h Summary Week Report Project transfoREMES Responsible Mansooreh Zahedi Week 2 Date 2010-01-18 Executive Summary Timeliness General Project Status Fulfillment of Next Milestone On track On track Project Cost Current Planned Cost 268800 SEK Current Actual Cost Planned project Cost Forecasted project Cost 438420 SEK 268800 SEK 436800 SEK Results This Week Activity Owner(s) Workl oad (hour) Activity Nenad 16 Jakov - Mansooreh - Christoph - Ashwini - Fore cast Result / Comment All deliverables are ready. Editing documentation. (5h) Editing and reviewing documentation. (6h) Final documentation review. (2h) Final questionnaire. (3h) Work on Pack Of Product Parser Documentation review Final questionnaire Preparing final presentation stuff. Reviewing all the documents and preparing deliverables. Preparing presentation (slides, diagrams) documentation (project design document, test report, acceptance plan, final project report) 14 All deliverables are ready. 17 All deliverables are ready. 13 All deliverables are ready. Final presentation slides Final revision of Test report and 18 All deliverables are ready. 1 Mridul Aleksandra Acceptance Test plan Preparation for Presentation - Technical document, Requirements definition, Design description and Final Project Report are modified. Presentation slides prepared. ATL part in the user manual document is added. - Documentation review (1.5h) - doing some changes on “User manual” (1h) - Documentation review (2h) - doing Week report (0.5h) - Final questionnaire (4h) 16 All deliverables are ready. 9 All deliverables are ready. Activities Planned for Next Period Activity Owner(s) Nenad - Jakov - Work load Activity Mansooreh - Christoph - Ashwini - Mridul - Aleksandra - Result / Comment Filling Final questionary Filling Final questionary Filling Final questionary Filling Final questionary Filling Final questionary Filling Final questionary Filling Final questionary Comments / Experiences / Problems Milestones Id M-007 Milestone Description Final Release Responsible Dept./Initials Plan All W2 2 Finished week Forecast Actual Week +/W2 W2 Metr Rem Working Hours Member W40 W41 W42 W43 W44 W45 W46 W47 W48 Nenad 6.5 5 11 19 8 Aleksandra 6 10 10 15 0 Jakov 4 13.5 6.5 14.5 10 Mansooreh 7 7 6 12 8 Christoph 7.5 5 13.45 10.5 11 Ashwini 6.5 5 7 10 4 Mridul 4 5 11.45 20 7 Total 41.5 60.5 66 101 48 W49 W50 W51 W52 W53 W01 W02 Total 23.5 16 15 35 16 12 22.5 37 9 10 40 7 6 37 12.5 7.5 38 12 18 32 12 9 30 5 4 34 12 24.5 36 8.5 9 15 16 15 7.5 28.5 19 21 18 15 12.5 13.5 6.5 7 5 10 10 9 7 4 5.5 5 6 6.5 0 5 5.5 2.5 6 6 9.5 0 6 16 10 18.5 20 40.5 26.5 27.5 16 9 14 17 13 18 16 241.5 171.5 199 235 226.95 164.5 222.95 140 248 69.5 107 127.5 54.5 32 35.5 159 103 1461.4 79 Note: Working hours has been calculated without meeting hours on skype. 3