Procedure – N-type Spin On or Paint On Dopant Diffusion @ 9500C The N-type dopant which was previously spun or painted on the wafer is diffused into the silicon crystal at 9500C. Depth of the diffusion is determined by time alone since the temperature is fixed at 9500C. 1. Furnace #6 is used for N-type dopants (phosphorus) 2. Verify furnace #6 is available for use Furnace #6 for phosphorus doping only. Wafer tweezers for Furnace #6 only 3. Verify the center zone of furnace is 9500C +/- 50C. Temperature controller is under gas panels. 4. Adjust temperature if needed. Verify or set center zone for 9500C Do not adjust front and rear zones File: - Procedure – N-Type Spin-on or Paint-on dopant diffusion @ 9500C 11-28-2012 Procedure – N-type Spin On or Paint On Dopant Diffusion @ 9500C 5. Using the high temperature gloves, carefully remove the end cap and place on the lowest loader area. High Temperature Gloves 6. Using only the tweezers designated for phosphorus diffusion load the wafers into the quartz boat. Wafer tweezers for phosphorus doping ONLY File: - Procedure – N-Type Spin-on or Paint-on dopant diffusion @ 9500C 11-28-2012 Procedure – N-type Spin On or Paint On Dopant Diffusion @ 9500C 7. With the robot load in the manual mode, switch to “load” and the wafers should begin to enter the furnace Switch in manual mode Load/unload switch 8. Allow the loader to load the wafers into the furnace tube. The loader will stop automatically in the center zone of the furnace. 9. Once the wafers have stopped moving start the oxygen flow. The oxygen gas flow meter is located in the back of the furnace. Set to 100 using the stainless steel ball. Furnace #6 gas flow meters. Set the oxygen to 100 as read using the stainless steel ball File: - Procedure – N-Type Spin-on or Paint-on dopant diffusion @ 9500C 11-28-2012 Procedure – N-type Spin On or Paint On Dopant Diffusion @ 9500C 10. At the end of the diffusion time specified on the traveler, turn off oxygen 11. Change the load/unload switch on the Robot Load to unload and allow the wafers to come out of the furnace 12. Allow the wafer to cool. 13. Once cool, unload the wafers with the phosphorus tweezers. Do not touch or remove the quartz boat from the robot load arm. File: - Procedure – N-Type Spin-on or Paint-on dopant diffusion @ 9500C 11-28-2012