Gcxeneral Notes: 1. 2. 3. 4. 5. 6. Insure all maintenance items in areas and rooms included in this area are completed by Physical Plant prior to executing work under this Contract. Maintenance items include repair and restoration of all surfaces, materials, and components/items to like original construction and appearance with the exception of work specific under this Contact – i.e. repainting of doors, frames, partitions (and other noted items) and replacement of resilient floor and stair materials. Prepare all surfaces and install products in strict accordance with manufacturer’s written installation instructions and highest standards of the trade. All products to be compatible to all existing substrates and finishes. Prepare all surfaces and components for painting where indicated. Remove all dirt, scale, and peeling paint, etc. Remove all indicated items and fill holes and cracks with compatible materials, prepare, prime and paint as indicated. See David Jamison for signs to be removed and replaced by separate contract. Paint all raceways, conduits, and miscellaneous items to match adjacent partitions. Remove existing resilient flooring and stair materials where indicated. Identify any possible asbestos containing materials and notify Physical Plant and Planning / Charlie Black for content testing. All asbestos containing materials will be removed by Physical Plant. Install resilient flooring and stair materials as indicated. Install resilient materials on stairs to strictly comply with all 2010 ADA requirements in accordance with manufacturer’s written installation instructions. Two-part epoxy compound installation at all stair nosings per manufacturer’s written installation is required; inspection of this method of installation and confirmation of all other types of adhesives is mandatory by Physical Plant’s assigned construction coordinator – notify them of exact installation schedule 72 in advance, minimum. Do not scale drawings. Base all pricing on field measurements and inspection. Keyed Notes: 1.1 1.2 1.3 1.4 Paint partitions this elevation, inside corner to inside corner. Paint partitions, doors, and frames this room. Paint door and frame this elevation. Remove wall covering and double chair rail, repair partition, and paint partition this elevation, inside corner to inside corner. 1.5 Clean/remove coatings and paint all exposed edges of concrete stair not clad with resilient materials. 1.6 Remove finish flooring this room and install new vinyl composition flooring and resilient rubber base at all partitions. Provide approved termination at any flooring edge that does not terminate at thresholds or similar thickness/type material. 1.7 Remove finish flooring this stair/landing and install new rubber stair treads, landing tile, risers, and stringers. 1.8 Remove resilient base this room and install resilient rubber base at all partitions. 1.9 Remove unused enclosed bulletin board, return to Client Department, repair partition. 1.10 Paint all sides skylight shaft and wood curb. 1.11 Alternate A: Remove existing finish and refinish existing wood handrail to remain, stain, and provide two coats of high performance clear coating. Finish / Material Notes: 1. 2. 3. 4. 5. All paints are to be building standard color per west main corridor second floor - PPG Porter Paints Advantage System 900 Acrylic Enamel, Color: Grey Shell (confirm): Semi-gloss, Two coats minimum. Patching materials and primers/compatibility primers as required. Min. 1 gallon of grey paint each type extra stock required. Doors, frames, and partitions to be painted single/same color. All edges of skylight surrounds and upper wood trim to be painted single color off white to match existing ceiling color; exact color to be selected. Provide paint sample on partitions for approval of partition color and finish by both Campus Planning + Design and Client Department. Resilient flooring on second floor vestibule to be vinyl composition tile, color and pattern to match existing first floor entry. All leftover carton materials extra stock - min. 12 pieces grey color; min. 4 pieces blue color. 6. 7. 8. Resilient materials on stair including stair threads, landing tile, risers, stringers, and trim are to match materials on stair from second floor to first floor outside southeast stair near main gym 228. 6’ length stair treads and risers; all leftover carton materials extra stock - min. 4 each treads and risers; min. 1 full length stringer Resilient bases all areas are to be 4” height, 1/8” thick; color to match new stair threads; 120’ coils; all leftover carton materials extra stock - min. 24’ length. Provide submittals and samples on all materials for approval of Campus Planning + Design prior to beginning any work.