TECHNICAL MEMORANDUM Rock Creek Post Flooding Pictures PREPARED FOR: UDFCD Town of Superior COPY TO: PREPARED BY: CH2M HILL DATE: September 20, 2013 PROJECT NUMBER: 418389 The photos shown below were taken on September 19, 2013. These images show the improved section of Rock Creek between Rock Creek Parkway and West Flatirons Crossing Drive adjacent to the Town of Superior Wastewater Treatment Plant. Pedestrian Bridge Both Photos Looking Upstream at the Pedestrian Bridge Upstream Concrete Log Drop with Flow Splitter Structure Left: Looking at the flow split towards the overbank area DOCUMENT1 Right: Looking upstream of the flow splitter COPYRIGHT 2013 BY CH2M HILL, INC. COMPANY CONFIDENTIAL 1 ROCK CREEK POST FLOODING PICTURES Log Drops Photos showing two different log drops Overbank Area Left: Overbank flow back into Rock Creek Mainstem Right: Looking upstream towards the flow splitter Trees and Debris in the Overbank Left: Tree knocked over during flood event 2 Right: Large debris in overbank COPYRIGHT 2013 BY CH2M HILL, INC. COMPANY CONFIDENTIAL DOCUMENT1 ROCK CREEK POST FLOODING PICTURES Downstream Overbank Area at Concrete Wall Left: Looking upstream Right: Looking downstream Downstream Concrete Log Drop Left: Looking downstream towards Concrete Log Drop Right: Looking upstream Summary: All log drop and concrete log drop structures are intact No damage at the pedestrian bridge Erosion upstream of the log drop/flow splitter structure and downstream of the flow splitter into the overbank Cobbles deposited immediately downstream of the upstream concrete log drop, raising the channel invert Erosion at the concrete wall in the downstream overbank area Bank erosion near the downstream concrete log drop structure DOCUMENT1 COPYRIGHT 2016 BY CH2M HILL, INC. • COMPANY CONFIDENTIAL 3