Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
1.
Purpose of Document
2.
Introduction
2.1
Background
2.2
Description
3.
Charge Code Requirements
3.1
Business Rules
3.2
Predecessor Charge Codes
3.3
Successor Charge Codes
3.4
Inputs – External Systems
3.5
Inputs - Predecessor Charge Codes or Pre-calculations
3.6
CAISO Formula
3.7
Outputs
4.
Charge Code Effective Date
Version: 5.3
Date: 7/7/14
3
4
7
8
12
4
6
6
6
3
3
4
15
CAISO, 2020 Page 2 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
The purpose of this document is to capture the requirements and design specification for a Charge Code in one document.
2.1 Background
A flexible ramping constraint applies as part of the market optimization for the real-time processes. This constraint addresses certain reliability and operational issues observed in the ISO’s operation of the grid.
In accordance with the CAISO Tariff, resources that resolve the flexible ramping constraint are to be compensated in Settlements at the Flexible Ramping Constraint
Derived Price. The Flexible Ramping Constraint Derived Price is equal to the lesser of:
1) $800/MWh; or
2) the greater of: a) zero, or b) Real-Time Spinning Reserve Ancillary Service
Marginal Price; or c) the Flexible Ramping Constraint Shadow Price minus seventy-five percent of the maximum of zero or the simple average Real-Time
System Marginal Energy Cost for each of the three five-minute RTD intervals in the applicable fifteen-minute FMM interval.
The Flexible Ramping Constraint Shadow Price is the reduction of the total Energy and
Ancillary Services procurement cost associated with a marginal change at each constraint for the individual Balancing Authority Areas (BAA) in the EIM Area and applicable groupings of those areas in which the constraint is enforced, which will be equal to zero
(0) if the Flexible Ramping Constraint is not binding.
The CAISO will determine the Flexible Ramping Constraint costs for each constraint as the product of:
1) the resource-specific total Flexible Ramping Constraint costs, calculated as the total compensation, net of rescinded amounts; and
2) the ratio of the Flexible Ramping Constraint Shadow Price to the total Flexible
Ramping Constraint Shadow Price
For each constraint and each BAA in the EIM Area, the CAISO will determine the Flexible
Ramping Constraint costs attributable to that BAA for which the applicable constraint(s) were binding in the applicable interval, based on the ratio of the BAA ’s requirement to its contribution to the individual constraint or group of constraints to which that BAA contributes, and determine each BAA ’s apportionment of Flexible Ramping Constraint costs as the summation of the BAA ’s amounts.
The costs associated with such compensation, as netted by BAA, are allocated to the
CAISO BAA as twenty-five percent of daily gross negative supply deviations and seventy-
CAISO, 2020 Page 3 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14 five percent of hourly measured demand, which consists of metered load and exports. At the end of each month, the costs allocated to daily gross negative supply deviations will be reversed and re-allocated to monthly gross negative supply deviations. The associated costs for individual EIM BAAs are allocated to the EIM Entity Scheduling Coordinator(s).
2.2 Description
In this Charge Code (CC) 7056 Flexible Ramp Cost Allocation, the costs from CC 7050
Flexible Ramp Up Capacity Payment, net of the rescission payment from CC 7024
Flexible Ramp Up No Pay Capacity Charge, are apportioned to the Balancing Authority
Area (BAA) based on the ratio of the proportion of the shadow price contribution of each constraint or group of constraints resolved by a resource to the total shadow price across all constraints, and by the ratio of a BAA ’s Flexible Ramp requirement to its total contribution toward relieving a Flexible Ramp Constraint or constraint group. The total output costs for the CAISO BAA are allocated seventy-five percent to hourly resourcelevel Measured Demand without exemption to the demand quantities, and twenty-five percent to daily gross negative supply deviation. The total output costs for the EIM BAA are allocated to the EIM Entity Scheduling Coordinator.
3.1 Business Rules
Bus
Req
ID
1.0
Business Rule
For the CAISO BAA, the costs of flexible ramping capacity payments, as apportioned to CAISO and net of the rescission No Pay payment, are allocated seventy-five percent to hourly resource-level Measured Demand without exemption to the demand quantities, and twenty-five percent to daily gross negative supply deviation.
2.0
There shall be no exemption to the hourly Measured Demand quantities for the purpose of allocating the flexible ramping capacity payments to
Scheduling Coordinators in the CAISO BAA.
CAISO, 2020 Page 4 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
Bus
Req
ID
Business Rule
2.1
3.0
4.0
The daily gross negative supply deviation is calculated per resource in the
CAISO BAA as the sum of total negative Settlement Interval UIE plus total negative Settlement Interval import Operational Adjustments
The net imbalance amount calculated as the sum of the final Settlement amounts for Charge Codes 7050 and 7056 in a given trade interval is attributed to rounding and must be output to CC 4989 Daily Rounding
Adjustment Allocation.
The costs of flexible ramping capacity payments, as apportioned to an EIM
BAA and net of rescission No Pay payment, are allocated to the EIM Entity
Scheduling Coordinator.
4.1 A resource participating in the EIM can only be part of one BAA.
5.0
5.1
6.0
7.0
8.0
8.0
Each resource with awarded flexible ramping capacity may resolve Flexible
Ramping Constraints associated with multiple BAAs within the EIM Area, or just one. This potential combination of Flexible Ramping Constraints is referred to as a group of constraints in which the resource participates.
Each Flexible Ramping Constraint corresponds to a BAA or group of BAAs.
All permutations of BAAs within the EIM Area are taken into consideration.
The total Flexible Ramping Constraint Shadow Price is the resource-specific summation of the flexible ramping shadow prices of all constraints in the group of constraints which the resource may resolve. This is the same shadow price used in the calculation of compensation in Charge Code 7050.
The Flexible Ramping Constraint Shadow Price is a constituent element of the aforementioned total – it is the shadow price associated with one
Flexible Ramping Constraint or group of such constraints.
For the purposes of this Charge Code 7056, the Flexible Ramping
Constraint Shadow Price is shown at the resource level. When a resource resolves a constraint pertaining to multiple BAAs, the shadow price is separated by BAA in proportion to the BAA ’s Flexible Ramping Constraint requirement quantity, as determined by the CAISO market software.
The Flexible Ramping Constraint costs, net of rescission, are apportioned to
Flexible Ramping Constraint or group of constraints, as the ratio of the individual Flexible Ramping Constraint Shadow Price to the total Flexible
Ramping Constraint Shadow Price
CAISO, 2020 Page 5 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
Bus
Req
ID
Business Rule
9.0
The total apportionment to BAAs in the EIM Area represents the netting of
Flexible Ramping Constraint costs per Flexible Ramping Constraint or group of Constraints to the individual BAA in which an awarded resource is located.
3.2 Predecessor Charge Codes
Charge Code/ Pre-calc Name
CC 7050
– Flexible Ramp Up Capacity Payment
Pre-calculation Measured Demand over Control Area
Real Time Energy Quantity Pre-calculation
CC 7024
– Flexible Ramp Up Capacity No Pay Charge
3.3 Successor Charge Codes
Charge Code/ Pre-calc Name
CC 7057 - Flex Ramp Up Supply Cost Allocation Reversal
CC 7058 – Monthly Flex Ramp Up Supply Cost Allocation
CC 4989 – Daily Rounding Adjustment Allocation
3.4 Inputs – External Systems
Row
#
Variable Name Description
1 BAABAFMMIntervalResourceFlex
RampUpConstraintPrice
BrtQ
’mdhc
The resource-specific price for an individual Flexible Ramping Constraint or
CAISO, 2020 Page 6 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
Row
#
Variable Name Description
2
3
BA15MResourceFlexRampUpCapa cityPayment BrtF’S’mdhc
SettlementIntervalMeteredEnergy
BrtuT’I’Q’M’F’S’mdhcif
SettlementIntervalRealTimeUIE
BrtuT’I’Q’M’F’S’mdhcif group of constraints which the resource may resolve in an FMM Interval. For a shadow price that involves a group of constraints, this price will reflect the proportional BAA contribution to the
Flexible Ramping Constraint requirement.
($/MW)
The shadow price for flexible ramping up constraint for an FMM interval. ($/MW)
2
1
BAResourceFlexRampUpShadow
Price
Brtmdhc
3
EIMEntitySCFlag BQ’
A flag input that, when equal to 1, relates an EIM Balancing Authority Area (EIM
BAA) with the associated Business
Associate of the EIM Entity Scheduling
Coordinator ID.
3.5 Inputs - Predecessor Charge Codes or Pre-calculations
Predecessor Charge Code/
Row
#
Variable Name
Pre-calc Configuration
CC 7050 – Flexible Ramping Capacity
Payment
Real Time Energy Quantity Precalculation
Real Time Energy Pre-Calculation
4
CC 7024 – Flexible Ramp Up No Pay
Capacity Charge
5
6
BAFMMIntervalResourceFlexibleRa mpUpNoPayCapacity BrtF’S’mdhc
SettlementIntervalOAEnergy
BrtuT’I’Q’M’F’S’mdhcif
CAISOTotalHourlyMeasuredDeman dControlAreaQty mdh
Real Time Energy Quantity Precalculation
Pre-calculation Measured Demand over
Control Area
CAISO, 2020 Page 7 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
3.6 CAISO Formula
3.6.1 BADailyResourceFlexRampCostAllocationAmount
BADailyResourceFlexRampCostAllocationAmount
B rtF’S’md =
BADailyResourceFlexRampSupplyCostAllocationAmount BrtF’S’md +
BADailyResourceFlexRampDemandCostAllocationAmount
B rtF’S’md
3.6.2 BADailyResourceFlexRampSupplyCostAllocationAmount
BADailyResourceFlexRampSupplyCostAllocationAmount BrtF’S’md =
BADailyResourceGrossNegativeSupplyQuantity BrtF’S’md *
CAISODailyFlexRampSupplyAllocationPrice md
3.6.3 CAISODailyFlexRampSupplyAllocationPrice
CAISODailyFlexRampSupplyAllocationPrice md
=
CAISODailyNetFlexRampUpSupplyCosts md
/ CAISODailyGrossNegativeSupplyQuantity md
3.6.4 BADailyResourceFlexRampDemandCostAllocationAmount
BADailyResourceFlexRampDemandCostAllocationAmount
B rtF’S’md =
h
BAHourlyResourceFlexRampDemandCostAllocationAmount BrtF’S’mdh
3.6.5 BAHourlyResourceFlexRampDemandCostAllocationAmount
BAHourlyResourceFlexRampDemandCostAllocationAmount BrtF’S’mdh =
((-1) * BAHourlyResourceMeasuredDemandQuantity BrtF’S’mdh *
CAISOHourlyFlexRampDemandCostAllocationPrice mdh
)
3.6.6 CAISOHourlyFlexRampDemandCostAllocationPrice
IF
CAISOTotalHourlyMeasuredDemandControlAreaQty mdh
<= (-0.001)
THEN
CAISOHourlyFlexRampDemandCostAllocationPrice mdh
=
(CAISOHourlyNetFlexRampUpDemandCosts mdh
/
(ABS(CAISOHourlyMeasuredDemandQuantity mdh )) )
ELSE
CAISOHourlyFlexRampDemandCostAllocationPrice mdh
= 0
CAISO, 2020 Page 8 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
3.6.7 CAISOHourlyMeasuredDemandQuantity
CAISOHourlyMeasuredDemandQuantity mdh
=
B r t F ' S '
BAHourlyResourceMeasuredDemandQuantity
BrtF
’S’mdh
3.6.8 BAHourlyResourceMeasuredDemandQuantity
BAHourlyResourceMeasuredDemandQuantity BrtF’S’mdh =
SettlementIntervalMeteredEnergy BrtuT’I’Q’M’F’S’mdhcif u T ' I ' ' ' c f
c
Where Resource Type (t) = ‘LOAD’ or ‘ETIE’
And Where Balancing Authority Area (Q ’) = ‘CISO’
3.6.9 CAISODailyGrossNegativeSupplyQuantity
CAISODailyGrossNegativeSupplyQuantity md
=
B r t F ' S '
BADailyResourceGrossNegativeSupplyQuantity BrtF’S’md
3.6.10 BADailyResourceGrossNegativeSupplyQuantity
BADailyResourceGrossNegativeSupplyQuantity BrtF’S’md = h
BAHourlyResourceGrossNegativeSupplyQuantity BrtF’S’mdh
3.6.11 BAHourlyResourceGrossNegativeSupplyQuantity
BAHourlyResourceGrossNegativeSupplyQuantity BrtF’S’mdh =
c f
c
BASettlementIntervalResourceGrossNegativeSupplyQuantity BrtF’S’mdhcif
3.6.12 BASettlementIntervalResourceGrossNegativeSupplyQuantity
BASettlementIntervalResourceGrossNegativeSupplyQuantity BrtF’S’mdhcif =
BASettlementIntervalCAISOBAAResourceNegativeUIEQuantity BrtF’S’mdhcif +
BASettlementIntervalResourceNegativeOAQuantity BrtF’S’mdhcif
3.6.13 BASettlementIntervalCAISOBAAResourceNegativeUIEQuantity
BASettlementIntervalCAISOBAAResourceNegativeUIEQuantity BrtF’S’mdhcif =
T ' u I ' ' '
ABS (Min (0, SettlementIntervalRealTimeUIE BrtuT’I’Q’M’F’S’mdhcif ))
Where Resource type (t) = GEN or ITIE
And Where Balancing Authority Area (Q’) = ‘CISO’
3.6.14 BASettlementIntervalResourceNegativeOAQuantity
CAISO, 2020 Page 9 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
BASettlementIntervalResourceNegativeOAQuantity BrtF’S’mdhcif =
T ' u I ' ' '
ABS (Min
(0,( SettlementIntervalOAEnergy BrtuT’I’Q’M’F’S’mdhcif )
Where Resource Type (t) = ‘ITIE’
And Where Balancing Authority Area (Q’) = ‘CISO’
3.6.15 CAISOHourlyNetFlexRampUpDemandCosts
CAISOHourlyNetFlexRampUpDemandCosts mdh
= (.75) *
CAISOHourlyNetFlexRampUpCosts mdh
3.6.16 CAISODailyNetFlexRampUpSupplyCosts
CAISODailyNetFlexRampUpSupplyCosts md
= h
CAISOHourlyNetFlexRampUpSupplyCosts mdh
3.6.17 CAISOHourlyNetFlexRampUpSupplyCosts
CAISOHourlyNetFlexRampUpSupplyCosts mdh
= (.25) *
CAISOHourlyNetFlexRampUpCosts mdh
3.6.18 CAISOHourlyNetFlexRampUpCosts
CAISOHourlyNetFlexRampUpCosts mdh
= c
CAISOFMMIntervalFlexRampUpTotalCost mdhc
3.6.19 CAISOFMMIntervalFlexRampUpTotalCost
Q
CAISOFMMIntervalFlexRampUpTotalCost mdhc
=
'
BAAFMMIntervalFlexRampUpTotalCost
Q
’mdhc
Where Balancing Authority Area (Q ’) = ‘CISO’
3.6.20 EIMEntitySCDailyFlexRampUpTotalCostAllocAmount
EIMEntitySCDailyFlexRampUpTotalCostAllocAmount
Bmd
=
EIMEntityFMMIntervalFlexRampUpTotalCost
Q
’mdhc * EIMEntitySCFlag BQ’
Q ' h c
CAISO, 2020 Page 10 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
3.6.21 EIMEntityFMMIntervalFlexRampUpTotalCost
EIMEntityFMMIntervalFlexRampUpTotalCost
Q ’mdhc =
BAAFMMIntervalFlexRampUpTotalCost
Q ’mdhc
Where Balancing Authority Area (Q ’) <> ‘CISO’
3.6.22 BAAFMMIntervalFlexRampUpTotalCost
BAAFMMIntervalFlexRampUpTotalCost
Q ’mdhc =
B r t
BAABAFMMIntervalResFlexRampUpAllocAmount
BrtQ ’mdhc
3.6.23 BAABAFMMIntervalResFlexRampUpAllocAmount
BAABAFMMIntervalResFlexRampUpAllocAmount
BrtQ ’mdhc =
BAFMMIntervalNetFlexRampUpCosts
Brtmdhc
*
BAABAFMMIntervalResourceFlexRampUpConstraintRatio
BrtQ
’mdhc
3.6.24 BAABAFMMIntervalResourceFlexRampUpConstraintRatio
If BAResourceFlexRampUpShadowPrice
Brtmdhc
= 0
Then BAABAFMMIntervalResourceFlexRampUpConstraintRatio
BrtQ ’mdhc = 0
Else
BAABAFMMIntervalResourceFlexRampUpConstraintRatio
BrtQ
’mdhc =
BAABAFMMIntervalResourceFlexRampUpConstraintPrice
BrtQ
’mdhc /BAResourceFlexRampUpShadowPrice
Brtmdhc
3.6.25 BAFMMIntervalNetFlexRampUpCosts
BAFMMIntervalNetFlexRampUpCosts
Brtmdhc
=
F ' S '
(BA15MResourceFlexRampUpCapacityPayment
(-1) *
BrtF’S’mdhc +BAFMMIntervalResourceFlexibleRampUpNoPayCapacity BrtF’S’mdhc )
3.6.26 BACISODailyFlexRampCostAllocationAmount
BACISODailyFlexRampCostAllocationAmount
Bmd
=
r t F ' S '
BADailyResourceFlexRampCostAllocationAmount BrtF’S’md
3.6.27 BATotalDailyFlexRampCostAllocationAmount
BATotalDailyFlexRampCostAllocationAmount
Bmd
=
BACISODailyFlexRampCostAllocationAmount
Bmd
+
EIMEntitySCDailyFlexRampUpTotalCostAllocAmount
Bmd
CAISO, 2020 Page 11 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
3.6.28 EIMAreaDailylTotalFlexRampCostAllocationAmount
EIMAreaDailyTotalFlexRampCostAllocationAmount md
=
B
BATotalDailyFlexRampCostAllocationAmount
Bmd
Implementation Note: This is provided as part of reporting structure and is not configured as an individual charge type.
3.7 Outputs
Output
Req ID
Name Description
1 In addition to any outputs listed below, all inputs shall be included as outputs.
All inputs.
2
3
BAHourlyResourceMeasuredDeman dQuantity BrtF’S’mdh
BADailyResourceFlexRampDemand
CostAllocationAmount BrtF’S’md
Hourly Measured Demand Quantity for a resource in the CAISO BAA for a
Trading Hour
(Assumption: Trade Month m and
Trading Day d)
Total Daily Flex Ramp Cost Allocation
Amount per Business Associate and resource for a Trading Day
4
5
BADailyResourceFlexRampSupplyC ostAllocationAmount BrtF’S’md
Total Daily Flex Ramp Supply Cost
Allocation Amount per Business
Associate and resource for a Trading
Day
CAISODailyFlexRampSupplyAllocati onPrice md
The CAISO Total Daily Flex Ramp
Supply Allocation Price per Trading
Day
6 BAHourlyResourceFlexRampDeman dCostAllocationAmount BrtF’S’mdh
Hourly Flexible Ramp demand cost allocation amount for a resource for a
Trading Hour
(Assumption: Trade Month m and
CAISO, 2020 Page 12 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
Output
Req ID
Name Description
Trading Day d)
7
8
9
CAISOHourlyFlexRampDemandCost
AllocationPrice mdh
CAISODailyGrossNegativeSupplyQu antity md
BADailyResourceGrossNegativeSup plyQuantity BrtF’S’md
The CAISO Total Flex Ramp Demand
Allocation Price per Trading Hour.
(Assumption: Trade Month m and
Trading Day d)
The CAISO total daily gross negative
Supply quantity per Trading Day.
(Assumption: Trade Month m and
Trading Day d)
The total daily gross negative Supply quantity for a resource for a Trading
Day
10
11
BASettlementIntervalResourceGross
NegativeSupplyQuantity BrtF’S’mdhcif
BASettlementIntervalCAISOBAARes ourceNegativeUIEQuantity
BrtF’S’mdhcif
The total Settlement Interval gross negative Supply quantity for a resource for a Settlement Interval
(Assumption: Trade Month m and
Trading Day d)
The absolute value of the total
Negative Uninstructed Imbalance by resource in the CAISO BAA.
12
13
BASettlementIntervalResourceNegat iveOAQuantity BrtF’S’mdhcif
CAISOHourlyNetFlexRampUpDema ndCosts mdh
The total Settlement Interval gross negative Operational Adjustment quantity per Business Associate and resource for a Settlement Interval in the CAISO BAA.
(Assumption: Trade Month m and
Trading Day d)
The CAISO hourly net Flexible Ramp
Up Demand Costs for a Trading Hour
(Assumption: Trade Month m and
Trading Day d)
CAISO, 2020 Page 13 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
Output
Req ID
14
Name
CAISODailyNetFlexRampUpSupply
Costs md
Description
The CAISO daily net Flexible Ramp
Up Demand Costs for a Trading Day
15
16
17
CAISOHourlyNetFlexRampUpSuppl yCosts mdh
CAISOHourlyNetFlexRampUpCosts mdh
EIMAreaDailyTotalFlexRampCostAll ocationAmount md
The CAISO hourly net Flexible Ramp
Up Demand Costs for a Trading Hour
(Assumption: Trade Month m and
Trading Day d)
The CAISO hourly total net Flexible
Ramp Up Costs for a Trading Hour
(Assumption: Trade Month m and
Trading Day d)
The EIM Area total daily Flexible
Ramp Up Costs Allocation Amount for a Trading Day
18 BADailyResourceFlexRampCostAllo cationAmount BrtF’S’md
Total Daily Flex Ramp Cost Allocation
Amount per Business Associate for a
Trading Day
19 BAHourlyResourceGrossNegativeSu pplyQuantity BrtF’S’mdh
Hourly Gross Negative Supply
Quantity per Business Associate for a
Trading Hour
20 CAISOHourlyMeasuredDemandQua ntity mdh
CAISO Hourly Measured Demand quantity for a Trading Hour
21 EIMEntitySCDailyFlexRampUpTotal
CostAllocAmount
Bmd
EIM Entity Scheduling Coordinator
Flex Ramp Up Allocation. This is the total allocation amount for an EIM SC.
CAISO, 2020 Page 14 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
Output
Req ID
22
Name
EIMEntityFMMIntervalFlexRampUpT otalCost
Q
’mdhc
Description
Total Flex Ramp Up Allocation Costs for an EIM BAA (non-CAISO) for an
FMM Interval
23 BAAFMMIntervalFlexRampUpTotalC ost
Q
’mdhc
Total Flex Ramp Up Allocation Costs for a given BAA throughout the EIM
Area for an FMM Interval
24 BAABAFMMIntervalResFlexRampU pAllocAmount
BrtQ ’mdhc
Resource Total Flex Ramp Up
Allocation Costs for an FMM Interval
25
26
27
BAABAFMMIntervalResourceFlexRa mpUpConstraintRatio
CAISOFMMIntervalFlexRampUpTot alCost mdhc
BrtQ ’mdhc
BAFMMIntervalNetFlexRampUpCost s
Brtmdhc
Resource Flexible Ramp Shadow
Price Contribution Ratio to the resource total Flexible Ramping
Constraint Shadow Price, where the price is proportional to the BAA Flex
Ramp Up requirement quantity, for an
FMM Interval.
Resource Flexible Ramping
Constraint Compensation, adjusted for payment rescission (No Pay), expressed as a positive value for an
FMM Interval
CAISO BAA Total Flex Ramp Up
Allocation Costs for an FMM Interval
28 BATotalDailyFlexRampCostAllocatio nAmount Bmd
Total Daily Flex Ramp Cost Allocation
Amount per Business Associate for a
Trading Day across the EIM Area
CAISO, 2020 Page 15 of 16
Settlements & Billing
Configuration Guide for: CG CC 7056 Flexible Ramp Cost Allocation
Version: 5.3
Date: 7/7/14
Charge Code/
Pre-calc Name
CC 7056
Ramp Cost Allocation
CC 7056
Ramp Cost Allocation
CC 7056
Ramp Cost Allocation
CC 7056
Ramp Cost Allocation
Document
Version
Effective
Start Date
Effective
End Date
Version Update
Type
5.2
5.3
5.0
5.1
12/13/11
11/01/12
5/01/14
10/01/14
10/31/12
4/30/13
Configuration
Impacted
Configuration
Impacted
09/30/14
Open
Configuration
Impacted and
Documentation
Updates
Configuration
Impacted and
Documentation
Updates
CAISO, 2020 Page 16 of 16