Project Name:
Architect:
Project nr.:
Vegetated Protected Membrane Roofing
Section:
Page: 1
Date:
07 55 63
(ZinCo Walkway with bedding material)
Spec note:
This guide specification gives detailed information about the ZinCo green roof systems. It has to be clear, that the information that is shown must be understood as guide and recommendations. It is possible that your green roof project need special technical requirements. Please contact ZinCo Canada Inc. (905-690-1661) for further information regarding technical advice, specifications and budget cost.
PART 1 – GENERAL
1.1
1.2
General instructions
.1 Read and be governed by conditions of Division 1.
Work includes
Technical Data:
Depth:
>100 mm (>4")
Slope:
2-5 degrees
1.3 Related work
1.4
.1
.2
.3
.4
.5
.6
References
Section 03 51 00 -
Section 05 31 23 -
Section 06 15 16 -
Section 07 50 00 -
Section 07 70 00 -
Section 33 49 23 -
.1
Cast Roof Decks
Steel Roof Decking
Wood Roof Decking
Membrane Roofing
Roof and Wall Specialties and accessories
Storm Drainage Water Retention Structures
FLL-standards (Guideline for Planning, Execution and Upkeep of Green-Roof Sites, Release 2002).
.1
.2
.3
.4
.5
Moisture retention & protection mat.
Drainage element
High performance bedding material
Hard surfacing
Accessories.
.2 ASTM E2396-05: Standard Test Method for Saturated Water Permeability of Granular Drainage Media for Green Roof Systems.
.3 ASTM E2397-05: Standard Practice for Determination of Dead Loads and Live Loads associated with
Green Roof Systems.
.4 ASTM E2398-05: Standard Test Method for Water Capture and Media Retention of Geo composite
ZinCo Canada Inc.
- P.O. Box 29 - Carlisle - Ontario - L0R 1H0
Tel. 1-905-690-1661 - Email: greenroof@zinco.ca - Website: www.zinco.ca
Project Name:
Architect:
Project nr.:
Section:
Page: 2
Date:
07 55 63
Vegetated Protected Membrane Roofing (ZinCo Walkway with bedding material)
.5 ASTM E2399-05: Standard Test Method for Maximum Media Density for Dead Load Analysis of Green
Roof Systems.
Submittals 1.5
.1 Submit signed shop drawings showing that the roofing system, green roof assembly, materials, perimeter and penetration details and fall protection are accepted by the green roof manufacturer to ensure that the green roof system meets the necessary performance requirements.
.2 Submit a certification showing that all the components of the green roof assembly are supplied and warranted by the green roof manufacturer.
.3 Submit an inspection report, signed by the roof contractor and the green roof contractor, resulting from the quality control of the roofing system installation prior to the installation of the green roof assembly indicating that the roofing system is installed correctly.
.4 Submit references which indicate that the green roof manufacturer as well as the green roof contractor has recently successfully completed projects of similar scope and nature.
1.6
Quality assurance
.1 Installers Qualifications: Work of this section shall be installed by a recognized green roof or landscape contractor, approved by the green roof manufacturer. The contractor shall have adequate equipment, skilled workers with extensive practical experience, skills and overall landscape design requirements.
.2 The green roof manufacturer shall inspect the roofing system prior to commencement of work, during application and upon completion.
.4 Prior to the installation of the green roof system, test the water tightness of the roofing system by flood testing for at least a 48 hour period or an electronic leak detection process performed by a qualified testing agency.
.5 Submit documentation certifying that he load bearing capacity of the roof and building construction is tested and approved by an structual engineer, with regard to the extra weight of the Green Roof system.
1.7
Environmental conditions
.1 Provide a temporary fall protection (safety railing or fall arrest) during the installation to ensure a safe and healthy work environment.
.2 healthy work environment.
ZinCo Canada Inc.
- P.O. Box 29 - Carlisle - Ontario - L0R 1H0
Tel. 1-905-690-1661 - Email: greenroof@zinco.ca - Website: www.zinco.ca
Project Name:
Architect:
Project nr.:
Vegetated Protected Membrane Roofing
Section:
Page: 3
Date:
07 55 63
(ZinCo Walkway with bedding material)
1.8
Delivery, storage and handling
.1 Store the materials in a dry area, out of direct sunlight, protected from freezing, staining or damage.
By storage on the roof makes sure that the load of the materials does not exceed the load bearing capacity of the roof and building construction
1.9
Waste management and disposal
Separate and recycle waste materials as plastic and paper in accordance with waste management plan. .1
1.10
Warranty
.1 Submit a 5-year product manufacturing warranty according to the specifications of the green roof manufacturer which warrants all the components of the walkway system.
.2 Submit a 2-year workmanship warranty which warrants the installation of the green roof system according to the specifications.
PART 2 - PRODUCTS
2.1
Specified product: ZinCo Floradrain ® FD25-E: Walkway with bedding material
.1 Supplier: ZinCo Canada Inc.
P.O. Box 29
Carlisle, ON Canada, L0R 1H0
Phone: 905-690-1661
E-mail: greenroof@zinco.ca
Website: www.zinco.ca
2.2 Protection mat (CONVENTIONAL ROOF)
.1 ZinCo protection mat SSM45 made of recycled non-rotting fibers for water- and nutrient retention as well as a protection layer. Thickness: 5 mm. Weight approx. 470 g/m 2 . Water retention capacity: 5 l/m 2 . Bitumen resistant – Biologically and Chemically neutral. Penetration resistance: > 2400N. Tensile strength length wise: >8.5 KN/m.
OR (PLEASE CHOOSE CONVENTIONAL OR INVERTED)
ZinCo Walkway with bedding material
ZinCo Canada Inc.
- P.O. Box 29 - Carlisle - Ontario - L0R 1H0
Tel. 1-905-690-1661 - Email: greenroof@zinco.ca - Website: www.zinco.ca
Project Name:
Architect:
Project nr.:
Vegetated Protected Membrane Roofing
Section:
Page: 4
Date:
07 55 63
(ZinCo Walkway with bedding material)
Diffusion membrane (INVERTED ROOF)
.2 Air and vapour permeable membrane ZinCo diffusion membrane TGV21 made of thermal consolidated Polypropylene. Bitumen resistant – Biologically and Chemically neutral. Vapour opening size Sd ≤ 0,01 m) Thickness: 0,55 mm. Weight: 80 g/m roofs and protection against small particle infiltration.
2 . To be used as separation layer on inverted
2.3
Drainage element
.1 ZinCo Drainage element Floradrain® FD25-E made of 100% thermoformed recycled polyethylene, with water storage cells, openings for aeration and diffusion as well as a multidirectional drainage channel system on the underside. Bitumen resistant – Compressive strength: 270 kN/m 2 . Weight: approx. 1,7 kg/m 2 . Dimensions: 1.00 x 2.00 x 0.025 m.
Or (PLEASE CHOOSE REQUIRED DRAINAGE ELEMENT)
.2 ZinCo drainage and water storage element Floradrain® FD40-E made of 100% thermoformed recycled polyethylene, with water storage cells, openings for aeration and diffusion as well as a multidirectional drainage channel system on the underside. Bitumen resistant – Compressive strength:
170 kN/m 2 . Water retention capacity: 6 l/m 2 . Weight: approx. 2,2 kg/m 2 . Dimensions: 1.00 x 2.00 x
0.040 m.
Bedding material 2.4
.1
High performance bedding material (HPD) made of angular, washed limestone material that is both free draining and self compacting. Size: ¼” clear.
2.5
Hard Surfacing
.2
Concrete or natural stone determined according to load-bearing capacity demand and the requirements of the relevant standards.
2.6 Related products
.1
.2
Facade grill / Trench drain [ZinCo FR, ZinCo FTR, ZinCo BTR – Choose the required one]
Adjustable trench drain with grill for foot traffic.
Terrace grill (Area drain) ZinCo TR-H – Vertically adjustable terrace grill made of galvanized steel.
ZinCo Walkway with bedding material
ZinCo Canada Inc.
- P.O. Box 29 - Carlisle - Ontario - L0R 1H0
Tel. 1-905-690-1661 - Email: greenroof@zinco.ca - Website: www.zinco.ca
Project Name:
Architect:
Project nr.:
Vegetated Protected Membrane Roofing
PART 3 – EXECUTION
3.1 Inspection
.1
Section:
Page: 5
Date:
07 55 63
(ZinCo Walkway with bedding material)
Clean up the waterproofing membrane carefully (well-swept)
3.2
.2 Careful inspection of the waterproofing membrane including seams, penetrations and details after flood testing or electronic leak detection. If the waterproofing system and the Green Roof system are not carried out by the same company, the acceptance of the method used for waterproofing quality should be agreed by all the parties (see section 1.5.3.). Identified defects are to be reported in written form. Do not proceed until corrected.
Moisture retention and protection mat
.1 Deliver and install the ZinCo protection mat SSM45 directly on the top of the root barrier with a minimum overlap of 100 mm, according to the manufacturers instructions. The protection mat has to be taken above the growing medium along the edges and roof penetrations. Cut the protection mat in place at the roof penetrations.
OR (PLEASE CHOOSE CONVENTIONAL OR INVERTED)
Diffusion membrane
.2 In the case of an inverted roof: Deliver and install the ZinCo diffusion membrane TGV21 directly on the top of the insulation with a minimum overlap of 100 mm, according to the manufacturer’s instructions. The separation sheet must be installed above the growing medium along the edges and at roof penetrations.
3.3
Drainage element
.1 Deliver and install the ZinCo drainage and water storage element Floradrain ® FD25-E or FD40-
E directly on the protection mat or diffusion membrane according to the manufacturers instructions.
Install the Floradrain elements side by side with the ventilation and evaporation holes facing down and fix the elements together with connection clips or overlap them. Cut the drain elements in place along the edges and roof penetrations. Fill the water retention cups of the drain layer once with water.
3.4
Bedding material
.1 Deliver and install the High Performance Bedding material on the drainage layer. Spread out the bedding material equally to the required depth with a minimum of 50 mm. Check the depth on several places to ensure the right thickness. A tolerance of 1 cm is acceptable. Compact the bedding material with a roller.
ZinCo Walkway with bedding material
ZinCo Canada Inc.
- P.O. Box 29 - Carlisle - Ontario - L0R 1H0
Tel. 1-905-690-1661 - Email: greenroof@zinco.ca - Website: www.zinco.ca
Project Name:
Architect:
Project nr.:
Vegetated Protected Membrane Roofing
Section:
Page: 6
Date:
07 55 63
(ZinCo Walkway with bedding material)
3.5
3.6
3.7
Hard Surfacing
.1 Deliver and install the hard surfacing on top of the bedding material according to the manufacturers instructions.
Related products
.1
.2
Deliver and install Facade grill / Trench drain [ZinCo FR, ZinCo FTR, ZinCo BTR – Choose the required one] on top of the bedding material according to the manufacturer’s instruction. Adjust the grill to the required height. Cut the hard surfacing tight around it.
Deliver and install Terrace grill (Area drain) ZinCo TR-H on top of the bedding material or drainage layer according to the manufacturer’s instruction. Adjust the grill to the required height.
Cut the hard surfacing tight around it
Completion
1. Upon completion, leave the site in a neat, clean and workmanlike condition.
END OF SECTION