Attachment C 1. HE Sender - 180 Day Integration Implementation Plan (Includes Activation, SSO integration as well as Sender integration): Task Task Name Duration* Docufide Sender - Electronic Transcript Project Resources 180 days days 1 1.1 Project Planning Kickoff Meeting Introduction of Project Team Scope Overview Overview of Transcript Process & Discovery Timeline 1.2 Provide Technical Documentation Installation Instructions SSO Setup Guide SFTP Setup Guide 1.3 Assign Resources Business Owner Technical Owner 2 Configuration 2.1 Technical Overview Review Institution SIS configuration Recommend deployment options Provide technical details and documentation 2.2 Install and Configure Service Deployment Options vary per Institution o Install Docufide Print Driver o Configure SFTP Interface 2.3 Generate Samples for Review 2.3.1 Generate sample transcript input (from Institution to Parchment) for Parchment testing 3days (Melissa the total plan rolls up to 154 days not 60 and not 180 as the title states. I adjusted the plan to equal 180 days. Can you have someone look at this and confirm that you agree with my changes? (This differences may be due to overlapping tasks but it needs to add up in this document to the number stated at the top.)iThank you.) 3 days Parchment PM Institution Team 1 day 1 day Parchment PM 1 day 1 day 1 Day 1 Day 32days 35 days 2 days Institution PM 1 day Parchment Technical Resource Institution Technical Resource 7 days Institution Technical Resource 4 days Institution BA 7 days 3 days 1 2.3.2 Provide Registrar Signature, Seal and Legend 2.3.3 Generate sample transcript output for Institution Review 2.4 Deploy Single Sign-On (SSO) Configure SSO Test SSO 2.5 Testing and Validation 2.5.1 Transcript Output Testing 2 days 7 days 3 days Institution BA 7 days Parchment Technical Resource Institution Technical Resource 7 days 7 days 3 days 3 days 2 days 2 days 57 days 81 days 1 2.5.2 End-to-End Testing 3 3.1 Integration Integration Kickoff Meeting 1 days 3.2 3.3 3.4 SIS Integration Functional Analysis Identify gaps in standard integration package Develop plan to address gaps Assign resources to resolve gaps Integration Package Sizing and Resource Allocation Identify resources required Allocate resources Integration Package Installation 14 7 days Parchment Integration Resource Institution Technical Team 7 Parchment Integration Resource Institution Technical Team Parchment Integration Resource 7 days Integration Package Configuration 28 21 days 3.6 3.7 Integration Package Testing End-To-End Testing Validation and Signoff 14 7 days Integration Package – Production Migration Install integration components in Production 7 days Migrate configuration settings to Production Validation and Signoff Parchment PM Parchment Technical Resource Parchment Integration Resource Institution Technical Team Parchment BA Parchment Integration Resource Institution Technical Team 7 7 days 3.5 Parchment PM Parchment Technical Resource Institution Team Parchment PM Parchment Technical Resource Institution Team 10 Parchment Integration Resource Institution Technical Team Parchment Integration Resource Institution Technical Team 2 4 4.1 50 days 5 5.1 Parse Generate Transcript Samples For Parse Input Generate Parse Template Submit Parse Output for Review and Approval Approve Parse Template May Require Parse Template Revisions Multiple Review Cycles Training Coordinate Administrative Training 5.2 6 6.1 Provide Training Class Launch Project Launch Planning 1 day 5 days 6.2 Project Launch 4.2 4.3 4.4 7 days 28 days 1 days 51 days 7 Institution BA 28 2 Parchment Parse Team Parchment PM 14 Institution PM Parchment Parse Team 14 days 5days 4 day 4 days 1 day 5 days 4 1 5 days 4 1 Parchment PM Institution PM Parchment PM Parchment PM Institution PM Parchment PM Institution PM *Note: Durations are estimates and include allowances for time spent on analysis and review. Actual time spent on project may be significantly less. Many tasks may be performed in parallel. 3