The European Organisation for Astronomical Research in the Southern Hemisphere Organisation Européenne pour des Recherches Astronomiques dans l’Hémisphère Austral Europäische Organisation für astronomische Forschung in der südlichen Hemisphäre DMO The European ALMA Regional Centre: the ESO ARC and the ARC nodes Doc. No.: DMO-xxx-ESO-xxxxx-xxxx Issue: 1 Date: 1.07.2009 Prepared: P. Andreani 01.07.2009 Name Date Signature Name Date Signature Name Date Signature Approved: Released: ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 CHANGE RECORD ISSUE DATE 0.1 0.2 0.3 July July August 1. September 2009 1.0 Sept 2009 SECTION/PARA. AFFECTED REASON/INITIATION DOCU MENTS/REMARKS All Copied as ALMA document Ready for Implementation Plan review: Santiago Sept 30-Oct 1, 2009 ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 RELATED DOCUMENTS ISSUE DATE NAME OF THE DOCUMENT BODIES Version III May 7th 2009 ALMA Project Plan JAO/ALMA Board Version D Oct. 9 2007 OPERATIONS PLAN JAO Version 3 Version ? May 25 2008 Sep 2009 Sep 2009 Memorandum of Understanding ESO/DMO, ARC nodes ESO ARC Implementation Plan ESO ARC/DMO ARC nodes Implementation Plan ARC nodes ARC/DMO ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 Table of Contents 1 ....................................................................................................................................................... 5 1 INTRODUCTION AND GOALS .......................................................................................... 5 2 BACKGROUND...................................................................................................................... 5 2.1 2.2 2.3 3 TIMELINE ........................................................................................................................................................ 6 THE ROLE OF THE CENTRAL ARC NODE AT ESO ............................................................................................. 6 THE ROLE OF ARC NODES ............................................................................................................................... 6 STAKEHOLDERS .................................................................................................................. 8 3.1 PEOPLE INVOLVED ........................................................................................................................................... 8 3.1.1 ARC staff ..................................................................................................................... 8 3.1.2 ARC node staff ............................................................................................................. 8 3.1.3 The user community .................................................................................................... 8 3.2 RESPONSIBILITIES............................................................................................................................................ 9 3.2.1 The ARC Manager ....................................................................................................... 9 3.2.2 The ESO ARC astronomer........................................................................................... 9 3.2.3 The ARC nodes representatives................................................................................... 9 4 SETUP AND PLANNING .................................................................................................... 10 4.1 SETUP OF THE FACE TO FACE HELP ................................................................................................................ 11 4.2 ........................................................................................................................................................................... 10 4.3 COMMUNICATION CHANNELS BETWEEN THE ESO ARC AND THE ARC NODES ............................................. 10 4.3.1 Telecons ..................................................................................................................... 10 4.3.2 Face-to-face meetings ............................................................................................... 10 4.3.3 TWiki ......................................................................................................................... 11 5 CONTROLLING .................................................................................................................. 13 5.1 5.2 5.3 5.4 6 VISITS AND MEETINGS (WITH ARC STAFF AND REPRESENTATIVES) .............................................................. 13 FEEDBACK FROM USERS ................................................................................................................................ 13 FEEDBACK FROM ARC STAFF ........................................................................................................................ 13 PROVIDING FEEDBACK TO THE ARC NODES .................................................................................................. 13 RISKS ANALYSIS ................................................................................................................ 15 6.1 6.2 6.3 6.4 6.5 DEALING WITH PROJECTS DELAYS ................................................................................................................. 15 DEALING WITH PROJECTS AND OPERATIONS CHANGES .................................................................................. 15 DEALING WITH FUNDING SHORTAGE ............................................................................................................. 15 DEALING WITH STAFF CHANGES .................................................................................................................... 15 DEALING WITH CONFLICTS ............................................................................................................................ 15 ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 Introduction and goals This document describes how the network of the European ALMA Regional Centre will work together in order to offer a coherent and organized service for the European user community. It outlines the interaction between the ALMA Regional Centre (ARC) Department at ESO (also referred to as the main node) and the European ARC nodes. The role of the Regional Centres in the ALMA project is extensively described in the ALMA Project Plan and the ALMA Operations Plan. The scope and mission of the European Regional Centre at ESO are detailed in the ESO/ARC Implementation Plan. A similar plan is in progress for the ARC nodes. The goal of this document is to outline how the network of the European Regional centres works together, how information is exchanged, problems are identified, and solutions are foreseen. It highlights risk areas and proposes backup solutions. It is of formenost importance that the European ALMA Regional Centre be perceived by European users as a single entity. The services provided by the ARC structure should be transparent to the users. Every user should know where and who to find help when they need it and every interaction between the user and ALMA should happen in such a way that the user perceives the ARC as a unified structure, not as seven individual entities. Background The European ALMA Regional Centre forms the interface between the ALMA observatory and the European user community from the proposal preparation stage to actual distribution of data and subsequent analysis. As such, the ARC provides critical services to both the ALMA operations in Chile and to the European user community. These services can be divided into core services, which are financed by the ALMA operations budget and are critical to a successful operation of ALMA, and additional services, which are not funded by the ALMA project but are critical to achieve its full scientific potential. Most core services will be provided by the ARC department at ESO, while most additional services will be provided by the ARC nodes The agreement between ESO/ARC and the ARC nodes in Europe was signed in 2008 by the institutes hosting a regional centre and the ESO upper management in the form of a Memorandum of Understanding. This documents states that, following the dictation of the ALMA Operations Plan, some of the additional functions, particularly one-on-one or face-toface support and support for archival research, be included in the core functionalities. In Europe the face-to-face support will be hosted and supported at the ARC nodes. ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 As a core function the face-to-face user support is one of the main deliverables of the ALMA Regional Centres. The ESO ARC Department has therefore the responsibility for its happening, implementation and success. One of the ARC astronomers will be appointed to coordinate the face-to-face support at the ARC nodes. It is important to stress that the ESO ARC is not staffed to support ARC node activities beyond managing face-to-face support. 1.1 Timeline The ARC activities can be divided into two separate phases, a pre-operations stage and a operations stage. The first stage refers to the period up to point when the ARC begins it full operations, which is defined to coincide with the Early Science Decision Point (ESDP). The pre-operations stage will require activities that ensure that the nodes and the ESO ARC department are ready to conduct their support functions and related activities as soon as this is needed. The pre-operations stage is characterized by tasks related to software testing, training, and preparing for and assisting with ALMA commissioning. After the ESDP, i.e. eight months for the start of Early Science, the ARC moves into its operations stage. The activities of the central ARC during this stage are stipulated in the ESO ARC Implementations Plan, whereas the tasks of the ARC nodes are detailed in the ARC Nodes Implementation Plan. The following sections briefly summarize these tasks. 1.2 The role of the central ARC node at ESO The most important services of the ARC at ESO are to provide user support to European users, host and maintain a complete mirror of the ALMA archive, and provide duties at the OSF during observations. In terms of expected number of person days per year spent on the various tasks, the most significant tasks of the ESO ARC during the operations stage are validation of user supplied scheduling blocks, astronomer on duty support in Chile, offline and data reduction helpdesk support, and archive reseach support. These tasks amount to roughly 60% of the ESO ARC work. An important role for the ESO ARC is to interface with the Joint ALMA Observatory. This function of the ESO ARC consists of supporting the Chilean Operations and of shielding the JAO as much as possible from questions regarding user support. In fact, the primary function of the JAO is to operate and maintain the array at the Array Operations Site (AOS) and the Operations Support Facility (OSF). As such, the number of communication channels to the JAO is kept to a minimum. Therefore, all queries from the nodes that concern the JAO should be made via the central node. 1.3 The role of ARC nodes In addition to the face-to-face help, the ARC nodes have agreed to fulfill the following tasks: ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 Enhanced archive and data reduction operations: This includes face-to-face data processing support for large and/or complex datasets, and help with archival research projects. Helpdesk support: Helpdesk tickets that can be better handled by the nodes will be forwarded from the ESO ARC Development and maintenance of new software and techniques: This implies e.g., development of modified pipeline versions, advanced simulation development and use, and the development of novel algorithms Special projects support: Providing support for public surveys and large programs. Storage of advanced data products: Help users with making available advanced data products, including cubes, images, calibration data, etc. Scientific community development: Providing support for ALMA research (e.g., basic training for new users), post-doctoral fellowships, training schools and workshops, ALMArelated specific science workshops, and leading science community development activities. Public relations and outreach: Advertising ALMA through outreach programmes. Feedback to the ESO node: The nodes will need to report to the ESO node on all their acivities. ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 Stakeholders This section describes the roles of the different actors involved in the ARC structure in Europe and details their resposibilities. 1.4 People involved 1.4.1 ARC staff During the ARC operations stage, the ESO ARC will employ seven astronomers and five scientists. This pool ensures that a different mixture of expertise is covered from experts in observations to experts in data reduction and the archive. Scientists will concentrate mainly on the technical aspects of scientific support tasks, whereas astronomers will work most on the more scientific tasks. Within the ESO ARC, two groups are set up to enable a more efficient management: the ALMA User Support Astronomers Group (AUSG), and the ALMA Operations Support Group (AOSG). ARC staff communicates with the user community on a number of occasions throughout the lifetime of an observing project. Primarily, this will happen during preparation of Phase 1 and Phase II material, and when data reduction help is needed. All communications with the users happen through the ALMA user portal or via regular email and telephone. 1.4.2 ARC node staff The ARC nodes together employ a large pool of support astronomers and technical personnel. The exact job description of these staff vary from node to node. Partly, the ARC node staff will consist of postdoctoral researchers with a substantial amount of time available for their personal research, while other node staff may be on permanent contracts and are contractually allocated less time for scientific research. Each node will have at least two members of staff whose primary function is to provide face-to-face support. Each node also employs at least one technical staff, responsible for setting up and maintaining the computing facilities for visiting astronomers. A complete directory of all staff in the ESO ARC and the ARC nodes will be maintained on the ARC TWiki pages. This directory will list for each staff member their position, their responsibilities, and their expertise areas. The availability of each member of staff (in the office, on leave, or travelling) should also be registered. An important difference between ARC node staff and ESO ARC staff is that the node staff also interacts with users face-to-fase. 1.4.3 The user community At this stage it is very difficult to characterize the user community in Europe. It is expected that the potential user community increases in volume during the next few years, especially when first science verification results will be made public and when the call for Early Science will be ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 released. It is essential for a good functioning of the European ARC that the ARC structure be perceived as a single, unified entity. Although European ARC staff are distributed over seven locations (in reality even more since some ARC nodes are split in several locations), it is important that the user community can communicate with the ARC through well defined channels… . 1.5 Responsibilities 1.5.1 The ARC Manager The ARC manager performs a critical role in maintaining the linkage between the ALMA Director’s Office, ESO management, and the ARC nodes. For operational purposes, the ARC manager reports to the ALMA director, as he/she is responsible for providing Board-approved operational deliverables to the JAO and the user community. The ARC manager is responsible for the running of the ESO ARC and for creating the network of nodes in Europe and overseeing it successful operation. 1.5.2 The ESO ARC astronomer One of the astronomers in the ESO ARC has the responsibility for dealing with matters related to the nodes. It is their responsibility to coordinate the nodes, make sure that they work according to commonly agreed standards and provide the face-to-face services that ESO is contractually obliged to. This ARC astronomer will work closely with the ARC manager. 1.5.3 The ARC nodes representatives Each ARC node appoints one representative, who is responsible for the node’s activities and acts as the main contact point. An ARC Coordinating Committee (ACC), consisting of these representative of each ARC node and chaired by the ARC manager, is set up. The ACC provides descriptions of the tasks of each node, coordinates the activities of the central node and the nodes in terms of tasks and expertise areas. Staffing and budget are the responsibility of the individual nodes. ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 Setup and planning In order to ensure that the European ARC is functioning satisfactorily, it is essential that there is a good interaction and exchange of information between the ARC department at ESO and the ARC nodes, and between the individual nodes. It is crucial that the various services delivered by the ARC nodes are coordinated … 1.6 Communication channels between the ESO ARC and the ARC nodes Given the unique setup of the European ARC structure, it is essential that this crosscommunication also takes place between the ARC nodes in Europe. To ensure that the European ARC is functioning satisfactorily, it is essential that there is a good interaction and exchange of information between the central and other nodes. The dispersion of ALMA user support in Europe to a number of geographically separated institutions makes it crucial that the various services provided by the nodes are coordinated. This role is assigned to the central node at ESO. The service provided by the ARC will be assessed by the JAO and the ESO node will also be responsible for reporting on ARC activities to this body. Therefore, as much information as possible on activities at the nodes will need to be passed on to ESO. A number of interfaces between the central and other nodes are already in place (e.g. web/TWiki pages, telecons and face-to-face meetings) and these will provide a basis for the more intense communications that will be necessary as ALMA moves towards full operations. 1.6.1 Telecons These will be held on a monthly basis with participants including the representatives of each node and the ARC manager. The chair of the telecon will rotate through this pool of people and will be responsible for preparing the agenda, publishing it in advance on the ARC TWiki and writing the minutes. In addition to these, sub-groups of each node (e.g. software developers, pipeline experts, face-to-face support staff) should hold separate regular telecons so that they can keep each other updated on their activities. Such sub-groups should nominate a leader who should in turn attend the main ARC telecon. 1.6.2 Face-to-face meetings Staff from the various nodes will meet face-to-face on a number of occasions during the year. At least twice a year, there will be a meeting organized which will be attended by all European ARC staff. This will be an excellent opportunity to summarize the various parts of the ARC activities over the past year, to discuss ALMA operations in general and to plan for the future. Scientific presentations should be an important part of this. The venue for this will rotate ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 through each of the nodes and ESO in turn. Either the central node’s manager or the appointed astronomer will also visit each node at least once, and preferably twice, a year. This will allow each party an opportunity to concentrate on the services provided by each i.e. to discuss whether each is satisfied with the current arrangements and to establish whether there are any improvements that could be made. 1.6.3 TWiki As this is the quickest way to get information about the ARC it is essential that this be kept upto-date and contain as much useful information as possible. This will also reduce the need to distract ARC staff members from their duties, ALMA-related or otherwise. Each node should assign someone the task of, once every two weeks, ensuring that their node’s information on the TWiki is up to date. In addition to the above-described communication activities within the European ARC, the three ARCs in Europe, North America and East Asia will also keep in touch via regular telecons and occasional meetings. It is very likely that the expertise and experience shared will prove very useful to the operations of all three centres. Staff from the European ARC nodes will be important contributors to these. 1.6.4 Common logo and webpages with similar look and feel Each node will require a web site on which all information that is likely to be needed by their user community can be published. In order to present the European ARC and its nodes as a united and coordinated entity, the web pages of each node should, within reason, look similar to each other. Of course, it is appreciated that ARC node webpages may need to conform with local standards as well. 1.7 Setup of the face-to-face help Face-to-face support is currently described in the Implementation Plan for the ARC Nodes. Nodes should only provide face-to-face support at Phase II and data reduction phases. Face-toface help for Phase I should only happen if the proposal and/or the observing program is particularly complicated. The face-to-face support staff should therefore be familiar with the operation of the ALMA Software tools. Nodes should also provide support for users wishing to make visits for the purpose of exploiting the archive. 1.7.1 Coordinating a face-to-face support visit Visits will usually be made to a user's local node as national funding bodies will normally expect this. If the user requires specialist support that can only be (or better) provided at another node, this should be encouraged (providing funding is available). Each visitor should be assigned a single member of staff for support purposes and all support of a particular visitor should as much as possible come through this member of staff. ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 Requests for face-to-face support received via Helpdesk (or sent directly to ESO) will be forwarded by email to the appropriate node. Requests made directly to the nodes should likewise be transmitted to ESO. Once a node is made aware of a visit request, support staff at this node will be responsible for arranging the details of the visit. It should be established as soon as possible (ideally within a week) whether a visit is appropriate, that the user's needs can be catered for and support is available on dates acceptable to the user. In the unlikely event that it proves impossible to arrange a visit (e.g. the node is fully booked around the only dates available to a user) then the node shall inform ESO who will try and arrange support from another node. If the node is able to host a visit for dates and duration acceptable to the user, and funding is available, then the details of that visit should be forwarded to ESO. Prior to a visit, the following information should be forwarded to ESO. This will be put into a table, one per node, on the ESO web pages. Name. Affiliation. Project Code. Dates of Visit. Node Support Person. Purpose of Visit. (Phase I/II, data reduction, archival research, etc.) Feedback received? After a visit, the user will be invited to submit feedback on the service received and whether the goals of the visit were met. This will be done via a web form on the ESO web pages and whether feedback has been received will be noted in the aforementioned table. Feedback will also be required from the node support staff in terms of problems encountered/ lessons learned regarding the data analysis during the visit. It is important that the nodes share their F2F experience. This will also be done via a web form on the ESO pages. This feedback will be discussed in monthly telecons of F2F support staff/interested parties. 1.7.2 ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 Controlling ESO are required to report and provide statistics on face-to-face support to the ALMA board and the JAO. Therefore, the nodes will need to report on all their activities to the ESO central node. This section describes how information on face-to-face support will flow from the nodes to the the ESO ARC and which mechanisms are put in place to monitor the ARC nodes’ functioning. 1.8 Visits and meetings (with ARC staff and representatives) The ARC manager or a nominated deputy will visit each node at least once per year. This will allow the nodes and ESO an opportunity to concentrate on the services provided by each, i.e., to discuss whether each is satisfied with the current arrangements and to establish whether any improvements could be made. 1.9 Feedback from users The feedback submitted by the users will form an important part of assessing the service provided by the European ARC. The nodes will also submit feedback on a regular basis in order to discuss mainly technical aspects of the support e.g. * Problems encountered during data reduction. * Solutions to those problems. * Projects that, whilst possibly straightforward, are of interest to the other nodes. After a visit, the user will be invited to submit feedback on the service received and on whether the goals of the visit were met. This will be done via a web form on the ESO web pages. Whether feedback has been received will be noted in the aforementioned table. Feedback will also be required from the node support staff in terms of problems encountered/lessons learned regarding the data analysis during the visit. It is important that the nodes share their f2f experience. This will also be done via a web form on the ESO pages. This feedback will be discussed in monthly telecons of f2f support staff/interested parties. 1.10 Feedback from ARC staff The nodes will need to give detailed information regarding the face-to-face support delivered to users. 1.11 Providing feedback to the ARC nodes ESO will also pass on information to nodes regarding requests for f2f support. ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 Risk analysis 1.12 Dealing with projects delays 1.13 Dealing with project and operations changes 1.14 Dealing with funding shortage Funding for the ARC nodes is sought through their local national funding agencies and/or the European Community funding programs such as the FP7 program. Therefore, it is not ESO’s or ALMA’s responsibility that the nodes are funded to sufficient levels. If a particular node cannot find sufficient funding the carry out its most important tasks, in particular face-to-face support, solutions have to be found to avoid that certain ESO member states have no access to user support through a local ARC node. Other nodes in Europe may take over user support tasks of the node with funding difficulties. Furthermore, if due to funding difficulties a node cannot function anymore in accord with the MoU and the ARC nodes Implementation Plan, there is a risk that certain support expertise areas are no longer covered in Europe. To avoid this situation, it is important that all main expertise areas are covered by at least two, or preferentially more, different nodes. 1.15 Dealing with staff changes Some of the support taks of the ARC nodes are delivered by staff on fixed-term contracts, i.e., postdocs. During their period of work at the nodes, these staff build up expertise in many areas related to user support as well as in technical areas. To avoid that the ARC nodes lose a significant fraction of their expertise upon departure of one of their staff, it is essential that all ARC node staff keep detailed logs of their support activities, such that staff replacing them can get up to speed in a short time. When nodes hire replacement staff member for staff that reach the end of their contract or leave the node for other reasons, they should ensure that the new hire overlaps for at least one month with the previous staff member to enable a smooth transition and an optimal transfer of the knowledge. 1.16 Dealing with conflicts Should any dispute arise on any matter relating to the provision of user support by the ARC nodes, or relating the communication between the ARC nodes and ESO, such dispute will be referred to the ACC, which will seek to resolve the dispute by mutual agreement. If a solution cannot be found, the problem will be referred to the ESO Director General, ALMA director,… If either through feedback from users, or through the direct observations of the ARC astronomer in charge of coordinating the face-to-face support, it becomes evident that the face- ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 1 of 18 to-face support delivered by a particular node is not in agreement with the agreed standards, the following mechanism shall be put in place. First, the ARC node representative of the node in question is contacted by the ARC manager or the ARC astronomer in charge of coordinating the face-to-face support, and the observed problems are discussed. If the parties agree on the gravity of the problem, the ARC manager will propose a plan to improve situation. Solution could be, for example, training of node staff members, procurement of improvement computer equipment, improvements of office space, or agreeing to dedicate more time to visiting astronomers. This plan will be submitted in writing to the ARC manager. If the ARC node representative and ESO cannot reach an agreement, or when after implementing the recovery plan the situation has not improved after a few months, the case is put forward to the ESO director general. The ARC node representative always has the right to appeal to the ACC, the ESO DG or the ALMA director. 1.17 Backup solutions If during Early Science it turns out that one or more ARC nodes are not ready to deliver their user support tasks to the agreed standards, ESO will take over the task of user help, including face to face during the first year of ALMA operations. ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany European ALMA Regional Centre: ESO ARC and the ARC nodes Doc: Issue Date Page DMO-xxx-ESO-xxxxxxxxx 1 01.07.2009 4 of 18 ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany Abbreviations ACA ALMA Compact Array ALMA Atacama Large Millimeter Array AIV Assembly, Integration, and Verification AoD Astronomer-on-Duty AOS Array Operations Site AOT ALMA Observing Tool ARC ALMA Regional Center ATF Antenna Test Facility CSV Commissioning & Science Verification DSO Department of Science Operations ESDP Early Science Decision Point ESO European Southern Observatory FTE Full-Time Equivalent ISM International Staff Member IPT Integrated Product Team JAO Joint ALMA Office NRAO National Radio Astronomy Observatory OSF Operations Support Facility OT Observing Tool PRC Program Review Committee QA Quality Assurance SB Scheduling Block SCO Santiago Central Office STS Short-Term Schedule SV Science Verification VO Virtual Observatory ESO, Karl-Schwarzschild-Str. 2, 85748 Garching bei München, Germany