REPORT REGARDING DEMOLITION/SEALING ACTION TAKEN BY THE BUILDING DEPARTMENT, ROHINI ZONE-I, DURING THE MONTH OF SEPTEMBER- 2015 Sl. No. Date Property No. Details of Action Taken 1 01.09.15 A-6/273, Paschim Vihar Demolished projection on Mpl Land at ongoing stage. A-6/274, Paschim Vihar Demolished projection on Govt. land at ongoing stage. 2 3 02.09.15 134, Sainik Vihar Demolished roof slab in rear set back agaisnt S.B.P at stilt floor at ongoing stage. 4 03.09.15 CU-151, Pitampura Demolisehd partly the prjection of TF along with parapet wall. File No. 109/UC/B/RZI/15 dated 03.07.15 (regular action) BW-21D, Shalimar Bagh Demolished shuttering and partition side walls at roof of flat at ongoing stage. BC-80, Mangolpuri Indl. Area-II First floor shuttering in rear set back has been removed and made unusable at ongoing stage. B-6, DSIIDC, Peeragarhi Demolished the brick walls on the roof of third floor in the shape of room at ongoing stage. BG-6/86C, Paschim Vihar Demolished roof slab and partition wall of unauthorized construction at ongoing stage. RZA-11B, Laxmi Park, Nangloi Mobile/Cell Tower has been sealed on TF roof at four point. QU-170C, Pitampura Demolished the roof of one room alongwith the brick wall of kitchen/room. File No. 128/UC/B/RZ-I/15 dated 24.07.15 (regular action) BF-62, Garage Area, Shalimar Bagh Demolished by way of removing shutering and removing shuttering and partition walls at ongoing stage. C-43, Shiv Ram Park One side brick wall is damage on GF at ongoing stage. 13 A-5B/58, Paschim Vihar Partition wall has been demolished at ongoing stage. 14 209, Avtar Enclave Room constructed at stilt parking has been demolished with help of heavy hammer at ongoing stage. GH-13/768, Paschim Vihar Demolition action has been taken in the shape of puncturing of slab at ongoing stage. 9, Sainik Vihar, Pitampura Demolished rear set back at stilt floor against S.B.P at ongoing stage. WP-11C, DDA Flat, Pitampura Demolished/removed the W.C/Bath Competely. File No. 102/UC/B/RZ-I/14 dated 11.07.14 (regular action) AC-140, Shalimar Bagh Demolished shuttering and extended portion at GF at ongoing stage. C-506, Saraswati Vihar Third floor another one pannel has been cut with gas cutter. File No. 233/UC/B/RZI/14 dated 15.10.14 (regular action) 5 6 04.09.15 7 8 07.09.15 9 10 08.09.15 11 12 15 09.09.15 10.09.15 16 17 11.09.15 18 19 14.09.15 20 F-36, DSIIDC, Peeragarhi Demolished the one room on the roof of second floor at ongoing stage. 21 15.09.15 428, Pocket-1, Paschim Puri Room constructed at third floor has ben demolished with the help of gas cutter and heavy hammer at ongoing stage. 22 15.09.15 521/7, Arya Mohalla, Nangloi Two room wall are demolished on FF at ongoing stage. 23 16.09.15 CC-110C, Shalimar Bagh Demolished by way of removing partition wall and projection on Mpl land at ongoing stage. 24 JU- 01C, DDA Flat, Pitampura Demolished the roof of one room along with brick wall of room and made it unusable or unhabitable at ongoing stage. 25 C-506, Saraswati Vihar Third floor & second floor demolished and roof of TF & SF has been cut by gas cutter and partition walls in excess coverage also has been demolished. File No. 233/UC/B/RZ-I/14 dated 15.10.14 (regular action) RZA-55, Nihal Vihar Walls of the room & roof slab is damaged at TF . File No. 142/UC/B/RZ-I/15 dated 17.08.15 (regular action) 209, Avtar Enclave Remaining portion of rooms at stilt parking area has been demolished with help of heavy hammer. u/c frok parking area (stilt) has completely removed at ongoing stage. B-29, LIC Colony, Paschim Vihar Demolition of excess coverage which is against the sanction building plan at rear side shaft at stilt to third floor at ongoing stage. B-70, Rishi Nagar Demolished roof slab of baramdha at TF & reinforcement cuted down with the help of gas cutter. File No. 137/UC/B/RZ-I/15 dated 06.08.15 (regular action) 26 17.09.15 27 28 18.09.15 29 30 21.09.15 AC-69D, Shalimar Bagh Demolished projection on Mpl land at ongoing stage. 31 22.09.15 A-109, Mangolpuri Indl. Area-II Shuttering at SF completely has been removed at ongoing stage. K-47, Udyog Nagar, Peeragarhi Demolished the brick walls and also remove the door and windows at the roof top of SF at ongoing stage. B-2/82, Paschim Vihar Demolition action has been taken with the help of gas cutter and heavy hammer on projection and excess coverage on back side stilt floor to FF. File No. 32 33 23.09.15 125/UC/B/RZ-I/15 (regular action) dated 17.07.15 34 BG-6/307A, Paschim Vihar Demolishing partition wall and chajja extended at GF level at ongoing stage. 35 A-12, Laxmi Park, Nangloi Room walls are demolished & shad of the slab is damaged at ongoing stage. 36 PD-101C, DDA Flat, Pitampura Removed the centering & shuttering of front room along with front brick wall at ongoing stage. 37 AN-60B, Shalimar Bagh Demolished projection on Mpl Land and cut reinforcement by gas cutter at ongoing stage. 38 AN-60C, Shalimar Bagh Demolisehd projection by way of punctured projection at ongoing stage. 39 AL-82, Shalimar Bagh Demolisehd projection at back side at side walls removed at ongoing stage. 1800, Multani Mohalla, Rani Bagh Demolished the roof slab of one room at SF at ongoing stage at ongoing stage. H-82, Nihal Vihar Brick walls are demolisehd on GF at ongoing stage. UU-183, Pitampura Demolished the projection on Mpl land in back lane at GF at ongoing stage. 902/290, Gali No. 2, Shalimar Village Demolished by way of removing back side room girder and stone and puctured RCC and removing partition wall. File No. 40 24.09.2015 28.09.15 41 42 29.09.15 43 130/UC/B/RZ-I/15 dated 27.07.15 (regular action) 44 45 30.09.16 8, Janta Flat, DDA Block No. 4, Paschim Vihar Projection and excess coverage has been demolished by demolishing roof slab with help og heavy hammer at ongoing stage. B-113, Shiv Park Brick walls are demolished on SF at ongoing stage.