FALL 2008 WMGT 112: Irrigation Principles DEPARTMENT: Water Management & Irrigation Technology INSTRUCTOR: Greg Farrens ADDRESS: Walla Walla Community College 500 Tausick Way Walla Walla, WA 99362 PHONE: (509) 527-4250 Office (509) 522-2390 Home (509) 527-4572 Fax E-MAIL: greg.farrens@wwcc.edu TYPE OF COURSE: Lectures and hands-on activities related to water management and irrigation principles, methods, and applications. COURSE LENGTH: Fall Quarter CREDIT HOURS: 1 quarter credit PREREQUISITES: None COURSE DESCRIPTION: An introduction of pump and piping systems. Basic water hydraulics related to irrigation systems. Analysis of plant-water-soil relationships COURSE OBJECTIVES: Upon completion of this course, you will be able to: 1. Identify water management techniques 2. Identify irrigation systems 3. Analyze irrigation methods 4. Apply the principles of soil-water-plant relationships 5. Experience installation, operation and maintenance of irrigation systems REFERENCE TEXT: Irrigation, Fifth Edition, The Irrigation Association, Pair, Hinz, Frost, Sneed, and Schiltz, 1983 1 WMGT 112 - Course Expectations 1. Class attendance: Attend each class on time! 2. Assignments: All ten (10) assignments are to be turned in before class on the day due. Late assignments are accepted with a 20% penalty per class day. You may turn an assignment in early or send it with someone to turn in. Assignments will be 50% of the course grade. Unit 1: Unit 2: Unit 3: Unit 4: Unit 5: Unit 6: Unit 7: Unit 8: Unit 9: Unit 10: Sprinkler Applications and Water Management Installation, Operation and Maintenance Water Hydraulics and Pumps Soil-Water-Plant Relationships Plant–Water Requirements Irrigation of Specific Crops Water Quality and Supply Environmental Controls Chemical Applications Economics 3. Tests: There will be five (5) tests. 4. Grading Summary: Assignments (10 @ 5% each) Tests (5 @ 10%) Grade A AB+ B BC+ C CD+ D F 50% 50% 100% Percentage 93-100 90-92 87-89 83-86 80-82 77-79 73-76 70-72 65-69 60-64 <60 2 WMGT 112: Irrigation Principles Fall Quarter Schedule 2008 Monday Tuesday Wednesday Thursday Friday 112A Introduction Sprinklers Mainline Hand Line/ Wheel Line Center Pivot Solid Set Drip Turf Nelson Tour Test 112B Sprinkler Performance Sprinkler Performance Sprinkler Patterns Can Testing Uniformity Installation Installation Operation Operation Maintenance Test 112C Pressure Flow Piping Pumps Pumps Soils Intake Rates Water Holding Capacities Soil Moisture Measurement Test 112D ET and CU Irrigation Requirements Water Scheduling Weather Stations Crops Holiday Crops Water Supplies Water Quality Water Law Test 112E Frost Protection Crop Cooling Liquid Waste Chemical Injection Chemical Injection Other Sprinkler Applications Capital Costs Annual Costs Energy and Water Savings Energy and Water Savings Test 11:30-1:30 3