The CIMO China Programme Guidelines for Reporting 2014-2016 The coordinating Higher Education Institution is responsible to report about the use of funds awarded and the implementation of the project to CIMO two times during the project period. The Interim Report needs to be returned by 18th December 2015 The Final Report needs to be returned by 14th of November 2016 INTERIM REPORT The interim report consists of the following documents: 1) Financial and statistical report (excel-sheet, annex 1 of grant agreement) concerning travelling and/or exchanges between Finland and China between 4.12.2014-30.11.2015. Each trip and/or exchange between Finland and China should be reported in the financial and statistical report. The financial and statistical report will be sent both by e-mail to aasia@cimo.fi and in paper to CIMO. Both the coordinator and a representative of the financial unit of the HEI will sign the paper version of the financial and statistical report. N.B. Lists of participants needs to be attached to the report whenever food and/or refreshments have been served to the participants 2) Extracts of the accounts from the separately kept internal bookkeeping on the expenses of the China-project between 4.12.2014-30.11.2015. N.B. In the final report the total amount of the extracts of the accounts should match with the financial and statistical reporting, except when part of the activities is funded by Chinese project partners. 3) Narrative report on the realization and proceeding of the project. The length of narrative part for the interim report should be about 1 page long and the following topics should be covered: - Overall perception on how the project has started Have there been any difficulties in launching & implementation of the project Does it look realistic with about one year ahead to achieve the aims that have been set up for the project 4) Individual mobility reports by students (annex 2 of grant agreement) written by each student (both undergraduate and post-graduate) who has received a grant for travelling to Finland /China within the project. For interim report these documents should be sent by 18th December 2015 to the following address: CIMO, Kiina-ohjelma, PL 343, 00531 HELSINKI 1/2 FINAL REPORT The final report consists of the following documents: 1) Financial and statistical report (excel-sheet, annex 1 of grant agreement) concerning travelling and/or exchanges between Finland and China between 4.12.2014-31.10.2016. a) Travelling and/or exchanges between Finland and China in between 4.12.2014-31.10.2016. Each trip and/or exchange between Finland and China should be reported in the financial and statistical report. b) A breakdown of organizational costs between 4.12.2014-31.10.2016. Please specify and open up every cost clearly. + Lists of participants needs to be attached to the report whenever food and/or refreshments have been served to the participants. Please note! The financial and statistical report will be sent both by e-mail to aasia@cimo.fi and in paper to CIMO with other parts of the final report. Both the coordinator and a representative of the financial unit of the HEI will sign the paper version of the financial and statistical report. 2) Extracts of the accounts from the separately kept internal bookkeeping on the expenses of the China-project between 4.12.2014-31.10.2016. N.B. In the final report the total amount of the extracts of the accounts should match with the financial and statistical reporting, except when part of the activities is funded by Chinese project partners. 3) Qualitative report on the results of the project, covering all the questions of a separate template for qualitative reporting. The length of narrative part for the final report should be about 3 pages long. 4) Individual mobility reports by students (annex 2 of grant agreement) written by each student (both undergraduate and post-graduate) who has received a grant for travelling to Finland /China within the project. 5) Summary report for publication A separate template is to be filled in order to provide a short summary on the project & its achievements. CIMO will send the template in 2016. For final report these documents should be sent by 14th November 2016 to the following address: CIMO/Kiina-ohjelma PL 343 00531 HELSINKI 2/2