BUILDING DEPARPTMENT-I ROHINI ZONE SUB:

advertisement
BUILDING DEPARPTMENT-I
ROHINI ZONE
SUB:- Demolition/sealing action.
JUNE-2013
Sl. No.
Date
1
Property No.
LD-193, Pitampura
03.06.13
2
A-4/29, Paschim Vihar
3
H-6, Udyog Nagar
4
04.06.13
31, Subh Enclave, Pitampura
5
CC-6B, Shalimar Bagh
6
CC-6C, Shalimar Bagh
05.06.13
7
116A, Kavita Colony
8
1824, Multani Mohalla, Rani
Bagh
AN-23B, Shalimar Bagh
9
06.06.13
10
11
G&JU-93D, Pitampura
07.06.13
RZF-43, Nihal Vihar
12
RZF-18, Nihal Vihar
13
GH-14/417, Paschim Vihar
14
GH-14/702, Paschim Vihar
15
WZ-77, Hari Singh Park
10.06.13
16
WZ-78, Hari Singh Park
17
WZ-40, Hari Singh Park
18
B-10, Brij Vihar
11.06.13
Details of Action Taken at ongoing
stage/misuse.
Two rooms constructed at SF, brick
walls, slab and columns demolished and
made property unusable at ongoing
stage.
Demolished the chajja on Mpl land at
GF and also demolished the parapet
walls and remove the railing at FF at
ongoing stage.
Demolished the brick walls and also
removed the tin shed in the shape of
rooms at SF at ongoing stage.
Demolished/removed completely the
shade which was holded & welded with
M.S hollow pipe frame, covering the
whole terrace at ongoing stage.
Demolished/punctured projection on
Mpl land at ongoing stage.
Demolished/punctured roof slab of
room at rear side balcony at ongoing
stage.
Demolished the front open space
covered by RCC roof along with internal
brick wall also at SF whereas the
remaining portion in this property is old
& occupied at ongoing stage.
Roof slab of top floor
demolished/punctured at ongoing stage.
Demolished/removed one slab & walls
in front court yard with the help of gas
cutter at ongoing stage.
Demolished/removed all side walls over
flat No. G&JU-93D at ongoing stage.
Demolished/removed the brick walls at
GF completely at ongoing stage.
Demolished the projection in front at
Mpl land at stilt floor and ground floor
at ongoing stage.
Demolished all new constructed wall in
the shape of room in the front court
yard at ongoing stage.
Demolished newly constructed partition
wall at ongoing stage.
Demolished the projection on Mpl land
at rear back side on stilt floor & ground
floor and also cut the reinforcement at
stilt floor with the help of gas cutter at
ongoing stage.
Demolished the projection on Mpl land
at rear back side on stilt floor and cut
the reinforcement with the help of gas
cutter at ongoing stage.
Demolished the projection on Mpl land
at rear back side on ground floor at
ongoing stage.
Sealed under unauthorized
construction.
19
20
H.No. 143, gali No. 9, Shalimar
Bagh Village
12.06.13
BW-73D, Shalimar Bagh
21
BW-73C, Shalimar Bagh
22
H.No. 252, Pkt-I, Paschim Puri
12.06.13
23
H.No. 229, Pkt-I, Paschim Puri
24
AD-62C, Pitampura
25
WP-123B, Pitampura
13.06.13
26
WP-123C, Pitampura
27
428, Rishi Nagar, Rani Bagh
28
14.06.13
29
30
89, LIC Colony, Paschim Vihar
17.06.13
31
32
A-5/362, Paschim Vihar
99, Apna Ghar Society
97, Apna Ghar Society
18.06.13
33
Adj. to A-84, gali No. 5, Shiv
Ram Park, Nihal Vihar
Opposite to C-39, gali No. 5,
Shiv Ram Park, Nihal Vihar
34
19.06.13
J-38, Udyog Nagar
35
20.06.13
AG-140, Shalimar Bagh
36
21.06.13
H.No. 379 Block RZ-R, Nihal
Vihar
37
WZ-844, Rishi Nagar, Rani
Bagh
24.06.13
38
39
WZ-480, Rishi Nagar, Rani
Bagh
GH-5&7/1152, Paschim Vihar
40
GH-13/312, Paschim Vihar
Demolished the brick walls at second
floor in the shape of rooms at ongoing
stage.
Remove centering/shuttering in rear
court yard at ongoing stage.
Demolished /remove the roof slab in
rear court yard and made unusable at
ongoing stage.
Slab of one room constructed at the
terrace of house cut down with the help
of gas cutter & one toilet also
demolished at ongoing stage.
Slab of one room constructed at the
terrace cut down with the help of gas
cutter at ongoing stage.
Demolished/removed all sides and
partition wall at ongoing stage.
Demolished/punctured projections on
Mpl land. File No. 108/B/UC/RZ-I/13
dated 21.05.13 (Regular action).
Demolished/punctured projections on
Mpl land. File No. 108/B/UC/RZ-I/13
dated 21.05.13 (Regular action).
Roof slab of one room at TF
demolished/punctured at ongoing stage.
Demolished the projection on stilt floor
and reinforcement cut with the help of
gas cutter at ongoing stage.
Demolished the roof slab of rear opening
at ground floor at ongoing stage.
Demolished roof slab of one room and
roof slab of kitchen by way of cutting
reinforcement steel using gas cutter.
File No. 111/B/UC/RZ-I/12 dated
22.08.12 (Regular action).
Demolished roof slab of one room
constructed at/on extended balcony in
rear set back. File No. 81/B/UC/RZI/13 dated 01.02.13 (Regular action).
Demolished the projection and brick
wall of front room at first floor at
ongoing stage.
Demolished the projection in front and
also demolished the brick wall of
bathroom at projection at ongoing stage.
Demolished one bathroom newly
constructed in front set back at ongoing
stage.
Demolished/punctured roof slab in
front side and one room at second floor
at ongoing stage.
Demolition roof slab partition wall of top
floor was demolished and SF was
punctured and made unusable at
ongoing stage.
Demolished/ punctured roof slab at
third floor and demolished partition
walls at ongoing stage.
Demolished shuttering and all partition
wall at FF at ongoing stage.
Remove c/s and demolish four column
on the roof top of 1152 at ongoing stage.
Demolish/punctured roof slab of one
room at one point. File No.
87/B/UC/RZ-I/13 dated 05.03.13
25.06.13
41
248, gali No. 3, Shalimar Bagh
Village
42
P.No 97A, Shalimar Bagh
Village
43
A-5/114C, Paschim Vihar
44
26.06.13
45
A-5/113C, Paschim Vihar
G&JU-93D, Pitampura
46
27.06.13
BG-6/230B, Paschim Vihar
47
28.06.13
NP-10B, Pitampura
(Regular action).
Demolish the projection on ground floor
& first floor on Mpl Land at ongoing
stage.
Demolish the roof slab of one room at
ground floor and also demolish the
parapet walls at ongoing stage.
Demolished one bathroom at top floor
including walls at ongoing stage.
Demolished roof slab of one room at top
floor at ongoing stage.
Room extended adjacent to mumty was
demolished. File No. 104/B/UC/RZI/13 dated 29.04.13 (Regular action).
Demolish the construction carried out
at BG-6/230B first floor completely .
The construction was carried out up to
roof level in the shape of brick work
RCC column, fixing of chokets &
windows etc. at ongoing stage.
Demolished the roof slab of two room at
roof top of flat No. NP-10B &
reinforcement has been cut with the
help of gas cutter. File No.
107/B/UC/RZ-I/13 dated 21.05.13
(Regular action).
JULY-2013
Sl. No.
Date
1
Property No.
GH-13/312, Paschim Vihar
01.07.13
2
WZ-562, Rishi Nagar, Rani
Bagh
3
KH.No. 282, gali No. 4, Indl.
Area Shalimar Village
02.07.13
4
5
03.07.13
A-6/91C, Paschim Vihar (Top
floor)
MU-49, Pitampura
6
C-462, Ashok Mohalla, Nangloi
7
BG-6/354, GF, Paschim Vihar
8
04.07.13
9
AD-7D, Shalimar Bagh
E-41, Mangolpuri Indl. Area-II
05.07.13
10
RZG-128, Mandir wali gali,
Nihal Vihar
AD-54C, Pitampura
11
12
08.07.13
H-19, Udyog Nagar
Details of Action Taken at ongoing
stage/misuse.
Demolish roof punctured at one point
and reinforcement cut by the gas cutter
at two points. File No. 87/B/UC/RZI/13 dated 05.03.13 (Regular action).
Demolished roof punctured and
removed partition wall at third floor at
ongoing stage.
Demolished the brick walls in the shape
of room and also remove the shuttering
on third floor at ongoing stage.
Demolished roof slab of flat at ongoing
stage.
Demolished slab on rear set back and
room at IVth floor at ongoing stage.
Demolished/punctured roof slab of
basement floor at ongoing stage.
Demolished the front portion of DDA
flat, covered in the shape of kitchen at
ongoing stage.
Demolished the roof slab of one room by
way of cutting reinforcement. File No.
117/B/UC/RZ-I/12 dated 12.09.12
(Regular action).
Demolished RCC projections & stair
case on Mpl land, beyond the sanction
building plan at ongoing stage.
Roof slab at third floor and partition
wall was demolished at ongoing stage.
Demolished two room and roof slab &
reinforcement has been cut with the
help of gas cutter at roof top at ongoing
stage.
Demolished the brick walls in the shape
of boundary and also remove the
windows in the second floor at ongoing
13
14
99, Apna Ghar Society
09.07.13
GH-5&7/811, Paschim Vihar
15
GH-5&7/812, Paschim Vihar
16
BA-59, Shalimar Bagh
17
10.07.13
18
19
20
Flat No. 23 & 24, Adrash
Apartment, Paschim Vihar
Flat No. 25, Adrash Apartment,
Paschim Vihar
11.07.13
11.07.13
21
Khasra No. 72/4, saini, Nihal
Vihar
C-256, Chandan Vihar, Nangloi
JU-12C, Pitampura
22
12.07.13
473, Pkt-I, Paschim Puri
23
15.07.13
BK-1/63, Shalimar Bagh
24
16.07.13
D-806, Saraswati Vihar
25
RZG-57, Nihal Vihar
17.07.13
26
27
RZS-250, Nihal Vihar
18.07.13
47C, Ekta Apartment
28
AD-95C, Pitampur
29
AD-71C, Pitampura
19.07.13
30
JD-39D, Pitampura
31
JD-38D, Pitampura
32
67, Rishi Nagar, Rani Bagh
33
337, gali No. 6, Shalimar
Village
stage.
Demolished roof slab of remaining
portion and cut reinforcement by gas
cutter and demolished partition walls.
File No. 111/B/UC/RZ-I/12 dated
22.08.12 (Regular action).
Demolish roof slab at shaft area. File
No. 105/B/UC/RZ-I/13 dated 15.05.13
(Regular action).
Demolish the walls and one toilet with
bathroom at terrace and punctured roof
slab at shaft area. File No.
106/B/UC/RZ-I/13 dated 15.05.13
(Regular action).
Demolished/punctured the roof slab in
the shape of room and also demolished
the parapet walls above the slab on SF
at ongoing stage.
Demolish projection on Mpl land at GF
and reinforcement cuted down by gas
cutter at ongoing stage.
Demolish projection on Mpl land at GF
and reinforcement cutted down by gas
cutter at ongoing stage.
Projection on Mpl land demolished at
ongoing stage.
Slab of GF has been cut down with the
help of gas cutter at ongoing stage.
One room and toilet was demolished at
ongoing stage.
Demolished completely a room at TF
and demolished partition walls at SF at
ongoing stage.
Demolished projection on Mpl land at
stilt floor at rear set back at front set
back at ongoing stage.
Demolished brick walls, partition walls
in the shape of bathroom on each floor
beyond sanction building plan at
ongoing stage.
Column and partition wall were
demolished at ongoing stage.
Column and chajja of building has been
demolished at ongoing stage
Extended room of flat has been
demolished at ongoing stage.
Demolished the roof slab of room
constructing of roof top of lat at ongoing
stage.
Demolished the roof slab of room
constructing of roof top at ongoing
stage.
Demolished the roof slab of two rooms
constructing at roof top of flat at
ongoing stage.
Demolished the roof slab of room
constructing at roof top of flat at
ongoing stge.
Demolished partition walls and
punctured projection on Mpl Land at
second floor and removed partition wall
at third floor at ongoing stage.
Demolished the projection on SF at
ongoing stage.
34
22.07.13
35
335, gali No.6, Shalimar Village
36
330, gali No. 6, Shalimar
Village
331, gali No.6, Shalimar Village
37
GH-14/511, Paschim Vihar
38
23.07.13
GH-14/512, Paschim Vihar
39
GH-14/881, Paschim Vihar
40
GH-14/882, Paschim Vihar
41
A-11, New Multan Nagar
42
24.07.13
FIU-170, Pitampura
43
FIU-171, Pitampura
44
FIU-172, Pitampura
45
A-2/58, Paschim Vihar
25.07.13
46
BG-6/298D, Paschim Vihar
Demolished the projection on GF at
ongoing stage.
Demolished the projection on GF &FF at
ongoing stage.
Demolished the projection on GF at
ongoing stage.
Demolished the roof slab in front court
yard at ongoing stage.
Demolished the roof slab in front court
yard at ongoing stage.
Demolished the roof slab and projection
on Mpl land at ongoing stage.
Demolished roof slab and projection on
Mpl land at ongoing stage.
Removed/demolished partition walls
constructed at stilt floor. No.
209/B/UC/RZ-I/12 dated 17.12.12
(Regular action).
One room completely demolished with
wall top slab and partition wall at fourth
floor at ongoing stage.
Two room completely demolished at
fourth floor at ongoing stage.
One room at IVth floor wall, door are
demolished and top roof punctured
made unusable at ongoing stage.
Demolished the projection and brick
wall of room partly. File No.
135/B/UC/RZ-I/13 dated 21.06.13
(Regular action).
Demolished partly the roof of room. File
No. B-I/WZ/UC/12/47 dated 27.01.12
(Regular action)
47
26.07.13
48
29.07.13
49
WP-240A, Pitampua
B-83, Mangolpuri Indl. Area-II
47, Jyoti Apartment
50
30.07.13
51
BP-3, Shalimar Bagh
247, Rishi Nagar, Rani Bagh
31.07.13
52
B-85/1, Rishi Nagar, Rani
Bagh
Punctured the roof slab at rear court
yard at ongoing stage.
Demolished column with reinforcement
& brick wall at GF at ongoing stage.
Sealed under unauthorized
construction.
Demolished the projection on Mpl Land
at rear side at ongoing stage.
Demolished/punctured roof slab of
third floor and removed partition walls
at ongoing stage.
Demolished roof slab of third floor and
projection on Mpl land at TF at ongoing
stage.
AUGUST -2013
Sl. No.
Date
1
2
3
Property No.
AS-14, Shiva Enclave
01.08.13
B-117, Laxmi Park, Nangoi
BJ-6, East Shalimar Bagh
Details of Action Taken at ongoing
stage/misuse.
Demolished/punctured roof slab of one
room at ongoing stage.
Slab of second floor punctured & one
toilet demolished at ongoing stage.
Demolished the brick walls and
windows in front set back in the shape
of bathroom on GF, FF & SF at ongoing
stage.
4
U&V-69D, Shalimar Bagh
02.08.13
5
6
7
8
9
05.08.13
10
11
12
06.08.13
13
14
07.08.13
15
16
08.08.13
17
12.08.13
18
19
20
21
13.08.13
14.08.13
22
23
16.08.13
24
25
Sealed under unauthorized
construction.
CB-11D, Shalimar Bagh
Sealed under unauthorized
construction.
LU-37, Pitampura
One room on fourth floor was
completely demolished and one room
made unusable at ongoing stage.
585, PKT-I, Paschim Puri
Demolished partly the RCC slab at
second floor. File No. 136/B/UC/RZI/13 dated 21.06.13 (Regular action)
586, PKT-I, Paschim Puri
Demolished partly the RCC slab at
second floor. File No. 137/B/UC/RZI/13 dated 21.06.13 (Regular action)
585 & 586, PKT-I, Paschim Puri Demolished completely the one room at
4th floor and brick walls at 3rd floor at
ongoing stage.
B-679, Jawalapuri
Demolished walls at terrace of FF &
shuttering of projection removed at
ongoing stage.
WP-53C, Pitampura
Back, side & font wall removed. File No.
123/B/UC/RZ-I/12 dated 13.09.12
(Regular action)
BB-58D, Shalimar Bagh
Demolished roof slab at rear open court
yard and slab made unusable at
ongoing stage.
BB-64D, Shalimar Bagh
Demolished/removed c/s & remove
partition walls at rear court yard at
ongoing stage.
LP-11F, Pitampura
Demolished projection at back side and
partition wall which was newly
constructed at ongoing stage.
RZB-95, Nihal Vihar
Top roof of second floor was completely
demolished at ongoing stage.
751, Rani Bagh
Demolished projection and partition
wall at SF at ongoing stage.
A-6/279D, Paschim Vihar
Demolished/punctured roof slab of two
room at top floor at ongoing stage.
C-32, Punjabi Basti, Nangloi
Demolished slab of second floor at
ongoing stage.
B-92, Gali No. 8, Shalimar
Demolished the projection on Mpl Land
Bagh Village
and parapet wall at SF at ongoing stage.
LU-39, Pitampura
Excess coverage from third floor roof
was demolished at ongoing stage.
C-185, Ekta Enclave
Demolished extended room of flat at
ongoing stage.
B-3/13, DDA Janta flat, Jwala Sealed under misuse.
Heri, Paschim Vihar
77, Tarun Enclave
Demolished RCC projection on Mpl
Land at stilt floor & GF at ongoing
stage.
BR-65C, Shalimar Bagh
Demolished the roof slab and remove
the c/s on chajjas and walls and doors
/windows at ongoing stage.
LD-36, Pitampura
19.08.13
26
E-52 & E-57, Adhyapak Nagar
27
364, Rishi Nagar, Rani Bagh
28
GH-5&7/332, Paschim Vihar
Punctured the roof slab of front court
yard & projection at ongoing stage.
Column, partition wall and slab was
demolished at ongoing stage.
Demolished/punctured at third floor
and Mpl Land at ongoing stage.
Demolished back side projection on Mpl
Land at rear court yard and
reinforcement cut by the gas cutter. File
No. B/UC/WZ-II/11/376 dated
29
21.08.13
GH-5&7/331, Paschim Vihar
30
GH-5&7/330, Paschim Vihar
31
A-4/403, Paschim Vihar
32
MU-42, Pitampura
22.08.13
33
MU-43, Pitampura
34
MU-44, Pitampura
35
23.08.13
36
86, Shakti Vihar
LD-37, Pitampura
26.08.13
37
1364,Rani Bagh
38
AD-88C, Shalimar Bagh
39
AM-78, Shalimar Bagh
40
AM-107, Shalimar Bagh
41
MU-42, Pitampura
27.08.13
42
MU-43, Pitampura
43
MU-44, Pitampura
44
1349, Rani Bagh
45
46
29.08.13
B-7, Main Market, Shalimar
Village
GH-13/160, Paschim Vihar
04.07.11 (Regular action)
Demolished back side projection on Mpl
Land at rear court yard and
reinforcement cut by the gas cutter. File
No. B/UC/WZ-II/11/375 dated
04.07.11 (Regular action)
Demolished the back side projection on
Mpl Land at rear court yard and
reinforcement cut by the gas cutter. File
No. B/UC/WZ-II/11/374 dated
04.07.11 (Regular action)
Roof slab of two rooms at third floor is
demolished/punctured at ongoing stage.
Demolished ground floor & railing. File
No. 128/B/UC/RZ-I/12 dt. 19.09.12
(Regular action)
Demolished ground floor & railing. File
No. 129/B/UC/RZ-I/12 dt. 19.09.12
(Regular action)
Demolished ground floor & railing. File
No. 130/B/UC/RZ-I/12 dt. 19.09.12
(Regular action)
Demolished RCC projection beyond
sanction building plan at stilt floor &
ground floor at ongoing stage.
Demolished the roof slab of side court
yard. File No. 142/B/UC/RZ-I/13 dt.
01.07.13 (Regular action)
Demolished/remove all partition wall at
FF and demolished the projection at Mpl
land at all floors at ongoing stage.
Demolished one wall and remove door &
window in balcony and remove wall
toilet, which deviated standard building
plan by DDA flats at ongoing stage.
Demolished projection at rear side on
Mpl Land at stilt floor at ongoing stage.q
Demolished projection at rear side on
Mpl Land at stilt floor at ongoing stage.
Parking floor and ground floor was
demolished and reinforcement was cut
with the help of gas cutter. . File No.
128/B/UC/RZ-I/12 dt. 19.09.12
(Regular action)
Parking floor and ground floor was
demolished and reinforcement was cut
with the help of gas cutter. . File No.
129/B/UC/RZ-I/12 dt. 19.09.12
(Regular action)
Parking floor and ground floor was
demolished and reinforcement was cut
with the help of gas cutter. . File No.
130/B/UC/RZ-I/12 dt. 19.09.12
(Regular action)
Demolished/removed shuttering and
punctured roof slab of third floor at
ongoing stage.
Demolished the roof slab of FF in the
shape of room and also demolished the
brick walls and doors raising above the
FF at ongoing stage.
Demolished roof slab of room, toilet,
kitchen at the roof top of 160 and also
remove walls at ongoing stage.
47
GH-14/434, Paschim Vihar
30.08.13
48
GH-14/435, Paschim Vihar
49
BG-6/298D, Paschim Vihar
Demolished front court yard roof and
made unusable at ongoing stage.
Demolished front court yard roof and
made unusable at ongoing stage.
Demolished completely the remaining
portion. File No. B-I/WZ/UC/12/47 dated
27.01.12 (Regular action)