Summary Week Report
Project
transfoREMES
Responsible Mansooreh Zahedi
Week
2
Date
2010-01-18
Executive Summary
Timeliness
General Project Status
Fulfillment of Next Milestone
On track
On track
Project Cost
Current Planned Cost
268800 SEK
Current Actual Cost
Planned project Cost
Forecasted project Cost
438420 SEK
268800 SEK
436800 SEK
Results This Week
Activity
Owner(s)
Workl
oad
(hour)
Activity
Nenad
16
Jakov
-
Mansooreh
-
Christoph
-
Ashwini
-
Fore
cast
Result / Comment
All deliverables are ready.
Editing documentation. (5h)
Editing and reviewing
documentation. (6h)
Final documentation review. (2h)
Final questionnaire. (3h)
Work on Pack Of Product Parser
Documentation review
Final questionnaire
Preparing final presentation stuff.
Reviewing all the documents and
preparing deliverables.
Preparing presentation (slides,
diagrams)
documentation (project design
document, test report, acceptance
plan, final project report)
14
All deliverables are ready.
17
All deliverables are ready.
13
All deliverables are ready.
Final presentation slides
Final revision of Test report and
18
All deliverables are ready.
1
Mridul
Aleksandra
Acceptance Test plan
Preparation for Presentation
- Technical document,
Requirements definition, Design
description and Final Project Report are
modified.
Presentation slides prepared.
ATL part in the user manual document is
added.
- Documentation review (1.5h)
- doing some changes on “User
manual” (1h)
- Documentation review (2h)
- doing Week report (0.5h)
- Final questionnaire (4h)
16
All deliverables are ready.
9
All deliverables are ready.
Activities Planned for Next Period
Activity
Owner(s)
Nenad
-
Jakov
-
Work
load
Activity
Mansooreh
-
Christoph
-
Ashwini
-
Mridul
-
Aleksandra
-
Result / Comment
Filling Final
questionary
Filling Final
questionary
Filling Final
questionary
Filling Final
questionary
Filling Final
questionary
Filling Final
questionary
Filling Final
questionary
Comments / Experiences / Problems
Milestones
Id
M-007
Milestone
Description
Final Release
Responsible
Dept./Initials
Plan
All
W2
2
Finished week
Forecast
Actual
Week
+/W2
W2
Metr Rem
Working Hours
Member
W40 W41 W42 W43 W44 W45 W46 W47 W48
Nenad
6.5
5
11 19
8
Aleksandra 6
10
10 15
0
Jakov
4 13.5 6.5 14.5 10
Mansooreh 7
7
6
12
8
Christoph 7.5
5 13.45 10.5 11
Ashwini
6.5
5
7
10
4
Mridul
4
5 11.45 20
7
Total
41.5 60.5
66
101
48
W49
W50
W51 W52
W53 W01 W02
Total
23.5
16
15
35
16
12
22.5
37
9
10
40
7
6
37 12.5 7.5
38 12
18
32 12
9
30
5
4
34 12 24.5
36
8.5
9
15
16
15
7.5
28.5
19
21
18
15
12.5
13.5
6.5
7
5
10
10
9
7
4
5.5
5
6
6.5
0
5
5.5
2.5
6
6
9.5
0
6
16
10
18.5
20
40.5
26.5
27.5
16
9
14
17
13
18
16
241.5
171.5
199
235
226.95
164.5
222.95
140
248 69.5
107
127.5 54.5
32
35.5
159
103
1461.4
79