General instructions:
1. BESCOM is empanelling Grid-tied inverter manufacturers for its solar roof top
programme. This empanelment programme is a continuous process.
2. Interested manufacturers shall register their application at the office of the
General Manager(DSM) Room no. 12, Ground floor, Block No. 2, corporate office,
BESCOM, K R circle, Bangalore.
3. The Empanelment for the solar rooftop PV generation programme shall be for a
period of one year and which may be extended up to two years.
4. The Applicant shall pay the vendor fee of Rs.25,000/- by DD drawn in favor of
AGM(E&S), Corporate Office, BESCOM, Bangalore on intimation in writing from
the General Manager (El), DSM.
5. The Manufacturer shall submit the copy of all the relevant IEC Certificates/Test
reports of Grid-tied inverters as per technical standards and grid connectivity
standards as specified in Annexure – I (In Both Hard and soft copies).
6. The inverter manufacturer shall furnish an undertaking to maintain for five years
full-fledged service centers in Bangalore, Mangalore, Mysore, Hubli, Gulbarga
cities in Karnataka state. The manufacturer should provide the details of service
center with address, Name of the contact person, mobile no., email id etc.
7. The manufacturer shall furnish the minimum guarantee of 5 years for the
inverters.
8. The manufacturer or the firm shall not have been black listed in any of the
DISCOM’s / Utilities in INDIA.
9. The manufacturer shall submit an undertaking on a non-judicial stamp paper of
Rs.200/- for providing service support during the entire guaranteed period of 5
years after approval from BESCOM.
10. The manufacturers shall submit the price list of empanelled rating inverters from
time to time for publishing the same in BESCOM website.
11. BESCOM reserves the right to delist such of the manufacturer from the
empanelment list in case the performance of inverters is not satisfactory within
the guaranteed period.
SdGM (DSM) BESCOM
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
(Wholly owned Government of Karnataka Undertaking)
APPLICATION FORM
FOR EMPANELMENT OF GRID-TIED INVERTER MANUFACTURERS
COMPANY DETAILS
1
Name of the Company
2
Brand Name of the Product
3
4
Address of the Company with Telephone/ Fax
No., Email id
Name of the authorized representative at the
company with address, contact no. and email
id
2011-12
5
6
7
2012-13
2013-14
Turnover of the company for past 3 years
duly certified by auditor
Excise, CST/VAT Registration numbers of the
company
Grading of the Company by Rating Agencies
Rating Agency
Grade
Place
Country
PRODUCT DETAILS
7
Name of the place & country of
manufacturing unit
Product range(capacity wise) offered for
empanelment (Shall be supported by test
certificates as stated in Annexture-I)
SERVICE DETAILS
Service centers maintained in Bangalore,
Mysore, Mangalore, Hubli, Gulbarga in
9
Karnataka state with address of the service
centers maintained with the name of the
contact person, Mobile No. & E-Mail id.
Vendor fees Paid Details
11 Amount Paid
DD No. & Date
Name of the Bank & Branch
8
Name & Signature of Authorized person
with seal of the company
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
(Wholly owned Government of Karnataka Undertaking)
Annexure-I
Technical Standards for Grid tied inverters
BOS Item / System
Standard Number
Standard Description
Grid tied
inverters
1
Environmental Testing
IEC 60068-2 (1, 2,14,30)
2
Efficiency Measurements
IEC 61683: 1999
3
Product safety standard
IEC - 62109-1 (2010)
IEC - 62109-2 (2011)
4
Grid Connectivity standard /Utility
interface
5
6
Test procedure for islanding prevention
measures for utility-interconnected PV
inverters
Electromagnetic compatibility &
Electro Magnetic Interference
vii Ingress protection
IEC 61727:2004.
IEC 62116:2008
or
IEEE 1547 and IEEE 1547.1
IEC
IEC
IEC
IEC
61000-6-1:2007.
61000-6-3:2007.
61000-3-2:2006
61000-3-3:2007.
IP 65 (for outdoor)/
IP 21 (for indoor)
As per IEC 529
Note:
1. For above 10KVA rating, self-certification by manufacturers for
Environmental Testing & Efficiency Measurements is acceptable.
2. In case if the Charge controller is not built-in the inverter, IEC 62093
test is required separately for Charge controller.
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
(Wholly owned Government of Karnataka Undertaking)
Specifications of Inverter
Parameters
Nominal Voltage
Voltage range
Operating frequency
range
Waveform
Harmonics
Ripple
Efficiency
Losses
Casing protection
levels
Temperature
Humidity
Operation
MPPT
Protections
Recommended
LED indications
Recommended
LCD Display on Front
Panel
Communication
interface
Detailed Specifications
230V / 415V
+10% to -20% of nominal voltage
50 Hz ( 47.5 to 52 Hz)
Sine Wave
AC side total harmonic current distortion < 5%
DC voltage ripple content shall be not more than 1%.
Efficiency shall be >95%
Maximum losses in sleep mode: 2W per 5kW
Maximum losses in stand-by mode: 10W
Degree of protection: Minimum IP-21 for internal units
and IP 65 for outdoor units
Should withstand from -10 to +60 deg Celsius
Should withstand up to 95% (relative humidity)
Completely automatic including wake up, synchronization (phaselocking) and shut down
MPPT range must be suitable to individual array voltages in power
packs
Over voltage; both input & output
Over current; both input & output
Over/Under grid frequency
Over temperature
Short circuit
Lightening
Surge voltage induced at output due to external source
Islanding
Inverter ON
Grid ON
Inverter Under / Over Voltage
Inverter Overload
Inverter Over Temperature
Accurate displays on the front panel:
DC input voltage
DC current
AC Voltage ( all 3 phases)
AC current ( all 3 phases)
Ambient temperature
Instantaneous & cumulative output power
Daily DC energy produced
RS485 / RS 232 (with or without USB)
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
(Wholly owned Government of Karnataka Undertaking)
Sl.
No.
Parameters
Requirements
1.
Overall
Conditions of
Service
2.
Overall Grid
Standards
Reference to regulations
3.
Equipment
Applicable industry standards
4.
Safety and
Supply
5.
Meters
6.
7.
8.
Harmonic
Current
Reference to regulations
Reference
Conditions
for
Supply
of
Electricity
of
Distribution
Licensees
in
the
State
of
Karnataka
Central Electricity Authority (Grid
Standards) Regulations 2010
IEC/EN standards
Central
Electricity
Authority
(Measures
of
Safety
and
Reference to regulations, Chapter
Electricity Supply) Regulations,
III (General Safety Requirements)
2010
and
subsequent
amendments
Central
Electricity
Authority
Reference to regulations and
(Installation & Operation of
additional conditions issued by
Meters) regulations 2006 and
the Commission.
subsequent amendments
IEEE 519 relevant CEA (Technical
Harmonic current injections from
Standards for Connectivity of the
a generating station shall not
distributed generation resource)
exceed the limits specified in
regulations 2013 and subsequent
IEEE 519
amendments
Photovoltaic system must be
equipped with a grid frequency
synchronization device, if the
Synchronization system is using synchronizer
inherently built into the inverter
then no separate synchronizer is
required.
The voltage-operating window
should
minimize
nuisance
tripping and should be under
operating range of 80% to 110%
Voltage
of the nominal connected voltage.
beyond a clearing time of 2
seconds, the Photovoltaic system
must isolate itself from the grid.
Relevant
CEA
(Technical
Standards for Connectivity of the
distributed generation resources)
regulations 2013 and subsequent
amendments.
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
(Wholly owned Government of Karnataka Undertaking)
Technical Standards for Interconnection
8.
Flicker
9.
Frequency
10.
DC Injection
11.
Power Factor
12.
Islanding and
Disconnection
13.
Overload and
Overheat
Operation of Photovoltaic system
shouldn’t cause voltage flicker in
excess of the limits stated in IEC
61000 or other equivalent Indian
standards, if any
When the Distribution system
frequency deviates outside the
specified conditions (50.5 Hz on
upper side and 47.5 Hz on lower
side up to 0.2 sec), the Photovoltaic
system shouldn’t energize the grid
and should shift to island mode
Photovoltaic system should not
inject DC power more than 0.5% of
full
rated
output
at
the
interconnection point. or 1% of
rated inverter output current into
distribution system under any
operating conditions
While the output of the inverter is
greater than 50%, a lagging power
factor of greater than 0.9 shall be
maintained
The Photovoltaic system in the
event of voltage or frequency
variations must island/ disconnect
itself within IEC standard on
stipulated period
The inverter should have the facility
to automatically switch off in case
of overload or overheating and
should
restart
when
normal
conditions are restored
Relevant CEA regulations
2013 and subsequent if
any, (Technical Standards
for Connectivity of the
distributed
generation
resource)
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
(Wholly owned Government of Karnataka Undertaking)
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
(Wholly owned Government of Karnataka Undertaking)
Checklist to be enclosed:
Sl
n
o
Particulars
Please enclose a copy of the
particulars stated
Details to be filled by the applicant.
1
Name of the Company
Copy of Company registration certificate
2
Brand Name of the Company
Copy of the, self-certification letter of
the company
3
Excise, CST/VAT Registration numbers
Copy of Excise, CST/VAT certificates
4
Turnover of the company (For the Years
2011-12, 2012-13, 2013-14)
5
Details of Service centers maintained
in Bangalore, Mysore, Mangalore,
Hubli, Gulbarga in Karnataka state.
6
Capacity of the Grid tied inverters
offered for empanelment
7
Undertaking
8
Blacklisted in any of
DISCOM’s/Utilities in India
9
Test certificates & Test reports
Copy of the company’s turn over for
past 3 years duly certified by Auditor
Copy of list of service centers in
Bangalore, Mysore, Mangalore, Hubli,
Gulbarga along with address,
Name of the contact person with Mobile
no. and email id.
Details of Capacity wise inverters offered
for empanelment with details of Model
etc.
Terms and conditions of undertaking will be
furnished after the approval.
Shall furnish in Rs. 200/- non
judicial stamp paper
Self-certification letter shall be
enclosed for not-black listed in any
DISCOM’s/Utilities/ Govt. related
concerns/ Nodal agencies.
Please furnish details.
To be enclosed as per Annexure-I
Name & Signature of Authorized person
with seal of the company
Download