Asset Management Strategy 2014 Adopted 26 November 2014 Macedon Ranges Shire Council Asset Management Strategy 2014 Contents 1. INTRODUCTION ........................................................................................... 1 2. BACKGROUND ............................................................................................ 2 3. 4. 5. 2.1 W HAT IS ASSET MANAGEMENT? ......................................................................... 2 2.2 W HY IS ASSET MANAGEMENT IMPORTANT TO COUNCIL?...................................... 2 2.3 ASSET MANAGEMENT FRAMEWORK .................................................................... 2 CURRENT SITUATION ................................................................................. 4 3.1 CURRENT ASSETS ............................................................................................. 4 3.2 ASSET HIERARCHY - INFRASTRUCTURE ASSETS .................................................. 4 3.3 ASSET VALUES - INFRASTRUCTURE ASSETS ........................................................ 4 3.4 CURRENT ASSET MANAGEMENT SYSTEMS .......................................................... 5 3.5 ASSET MANAGEMENT PROCESSES – INFRASTRUCTURE ASSETS .......................... 6 3.5.1 ROADS .............................................................................................................. 6 3.5.2 DRAINAGE ......................................................................................................... 6 3.5.3 BUILDINGS & FACILITIES ..................................................................................... 6 3.5.4 OPEN SPACE ..................................................................................................... 7 3.5.5 ASSET RESPONSIBILITIES ................................................................................... 7 3.6 CONDITION OF CURRENT ASSETS ....................................................................... 7 3.7 USER SATISFACTION WITH SERVICE PROVISION .................................................. 8 3.8 FUTURE RENEWAL PROFILE ............................................................................... 8 WHERE DO WE WANT TO BE ................................................................... 10 4.1 IMPROVEMENT PLAN ........................................................................................ 10 4.2 MONITORING ................................................................................................... 11 APPENDICES ............................................................................................. 11 5.1 APPENDIX A – IMPROVEMENT PLAN .................................................................. 12 5.2 APPENDIX B – ASSET RESPONSIBILITY MATRIX ................................................. 16 5.3 APPENDIX C – ASSET HEIRARCHY .................................................................... 21 Macedon Ranges Shire Council 1. Asset Management Strategy 2014 INTRODUCTION Council is the owner and custodian of a large portfolio of assets which includes roads, drains, buildings and facilities, open space, plant & equipment, library materials, art works and land. These assets enable the community to access and enjoy all the services and facilities that Macedon Ranges Shire Council has to offer. These assets represent a vast investment built up over many generations, which in itself presents a significant challenge as many assets were constructed or acquired many decades ago and as such are approaching the end of their useful lives. Infrastructure costs consume a large part of Council’s budget and can have a substantial impact on Council’s budget and human and capital resource planning. The efficient management of these assets is vital in maintaining safe, reliable and efficient services that help achieve the strategic priorities and goals of Council. Failure to adequately plan for the replacement of existing assets and the development of new assets will result in assets not meeting the needs of the community, now and in the future. The environment in which local government operates is constantly changing. As assets continue to age, Councils will need to demonstrate an accepted level of skill, expertise and also a duty-of-care in relation to management practices and maintenance of assets. The review and development of this Asset Management Strategy has been identified as a result of the development and adoption of Council’s Asset Management Policy and a review of asset management practices carried out in association with the MAV Step Asset Management & Financial Sustainability Program. This Asset Management Strategy is designed to take into consideration all of Council’s assets in varying stages. Council’s infrastructure assets e.g. Roads, Drains, Buildings and Facilities and Open Space will be the first priority as infrastructure assets are the main focus of the Step Program. Page 1 Macedon Ranges Shire Council 2. BACKGROUND 2.1 What is Asset Management? Asset Management Strategy 2014 Asset management is a process of logic used to guide the planning, acquisition, operation and maintenance, renewal and disposal of assets. Its objective is to maximise asset service-delivery-potential and manage related risks and costs over the entire life of assets. Asset management ensures that Council’s assets are capable of providing services, of an agreed quality, in a sustainable manner, for present and future generations. 2.2 Why is Asset Management Important to Council? Asset management delivers benefits that are realised in the areas of improved accountability, sustainable service delivery, risk reduction and financial management and forecasting. Specific benefits can include: More informed decision-making Improved efficiency and reduction of limited capital funds and asset operation costs. Ability to plan for present and future generations. Improved long-term financial forecasting and management. Assets that are suitable and capable of supporting the service delivery needs of the community. 2.3 Asset Management Framework Council’s asset management framework as illustrated in Figure 1 shows the relationship between the Council Plan, the asset management policy, this strategy and asset management plans. The Long Term Financial Plan, Strategic Resource Plan and Budget are also directly linked to the Asset Management Plan outputs. This framework will ensure a strategic approach to asset management. Each asset class has its own Asset Management Plan. Management Plan format is described below: The Asset Part A – General Information: Background and information common to all assets. Part B – Roads Part C – Buildings Part D – Drainage Part E – Open Space Page 2 Macedon Ranges Shire Council Asset Management Strategy 2014 Vision 2040 Council Plan Other Council Strategies Strategic Resource Plan Annual Budget Long Term Capital Plan Asset Management Policy Key Associated Policies Capital Works Program Asset Management Strategy Asset Management Plans AMP Financial Forecast Summary Figure 1 – Asset Management Framework Page 3 Macedon Ranges Shire Council Asset Management Strategy 2014 3. CURRENT SITUATION 3.1 Current Assets Council’s assets are made up of a wide range of different asset types all of which are fundamental in meeting the needs of the community. Assets may be physical (i.e. tangible e.g. plant, buildings) or non-physical (i.e. intangible e.g. intellectual property, good will). This strategy only considers physical infrastructure assets. The major characteristics of an asset are: There must be service potential or future economic benefits; The future economic benefits must be quantifiable; and Council must have control of the service potential. 3.2 Asset Hierarchy - Infrastructure Assets Council’s assets are categorised as shown in Table 1. Asset Category Asset Class Infrastructure Assets Roads Drains Buildings and Facilities Open Space Infrastructure Non-Infrastructure Assets Plant & Equipment Other Table 1 – Asset Categories The hierarchy for the infrastructure assets have been broken down by asset class and are attached to this document as Appendix C. 3.3 Asset Values - Infrastructure Assets The replacement and written down values of Council’s infrastructure assets as at 30 June 2014 are shown in Table 2. Written Down Value $390,344,038 $290,422,224 Asset Class Replacement Value Sealed Roads Unsealed Roads $49,716,000 $43,319,000 Bridges $31,188,000 $18,577,000 Footpaths $51,411,000 $38,397,000 Kerb & Channel Drainage (stormwater $33,741,378 $24,874,611 $49,137,943 $37,204,689 $124,475,612 **$70,970,000 $16,087,866 $11,654,823 pits pipes) Buildings and Facilities Open Space Infrastructure & Table 2 – Asset Values (taken Asset Register) ** Written down value for Buildings & Facilities is taken from the 2013/14 Annual Report. Page 4 Macedon Ranges Shire Council 3.4 Asset Management Strategy 2014 Current Asset Management Systems Council has purchased an integrated Asset Register, myData, and is in the process of migrating asset data associated with infrastructure asset classes into the new system. The asset register calculates replacement values, written down values and depreciation. To date the following assets have been successfully migrated into the asset register: Bridges Buildings Footpaths Pits Pipes Retarding Basins It is anticipated that the remainder of the infrastructure assets will be recorded in the myData system by June 2015. These include: Sealed roads Unsealed roads Kerb & Channel Rural & township culverts Open space infrastructure assets (including playgrounds) These remaining assets are currently recorded in various formats. Road related assets are recorded in the Moloney Asset Management System which is a series of excel spreadsheets. Open Space assets are recorded within Council’s GIS and various spreadsheets throughout the organisation. Rural & township culverts are recorded within Council’s GIS. As a participant in the Step Program and through the adoption of this Asset Management Strategy, Council is committed to establishing a comprehensive and sustainable asset management system to best meet the infrastructure and service-needs of the community. The implementation of a single Corporate Asset Management System that is integrated with other key Council systems, (such as asset register, financial system, GIS and customer request system) will allow Council to have a better and consolidated view of all its assets. Having improved and detailed asset information regarding condition, complaints, requests, maintenance history and financial information, all in the one system will place Council in a position to better manage its assets and provide the community with improved customer service. Funding for the purchase and implementation of an Asset Management & Maintenance system has been identified in the 10 year Long Term Financial Plan for consideration in the 2015/16 budget process. Page 5 Macedon Ranges Shire Council 3.5 Asset Management Strategy 2014 Asset Management Processes – Infrastructure Assets 3.5.1 Roads The Moloney Asset Management System is used to develop the bridge renewal program and the local road reseal and reconstruction programs. Road condition assessments are undertaken tri-annually by an external contractor for sealed pavements, sealed surface, unsealed pavements, footpaths, bridges and kerb & channel. Maintenance inspections for bridges, footpaths, kerb & channel and unsealed roads are documented manually using a paper system of inspections. Required repairs are documented in the Pathway Customer Request Management System (CRM). Required repairs for unsealed roads are scheduled on Council’s maintenance grading program. Maintenance inspections for sealed roads are recorded using the AXIM Maintenance Management System. Required repairs are recorded and work orders produced within the AXIM system. 3.5.2 Drainage Data is yet to be collected for the following drainage asset groups: Surface Drainage (i.e. open drains, easement drains) Water Quality Devices (i.e. wetlands, rain gardens, GPT’s) Flood Prevention (underground retention systems etc.) These assets may be recorded within Council’s GIS in the future. Maintenance inspections of roadside pits are undertaken annually and documented using a manual paper system of inspections. Required repairs are documented in the Pathway Customer Request Management System (CRM). Maintenance inspections for minor roadside culverts are undertaken over a two year period. The municipality is divided into twelve areas of which six are inspected in any given year. Inspections are documented using a manual paper system. Required repairs are documented in the Pathway Customer Request Management System (CRM). 3.5.3 Buildings & Facilities Building condition assessments are undertaken every five years and Essential Safety Measures inspections are undertaken monthly / quarterly. As there is no funding allocated for renewal of buildings and structures, the data from the audit is used to prepare capital business cases for the required works to be undertaken. It is anticipated that in the future the report will be used to produce a five year capital works renewal plan for buildings and structures. Reactive maintenance inspections and required repairs are documented in the Pathway Customer Request Management System Page 6 Macedon Ranges Shire Council 3.5.4 Asset Management Strategy 2014 Open Space Mowing and horticulture activities including frequency and time taken, are recorded in spreadsheets. This information is used to determine operating and maintenance costs each year. Maintenance inspections for play equipment are undertaken monthly and documented using a manual paper system of inspections. Required repairs are documented on Pathway Customer Request Management System (CRM). Bi-annual independent audits are also undertaken for play equipment. Scheduled and reactive maintenance procedures are in place for most other sub-assets under this class. 3.5.5 Asset Responsibilities An Asset Responsibility Matrix is used to set out general responsibilities for various stages of the asset life-cycle and is detailed in Appendix B. The Asset Responsibility Matrix is a stand-alone document that may be updated from time to time. 3.6 Condition of Current Assets By understanding the condition of Council’s assets and the various types of distresses that affect them, Council can utilise this data to assist in maintaining the level of service the community desires, in the context of affordability, and minimise the risk of asset failure. There are many reasons why Council assets fail/deteriorate and therefore do not meet current performance standards and community expectations. Among the most common reasons for not meeting performance standards or community expectations are the following: Lack of ongoing commitment to fund consumption of our building portfolio through investment in renewals; Lack of resources does not allow for periodic proactive inspections of Council buildings; Suitability of the asset to meet changing demographics and needs, e.g. requiring a building that was once used as a senior citizen centre to be upgraded to a childcare centre to meet the demands of an increase in a younger population; Damage by service authorities when installing/constructing their infrastructure within Council’s road reserve; Movement of the underlying soils; Increases in the allowable vehicle load limits on Council’s roads; and Increases in density of private developments placing additional loads on assets not designed for the level of development. It is crucial that condition audits and inspections are carried out on Council’s Infrastructure assets on a regular basis. Based on the results of these condition audits and inspections, Council’s assets overall, are currently estimated to be in average condition. Page 7 Macedon Ranges Shire Council 3.7 Asset Management Strategy 2014 User Satisfaction with Service Provision Council’s ongoing community consultation program contributes significantly to the development of Asset Management Policy, Strategy and Plans and the establishment of asset management programs and budgets. The following are some of the community consultations undertaken by Council which provide valuable feedback on asset management issues. 3.8 The Department of Planning and Community Development (DPCD) Annual Community Satisfaction Survey – In a telephone interview approximately 300 residents are asked to rate their local government’s performance on an overall basis as well as specific service responsibilities. Community Groups and Committees of Management – Councillors and Council Officers regularly attend meetings of these groups and receive feedback on a range of issues. Pathway Customer Request System (CRM) – Council’s customer request system provides valuable customer and community input into identifying asset management issues. Future Renewal Profile Assets are necessary to support the delivery of services to the community. Even though the service may be required indefinitely, like a residential street or park, no asset will last forever without proper management. Even with good maintenance, assets may deteriorate well before reaching the end of their design life (useful life) dependant upon many unplanned factors, such as ground conditions and the environment. All assets have a pre-defined life-cycle, from planning, creating, operating, maintaining and renewing or disposing. These life-cycle phases have a direct influence on one another, i.e. limiting maintenance on an asset can result in the asset requiring renewal or replacement earlier than expected. This may be suitable in the short term but will add significantly to the life-cycle cost of the asset. The current expenditure on assets falls within the following categories: Operations Operational expenditure has no effect on asset condition but is necessary to keep the asset appropriately utilised. Operational expenditure is not distinguished from maintenance expenditure in Council’s financial systems. Maintenance Maintenance is the day-to-day work required to keep assets operating at required service levels. Renewal Renewal work is the substantial replacement of the asset or a significant asset component to its original size and capacity. Upgrade Upgrade work is related to the extension of an asset in response to growth or an increase in the defined levels of service. Page 8 Macedon Ranges Shire Council Asset Management Strategy 2014 New New works create an asset that did not previously exist. This includes new assets created by Council in response to demand requirements, community expectations and strategic planning. Renewal Gap Macedon Ranges Shire Council is a participant of the MAV Step Asset Management & Financial Sustainability Program. As part of the Step Program, Councils respond to a generic survey each November which analyses the actual expenditure on infrastructure assets only, compared with the expenditure that is required to maintain the assets in a serviceable condition. This comparison results in the modelling and calculation of what is termed the “Renewal Gap”. The Renewal Gap results were calculated using the proposed expenditure for the 2013/14 year. Council has a total renewal gap of $6M going into 2014/2015 over all asset groups as shown in Figure 2. Total Annual Renewal Gap in $ - All Asset Groups (The Predicted Renewal Expend. To Maintain Asset Cond. - Less the Propsed Renewal Exp) $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $0 2015 2017 2019 2021 2023 2025 2027 2029 Year Ahead Figure 2 – Total Predicted Renewal Expenditure required for the next 15 years. Council’s renewal and maintenance expenditure has not increased sufficiently to match the growth of the asset base created through new construction and acquisition. Page 9 Macedon Ranges Shire Council 4. Asset Management Strategy 2014 WHERE DO WE WANT TO BE To manage the community assets in an ongoing sustainable manner Council must ensure they are good Asset Managers. Council measures its asset management maturity in the context of the National Asset Management and Financial Planning Framework (NAMAF). The NAMAF is a self assessment against 11 key elements. Figure 3 shows the current Council core maturity status as at 25 February 2014. Core Maturity Score 100 90 80 70 60 50 40 30 20 10 Evaluation Skills & Processes Data & Systems Levels of Service Governance & Management Asset Management Plans Asset Management Strategy Asset Management Policy Annual Report Annual Budget Strategic Longer Term Plan 0 Figure 3 – NAMAF Core Asset Management Maturity Score – May 2014 Council’s objective is to achieve core maturity by June 2015 and progress to advanced maturity in the future. 4.1 Improvement Plan An analysis of the intended level of asset management that Council wishes to achieve and the current systems and processes used, has identified actions which need to be implemented to deliver the desired improvements. The implementation of the actions addressed in the Improvement Plan will ensure that Council will deliver the strategic objectives of the Council Plan and the vision and goal of its Asset Management Policy whilst undertaking best appropriate asset management practices to ensure intergenerational benefits and sustainability. The Asset Management Strategy Improvement Plan is detailed in Appendix A. Page 10 Macedon Ranges Shire Council 4.2 Asset Management Strategy 2014 Monitoring Any strategy must be a dynamic document, reflecting and responding to changes over time. A full review of this Asset Management Strategy will be undertaken every four years. The improvement actions will be reviewed and reported to the Executive annually. Any amendments or additions to the improvement plan will be approved by the Executive. The Asset Responsibility Matrix will be reviewed as required. Any amendments or additions to the Asset Responsibility Matrix will be approved by the Asset Management Committee. 5. APPENDICES Page 11 Macedon Ranges Shire Council 5.1 No 1. 2 Asset Management Strategy 2014 Appendix A – Improvement Plan Improvement Opportunity Purchase & Implement remainder of Asset Management System Ensure asset data is kept up-to-date regarding condition, creation / acquisition, maintenance, renewal, refurbishment and disposal of assets Appendix A Action Purchase Work Order and maintenance management software including configuration and training Purchase Predictive modelling software for remaining asset classes including training Priority Responsibility Resource Internal / External 2014/15 2015/16 $20,200 H Integration with Pathway CRM H Asset Management Coordinator External $25,000 Mobile Functionality H Asset Management Coordinator External $38,000 H Asset Management coordinator Internal $80,000 Comments Identified for consideration in the 2015/16 budget process Asset Management Coordinator Continue with data collection and mapping of infrastructure assets Status $60,000 H External 2017/18 Identified for consideration in the 2015/16 budget process Asset Management Coordinator External 2016/17 $80,000 Identified for consideration in the 2015/16 budget process Identified for consideration in the 2015/16 budget process $80,000 $80,000 Ongoing Has been an allocation in the operational budget for the last 5 years Page 12 Macedon Ranges Shire Council No 3 Improvement Opportunity Develop and maintain policies, plans and procedures related to asset management Appendix A Asset Management Strategy 2014 Action Review and implement Fixed Assets Policies & Procedures document Develop Asset Handover Procedure including asset acquisition form Review and update adopted Asset Management Plans every three years Review & Update Asset Management Policy Review & Update Asset Management Strategy Develop service plans for services relevant to assets included in asset specific asset management plans Develop and implement Asset Disposal Policy Priority Responsibility Resource Internal / External 2014/15 H Financial Accountant /Asset Management coordinator Internal H Asset Management coordinator Internal M Asset Management Coordinator Internal / External M M H L Asset Management Coordinator Asset Management Coordinator Service Managers Financial Accountant / Asset Management Coordinator $5,000 2015/16 2016/17 Comments Split into Capitalisation and Revaluation Policy Commenced $5,000 $5,000 $5,000 Ongoing Four AM Plans – one done every year. Internal Internal Status Internal Internal / External 2017/18 $5,000 Commenced Page 13 Macedon Ranges Shire Council No 4 Improvement Opportunity Implement policies, plans and procedures related to asset management Appendix A Asset Management Strategy 2014 Action Develop and document a prioritisation system for forward planning of capital and major maintenance works Incorporate lifecycle costing into asset specific Asset Management Plans Incorporate lifecycle costing into all specific Business Cases for Capital Works projects Review Asset Management Plan improvement plans annually and report progress to Executive Review Asset Management Strategy improvement plan annually and report progress to Executive Responsibility Resource Internal / External L Coordinator Engineering Planning / Building Projects Coordinator Internal H Asset Management coordinator Internal M Capital Works Project Sponsors Internal M Asset Management Coordinator Internal M Asset Management Coordinator Internal Priority 2014/15 2015/16 2016/17 2017/18 Status Ongoing Ongoing Ongoing Comments Page 14 Macedon Ranges Shire Council No 5 6 Improvement Opportunity Minimise Council’s exposure to risk due to asset failures Undertake regular condition assessment surveys of all asset infrastructure assets Appendix A Asset Management Strategy 2014 Action Review asset management roles and responsibilities utilising the Asset Responsibility Matrix Develop risk management processes Develop Infrastructure Risk Register Road Condition Survey – including footpaths, kerb & channel, roads & paths in reserves Bridge Condition survey Priority H H M Responsibility Asset Management Committee Risk Management Coordinator Risk Management Coordinator Resource Internal / External 2015/16 Internal Internal Internal H Asset Management coordinator H Asset Management coordinator External H Building Projects coordinator External / Internal Building Condition survey 2014/15 External $36,000 $10,000 $36,000 $10,000 2016/17 2017/18 Status Comments Every 2 years unless major changes have occurred In conjunction with relevant managers $36,000 $10,000 $36,000 $10,000 Ongoing Ongoing Tri- annually – costs spread over 3 years Tri-annually – costs spread over 3 years Undertaken every five years – look at utilising internal staff for future condition surveys Page 15 Macedon Ranges Shire Council 5.2 Asset Management Strategy 2014 Appendix B – Asset Responsibility Matrix Asset Responsibility Matrix The Asset Responsibility Matrix sets out general responsibilities for various stages of the asset lifecycle at an Asset Sub-Class Level. More detailed analysis of responsibilities for Asset Management activities will be undertaken and reported as part of the Asset Management Planning process. Element Description OWNER The Asset Owner is a Director who is ultimately responsible for the asset. CLIENT The Client is a Manager or Director who requires the asset to deliver services. PLANNING Asset Planners are responsible for planning to meet the needs of the community through the use of specific assets. Asset planning covers the following items: Consultation with users Identifying users' needs Setting service levels Identifying future demand Risk identification DESIGN Asset design covers the preparation of concept, preliminary and construction drawings. Where asset designs are prepared by external entities the officer responsible for Asset Design is responsible for their specification and procurement. CONSTRUCTION Construction deals with the physical acquisition of an asset, either by construction or purchase. The Asset Constructor is responsible for managing the acquisition and ensuring that the Council Tendering and Purchasing Guidelines are adhered to during that process. OPERATION Asset operation covers the day-to-day use of the asset. The officer responsible for Asset Operations uses the asset to provide a service to the community. Actions by asset operators could include: Setting and managing lease arrangements Monitoring and reviewing service levels Responding to Citizen/user enquiries Requesting additional capital works to increase the level of service MAINTENANCE The Maintenance Manager is responsible for maintenance of the asset. This includes contact with citizens when requests for maintenance are received from users. RENEWAL The Manager responsible for Asset Renewal plans and executes major works to the asset that either result in a significant extension of its operating life or replacement of the asset at the end of its life. DISPOSAL The Manager responsible for Disposal of an asset arranges for its disposal according to Council policy and statutory requirements. Appendix B Page 16 Macedon Ranges Shire Council Asset Management Strategy 2014 Sealed Roads Unsealed Roads Footpaths Kerb & Channel On-Road Parking Area Off-Road Parking Area Bridges & Major Culverts Right-of-Ways Traffic Control Devices Retaining Walls School Crossings Pedestrian Crossings On-Road Bicycle Lanes Road Edge Treatments Signage Guide Posts Linemarking Bus Shelters Standpipes Water Sources MO MO MO MO MO MO MO MO MO MO MCSa MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO CEP MO MO MO CEP CEP CEP CEP MEIP MO MEIP MO MO MEIP MEIP MO MO MEIP MO MO MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MO MEIP MEIP MEIP MEIP MO MO MO MEIP MO MO Trees Rural N/A N/A N/A MO MO N/A MSPE Fire Plugs CFA (EXT CFA (EXT CFA (EXT MCSa MCSa CFA (EXT CFA (EXT DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP Renewal Disposal MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO Maintenance MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MO Operation Construction MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MEIP MO Asset Class Asset Sub-Class Roads Planning DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO MO DSE (EXT) CFA (EXT Client DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO MO DSE (EXT) CFA (EXT Owner Design Macedon Ranges Shire Council - Asset Responsibility Matrix Drainage Underground Culverts Pits Pipes Open Channels Table Drains Wetlands Retarding Basins Litter Control Devices Levee Banks Pumps Appendix B Page 17 Clock Tower / Museums DCW DCW MCC MEIP MEIP MEIP MEIP MEIP Community Facilities DCW DCW MCC MEIP MEIP MCC MEIP MEIP Neighbourhood House DCW DCW MCC MEIP MEIP MCC MEIP MEIP Hubs DCW DCW MCS MEIP MEIP MCS MEIP MEIP Senior Citizens Centre Maternal and Child DCW DCW MCS MEIP MEIP MCS MEIP MEIP Health Centre DCW DCW MCS MEIP MEIP MCS MEIP MEIP Kindergarten DCW DCW MCS MEIP MEIP MCS MEIP MEIP Playgroups Hall DCW DCW MCC MEIP MEIP MRS MEIP MEIP Housing DCW DCW MCC MCC MCC MCC MEIP MEIP Municipal Office/Facility CE CE CE MEIP MEIP MCCS MEIP MEIP SES DAO DAO MCSa MEIP MEIP MCSa MEIP MEIP Sheds DAO DAO MRS MEIP MEIP MEIP MEIP MEIP Shelters DAO DAO MRS MEIP MEIP MEIP MEIP MEIP Sporting Buildings DCW DCW MRS MEIP MEIP MRS MEIP* MEIP Toilet Blocks DAO DAO MEIP MEIP MEIP MO MEIP MEIP Pools DCW DCW MRS MEIP MEIP MRS MEIP MEIP Leisure Centres/Facilities DCW DCW MRS MEIP MEIP MRS MEIP MEIP Tourist Information Centres DPE DPE MEDT MEDT MEDT MEDT MEIP MEDT *Sporting clubs undertake minor maintenance, Council undertake structural maintenance Disposal Renewal Maintenance Operation Design Construction Asset Class Asset Sub-Class Buildings Planning Asset Management Strategy 2014 Client Owner Macedon Ranges Shire Council MCC MCC MCC MCS MCS MCS MCS MCC MCC MCCS MCSa MEIP MEIP MRS MEIP MRS MRS MEDT Open Space Streetscapes Entrance Treatments Trees Township Street Furniture Street Litter Bin / Stands Visitor Information Bays/Outlets Town / Interpretive Signage Fencing Public Lighting (non-standard) Monuments Fountains DAO DAO DAO DAO DPE DPE DCW DCW DCW DCW DAO DAO DAO DAO DPE DPE DCW DCW DCW DCW MCC MCC MCC MO MEDT MEDT MCC MCC MCC MCC MEIP MO MEIP MO MEDT MEDT MEIP MEIP MCC MCC MEIP MO MEIP MO MEDT MEIP MO MO MEIP MEIP MO MO MO MO MEDT MO MO MO MO MO MO MO MO MO MEDT MO MO MO MO MO MEIP MO MO MO MEDT MEDT MO MEIP MEIP MEIP MEIP MO MEIP MO MEDT MEDT MO MEIP MCC MCC DPE DPE DPE DPE DPE DPE DPE DPE MSPE MSPE MSPE MSPE MSPE MEIP MEIP MEIP MSPE MO MO MSPE MSPE MO MO MSPE MSPE MO MO MO MSPE MEIP MEIP MO MSPE MSPE MSPE MSPE DAO DAO DAO DAO DAO DAO DAO DAO MO MO MO MO MO MEIP MEIP MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO MO Conservation Reserves Trees Car park/roadway lighting Path/lighting Fence Botanic/Horticultural Gardens Trees Car park/roadway/lighting Path Fence Appendix B Page 18 Disposal Renewal Maintenance Operation Design Construction Asset Class Asset Sub-Class Open Space (continued) Planning Asset Management Strategy 2014 Client Owner Macedon Ranges Shire Council Recreation Reserves Trees Car park/roadway/lighting Path/lighting Fence BBQ Fountain Monument Park Furniture Raised Garden Bed Sports Oval Courts (Tennis/Netball) Sports Lighting Playground Skate Parks/BMX Velodrome Irrigation DAO DAO DAO DAO DAO DAO DAO DAO DAO DCW DCW DCW DCW DCW DCW DAO DAO DAO DAO DAO DAO DAO DAO DAO DAO DCW DCW DCW DCW DCW DCW DAO MRS MEIP MRS MRS MRS MRS MRS MRS MRS MRS MRS MRS MRS MRS MRS MRS MO MEIP MEIP MEIP MEIP MEIP MEIP MO MO MRS MRS MRS MO MEIP MEIP MO MO MO MO MEIP MEIP MEIP MEIP MO MO MEIP MEIP MEIP MO MEIP MEIP MO MO MO MO MO MEIP MO MO MO MO MRS MRS MRS MO MRS MRS MO MO MO MO MO MEIP MO MO MO MO MO MO MRS MO MO MO MO MO CEP MO MO MEIP MO MO MO MO MO MRS MEIP MO MRS MRS MO MO MO MO MO MRS MRS MRS MO MO MRS MRS MRS MRS MRS MRS MO DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW DCW MRS MEIP MRS MRS MRS MRS MRS MRS MRS MRS MO MEIP MEIP MO MEIP MO MO MO MO MO MO MO MO MO MEIP MEIP MEIP MO MO MO MO MO MO MO MEIP MO MO MO MO MO MO MO MO MO MEIP MO MO MO MO MO MO MO MO MO MEIP MO MO MO MO MO MO MRS MRS MO MRS MO MO MO MO MRS Open Space – Recreation/Parks DCW Vacant Property DCS Community Facilities DCW Conservation DPE Botanic / Horticultural Gardens DAO DCW DCS DCW MSPE DAO MRS MF DCW MSPE MO MRS MF DCW MSPE MO MF MF MF MF MF MO MF DCW MSPE MO MO MO MO MSPE MO MRS N/A N/A MSPE MO MRS MF MF MSPE MO Passive Open Space Reserves Trees Car park/roadway/lighting Path Fence BBQ Fountain Monument Park Furniture Raised Garden Bed Playground Land Appendix B Page 19 Design Construction Operation Maintenance Renewal Disposal DCS DAO DAO DCS MO MO MF MO MO N/A N/A N/A N/A N/A N/A MF MO MO MF MO MO MF MO MO MF MO MO CE DCS DCW DCW DCS DCS DCW DCW Various MIC MCC MCC N/A N/A MCC MCC N/A N/A MCC MCC Owner Planning Asset Management Strategy 2014 Client Macedon Ranges Shire Council Asset Class Asset Sub-Class Plant, Equipment Vehicular Plant Machinery Plant Minor Equipment Furniture and Equipment Furniture Information Technology Public Artworks Library Materials Various Various Various Various MIC MIC MIC MIC MCC MCC MCC MCC MCC MCC MCC MCC Abbreviations: CE CEP DAO DCW DCS DPE MCCS MCC MCS Chief Executive Co-ordinator, Engineering Planning Director, Assets & Operations Director, Community Wellbeing Director, Corporate Services Director, Planning & Environment Manager, Council & Customer Service Manager, Community & Culture Manager, Community Services MCSa MEDT MEIP MF MIC MO MRS MSPD MSPE N/A Manager, Community Safety Manager, Economic Develop. & Tourism Manager, Engineering Infrastructure & Projects Manager, Finance Manager, Information & Communication Manager, Operations Manager, Recreation & Sport Manager, Statutory Planning & Development Manager, Strategic Planning & Environment Not Applicable Note: On occasion joint responsibility may be required for some stages of the asset life. The officer above will liaise with other officers as required. . Appendix B Page 20 Macedon Ranges Shire Council 5.3 Asset Management Strategy 2014 Appendix C – Asset Heirarchy ROADS HIERARCHY Taken from Road Asset Management Plan – Adopted 28 September 2011 Appendix C Page 21 Macedon Ranges Shire Council Asset Management Strategy 2014 BUILDINGS & STRUCTURES HIERARCHY BUILDINGS HIERARCHY Asset Class Asset Group Community Facilities Recreation, Leisure and Cultural BUILDINGS Asset Type Maternal Child Health Playgroups Toy Libraries Child Care Pre-schools Occasional Care Senior Citizen Centres Neighbourhood Houses Youth Service Centres Housing Community Centres Gardener's Cottage Community Hubs Indoor Sports Courts Leisure Centres Club Social Rooms Ticket Boxes Change Rooms Grandstands Shelters Towers Old Court Houses Aquatic Centres Pools Halls Libraries Art Facilities Tourism Hanging Rock Facilities Visitor Information Centres Museums Municipal Offices Sale Yards Transfer Stations Open Space Toilet Blocks Rotundas Sheds Memorials Clock tower Taken from Building Asset Management Plan - Adopted 27 June 2012 Appendix C Page 22 Macedon Ranges Shire Council Asset Management Strategy 2014 Asset Type Asset Group Asset Class DRAINAGE HIERARCHY DRAINAGE Under Ground Drainage Pipes Pits Roadside Culverts Surface Drainage Open Drains Water Quality Devices Flood Prevention Swales Wetlands GPTs Rain Gardens Retarding Basin Sediment Pits/Ponds Underground Retention System Flood Walls Pumps Wells Pumps Non-Return Valves Taken from Drainage Asset Management Plan – Adopted 25 September 2013 Appendix C Page 23 Macedon Ranges Shire Council Asset Management Strategy 2014 Asset Class OPEN SPACE HIERARCHY Asset Group Open Space Infrastructure Sportsgrounds Playgrounds Trees Asset Type OPEN SPACE Retaining & Feature Walls Irrigation Systems Garden Beds BBQs Bin Stands Park Furniture and Equipment Lighting Fencing Recycled Water Tanks Basketball Facilities (slab, pole and ring) Hit Up Walls Signage Ornamental Fountains Monuments Ovals Cricket wickets (hard) Cricket wickets (turf) Athletics tracks Equestrian Facilities Netball Courts Tennis Courts Multipurpose Courts Irrigation Systems Recycled Water Tanks Water Tanks Ground Water Bores and Pumps Velodrome Skate Parks BMX Tracks Local – including Preschools District Major Street Trees Park and Reserve Trees Hedges Taken from Open Space Asset Management Plan – Adopted 25 September 2013 Appendix C Page 24