Estates Directorate Grounds and Gardens Salting and Gritting Policy Timing 1. On the day when snow has fallen and stayed. 2. On the day if temperatures are below freezing and ice has formed 3. If there is a visible ground frost, surfaces are checked and, if found slippery, gritted. 4. If ice or snow is forecast for the following day at the discretion of the Estates Supervisor. 5. Where snow or ice is forecast on a day when the University is closed, where the day immediately prior to that is a normal work day, gritting may take place in preparation of those conditions at the discretion of the Estates Supervisor. Priority The following priorities reflect the areas seen to be at the greatest risk of causing accidents, by slipping/skidding, to the largest number of people. Any times for completing the treatment of these areas have been set in accordance with what can be "reasonably" achieved with the current staffing and equipment levels. Priority 1 - Before 9.00am All ramps Steps not including those outside houses Priority 2 - Before 9.30am Main path ways Roads including science parks Car park driveways NOT parking bays Priority 3 - Before 10.00am Minor pathways Priority 4: Outside houses After the initial operation, gritting may take place throughout the day to ensure all surfaces, where possible, have been treated and in preparation for further ice or snow if forecast. Period of Operation Gritting operations are to be carried out within the standard working week Monday to Friday 8.00am to 4.00pm. At the discretion of the Estates Supervisor, this may alter to 7.30am to 3.30pm. THERE IS NO COVER OR CALL OUT ON WEEKENDS, BANK HOLIDAYS OR DURING OFFICIAL UNIVERSITY CLOSURE DAYS