REPORT REGARDING DEMOLITION/SEALING ACTION TAKEN BY

advertisement
REPORT REGARDING DEMOLITION/SEALING ACTION TAKEN BY THE BUILDING
DEPARTMENT, ROHINI ZONE-I, DURING THE MONTH OF SEPTEMBER- 2015
Sl.
No.
Date
Property No.
Details of Action Taken
1
01.09.15
A-6/273, Paschim Vihar
Demolished projection on Mpl Land at
ongoing stage.
A-6/274, Paschim Vihar
Demolished projection on Govt. land at
ongoing stage.
2
3
02.09.15
134, Sainik Vihar
Demolished roof slab in rear set back
agaisnt S.B.P at stilt floor at ongoing stage.
4
03.09.15
CU-151, Pitampura
Demolisehd partly the prjection of TF along
with parapet wall. File No. 109/UC/B/RZI/15 dated 03.07.15 (regular action)
BW-21D, Shalimar Bagh
Demolished shuttering and partition side
walls at roof of flat at ongoing stage.
BC-80, Mangolpuri Indl.
Area-II
First floor shuttering in rear set back has
been removed and made unusable at
ongoing stage.
B-6, DSIIDC, Peeragarhi
Demolished the brick walls on the roof of
third floor in the shape of room at ongoing
stage.
BG-6/86C, Paschim
Vihar
Demolished roof slab and partition wall of
unauthorized construction at ongoing stage.
RZA-11B, Laxmi Park,
Nangloi
Mobile/Cell Tower has been sealed on TF
roof at four point.
QU-170C, Pitampura
Demolished the roof of one room alongwith
the brick wall of kitchen/room. File No.
128/UC/B/RZ-I/15 dated 24.07.15
(regular action)
BF-62, Garage Area,
Shalimar Bagh
Demolished by way of removing shutering
and removing shuttering and partition walls
at ongoing stage.
C-43, Shiv Ram Park
One side brick wall is damage on GF at
ongoing stage.
13
A-5B/58, Paschim Vihar
Partition wall has been demolished at
ongoing stage.
14
209, Avtar Enclave
Room constructed at stilt parking has been
demolished with help of heavy hammer at
ongoing stage.
GH-13/768, Paschim
Vihar
Demolition action has been taken in the
shape of puncturing of slab at ongoing
stage.
9, Sainik Vihar,
Pitampura
Demolished rear set back at stilt floor
against S.B.P at ongoing stage.
WP-11C, DDA Flat,
Pitampura
Demolished/removed the W.C/Bath
Competely. File No. 102/UC/B/RZ-I/14
dated 11.07.14 (regular action)
AC-140, Shalimar Bagh
Demolished shuttering and extended portion
at GF at ongoing stage.
C-506, Saraswati Vihar
Third floor another one pannel has been cut
with gas cutter. File No. 233/UC/B/RZI/14 dated 15.10.14 (regular action)
5
6
04.09.15
7
8
07.09.15
9
10
08.09.15
11
12
15
09.09.15
10.09.15
16
17
11.09.15
18
19
14.09.15
20
F-36, DSIIDC, Peeragarhi
Demolished the one room on the roof of
second floor at ongoing stage.
21
15.09.15
428, Pocket-1, Paschim
Puri
Room constructed at third floor has ben
demolished with the help of gas cutter and
heavy hammer at ongoing stage.
22
15.09.15
521/7, Arya Mohalla,
Nangloi
Two room wall are demolished on FF at
ongoing stage.
23
16.09.15
CC-110C, Shalimar Bagh
Demolished by way of removing partition
wall and projection on Mpl land at ongoing
stage.
24
JU- 01C, DDA Flat,
Pitampura
Demolished the roof of one room along with
brick wall of room and made it unusable or
unhabitable at ongoing stage.
25
C-506, Saraswati Vihar
Third floor & second floor demolished and
roof of TF & SF has been cut by gas cutter
and partition walls in excess coverage also
has been demolished. File No.
233/UC/B/RZ-I/14 dated 15.10.14
(regular action)
RZA-55, Nihal Vihar
Walls of the room & roof slab is damaged at
TF . File No. 142/UC/B/RZ-I/15 dated
17.08.15 (regular action)
209, Avtar Enclave
Remaining portion of rooms at stilt parking
area has been demolished with help of heavy
hammer. u/c frok parking area (stilt) has
completely removed at ongoing stage.
B-29, LIC Colony,
Paschim Vihar
Demolition of excess coverage which is
against the sanction building plan at rear
side shaft at stilt to third floor at ongoing
stage.
B-70, Rishi Nagar
Demolished roof slab of baramdha at TF &
reinforcement cuted down with the help of
gas cutter. File No. 137/UC/B/RZ-I/15
dated 06.08.15 (regular action)
26
17.09.15
27
28
18.09.15
29
30
21.09.15
AC-69D, Shalimar Bagh
Demolished projection on Mpl land at
ongoing stage.
31
22.09.15
A-109, Mangolpuri Indl.
Area-II
Shuttering at SF completely has been
removed at ongoing stage.
K-47, Udyog Nagar,
Peeragarhi
Demolished the brick walls and also remove
the door and windows at the roof top of SF
at ongoing stage.
B-2/82, Paschim Vihar
Demolition action has been taken with
the help of gas cutter and heavy hammer
on projection and excess coverage on
back side stilt floor to FF. File No.
32
33
23.09.15
125/UC/B/RZ-I/15
(regular action)
dated
17.07.15
34
BG-6/307A, Paschim
Vihar
Demolishing partition wall and chajja
extended at GF level at ongoing stage.
35
A-12, Laxmi Park,
Nangloi
Room walls are demolished & shad of
the slab is damaged at ongoing stage.
36
PD-101C, DDA Flat,
Pitampura
Removed the centering & shuttering of
front room along with front brick wall at
ongoing stage.
37
AN-60B, Shalimar Bagh
Demolished projection on Mpl Land and
cut reinforcement by gas cutter at
ongoing stage.
38
AN-60C, Shalimar Bagh
Demolisehd projection by way of
punctured projection at ongoing stage.
39
AL-82, Shalimar Bagh
Demolisehd projection at back side at
side walls removed at ongoing stage.
1800, Multani Mohalla,
Rani Bagh
Demolished the roof slab of one room at
SF at ongoing stage at ongoing stage.
H-82, Nihal Vihar
Brick walls are demolisehd on GF at
ongoing stage.
UU-183, Pitampura
Demolished the projection on Mpl land
in back lane at GF at ongoing stage.
902/290, Gali No. 2,
Shalimar Village
Demolished by way of removing back
side room girder and stone and puctured
RCC and removing partition wall. File No.
40
24.09.2015
28.09.15
41
42
29.09.15
43
130/UC/B/RZ-I/15 dated 27.07.15
(regular action)
44
45
30.09.16
8, Janta Flat, DDA
Block No. 4, Paschim
Vihar
Projection and excess coverage has been
demolished by demolishing roof slab
with help og heavy hammer at ongoing
stage.
B-113, Shiv Park
Brick walls are demolished on SF at
ongoing stage.