BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) Procedure for Empanelment of Grid Tied Inverter Manufacturers for Implementation of SRTPV Electricity generation program in BESCOM. General instructions: 1. BESCOM is empanelling Grid-tied inverter manufacturers for its solar roof top programme. This empanelment programme is a continuous process. 2. Interested manufacturers shall register their application at the office of the General Manager(DSM) Room no. 12, Ground floor, Block No. 2, corporate office, BESCOM, K R circle, Bangalore. 3. The Empanelment for the solar rooftop PV generation programme shall be for a period of one year and which may be extended up to two years. 4. The Applicant shall pay the vendor fee of Rs.25,000/- by DD drawn in favor of AGM(E&S), Corporate Office, BESCOM, Bangalore on intimation in writing from the General Manager (El), DSM. 5. The Manufacturer shall submit the copy of all the relevant IEC Certificates/Test reports of Grid-tied inverters as per technical standards and grid connectivity standards as specified in Annexure – I (In Both Hard and soft copies). 6. The inverter manufacturer shall furnish an undertaking to maintain for five years full-fledged service centers in Bangalore, Mangalore, Mysore, Hubli, Gulbarga cities in Karnataka state. The manufacturer should provide the details of service center with address, Name of the contact person, mobile no., email id etc. 7. The manufacturer shall furnish the minimum guarantee of 5 years for the inverters. 8. The manufacturer or the firm shall not have been black listed in any of the DISCOM’s / Utilities in INDIA. 9. The manufacturer shall submit an undertaking on a non-judicial stamp paper of Rs.200/- for providing service support during the entire guaranteed period of 5 years after approval from BESCOM. 10. The manufacturers shall submit the price list of empanelled rating inverters from time to time for publishing the same in BESCOM website. 11. BESCOM reserves the right to delist such of the manufacturer from the empanelment list in case the performance of inverters is not satisfactory within the guaranteed period. SdGM (DSM) BESCOM BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) APPLICATION FORM FOR EMPANELMENT OF GRID-TIED INVERTER MANUFACTURERS COMPANY DETAILS 1 Name of the Company 2 Brand Name of the Product 3 4 Address of the Company with Telephone/ Fax No., Email id Name of the authorized representative at the company with address, contact no. and email id 2011-12 5 6 7 2012-13 2013-14 Turnover of the company for past 3 years duly certified by auditor Excise, CST/VAT Registration numbers of the company Grading of the Company by Rating Agencies Rating Agency Grade Place Country PRODUCT DETAILS 7 Name of the place & country of manufacturing unit Product range(capacity wise) offered for empanelment (Shall be supported by test certificates as stated in Annexture-I) SERVICE DETAILS Service centers maintained in Bangalore, Mysore, Mangalore, Hubli, Gulbarga in 9 Karnataka state with address of the service centers maintained with the name of the contact person, Mobile No. & E-Mail id. Vendor fees Paid Details 11 Amount Paid DD No. & Date Name of the Bank & Branch 8 Name & Signature of Authorized person with seal of the company BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) Annexure-I Technical Standards for Grid tied inverters BOS Item / System Standard Number Standard Description Grid tied inverters 1 Environmental Testing IEC 60068-2 (1, 2,14,30) 2 Efficiency Measurements IEC 61683: 1999 3 Product safety standard IEC - 62109-1 (2010) IEC - 62109-2 (2011) 4 Grid Connectivity standard /Utility interface 5 6 Test procedure for islanding prevention measures for utility-interconnected PV inverters Electromagnetic compatibility & Electro Magnetic Interference vii Ingress protection IEC 61727:2004. IEC 62116:2008 or IEEE 1547 and IEEE 1547.1 IEC IEC IEC IEC 61000-6-1:2007. 61000-6-3:2007. 61000-3-2:2006 61000-3-3:2007. IP 65 (for outdoor)/ IP 21 (for indoor) As per IEC 529 Note: 1. For above 10KVA rating, self-certification by manufacturers for Environmental Testing & Efficiency Measurements is acceptable. 2. In case if the Charge controller is not built-in the inverter, IEC 62093 test is required separately for Charge controller. BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) Specifications of Inverter Parameters Nominal Voltage Voltage range Operating frequency range Waveform Harmonics Ripple Efficiency Losses Casing protection levels Temperature Humidity Operation MPPT Protections Recommended LED indications Recommended LCD Display on Front Panel Communication interface Detailed Specifications 230V / 415V +10% to -20% of nominal voltage 50 Hz ( 47.5 to 52 Hz) Sine Wave AC side total harmonic current distortion < 5% DC voltage ripple content shall be not more than 1%. Efficiency shall be >95% Maximum losses in sleep mode: 2W per 5kW Maximum losses in stand-by mode: 10W Degree of protection: Minimum IP-21 for internal units and IP 65 for outdoor units Should withstand from -10 to +60 deg Celsius Should withstand up to 95% (relative humidity) Completely automatic including wake up, synchronization (phaselocking) and shut down MPPT range must be suitable to individual array voltages in power packs Over voltage; both input & output Over current; both input & output Over/Under grid frequency Over temperature Short circuit Lightening Surge voltage induced at output due to external source Islanding Inverter ON Grid ON Inverter Under / Over Voltage Inverter Overload Inverter Over Temperature Accurate displays on the front panel: DC input voltage DC current AC Voltage ( all 3 phases) AC current ( all 3 phases) Ambient temperature Instantaneous & cumulative output power Daily DC energy produced RS485 / RS 232 (with or without USB) BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) Sl. No. Parameters Requirements 1. Overall Conditions of Service 2. Overall Grid Standards Reference to regulations 3. Equipment Applicable industry standards 4. Safety and Supply 5. Meters 6. 7. 8. Harmonic Current Reference to regulations Reference Conditions for Supply of Electricity of Distribution Licensees in the State of Karnataka Central Electricity Authority (Grid Standards) Regulations 2010 IEC/EN standards Central Electricity Authority (Measures of Safety and Reference to regulations, Chapter Electricity Supply) Regulations, III (General Safety Requirements) 2010 and subsequent amendments Central Electricity Authority Reference to regulations and (Installation & Operation of additional conditions issued by Meters) regulations 2006 and the Commission. subsequent amendments IEEE 519 relevant CEA (Technical Harmonic current injections from Standards for Connectivity of the a generating station shall not distributed generation resource) exceed the limits specified in regulations 2013 and subsequent IEEE 519 amendments Photovoltaic system must be equipped with a grid frequency synchronization device, if the Synchronization system is using synchronizer inherently built into the inverter then no separate synchronizer is required. The voltage-operating window should minimize nuisance tripping and should be under operating range of 80% to 110% Voltage of the nominal connected voltage. beyond a clearing time of 2 seconds, the Photovoltaic system must isolate itself from the grid. Relevant CEA (Technical Standards for Connectivity of the distributed generation resources) regulations 2013 and subsequent amendments. BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) Technical Standards for Interconnection 8. Flicker 9. Frequency 10. DC Injection 11. Power Factor 12. Islanding and Disconnection 13. Overload and Overheat Operation of Photovoltaic system shouldn’t cause voltage flicker in excess of the limits stated in IEC 61000 or other equivalent Indian standards, if any When the Distribution system frequency deviates outside the specified conditions (50.5 Hz on upper side and 47.5 Hz on lower side up to 0.2 sec), the Photovoltaic system shouldn’t energize the grid and should shift to island mode Photovoltaic system should not inject DC power more than 0.5% of full rated output at the interconnection point. or 1% of rated inverter output current into distribution system under any operating conditions While the output of the inverter is greater than 50%, a lagging power factor of greater than 0.9 shall be maintained The Photovoltaic system in the event of voltage or frequency variations must island/ disconnect itself within IEC standard on stipulated period The inverter should have the facility to automatically switch off in case of overload or overheating and should restart when normal conditions are restored Relevant CEA regulations 2013 and subsequent if any, (Technical Standards for Connectivity of the distributed generation resource) BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned Government of Karnataka Undertaking) Checklist to be enclosed: Sl n o Particulars Please enclose a copy of the particulars stated Details to be filled by the applicant. 1 Name of the Company Copy of Company registration certificate 2 Brand Name of the Company Copy of the, self-certification letter of the company 3 Excise, CST/VAT Registration numbers Copy of Excise, CST/VAT certificates 4 Turnover of the company (For the Years 2011-12, 2012-13, 2013-14) 5 Details of Service centers maintained in Bangalore, Mysore, Mangalore, Hubli, Gulbarga in Karnataka state. 6 Capacity of the Grid tied inverters offered for empanelment 7 Undertaking 8 Blacklisted in any of DISCOM’s/Utilities in India 9 Test certificates & Test reports Copy of the company’s turn over for past 3 years duly certified by Auditor Copy of list of service centers in Bangalore, Mysore, Mangalore, Hubli, Gulbarga along with address, Name of the contact person with Mobile no. and email id. Details of Capacity wise inverters offered for empanelment with details of Model etc. Terms and conditions of undertaking will be furnished after the approval. Shall furnish in Rs. 200/- non judicial stamp paper Self-certification letter shall be enclosed for not-black listed in any DISCOM’s/Utilities/ Govt. related concerns/ Nodal agencies. Please furnish details. To be enclosed as per Annexure-I Name & Signature of Authorized person with seal of the company