LOCAL/REGIONAL MATERIALS SECTION 01355 {Instruction to Consultants: The Master Specification must only be considered to be general guidelines as it is not prepared for a Specific Project. If the items described in the Master Specification do not match the items actually going to be used in a Specific Project, then the Consultant must add new text or modify the existing text so that the final Specification is fully coordinated and consistent with the Contract Drawings. The Master Specification must not be considered complete. Additions and deletions necessary to make it Project specific are required from the Consultant. Items that are not part of the scope of the Specific Project must be deleted. The Consultant must add to and/or delete paragraphs, items, etc. to the Master Specification Section as required by the scope and nature of the Specific Project. The general format and general statements of the various Sections must remain unchanged. The Consultant must modify and finalize the footer to identify the Specific Project as to name of Project, Project number, and issued for/issue date.} PART 1 1.01 1.02 GENERAL SUMMARY A. This Specification includes use and tracking requirements and procedures for compliance with certain sustainable design guidelines based on the Chicago Department of Aviation Sustainable Airport Manual (SAM), August 5, 2009. Reference can be found at www.airportsgoinggreen.org. B. This Section includes tracking requirements and forms necessary for compliance with this Specification and in accordance with the requirements of Credit 5.8 of the SAM. DEFINITIONS A. Regional Materials: Materials and products that are manufactured, extracted, harvested, or recovered within a radius of 500 miles from the Project location. Materials and products manufactured, extracted, harvested, or recovered beyond 500 miles from the Project location but purchased within 500 miles (e.g. through a product sales representative) shall not be considered a Regional Material. B. Local Materials: Materials and products that are manufactured, extracted, harvested, or recovered within a radius of 250 miles from the Project location. Materials and products manufactured, extracted, harvested, or recovered beyond 250 miles from the Project location but purchased within 250 miles (e.g. through a product sales representative) shall not be considered a Local Material. CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-1 LOCAL/REGIONAL MATERIALS 1.03 1.04 C. Manufacturing refers to the final assembly of components into the building product that is installed at the Project site. D. Extracted, harvested, or recovered materials include raw building materials that are not manufactured but used in their final form at the Project site. This includes but is not limited to soil, aggregate, wood, salvaged masonry, and reclaimed concrete. SUBMITTALS A. Design Estimate – With each milestone submittal during design phase, the Designer of Record shall submit a design estimate that identifies total Project material cost (less labor and equipment) and all Local/Regional Materials that are proposed for the Project. For each material, its source and cost shall be identified. B. Pre-Construction Estimate - Prior to the initial Application for Mobilization Payment, the Contractor shall submit an estimate that identifies total Project material cost (less labor and equipment) and all Local/Regional Materials that are proposed for the Project. For each material, its source and cost shall be identified. C. Final Construction Total - With the Application for Reduction of Retainage from 5% to 3%, the Contractor shall submit the final actual total Project material cost (less labor and equipment) and all Local/Regional Materials that were used for the Project. For each material, its source and cost shall be identified. D. The above submittal must be transmitted to the Commissioner/Construction Manager and to the following email address: samdocs@cityofchicago.org. CALCULATIONS A. Only include items in CSI Divisions 2-10 in the calculation of the percentage of materials obtained locally and/or regionally. B. Mechanical, electrical, plumbing components, and specialty items (CSI Divisions 11-16) must not be included in this calculation. PART 2 PRODUCTS [NOT USED] PART 3 EXECUTION 3.01 DOCUMENTATION TEMPLATE CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-2 LOCAL/REGIONAL MATERIALS A. Local/Regional Materials Design Estimate – Template Form 013551.03A attached at the end of this Specification should be used by the Designer of Record as guidance for completion of the Local/Regional Materials submittal requirements as outlined in Part 1 of this Specification Section. B. Local/Regional Materials Pre-Construction Estimate – Template Form 01355-1.03B attached at the end of this Specification should be used by the Contractor as guidance for completion of the Local/Regional Materials submittal requirements as outlined in Part 1 of this Specification Section. C. Local/Regional Materials Final Construction Total – Template Form 01355-1.03C attached at the end of this Specification should be used by the Contractor as guidance for completion of the Local/Regional Materials submittal requirements as outlined in Part 1 of this Specification Section. PART 4 4.01 MEASUREMENT A. PART 5 5.01 METHOD OF MEASUREMENT Regional Materials will not be measured separately for payment, but will be considered included in the overall Contract. BASIS OF PAYMENT PAYMENT A. All costs associated with meeting these requirements are included in the overall Contract. No additional time or monies will be granted to the Contractor for compliance with these requirements and any associated regulations. END OF SECTION 01355 CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-3 LOCAL/REGIONAL MATERIALS Local/Regional Materials Design Estimate (01355-1.03A) Designer of Record: Project: WBS No.: Description of Material Spec Section Source of Material/Location Total Construction Cost Item - Equipment - (Subtract from Total) [$] [$] TOTAL $ Labor - Total Material Cost Local Materials within 250 miles Regional Materials within 500 miles (Less Labor & Equipment) [$] (per 01355-1.02A) [$] (per 01355-1.02A) [$] = (Subtract from Total) [$] - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - = $ - - $ - - $ - TOTAL LOCAL/REGIONAL MATERIALS AS A PERCENT OF TOTAL MATERIAL COST CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-4 LOCAL/REGIONAL MATERIALS $ #DIV/0! $ #DIV/0! CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-5 LOCAL/REGIONAL MATERIALS Local/Regional Materials Pre-Construction Estimate (01355-1.03B) Contractor: Project: WBS No.: Description of Material Spec Section Source of Material/Location Total Construction Cost Item $ - Equipment - (Subtract from Total) [$] [$] TOTAL Labor - (Subtract from Total) [$] - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - = - - - $ - - Local Materials within 250 miles Regional Materials within 500 miles (per 01355-1.02A) [$] (per 01355-1.02A) [$] = = $ - = $ #DIV/0! Company: Printed Name: Title: Signature: Date: CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-6 LOCAL/REGIONAL MATERIALS $ #DIV/0! Local/Regional Materials Final Construction Estimate (01355-1.03C) Contractor: Project: WBS No.: Contractor Certification I, Description of Material Spec Section (Contractor), declare the building materials and products as indicated are manufactured, extracted, harvested, or recovered locally/regionally (within 250/500 mile radius of the Project site). S ource of Material/Location Total Construction Cost Item $ - Equipment - (Subtract from Total) [$] [$] TOTAL Labor - Total Material Cost Local Materials within 250 miles Regional Materials within 500 miles (Less Labor & Equipment) [$] (per 01355-1.02A) [$] (per 01355-1.02A) [$] $ $ = (Subtract from Total) [$] - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - - - = $ - = $ - - $ - - $ - TOTAL LOCAL/REGI ONAL MATERI ALS AS A PERCENT OF TOTAL MATERI AL COS T Company: Printed Name: Title: Signature: Date: Reviewed by: (Resident Engineer) CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-7 LOCAL/REGIONAL MATERIALS #DIV/0! #DIV/0! CHICAGO DEPARTMENT OF AVIATION/ O’HARE MODERNIZATION PROGRAM MASTER SPECIFICATIONS VOLUME IIIA REV. 5, ISSUED 7/30/10 01355-8 LOCAL/REGIONAL MATERIALS