ALL INDIA COUNCIL FOR TECHNICAL EDUCATION Compliance Report for the year 2010-11 for Extension of Approval for the academic year 2011-12 Submitted By MUKHI POLYTECHNIC VISHNU NAGAR, GOHANA Phone: 09354724820 Website: www.mukhipolytechnic.com COMPLIANCE REPORT 1 i) Name and Address of the Institution Name Address MUKHI Polytechnic Permanent Location as approved by Temporary Location (if applicable) AICTE N/A Ward No 12, Vishnu Nagar, Gohana Behind bus stand Village Taluk GOHANA District SONEPAT Pin Code 131301 State Haryana STD Code 01263 Fax No. 01263-255730 Web site www,mukhipolytechnic.com Nearest Rly Station GOHANA Nearest Airport 1 ii) Phone No: 09354724820 DELHI Whether the institution is operating at temporary location (if so provide details of permanent location along with survey no.)? NO 2 i) Name and Address of the Society / Trust Name Address Mukhi Education Society, Gohana Pin Code Phone No. E-Mail 2 ii) 131301 STD Code 01263 Fax No. 01263-255730 Web site www.mukhipoloytechnic.com 09354724820 mukhipolytechnic@gmail.com Brief details regarding background of the Trust/Society, Governing body members, etc. Mukhi Educational Society was formed in1993 with the aim of establishing Schools/Institutes in the field of science, technology, literature, sports, music and arts in under developed part of the state to improve the technical literary and artistic skills of the students to create more avenues for their employment. 3 Name and Designation of the Head of the Institution (Principal / Director) Name Designation STD Code B.S.Hooda Principal 01263 Qualification & Experience Highest M.A Total M.A. English Literature Degree Experience 32 Years, 8 years as Prinicipal Ph.D (Eng.) 32 Phone No. 09416162474 Fax No. 255730 E-Mail 4. 5. Mobile No. 09416162474 Type of Technical Institution (Tick √ whichever is applicable) i) University Dept./Constituent College of University/Deemed to be University ii) Central / State Government iii) Government Aided iv) Self-Financing (Minority) v) Self-Financing (Non-Minority) vi) Any other (Please specify) √ Information on Establishment of the Institution i) Year of Establishment 2007 ii) Date on which first approval was accorded by the Council 16-10-2007 iii) Year of Commencement of the first batch 1-11-2007 iv) Details of Last extension letter with year of approval North West/1-479474841(1-9-2011 6. Whether there is any change of Name of the Institution, Society / Trust and Location of the Institution after AICTE approval? If yes, enclose details i) Whether the name of the Society has been changed Yes No √ Yes No √ If yes, give details ii) Whether the composition of the Society has been changed If yes, give details iii) Whether the name of the Institution has been changed Yes No √ iv) Whether the Institution is functioning at temporary site Yes No √ Yes No √ If yes, give details v) Whether the Institution has changed its permanent location If yes, give details 7. i) Whether there is any Court Case filed by the Institution against AICTE which is in Progress? (Please tick () appropriate box) Yes No √ If yes, then give details with name of the Court, Writ Petition No. Subject Matter and Latest Status. ____________NOT APPLICABLE___________________________________ _______________________________________________________________ _______________________________________________________________ _______________________________________________________________ 7. ii) Whether there is any case of Malpractices / Complaints/ or being penalized on account of non- submission of compliance within the cut-off-date, making excess admissions etc. against the Institution ? if yes, provide details _____________________ NOT APPLICABLE _________________________ _______________________________________________________________ _______________________________________________________________ 8. Name and Address of the Affiliating Board Name Haryana State Board of Technical Education, Haryana Address Bays No. 7-12, Sector 4 Panchkula Pin Code 134112 Period of Affiliation 2007-08, 2009-10 STD Code 0172 Phone No. 2583249 E-Mail/ Web site www.techeduhry.nic.in Fax No. 9. i) AICTE approved existing course(s) of study during academic year 2008-2009 AICTE Approved Intake during last 4 years 1st Year of Courses approval by AICTE (give approval 2011-2012 2010-2011 2009-2010 2008-2009 ref. no. & date) Sanc tione d intak e CSE UG(FT) F.No. 47 (DAL.HR. ECE ) 1/NWRO/ ME 3057 dt. 16-010Civil 07 F.No. 47 (DAL.HR. ) 1/NWRO/ Electrica 3411 dt. l Engg. 15-07-08 Memo No Spl 1/HSBTE Dated 2604-2010 CHEMIA CL ENGG UG(PT) N.A. Actual admission s Sanctio ned intake Actual admiss ions Sanction ed intake Actual admissio ns Sanctio ned intake Actual admissi ons 60 39 60 0 60 8 60 37 60 45 60 12 60 18 60 54 100 99 100 76 100 120 100 89 60 60 60 42 60 60 60 62 30 30 30 30 60- 23 60- 28 20 12 20 16 20 5 20 13 NIL FT: Full Time, PT: Part Time 9. ii) Whether any excess admissions over and above the sanctioned strength are made ? If yes, give details. No excess admission during 2011-12. S. No. Courses Sanctioned Intake 2011-2012 Actual Admissions No. of Excess Admissions NIL 9 iii) Is the Institution offering M. Phil or a Doctoral programmes ? If yes, give details Reasons No Status of Accredi tation (Validity period) S. No. 10. i) Program Specialization Intake Whether the Institution is sharing its facilities / premises with any other Institution or running any unapproved Programmes? If yes, give details. A. B. Name of the other Institutions, which are sharing the facilities Unapproved course(s) functioning in the college premises, its duration and intake Approving Degree / Authority Affiliating Duration Sanctioned Courses Diploma / Body (Years) Intake Certificate S. No. Yes No NiL NiL Actual Admissions during 200506 TOTAL 10 ii) Whether admissions under PIO / Foreign Nationals quota has been approved for your institution by the AICTE? If yes, give details. No S. No. 11. Courses Sanctioned Intake 2005-2006 Actual Admissions Status of Compliance of Specific Conditions / Deficiencies Communicated in the Last Approval/Extension of Approval by AICTE. S.No. Deficiencies Communicated / Specific Conditions Compliance Report No deficiencies communicated 12 DIRECTOR PROFILE Name : Mr. Suraj Bhan Mor Date of Birth : 02-08-1949 Academic qualifications (with field of specialization) : M.A. , Phd Physical Eduaction Details of Experience (Academic) 40 years teaching experience. :Date of the appointment in the present institution : 12-9-08 12 ii) Name of the Programme (UG & PG) (a) Total Sanctio ned Intake ( 20112012) *Faculty Position for the existing programme(s) (Programme-wise) No . of stu de nts Total number of Faculty required as per norms (column 2 divided by 20) Details of Faculty Available Professors (Rs. 1640022400 scale) Assistant Professors / Readers Lecturers Nature of Appointment Total (Rs.800013500) (Rs. 1200018000) Others/ visiting faculty Total number of faculty Permanent & Approved by Board Total number of faculty on adhoc basis ECE CSE 60 45 6 -- -- -- 6 60 39 6 -- -- -- 6 NIL NIL ME 100 99 10 -- -- -- 10 NIL Civil 60 60 6 -- -- -- 6 NIL EE 30 30 3 -- -- -- 3 NIL CHEMICAL 20 20 2 2 NIL *NOTE: The institution should clearly give information about the faculty in each approved course(s) separately without any ambiguity. 12 ii) Name of the Programme (UG & PG) (a) Total Sanctio ned Intake ( 200809) *Faculty Position for the existing programme(s) (Programme-wise) No. of stud ents Total number of Faculty required as per norms (column 2 divided by 20) Details of Faculty Available Professors (Rs. 1640022400 scale) Assistant Professors / Readers Lecturers Total (Rs.800013500) (Rs. 1200018000) ECE 60 58 6 CSE 60 50 6 ME 100 109 Civil 60 EE CHEMICAL -- Nature of Appointment Others/ visiting faculty Total number of faculty Permanent & Approved by Board Total number of faculty on adhoc basis -- 6 6 -- 6 NIL -- -- 6 6 -- 6 NIL 10 -- -- 10 10 -- 10 NIL 59 6 -- -- 6 6 -- 6 NIL 30 27 3 -- -- 3 3 -- 3 NIL 20 12 2 -- -- 2 2 -- 2 NIL *NOTE: The institution should clearly give information about the faculty in each approved course(s) 12 ii) (b) *Faculty Position for the existing programme(s) (Programme-wise) Name of the Programme (UG & PG) Total Sanctio ned Intake ( 200910) No. of stud ents Total number of Faculty require d as per norms (column 2 divided by 20) Professors (Rs. 1640022400 scale) Assistant Professors / Readers Lecturers Total (Rs.800013500) (Rs. 1200018000) ECE 60 58 CSE 60 50 ME 100 Civil Nature of Appointment Details of Faculty Available 6 Others/ visiting faculty Total number of faculty Permanent & Approved by Board Total number of faculty on adhoc basis -- -- 6 6 -- 6 -- 6 -- -- 6 6 -- 6 -- 109 10 -- -- 15 15 -- 15 -- 60 59 6 -- -- 2 2 -- 2 -- EE 30 27 3 -- -- 4 4 -- 4 -- CHEMICAL 20 12 2 3 3 1st 3 Note: * The faculty for year is common as the syllabus is common and some of nd this faculty teaching the 2 year students is teaching the 1st year students also. 12 ii) (b) Details of the Full Time Teaching Faculty (Programme wise). 12.2) (See Annexure DETAIL OF TEACHING STAFF Teaching Experience in Years Date of Joining Past Teaching Experience/ Professional Experience S.No First Name Designation QUALIFICATION 1 B.S.Hooda DIRECTOR M.A. ENGLISH 30 30/03/2009 NIL 2 KAPIL DEV SHARMA PRINCIPAL B.TECH MECHANICAL ENGG 9 1/1/2011 3 3 JITENDER SIWACH HEAD OF DEPT B.Tech CIVIL ENGINEERING 3 5/1/2011 1 4 NEERAJ LECTURER PG IN MATHEMATICS 2 1/10/2008 NIL 0.5 1/2/2011 NIL 5 ANIL SURA LECTURER B.E IN ELECTRICAL ENGINEERING 6 ASHOK AHLAWAT LECTURER B.TECH IN MECHANICAL ENGG 0.2 8/1/2011 NIL 7 AMIT NARWAL LECTURER B.E IN CSE 0.5 3/1/2011 NIL 8 VIKASH VASHISTH LECTURER B.E. IN CHEMICAL ENGG 0.5 1/3/2011 NIL 9 DANVIR NANDAL LECTURER B.TECH CIVIL ENGG 1 4/1/2011 NIL 10 NAVDEEP ARYA LECTURER B.TECH. MECHANICAL ENGG. 0.5 2/2/2011 NIL LECTURER B.Tech MECHANICAL ENGINEERING 0.5 1/8/2011 NIL LECTURER B.Tech MECHANICAL ENGINEERING 0.5 1/8/2011 NIL LECTURER B.Tech MECHANICAL ENGINEERING 0.5 1/8/2011 NIL LECTURER M.Tech COMPUTER ENGINEERING 0.5 1/8/2011 NIL 0.5 1/8/2011 NIL 11 12 13 14 GURDEV VIKRANT SUSHIL SACHIN 15 NEERAJ LECTURER B.Tech MECHANICAL ENGINEERING 16 RAVI LECTURER B.Tech ELECTRICAL ENGINEERING 0.5 1/10/2011 NIL 0.5 1/8/2011 NIL 17 MAHENDER LECTURER B.Tech MECHANICAL ENGINEERING 18 NISHA LECTURER B.Tech CHEMICAL ENGINEERING 1 8/8/2011 NIL 19 SEEMA LECTURER M.SC MATHEMATICS 1 23/08/2011 NIL 0.5 1/1/2012 NIL 20 RAKESH LECTURER B.Tech ELECTRICAL ENGINEERING 21 PRATEEK LECTURER B.Tech ECE 1 1/1/2012 NIL 0.5 1/11/2011 NIL 22 RHYTHM LECTURER B.Tech INFORMATION TECHNOLOGY 23 SHYAM PARWAL LECTURER B.E. IN CHEMICAL ENGG 1.5 15/03/2010 NIL 24 SANDEEP SRIVASTAV LECTURER B.TECH IN MECHANICAL ENGG 1.5 29/09/2010 NIL 25 AMIT SRIVASTAV LECTURER B.TECH IN MECHANICAL ENGG 1 7/9/2010 NIL 26 INDER PAL LECTURER B.TECH IN ECE 0.5 27/08/2010 NIL 27 JITENDER LECTURER B.E IN ELECTRICAL ENGG 0.5 1/8/2010 NIL 28 RAKESH LECTURER B. TECH. MECHANICAL ENGG. 0.5 12/12/2010 NIL 29 PANKAJ LECTURER B.TECH MECHANICAL ENGG 2 13/11/2010 NIL 30 RAHUL LECTURER B.TECH IN ECE 0.5 11/9/2010 NIL 31 PARMOD LECTURER B.TECH MECHANICAL ENGG 2 10/10/2010 NIL 32 DEEPAK LECTURER B.TECH MECHANICAL ENGG 2 2/8/2010 NIL 33 VIJAY LECTURER B.TECH MECHANICAL ENGG 0.5 19/09/2010 NIL 34 VIJAY HEAD OF DEPT PG IN COMPUTER ENGINEERING 5 10/8/2009 NIL 35 NAVEEN LECTURER B.TECH IN COMPUTER ENGG 2 27/01/2009 NIL 36 REENA LECTURER B.TECH IN ECE 1.5 8/9/2009 NIL 37 AMIT LECTURER B.E. IN COMPUTER ENGG 1.5 8/9/2009 NIL 38 NAVEEN LECTURER MSC PHYSICS 5 1/1/2010 NIL 39 AJAY LECTURER B.TECH. MECHANICAL ENGG. 0.5 2/12/2010 NIL SANJEEV HEAD OF DEPT B.E. IN ECE 5 15/06/2008 NIL 41 AMITA GERA HEAD OF DEPT Msc BIOCHEMISTRY 4 2/8/2008 NIL 42 RAMNARAIN LECTURER POST GRADUATE IN ENGLISH 7 10/5/2008 NIL SATPAL HEAD OF DEPT B.TECH MECHANICAL ENGG 5.5 12/12/2007 NIL 40 43 * 3 Guest Faculty 1 Instructor in Civil of Lect. 12 ii d) Mode of selection of faculty and staff: Open Selection through advertisement in two daily newspapers. Name of the newspapers in which advertisements are placed and their circulation status Dainik Bhaskar & Dainik Jagran Constitution of the selection committee Office Order attached One outside expert of the level of Principal was associated with the selection committee. Whether SBTE representative is invited in the selection committee meeting. No 12 ii) (e) S.No 1 Details of Technical / Administrative / supporting Staff Category Staff Technical Supporting Staff a) Workshop Instructor b) Librarian c) Instructor (Civil) d) Instructor (CSE) Number 6 2 1 1 2 13. Administrative Staff a) Administrative Officer b) Accounts Clerk c) DPE d) Others 1 1 1 1 10 Strengths & Weaknesses of the institution in terms of Teaching Methodology/Transaction of Syllabus /Innovations /best practices (if any)/ industrial project / Industrial consultancy / research taken up for industry and amount granted thereby: STRENGTH: Very good infrastructure and other facilities. Proximity to industrial towns like Delhi, Gurgaon, Chandigarh, Panipat. Polytechnic is situated in lush green pollution free rural area. An active academic monitoring cell for performance of students. A counseling service to advise the students. Near the bus stand. WEAKNESS: Being remote rural are a where facilities like educational coaching centre near by markets, medical facility like are not properly available. The facility members leave the job immediately when they get a job in big cites. Despite our efforts and advertisement the faculty for Civil Engg. Course is not available. Hence diploma holders are appointed as lecturers. 14. Students data and pass % since last three years. PART-V, STUDENTS Academic Performance of Last Three Years S.No Discipline Chemical 1 Civil 2 Computer 3 Electrical 4 ECE 5 Mechanical 6 Year 1st Year 2nd Year 3rd Year 1st Year 2nd Year 3rd Year 1st Year 2nd Year 3rd Year 1st Year 2nd Year 3rd Year 1st Year 2nd Year 3rd Year 1st Year 2nd Year 3rd Year No of Students Appeared 16 8 14 39 60 69 NA 8 36 30 24 33 11 18 59 76 120 115 Passed 1 5 8 14 3 24 NA 1 16 2 3 14 1 0 23 7 9 43 Passed with First Division 1 5 8 14 3 24 NA 1 16 2 3 14 1 0 23 7 9 43 Pass Percentage 6 63 57 36 5 35 NA 13 44 7 13 42 9 0 39 9 8 37 15 ii) Provide details of companies/Industries, which visited the institute for placement since the last three years. S.No. 1 Year Name of the Company/Industry 2 Number of Students placed Not Applicable 3 16. Utilization status of grants received under various schemes of AICTE (R&D, MODROB, Faculty development, IIPC etc for the last three years). S.No Name of the Scheme(s) Grant sanctioned (Amount & Date) Grant utilized Whether utilization certificate submitted, if yes amount for which submitted Major impact No Grant received so far from any source 17. Library facilities A Total area of the library 950 square feet. B Seating capacity of the library 100 seats C Reprographic facility (yes / No) Yes D Working hours of library E Library Networking facility (yes / No) No F Usage data of the library (in terms of books issued to the faculty & students etc.) 4000 G Annual library budget (% of annual student fee collected) H Details of the library staff with qualifications and pay scales 9:00 a.m to 8:00 p.m 5% 1 Librarian Bachelor in Lib. Sc. Rs. 12000/- (Consolidated ) I 1 Astt. Librarian 3Yrs. Dip. in Lib. Sc Rs. 8000/- (Consolidated ) Details of the library facilities Journals S.No 1. Course(s) Electronics & Communication Engg. Number of titles of the books 22 Number of volumes National International Online Journals 1320 -- -- -- -- Online 2. Computer Sci. & Engg. 23 1980 -- 3. Mechanical Engg. 24 2400 -- -- -- 4. Civil 24 1440 -- -- -- 5. Electrical Engg. 30 1500 -- -- -- 6. General 18 180 -- -- -- 9. TOTAL -- -- -- -- -- DETAIL OF EACH LABORATORY S.No Name of Laboratory Requirement as per Norms(Carpet area in sqm) Carpet area Available in sqm Shortfall if any 1 FLUID FLOW 72 72 Number Percentage 2 HEAT TRANSFER 72 72 NIL NIL 3 MASS TRANSFER 72 72 NIL NIL 4 REACTION ENGINEERING 72 72 NIL NIL 5 CONCRETE TECHNOLOGY EQUIPMENT 72 72 NIL NIL 6 CONSTRUCTION MATERIAL EQUIPMENTS 72 72 NIL NIL 7 HIGHWAY ENGG LAB 72 72 NIL NIL 8 SOIL AND FOUNDATIN ENGG EQUIPMENT 72 72 NIL NIL 9 SURVEYING EQUIPMENT 72 72 NIL NIL 10 DIGITAL AND MICROPROCESSOR 72 72 NIL NIL 11 72 72 NIL NIL 12 ELECTRICAL MACHINES ELECTRICAL MEASUREMENT AND MEASURING INSTRUMENT 72 72 NIL NIL 13 ELECTRICAL WORKSHOP 72 72 NIL NIL 14 ELECTRONICS DEVICES & CIRCUITS 72 72 NIL NIL 15 FUNDAMENTAL OF ELECTRICAL ENGG 72 72 NIL NIL 16 ANALOG ELECTRONICS 1 &2 72 72 NIL NIL 17 CONSUMER ELECTRONICS 72 72 NIL NIL 18 DIGITAL AND DATA COMMUNICATION 72 72 NIL NIL 19 DIGITAL ELECTRONICS 72 72 NIL NIL 20 INSTRUMENTATION 72 72 NIL NIL 21 NETWORK FILTERS & TRANSMISSION LINES 72 72 NIL NIL 22 OPTICAL FIBER COMMUNICATION 72 72 NIL NIL 23 POWER ELECTRONICS 72 72 NIL NIL 24 PRINCIPLE OF COMMUNICATION 72 72 NIL NIL 25 CHEMISTRY LAB 72 72 NIL NIL 26 LANGUAGE LAB 72 72 NIL NIL 27 PHYSICSL LAB 72 72 NIL NIL 28 APPLIED MECHANICS 72 72 NIL NIL 29 AUTOMOBILE ENGG AND THERMODYNAMICS 80 80 NIL NIL 30 MATERIAL AND METALLURGY 72 72 NIL NIL 31 REFRIGERATION AND AIR-CONDITION 72 72 NIL NIL 32 HYDRAULICS AND HYDRAULIC MACHINES 72 72 NIL NIL 33 ITM & IQC 72 72 NIL NIL 34 STRENGTH OF MATERIAL 72 72 NIL NIL 19. Computer Facilities for the existing programme(s) S.No Particulars Requirement as per norms Availability 1. No of Computer terminals 150 150 2. Hardware Specification P IV DUAL CORE 3. No of terminals of LAN/WAN 75 75 4. Relevant Legal Software 5. Peripheral(s)/ Printers 6. Internet Accessibility (in kbps & hrs) 10 10 1:10 1:10 256Kbps each 2 lines 128 (KBPS) two lines, DSL Lease line Whether the computer facilities are suitable for the existing programmes? Yes No 3.2 BUILDING (i) Total Built Up Area: - Particulars Building with RCC roof (sqm.) Building with Sheet roof (if suitable for educational Institution) (sqm.) Total area available (sqm.) 4616 560 5176 NIL 1315 NIL 1315 NIL 1790 NIL 1790 NIL 2100 NIL 2100 NIL Institutional Area (Carpet Area) Administrative Area (Carpet Area) Amenities Area (Carpet Area) Circulation & others Area(*) Total Shortfall, if any Area Percentage NIL NIL 10381 * Circulation and other area include, corridors, Toilets, Stair cases, Common area etc. 9821 (ii) Instructional Area Number of rooms Shortfalls if any Particulars Available Carpet areas of each room Available in the institution Shortfalls if any sqm Number Percentage Area in(sqm) Percentage Class Room 21 NIL 72 NIL 6 NIL 50 NIL 1 NIL 100 NIL 1 No of Roooms=42 NIL Tutorial Hall Computer Centre Library Total number & area for all laboratories & workshops Area=3096sqm 200 NIL NIL NIL Whether any academic activity is being carried out in the basement If yes, give details. Yes No Whether a barrier free environment has been created in the building for Physically challenged persons. Yes No Whether the Classrooms, Tutorial hall, Drawing hall, Computer centre, Library, Laboratory and workshops are well equipped for the existing courses. Yes No 22. Land Availability Land Category (Rural/ District Head Quarter/ State Capital/ Metropolitan city) Total Area available (Acres) Area required as per Land Category (Acres) 5 5.5 Rural (a) Whether the said land is demarcated by fencing/ boundary wall for the institution Yes No Yes No (Tick appropriate box) (b) Whether the land is contiguous (Tick appropriate box) If Not, Number of plots (c) Distance between the plots (Sq.M) Whether the surroundings of the institution are suitable for educational purpose. Yes No 23. Availability of other facilities: No. Parameter Availability 1 All Weather Approach Road (cemented ) YES 2 Potable Water Supply System (own bore well / municipal corporation) YES 3 Electrical Generator (5 KV., 30 KV. 4 Students’ Canteen 5 Students’ Common Room (Boys / Girls) 6 50 KV YES YES NO Boys Hostel NO Girls If no hostel facility is available, whether arrangements have been made for boarding and lodging of students near to the institution, if yes mode of travel from the place of stay to the institution 7 Principal’s Quarters NO 8 Digital Library NO 9 Quarters for Faculty NO 10 Guest House YES 11 Parking facilities YES 12 Medical facilities (full time / part time doctor / dispensary) 13 Insurance facilities YES NO 14 Telephone booth NO 15 Gymnasium /indoor / outdoor stadium YES 16 Rainwater-harvesting facilities are available YES 17 Post office facility NO 18 Bank facility NO 19 Transport facility for day scholars NO 20. Reprographic facilities in the Institutions. YES 21. Barrier free environment for physically challenged. YES CET quota S. No. Category Fixed by the State Fee Committee CSE 1. 2. 3. 4. 5. 6. 5. 6. 7. Admission Fee Tuition Fee Development Fees Student Funds SBTE fee (Examination fee, ) Registration Fees Hostel fee (Rent etc.) Laboratory fee Library fee Any other Total Fee ECE ME Management quota Being charged by the Institution Civil Being charged by the Institution Fixed by the State Fee Committee CSE --- ECE --- ME --- Civil --- --- 22500 5000 22500 5000 22500 5000 22500 5000 22500 5000 22500 5000 22500 5000 22500 5000 22500 5000 22500 5000 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 200 200 200 200 200 200 200 200 200 200 NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NOT APPLICABLE NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 NIL NIL 28900 #Note : Fees charged by the institution is same as fixed by the State Fees Committee. 24. Structure of the Institution 25. Financial Position (I) Whether applicant has opened a bank account in the name of the Society/ Trust for the existing institution (II) Source of income & expenditure during the last year S.No. Source of Income Rs. (in lakhs) Yes Central Government NIL Salary of Full-Time Faculty 2. State Government NIL Salary for Visiting/Adjunct faculty 3. University Grants Commission 4. Other Central/State Govt. Bodies 5. Private Trust NIL Donations 7. Student Fees 324071 11750 Computer Centre 988770 Equipments Labs and Workshops Building 1800000 NIL Others (please specify) All other expenses except deprecation and staff salary 900000 Internal Revenue Generation Others (please specify) Bank Loan, Interest, Mess, Transportation, Development Fund NIL 9. 10 Unsecured Loan NIL 11 Bus Loan NIL (II) 3,755,472 19,658,000 8. Total 25000 Library NIL Rs. (in lakhs) 8,286,938 Salary of Non-Teaching Staff NIL 6. NO Expenditure during the last year 1. NIL NIL NIL Payment of Bus Loan NIL 19,658,000 16,092,001 Total Details of Operational funds Name of Bank With Branch & Full Address S.No. Account No. Cash Balance (in lakhs) FDR, if any (Excluding joint FDR submitted to AICTE) Total Amount (in lakhs) 1. ALLAHABAD BANK,GOHANA 20639941794 280384 280384 2. ALLAHABAD BANK,GOHANA 20639936013 1125521 1125521 1405905 1405905 3. 4. 5. 6. G. Total Declaration: It is certified that: a) Existing Courses are being conducted as per norms, standards and guidelines of the AICTE. b) All the physical deficiencies stated in the last approval letter have been complied with. c) The AICTE pay scales are being paid to the faculty members. d) The admissions are made on merit and no capitation fee or donation of any kind is charged for admission. e) The teaching faculty has been recruited as per qualifications and experience laid down by AICTE. f) The tuition and the other fees are being charged as prescribed by the Competent Authority. g) No new course has been started (since the last approval by AICTE) without prior approval of AICTE. h) The institution is not running any courses not approved by AICTE in the premises of the AICTE approved institution. h) The intake in any of the AICTE approved course has not been increased beyond the sanctioned intake, without prior approval of AICTE. I/We solemnly declare that no information has been withheld and all the information provided in this Compliance Report is correct. If any information is found to be incorrect or false, I/We understand that proposal shall be liable for rejection. Date: Place: GOHANA Name and Signature of the Authorized Signatory of the institution with seal MUKHI POLYTECHNIC GOHANA Detail ofU Built-up Area VISHN NAGA R Course Room Type Area of room in Sqm CHEMICAL ENGINEERING Classroom 50 CHEMICAL ENGINEERING Classroom 50 CHEMICAL ENGINEERING Classroom 50 CHEMICAL ENGINEERING Laboratory 72 CHEMICAL ENGINEERING Laboratory 72 CHEMICAL ENGINEERING Laboratory 72 CHEMICAL ENGINEERING Laboratory 72 CHEMICAL ENGINEERING Tutorial Room 50 CIVIL ENGINEERING Classroom 72 CIVIL ENGINEERING Classroom 72 CIVIL ENGINEERING Classroom 72 CIVIL ENGINEERING Laboratory 72 CIVIL ENGINEERING Laboratory 72 CIVIL ENGINEERING Laboratory 72 CIVIL ENGINEERING Laboratory 72 CIVIL ENGINEERING Laboratory 72 CIVIL ENGINEERING Tutorial Room 50 COMPUTER ENGINEERING Classroom 72 COMPUTER ENGINEERING Classroom 72 COMPUTER ENGINEERING Classroom 72 COMPUTER ENGINEERING Tutorial Room 50 ELECTRICAL ENGINEERING Classroom 72 ELECTRICAL ENGINEERING Classroom 72 ELECTRICAL ENGINEERING Classroom 72 ELECTRICAL ENGINEERING Laboratory 72 ELECTRICAL ENGINEERING Laboratory 72 ELECTRICAL ENGINEERING Laboratory 72 ELECTRICAL ENGINEERING Laboratory 72 ELECTRICAL ENGINEERING Laboratory 72 ELECTRICAL ENGINEERING Laboratory 72 ELECTRICAL ENGINEERING Tutorial Room 50 ELECTRICAL ENGINEERING Workshop 80 ELECTRONICS & COMMUNICATION ENGG Classroom 72 ELECTRONICS & COMMUNICATION ENGG Classroom 72 ELECTRONICS & COMMUNICATION ENGG Classroom 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Laboratory 72 ELECTRONICS & COMMUNICATION ENGG Tutorial Room 50 FIRST YEAR/OTHER Laboratory 72 FIRST YEAR/OTHER Laboratory 72 FIRST YEAR/OTHER Laboratory 72 MECHANICAL ENGINEERING Classroom 72 MECHANICAL ENGINEERING Classroom 72 MECHANICAL ENGINEERING Classroom 72 MECHANICAL ENGINEERING Classroom 72 MECHANICAL ENGINEERING Classroom 72 MECHANICAL ENGINEERING Classroom 72 MECHANICAL ENGINEERING Drawing Hall 72 MECHANICAL ENGINEERING Drawing Hall 72 MECHANICAL ENGINEERING Laboratory 72 MECHANICAL ENGINEERING Laboratory 80 MECHANICAL ENGINEERING Laboratory 72 MECHANICAL ENGINEERING Laboratory 72 MECHANICAL ENGINEERING Laboratory 72 MECHANICAL ENGINEERING Laboratory 72 MECHANICAL ENGINEERING Laboratory 72 MECHANICAL ENGINEERING Seminar Hall 140 MECHANICAL ENGINEERING Tutorial Room 50 MECHANICAL ENGINEERING Tutorial Room 50 MECHANICAL ENGINEERING Workshop 80 MECHANICAL ENGINEERING Workshop 80 MECHANICAL ENGINEERING Workshop 80 MECHANICAL ENGINEERING Workshop 80 MECHANICAL ENGINEERING Workshop 80 MECHANICAL ENGINEERING Workshop 80 MECHANICAL ENGINEERING Workshop 80 Room Id/Name Room Type 100 Cabin for Head of Dept 10 101 Cabin for Head of Dept 10 102 Cabin for Head of Dept 10 103 Cabin for Head of Dept 10 104 Cabin for Head of Dept 10 105 Cabin for Head of Dept 10 33 Central Store 30 34 Maintenance 20 35 Principal Directors Office 40 36 Exam Control Office 30 37 Reception Area 50 38 Faculty Room 350 39 Office All Inclusive 200 40 Department Office 60 41 Board Room 75 42 Other Office 30 45 Security 20 77 Housekeeping 20 78 Placement Office 30 99 Office All Inclusive 300 Room Id/Name Room Type Area of room in Sqm Area of room in sqm 106 Principal's Quarter 160 107 Guest House 30 108 Sports Club 200 43 Toilet 100 44 Toilet 100 79 Stationery Store 20 91 Girls Common Room 100 92 Toilet 100 93 Boys Common Room 100 94 Student activity / GCR 180 95 First aid cum Sick Room 20 96 Cafeteria 180 97 Toilet 100 98 Auditorium 400