11.11.2013 Approved 11 BASF India Ltd Admixture KWTPL-049 Dt:10.04.2013 IE/APL/183, Dt:11.11.2013 Approved 12 STRATA RE Wall KWTPL-070 Dt:30.04.2013 IE/APL/096, Dt:14.08.2013 Approved 13 Mageba Bridge Products Pot Ltd POT-PTFE Bearings KWTPL-134 Dt:11.07.2013 IE/APL/186, Dt:11.11.2013 Approved 14 REX Polyextrusion Ltd HDPE Sheathing Duct KWTPL-074 Dt:03.05.2013 IE/APL/194, Dt:14.11.2013 Approved 15 TATA STEEL (WIRE DIVISION) HT STRANDS KWTPL-079 Dt:09.05.2013 IE/APL/177, Dt:09.11.2013 Approved 16 Sanfield (INDIA) Ltd Strip Seal Expansion joint KWTPL-144 Dt:20.07.2013 IE/APL/186, Dt:11.11.2013 Approved 17 Indian Oil Corporation Ltd Bitumen KWTPL-112 Dt:17.08.2013 IE/APL/104, Dt:19.08.2013 Approved 18 Borrow Area Soil Soil KWTPL/077, Dt:06.05.2013 IE/APL/201, Dt:22.11.2013 Approved Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 30/31 KWTPL Monthly Progress Report September 2015 Soil KWTPL/093, Dt:01.06.2013 IE/APL/029, Dt:16.07.2013 Approved Filter Media Mix Design Mix Design KWTPL/096, Dt:03.06.2013 IE/APL/188, Dt:11.11.2013 Approved 21 Grouting Mix Design Mix Design KWTPL/131, Dt:11.07.2013 IE/APL/030, Dt:16.07.2013 Approved 22 M-30 RE Blocks Concrete Mix Design KWTPL/114, Dt:26.06.2013 IE/APL/031, Dt:16.07.2013 Approved 23 Concrete Mix Designs Concrete Mix Design KWTPL/132 Dt:11.07.2013 IE/APL/032, Dt:16.07.2013 Approved 24 Water Base Camp KWTPL/135 Dt:13.07.2013 IE/APL/034, Dt:19.07.2013 Approved 25 PQC Mix Design PQC Mix Design KWTPL/175, Dt:22.08.2013 IE/APL/110, Dt:28.08.2013 Approved 19 Cutting Soil 20 CHAPTER 13: CORRESPONDENCE EXCHANGED Summary of correspondence exchanged between concessionaire, Independent Engineer and Employer in the knowledge of concessionaire is given in Annexure 13 CHAPTER 14: VISITS AND MEETINGS 14.1 VISITS During the month the following visits were made to site / out of project site by senior officials/Lenders and others relating to the project. Table: 14.1 Visits Date of Visit Name of the Officer 06.09.2015 Satish NL, AGM Representing Organisation Feedback Infra Private Limited Duration of Days 1 1 Site Visit discuss on Petition filed by Sri. R. Manikandan, S/o Ramankutty, Koyyamarakkad, Kanjikode, Palakkad before the KSHRC. 1 Site Visit discuss on various issues relating Project. Registrar, KSHRC 17.09.2015 Mohammed Basha Rama Krishna Reddy C.T.Abraham 18.09.2015 Mohammed Basha Rama Krishna Reddy 14.2 Team Leader, Artefact Projects Limited Project Manager, KNRCL Project Director, NHAI Team Leader, Artefact Projects Limited Project Manager, KNRCL Remarks if any Meetings No meetings were held during the month Four Laning of Walayar - Vadakkancherry Section in Kerala Km. 182.250 (Design Chainage Km. 182.250) to Km. 240.000 (Design Chainage Km. 236.135) of NH-47 –Package NS-2/BOT/KL-2 on DBFOT (Toll) Basis under NHDP Phase II Pg. 31/31