BUILDING DEPARPTMENT-I ROHINI ZONE SUB:- Demolition/sealing action. JUNE-2013 Sl. No. Date 1 Property No. LD-193, Pitampura 03.06.13 2 A-4/29, Paschim Vihar 3 H-6, Udyog Nagar 4 04.06.13 31, Subh Enclave, Pitampura 5 CC-6B, Shalimar Bagh 6 CC-6C, Shalimar Bagh 05.06.13 7 116A, Kavita Colony 8 1824, Multani Mohalla, Rani Bagh AN-23B, Shalimar Bagh 9 06.06.13 10 11 G&JU-93D, Pitampura 07.06.13 RZF-43, Nihal Vihar 12 RZF-18, Nihal Vihar 13 GH-14/417, Paschim Vihar 14 GH-14/702, Paschim Vihar 15 WZ-77, Hari Singh Park 10.06.13 16 WZ-78, Hari Singh Park 17 WZ-40, Hari Singh Park 18 B-10, Brij Vihar 11.06.13 Details of Action Taken at ongoing stage/misuse. Two rooms constructed at SF, brick walls, slab and columns demolished and made property unusable at ongoing stage. Demolished the chajja on Mpl land at GF and also demolished the parapet walls and remove the railing at FF at ongoing stage. Demolished the brick walls and also removed the tin shed in the shape of rooms at SF at ongoing stage. Demolished/removed completely the shade which was holded & welded with M.S hollow pipe frame, covering the whole terrace at ongoing stage. Demolished/punctured projection on Mpl land at ongoing stage. Demolished/punctured roof slab of room at rear side balcony at ongoing stage. Demolished the front open space covered by RCC roof along with internal brick wall also at SF whereas the remaining portion in this property is old & occupied at ongoing stage. Roof slab of top floor demolished/punctured at ongoing stage. Demolished/removed one slab & walls in front court yard with the help of gas cutter at ongoing stage. Demolished/removed all side walls over flat No. G&JU-93D at ongoing stage. Demolished/removed the brick walls at GF completely at ongoing stage. Demolished the projection in front at Mpl land at stilt floor and ground floor at ongoing stage. Demolished all new constructed wall in the shape of room in the front court yard at ongoing stage. Demolished newly constructed partition wall at ongoing stage. Demolished the projection on Mpl land at rear back side on stilt floor & ground floor and also cut the reinforcement at stilt floor with the help of gas cutter at ongoing stage. Demolished the projection on Mpl land at rear back side on stilt floor and cut the reinforcement with the help of gas cutter at ongoing stage. Demolished the projection on Mpl land at rear back side on ground floor at ongoing stage. Sealed under unauthorized construction. 19 20 H.No. 143, gali No. 9, Shalimar Bagh Village 12.06.13 BW-73D, Shalimar Bagh 21 BW-73C, Shalimar Bagh 22 H.No. 252, Pkt-I, Paschim Puri 12.06.13 23 H.No. 229, Pkt-I, Paschim Puri 24 AD-62C, Pitampura 25 WP-123B, Pitampura 13.06.13 26 WP-123C, Pitampura 27 428, Rishi Nagar, Rani Bagh 28 14.06.13 29 30 89, LIC Colony, Paschim Vihar 17.06.13 31 32 A-5/362, Paschim Vihar 99, Apna Ghar Society 97, Apna Ghar Society 18.06.13 33 Adj. to A-84, gali No. 5, Shiv Ram Park, Nihal Vihar Opposite to C-39, gali No. 5, Shiv Ram Park, Nihal Vihar 34 19.06.13 J-38, Udyog Nagar 35 20.06.13 AG-140, Shalimar Bagh 36 21.06.13 H.No. 379 Block RZ-R, Nihal Vihar 37 WZ-844, Rishi Nagar, Rani Bagh 24.06.13 38 39 WZ-480, Rishi Nagar, Rani Bagh GH-5&7/1152, Paschim Vihar 40 GH-13/312, Paschim Vihar Demolished the brick walls at second floor in the shape of rooms at ongoing stage. Remove centering/shuttering in rear court yard at ongoing stage. Demolished /remove the roof slab in rear court yard and made unusable at ongoing stage. Slab of one room constructed at the terrace of house cut down with the help of gas cutter & one toilet also demolished at ongoing stage. Slab of one room constructed at the terrace cut down with the help of gas cutter at ongoing stage. Demolished/removed all sides and partition wall at ongoing stage. Demolished/punctured projections on Mpl land. File No. 108/B/UC/RZ-I/13 dated 21.05.13 (Regular action). Demolished/punctured projections on Mpl land. File No. 108/B/UC/RZ-I/13 dated 21.05.13 (Regular action). Roof slab of one room at TF demolished/punctured at ongoing stage. Demolished the projection on stilt floor and reinforcement cut with the help of gas cutter at ongoing stage. Demolished the roof slab of rear opening at ground floor at ongoing stage. Demolished roof slab of one room and roof slab of kitchen by way of cutting reinforcement steel using gas cutter. File No. 111/B/UC/RZ-I/12 dated 22.08.12 (Regular action). Demolished roof slab of one room constructed at/on extended balcony in rear set back. File No. 81/B/UC/RZI/13 dated 01.02.13 (Regular action). Demolished the projection and brick wall of front room at first floor at ongoing stage. Demolished the projection in front and also demolished the brick wall of bathroom at projection at ongoing stage. Demolished one bathroom newly constructed in front set back at ongoing stage. Demolished/punctured roof slab in front side and one room at second floor at ongoing stage. Demolition roof slab partition wall of top floor was demolished and SF was punctured and made unusable at ongoing stage. Demolished/ punctured roof slab at third floor and demolished partition walls at ongoing stage. Demolished shuttering and all partition wall at FF at ongoing stage. Remove c/s and demolish four column on the roof top of 1152 at ongoing stage. Demolish/punctured roof slab of one room at one point. File No. 87/B/UC/RZ-I/13 dated 05.03.13 25.06.13 41 248, gali No. 3, Shalimar Bagh Village 42 P.No 97A, Shalimar Bagh Village 43 A-5/114C, Paschim Vihar 44 26.06.13 45 A-5/113C, Paschim Vihar G&JU-93D, Pitampura 46 27.06.13 BG-6/230B, Paschim Vihar 47 28.06.13 NP-10B, Pitampura (Regular action). Demolish the projection on ground floor & first floor on Mpl Land at ongoing stage. Demolish the roof slab of one room at ground floor and also demolish the parapet walls at ongoing stage. Demolished one bathroom at top floor including walls at ongoing stage. Demolished roof slab of one room at top floor at ongoing stage. Room extended adjacent to mumty was demolished. File No. 104/B/UC/RZI/13 dated 29.04.13 (Regular action). Demolish the construction carried out at BG-6/230B first floor completely . The construction was carried out up to roof level in the shape of brick work RCC column, fixing of chokets & windows etc. at ongoing stage. Demolished the roof slab of two room at roof top of flat No. NP-10B & reinforcement has been cut with the help of gas cutter. File No. 107/B/UC/RZ-I/13 dated 21.05.13 (Regular action). JULY-2013 Sl. No. Date 1 Property No. GH-13/312, Paschim Vihar 01.07.13 2 WZ-562, Rishi Nagar, Rani Bagh 3 KH.No. 282, gali No. 4, Indl. Area Shalimar Village 02.07.13 4 5 03.07.13 A-6/91C, Paschim Vihar (Top floor) MU-49, Pitampura 6 C-462, Ashok Mohalla, Nangloi 7 BG-6/354, GF, Paschim Vihar 8 04.07.13 9 AD-7D, Shalimar Bagh E-41, Mangolpuri Indl. Area-II 05.07.13 10 RZG-128, Mandir wali gali, Nihal Vihar AD-54C, Pitampura 11 12 08.07.13 H-19, Udyog Nagar Details of Action Taken at ongoing stage/misuse. Demolish roof punctured at one point and reinforcement cut by the gas cutter at two points. File No. 87/B/UC/RZI/13 dated 05.03.13 (Regular action). Demolished roof punctured and removed partition wall at third floor at ongoing stage. Demolished the brick walls in the shape of room and also remove the shuttering on third floor at ongoing stage. Demolished roof slab of flat at ongoing stage. Demolished slab on rear set back and room at IVth floor at ongoing stage. Demolished/punctured roof slab of basement floor at ongoing stage. Demolished the front portion of DDA flat, covered in the shape of kitchen at ongoing stage. Demolished the roof slab of one room by way of cutting reinforcement. File No. 117/B/UC/RZ-I/12 dated 12.09.12 (Regular action). Demolished RCC projections & stair case on Mpl land, beyond the sanction building plan at ongoing stage. Roof slab at third floor and partition wall was demolished at ongoing stage. Demolished two room and roof slab & reinforcement has been cut with the help of gas cutter at roof top at ongoing stage. Demolished the brick walls in the shape of boundary and also remove the windows in the second floor at ongoing 13 14 99, Apna Ghar Society 09.07.13 GH-5&7/811, Paschim Vihar 15 GH-5&7/812, Paschim Vihar 16 BA-59, Shalimar Bagh 17 10.07.13 18 19 20 Flat No. 23 & 24, Adrash Apartment, Paschim Vihar Flat No. 25, Adrash Apartment, Paschim Vihar 11.07.13 11.07.13 21 Khasra No. 72/4, saini, Nihal Vihar C-256, Chandan Vihar, Nangloi JU-12C, Pitampura 22 12.07.13 473, Pkt-I, Paschim Puri 23 15.07.13 BK-1/63, Shalimar Bagh 24 16.07.13 D-806, Saraswati Vihar 25 RZG-57, Nihal Vihar 17.07.13 26 27 RZS-250, Nihal Vihar 18.07.13 47C, Ekta Apartment 28 AD-95C, Pitampur 29 AD-71C, Pitampura 19.07.13 30 JD-39D, Pitampura 31 JD-38D, Pitampura 32 67, Rishi Nagar, Rani Bagh 33 337, gali No. 6, Shalimar Village stage. Demolished roof slab of remaining portion and cut reinforcement by gas cutter and demolished partition walls. File No. 111/B/UC/RZ-I/12 dated 22.08.12 (Regular action). Demolish roof slab at shaft area. File No. 105/B/UC/RZ-I/13 dated 15.05.13 (Regular action). Demolish the walls and one toilet with bathroom at terrace and punctured roof slab at shaft area. File No. 106/B/UC/RZ-I/13 dated 15.05.13 (Regular action). Demolished/punctured the roof slab in the shape of room and also demolished the parapet walls above the slab on SF at ongoing stage. Demolish projection on Mpl land at GF and reinforcement cuted down by gas cutter at ongoing stage. Demolish projection on Mpl land at GF and reinforcement cutted down by gas cutter at ongoing stage. Projection on Mpl land demolished at ongoing stage. Slab of GF has been cut down with the help of gas cutter at ongoing stage. One room and toilet was demolished at ongoing stage. Demolished completely a room at TF and demolished partition walls at SF at ongoing stage. Demolished projection on Mpl land at stilt floor at rear set back at front set back at ongoing stage. Demolished brick walls, partition walls in the shape of bathroom on each floor beyond sanction building plan at ongoing stage. Column and partition wall were demolished at ongoing stage. Column and chajja of building has been demolished at ongoing stage Extended room of flat has been demolished at ongoing stage. Demolished the roof slab of room constructing of roof top of lat at ongoing stage. Demolished the roof slab of room constructing of roof top at ongoing stage. Demolished the roof slab of two rooms constructing at roof top of flat at ongoing stage. Demolished the roof slab of room constructing at roof top of flat at ongoing stge. Demolished partition walls and punctured projection on Mpl Land at second floor and removed partition wall at third floor at ongoing stage. Demolished the projection on SF at ongoing stage. 34 22.07.13 35 335, gali No.6, Shalimar Village 36 330, gali No. 6, Shalimar Village 331, gali No.6, Shalimar Village 37 GH-14/511, Paschim Vihar 38 23.07.13 GH-14/512, Paschim Vihar 39 GH-14/881, Paschim Vihar 40 GH-14/882, Paschim Vihar 41 A-11, New Multan Nagar 42 24.07.13 FIU-170, Pitampura 43 FIU-171, Pitampura 44 FIU-172, Pitampura 45 A-2/58, Paschim Vihar 25.07.13 46 BG-6/298D, Paschim Vihar Demolished the projection on GF at ongoing stage. Demolished the projection on GF &FF at ongoing stage. Demolished the projection on GF at ongoing stage. Demolished the roof slab in front court yard at ongoing stage. Demolished the roof slab in front court yard at ongoing stage. Demolished the roof slab and projection on Mpl land at ongoing stage. Demolished roof slab and projection on Mpl land at ongoing stage. Removed/demolished partition walls constructed at stilt floor. No. 209/B/UC/RZ-I/12 dated 17.12.12 (Regular action). One room completely demolished with wall top slab and partition wall at fourth floor at ongoing stage. Two room completely demolished at fourth floor at ongoing stage. One room at IVth floor wall, door are demolished and top roof punctured made unusable at ongoing stage. Demolished the projection and brick wall of room partly. File No. 135/B/UC/RZ-I/13 dated 21.06.13 (Regular action). Demolished partly the roof of room. File No. B-I/WZ/UC/12/47 dated 27.01.12 (Regular action) 47 26.07.13 48 29.07.13 49 WP-240A, Pitampua B-83, Mangolpuri Indl. Area-II 47, Jyoti Apartment 50 30.07.13 51 BP-3, Shalimar Bagh 247, Rishi Nagar, Rani Bagh 31.07.13 52 B-85/1, Rishi Nagar, Rani Bagh Punctured the roof slab at rear court yard at ongoing stage. Demolished column with reinforcement & brick wall at GF at ongoing stage. Sealed under unauthorized construction. Demolished the projection on Mpl Land at rear side at ongoing stage. Demolished/punctured roof slab of third floor and removed partition walls at ongoing stage. Demolished roof slab of third floor and projection on Mpl land at TF at ongoing stage. AUGUST -2013 Sl. No. Date 1 2 3 Property No. AS-14, Shiva Enclave 01.08.13 B-117, Laxmi Park, Nangoi BJ-6, East Shalimar Bagh Details of Action Taken at ongoing stage/misuse. Demolished/punctured roof slab of one room at ongoing stage. Slab of second floor punctured & one toilet demolished at ongoing stage. Demolished the brick walls and windows in front set back in the shape of bathroom on GF, FF & SF at ongoing stage. 4 U&V-69D, Shalimar Bagh 02.08.13 5 6 7 8 9 05.08.13 10 11 12 06.08.13 13 14 07.08.13 15 16 08.08.13 17 12.08.13 18 19 20 21 13.08.13 14.08.13 22 23 16.08.13 24 25 Sealed under unauthorized construction. CB-11D, Shalimar Bagh Sealed under unauthorized construction. LU-37, Pitampura One room on fourth floor was completely demolished and one room made unusable at ongoing stage. 585, PKT-I, Paschim Puri Demolished partly the RCC slab at second floor. File No. 136/B/UC/RZI/13 dated 21.06.13 (Regular action) 586, PKT-I, Paschim Puri Demolished partly the RCC slab at second floor. File No. 137/B/UC/RZI/13 dated 21.06.13 (Regular action) 585 & 586, PKT-I, Paschim Puri Demolished completely the one room at 4th floor and brick walls at 3rd floor at ongoing stage. B-679, Jawalapuri Demolished walls at terrace of FF & shuttering of projection removed at ongoing stage. WP-53C, Pitampura Back, side & font wall removed. File No. 123/B/UC/RZ-I/12 dated 13.09.12 (Regular action) BB-58D, Shalimar Bagh Demolished roof slab at rear open court yard and slab made unusable at ongoing stage. BB-64D, Shalimar Bagh Demolished/removed c/s & remove partition walls at rear court yard at ongoing stage. LP-11F, Pitampura Demolished projection at back side and partition wall which was newly constructed at ongoing stage. RZB-95, Nihal Vihar Top roof of second floor was completely demolished at ongoing stage. 751, Rani Bagh Demolished projection and partition wall at SF at ongoing stage. A-6/279D, Paschim Vihar Demolished/punctured roof slab of two room at top floor at ongoing stage. C-32, Punjabi Basti, Nangloi Demolished slab of second floor at ongoing stage. B-92, Gali No. 8, Shalimar Demolished the projection on Mpl Land Bagh Village and parapet wall at SF at ongoing stage. LU-39, Pitampura Excess coverage from third floor roof was demolished at ongoing stage. C-185, Ekta Enclave Demolished extended room of flat at ongoing stage. B-3/13, DDA Janta flat, Jwala Sealed under misuse. Heri, Paschim Vihar 77, Tarun Enclave Demolished RCC projection on Mpl Land at stilt floor & GF at ongoing stage. BR-65C, Shalimar Bagh Demolished the roof slab and remove the c/s on chajjas and walls and doors /windows at ongoing stage. LD-36, Pitampura 19.08.13 26 E-52 & E-57, Adhyapak Nagar 27 364, Rishi Nagar, Rani Bagh 28 GH-5&7/332, Paschim Vihar Punctured the roof slab of front court yard & projection at ongoing stage. Column, partition wall and slab was demolished at ongoing stage. Demolished/punctured at third floor and Mpl Land at ongoing stage. Demolished back side projection on Mpl Land at rear court yard and reinforcement cut by the gas cutter. File No. B/UC/WZ-II/11/376 dated 29 21.08.13 GH-5&7/331, Paschim Vihar 30 GH-5&7/330, Paschim Vihar 31 A-4/403, Paschim Vihar 32 MU-42, Pitampura 22.08.13 33 MU-43, Pitampura 34 MU-44, Pitampura 35 23.08.13 36 86, Shakti Vihar LD-37, Pitampura 26.08.13 37 1364,Rani Bagh 38 AD-88C, Shalimar Bagh 39 AM-78, Shalimar Bagh 40 AM-107, Shalimar Bagh 41 MU-42, Pitampura 27.08.13 42 MU-43, Pitampura 43 MU-44, Pitampura 44 1349, Rani Bagh 45 46 29.08.13 B-7, Main Market, Shalimar Village GH-13/160, Paschim Vihar 04.07.11 (Regular action) Demolished back side projection on Mpl Land at rear court yard and reinforcement cut by the gas cutter. File No. B/UC/WZ-II/11/375 dated 04.07.11 (Regular action) Demolished the back side projection on Mpl Land at rear court yard and reinforcement cut by the gas cutter. File No. B/UC/WZ-II/11/374 dated 04.07.11 (Regular action) Roof slab of two rooms at third floor is demolished/punctured at ongoing stage. Demolished ground floor & railing. File No. 128/B/UC/RZ-I/12 dt. 19.09.12 (Regular action) Demolished ground floor & railing. File No. 129/B/UC/RZ-I/12 dt. 19.09.12 (Regular action) Demolished ground floor & railing. File No. 130/B/UC/RZ-I/12 dt. 19.09.12 (Regular action) Demolished RCC projection beyond sanction building plan at stilt floor & ground floor at ongoing stage. Demolished the roof slab of side court yard. File No. 142/B/UC/RZ-I/13 dt. 01.07.13 (Regular action) Demolished/remove all partition wall at FF and demolished the projection at Mpl land at all floors at ongoing stage. Demolished one wall and remove door & window in balcony and remove wall toilet, which deviated standard building plan by DDA flats at ongoing stage. Demolished projection at rear side on Mpl Land at stilt floor at ongoing stage.q Demolished projection at rear side on Mpl Land at stilt floor at ongoing stage. Parking floor and ground floor was demolished and reinforcement was cut with the help of gas cutter. . File No. 128/B/UC/RZ-I/12 dt. 19.09.12 (Regular action) Parking floor and ground floor was demolished and reinforcement was cut with the help of gas cutter. . File No. 129/B/UC/RZ-I/12 dt. 19.09.12 (Regular action) Parking floor and ground floor was demolished and reinforcement was cut with the help of gas cutter. . File No. 130/B/UC/RZ-I/12 dt. 19.09.12 (Regular action) Demolished/removed shuttering and punctured roof slab of third floor at ongoing stage. Demolished the roof slab of FF in the shape of room and also demolished the brick walls and doors raising above the FF at ongoing stage. Demolished roof slab of room, toilet, kitchen at the roof top of 160 and also remove walls at ongoing stage. 47 GH-14/434, Paschim Vihar 30.08.13 48 GH-14/435, Paschim Vihar 49 BG-6/298D, Paschim Vihar Demolished front court yard roof and made unusable at ongoing stage. Demolished front court yard roof and made unusable at ongoing stage. Demolished completely the remaining portion. File No. B-I/WZ/UC/12/47 dated 27.01.12 (Regular action)